Lampiran 9. Penerimaan KapalTahun Nelayan Responden di Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung
No Nelayan Responden
Ukuran kapal
Lama Melauthari
Frekuensi melauttriptahun Penerimaan
1 4
240 60 189,750,000
2 Nelayan toke
dan 4
300 60 171,900,000
3 nelayan buruh kapal 3
288 72
173,160,000 4 5 GT Datuk Bandar
4 240
60 191,550,000
5 3
300 60 142,800,000
6 4
300 60 199,200,000
7 4
288 72 226,580,000
8 4
240 60 205,500,000
Total 30 2196
504 1,500,440,000
Rata-Rata 3.75 274.5
63 187,555,000
9 7
240 60 299,400,000
10 Nelayan Toke
dan 7
240 60 313,800,000
11 Nelayan buruh
kapal 5
240 60 238,650,000
12 5-9 GT Datuk
Bandar 8 300
60 265,650,000
13 8
240 48 204,240,000
14 9
240 60 325,500,000
Total 44 1500
348 1,647,240,000
Rata-Rata 7.33 250
58 274,540,000
15 4
192 48 148,320,000
16 3
144 48 125,040,000
17 3
240 60 177,000,000
18 Nelayan toke
dan 4
192 48 149,040,000
19 nelayan buruh kapal 4
240 60
193,650,000 20 5 GT Teluk Nibung
4 144
48 180,960,000
21 3
240 60 171,600,000
22 4
240 60 171,000,000
23 4
240 60 210,150,000
24 4
192 48 191,280,000
25 4
180 60 161,850,000
Total 41
2244 600 2,154,430,000
Rata-Rata 3.72 204
54.54 170,899,091
26 6
240 48 254,400,000
27 Nelayan toke
dan 7
240 60 261,000,000
28 nelayan buruh kapal 5
240 60
199,500,000 29
5-9 GT Teluk Nibung 9
300 60
269,250,000 30
8 240
48 219,600,000
Total 35 1260
276 1,203,750,000
Rata-Rata 7 252
55.2 240,750,000
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 11. Biaya Pemeliharaan Perahu, Mesin, dan Alat TangkapKapalTrip Nelayan Toke di Kecamatan Datuk Bandar dan
Kecamatan Teluk Nibung
No Nelayan
Responden Biaya Pemeliharaan RP
Total biaya pemeliharaanRp
Perahu + mesin Alat Tangkap
1 100,000 100,000
200,000 2 100,000
100,000 200,000
3 100,000 150,000
250,000 4 150,000
100,000 250,000
5 120,000 100,000
220,000 6 110,000
120,000 230,000
7 100,000 120,000
220,000 8
Nelayan toke kapal 5 GT
Datuk Bandar 100,000 125,000
225,000
Total 880,000
915,000 1,795,000
Rata-Rata 110,000 114,375
224,375
9 150,000
100,000 250,000
10 150,000 125,000
275,000 11 100,000
175,000 275,000
12 120,000 100,000
220,000 13 100,000
110,000 210,000
14 Nelayan toke kapal
5-9 GT Datuk Bandar
120,000 100,000 220,000
Total 740,000
710,000 1,450,000
Rata-Rata 123,333 118,333
241,667 15 100,000
120,000 220,000
16 100,000 125,000
225,000 17 120,000
100,000 220,000
18 100,000 150,000
250,000 19 150,000
100,000 250,000
20 100,000 100,000
200,000 21 100,000
150,000 250,000
22 120,000 100,000
220,000 23 150,000
100,000 250,000
24 100,000 100,000
200,000 25
Nelayan toke kapal 5 GT Teluk
Nibung 100,000 120,000
220,000
Total 1,240,000
1,265,000 2,505,000
Rata-Rata 112,727 115,000
227,727 26 100,000
130,000 230,000
27 150,000 125,000
275,000 28 150,000
100,000 250,000
29 100,000 110,000
210,000 30
Nelayan toke kapal 5-9 GT Teluk
Nibung 100,000 100,000
200,000
Total 600,000
680,000 1,165,000 Rata-Rata
120,000 113,333 233,000
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 12. Biaya TetapKapalTrip Nelayan Toke di Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung
No Nelayan
Responden Biaya PenyusutanRp
biaya pemeliharaanRp
Biaya TetapRp
1 60,833 200,000
260,833 2 65,277.77
200,000 265,277.77
3 52,331.34 250,000
302,331.34 4 88,750.00
250,000 338,750.00
5 62,169.31 220,000
282,169.31 6 58,712.11
230,000 288,712.11
7 52,469.13 220,000
272,469.13 8
Nelayan toke kapal
5 GT Datuk Bandar
61,111.11 225,000 286,111.11
Total 501,654
1,795,000 2,296,654
Rata-Rata 62,707 224,375
287,082 9 71,296.29
250,000 321,296.29
10 81,250.00 275,000
356,250.00 11 79,861.11
275,000 354,861.11
12 95,238.09 220,000
315,238.09 13 108,258.92
210,000 318,258.92
14 Nelayan toke
kapal 5-9 GT Datuk
Bandar 81,904.75 220,000
301,904.75
Total 517,809.16
1,450,000 1,967,809.16
Rata-Rata 86,301.53 241,667
327,968.20 15 67,708.34
220,000 287,708.34
16 58,712.11 225,000
283,712.11 17 57,936.50
220,000 277,936.50
18 90,029.76 250,000
340,029.76 19 61,111.11
250,000 311,111.11
20 64,393.93 200,000
264,393.93 21 74,285.71
250,000 324,285.71
22 80,000.00 220,000
300,000.00 23 75,892.85
250,000 325,892.85
24 83,333.33 200,000
566,296.29 25
Nelayan toke kapal
5 GT Teluk Nibung
62,962.96 220,000 282,962.96
Total 776,366.60
2,505,000 3,281,366.60
Rata-Rata 70,578.78 227,727
298,306.05 26 82,812.50
230,000 312,812.50
27 62,301.58 275,000
337,301.58 28 78,750.00
250,000 328,750.00
29 88,359.78 210,000
298,359.78 30
Nelayan toke kapal
5-9 GT Teluk Nibung
100,694.44 200,000 300,694.44
Total 412,918.30
1,165,000 1,577,918.30
Rata-Rata 82,583.66 233,000
315,583.66
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 13. Biaya MelautKapalTrip Nelayan Toke di Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung
No Nelayan
Responden input Oli
Rp Solar
Rp minyak
tanah Rp
Es Rp Konsumsi
Rp Total biaya
melaut Rp
1 20,000 750,000 90,000 225,000 300,000 1,385,000
2 20,000 750,000 75,000 180,000 350,000 1,375,000
3 20,000 750,000 75,000 150,000 300,000 1,295,000
4 25,000 800,000
105,000 195,000 400,000 1,525,000 5
20,000 500,000 75,000 180,000 350,000 1,125,000 6
20,000 750,000 75,000 180,000 300,000 1,325,000 7
20,000 500,000 105,000 195,000 400,000 1,220,000
8 Nelayan toke
kapal 5 GT
Datuk Bandar 15,000 750,000 75,000 150,000 350,000 1,340,000
Total 160,000 5,550,000 675,000 1,455,000 2,750,000 10,590,000
Rata-Rata 20,000 693,750 84,375 181,875 343,750 1,323,750
9 25,000 800,000
120,000 225,000 300,000 1,470,000 10
25,000 1,000,000
105,000 225,000 350,000 1,705,000 11
20,000 750,000 75,000 195,000 300,000 1,340,000 12
25,000 800,000 120,000 225,000 450,000 1,620,000
13 25,000
1,000,000 105,000 225,000 400,000 1,755,000
14 Nelayan toke
kapal 5-9 GT Datuk
Bandar 30,000
1,000,000 120,000 225,000 450,000 1,825,000
Total 150,000 5,350,000 645,000 1,320,000 2,250,000 9,715,000
Rata-Rata 25,000 891,667
107,500 220,000 375,000 1,619,167
15 15,000 800,000 90,000 150,000 300,000 1,355,000
16 15,000 750,000 60,000 180,000 350,000 1,355,000
17 15,000 500,000 75,000 180,000 350,000 1,120,000
18 20,000 750,000 75,000 195,000 400,000 1,440,000
19 20,000 800,000 90,000 150,000 300,000 1,360,000
20 15,000 560,000 90,000 165,000 400,000 1,230,000
21 15,000 520,000 75,000 150,000 350,000 1,110,000
22 20,000 750,000
105,000 180,000 300,000 1,355,000 23
20,000 800,000 90,000 195,000 400,000 1,505,000 24
15,000 800,000 75,000 180,000 300,000 1,370,000 25
Nelayan toke kapal
5 GT Teluk Nibung
20,000 750,000 75,000 180,000 350,000 1,375,000
Total 190,000 7,780,000 900,000 1,905,000 4,175,000 14,950,000
Rata-Rata 17,273 707,273 81,818 173,182 345,455 1,325,000
26 20,000 800,000 75,000 180,000 400,000 1,475,000
27 20,000
1,000,000 90,000 210,000 450,000 1,770,000 28
15,000 750,000 60,000 180,000 400,000 1,405,000 29
25,000 1,000,000
120,000 225,000 500,000 1,870,000 30
Nelayan toke kapal
5-9 GT Teluk Nibung
25,000 800,000 105,000 210,000 450,000 1,590,000
Total 105,000 4,350,000 450,000 1,005,000 2,200,000 9,732,000
Rata-Rata 21,000 870,000 90,000 201,000 440,000 1,622,000
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 14. Biaya ProduksiKapalTrip Nelayan Toke di Kecamatan Datuk Bandar dan Teluk Nibung
No Nelayan Responden
Biaya TetapRp Biaya melaut Rp
Biaya ProduksiRp
1 260,833 1,385,000
1,645,833 2 265,277.77
1,375,000 1,640,277.77
3 302,331.34 1,295,000
1,597,331.34 4 338,750.00
1,525,000 1,863,750.00
5 282,169.31 1,125,000
1,407,169.31 6 288,712.11
1,325,000 1,613,712.11
7 272,469.13 1,220,000
1,492,469.13 8
Nelayan toke kapal 5 GT
Datuk Bandar 286,111.11 1,340,000
1,626,111.11
Total 2,296,654
10,590,000 12,886,654
Rata-Rata 287,082 1,323,750
1,610,832 9 321,296.29
1,470,000 1,791,296.29
10 356,250.00 1,705,000
2,061,250.00 11 354,861.11
1,340,000 1,694,861.11
12 315,238.09 1,620,000
1,935,238.09 13 318,258.92
1,755,000 2,073,258.92
14 Nelayan toke kapal
5-9 GT Datuk Bandar 301,904.75 1,825,000
2,126,904.75
Total 1,967,809.16
9,715,000 11,682,809.16
Rata-Rata 327,968.20 1,619,167
1,947,135.20 15 287,708.34
1,355,000 1,642,708.34
16 283,712.11 1,355,000
1,638,712.11 17 277,936.50
1,120,000 1,397,936.50
18 340,029.76 1,440,000
1,780,029.76 19 311,111.11
1,360,000 1,671,111.11
20 264,393.93 1,230,000
1,494,393.93 21 324,285.71
1,110,000 1,434,285.71
22 300,000.00 1,355,000
1,655,000.00 23 325,892.85
1,505,000 1,830,892.85
24 566,296.29 1,370,000
1,936,296.29 25
Nelayan toke kapal 5 GT Teluk Nibung
282,962.96 1,375,000 1,657,962.96
Total 3,281,366.60
14,950,000 18,231,366.60
Rata-Rata 298,306.05 1,325,000
1,623,306.05 26 312,812.50
1,475,000 1,787,812.50
27 337,301.58 1,770,000
2,107,301.58 28 328,750.00
1,405,000 1,733,750.00
29 298,359.78 1,870,000
2,168,359.78 30
Nelayan toke kapal 5-9 GT Teluk Nibung
300,694.44 1,590,000 1,890,694.44
Total 1,577,918.30
9,732,000 11,309,918.30
Rata-Rata 315,583.66 1,622,000
1,937,583.66
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 15. Biaya ProduksiKapalBulan Nelayan Toke di Kecamatan Datuk Bandar dan Teluk NIbung
No Nelayan
Responden Biaya Tetapbulan
Rp Biaya melautbulanRp
Biaya Produksibulan
Rp
1 1,304,166.65 6,925,000
8,229,166.65 2 1,326,388.85
6,875,000 8,201,388.85
3 1,813,988.04 7,770,000
9,583,988.04 4 1,693,750.00
7,625,000 9,318,750.00
5 1,410,846.55 5,625,000
7,035,846.55 6 1,443,560.55
5,725,000 7,168,560.55
7 1,669,999.98 6,150,000
7,819,999.98 8
Nelayan toke kapal 5 GT
Datuk Bandar 1,430,555.55 5,950,000
7,380,555.55
Total 12,093,256.17
52,645,000 64,738,256.17
Rata-Rata 1,511,657.02 6,580,625
8,092,282.02 9 1,606,481.45
7,350,000 8,956,481.45
10 1,781,250.00 8,525,000
10,306,250.00 11 1,774,305.55
6,700,000 8,474,305.55
12 1,576,190.45 8,100,000
9,676,190.45 13 1,273,035.68
7,020,000 8,293,035.68
14 Nelayan toke kapal
5-9 GT Datuk Bandar
1,509,523.75 9,275,000 10,784,523.75
Total 9,520,786.88
46,970,000 56,490,786.88
Rata-Rata 1,586,797.81 7,828,333
9,415,131.15 15 1,150,833.36
5,420,000 6,570,833.36
16 1,134,848.44 5,420,000
6,554,848.44 17 1,389,682.50
5,600,000 6,989,682.50
18 1,360,119.04 5,760,000
7,120,119.04 19 1,555,555.55
6,800,000 8,355,555.55
20 1,057,575.72 4,920,000
5,977,575.72 21 1,621,428.55
5,550,000 7,171,428.55
22 1,500,000 6,775,000
8,275,000 23 1,629,464.25
7,525,000 9,154,464.25
24 1,133,332.32 5,480,000
6,613,332.32 25
Nelayan toke kapal 5 GT Teluk
Nibung 1,414,814.80 6,875,000
8,289,814.80
Total 14,947,654.53
66,125,000 81,072,654.53
Rata-Rata 1,358,877.68 6,011,364
7,370,241.32 26 1,251,250.00
5,900,000 7,151,250.00
27 1,686,507.90 8,850,000
10,536,507.90 28 1,643,750.00
7,025,000 8,668,750.00
29 1,491,798.90 9,350,000
10,841,798.90 30
Nelayan toke kapal 5-9 GT Teluk
Nibung 1,202,777.76 6,360,000
7,562,777.76
Total 7,276,084.56
37,485,000 44,761,084.56
Rata-Rata 1,455,216.91 7,497,000
8,952,216.91
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 16. Biaya ProduksiKapalTahun Nelayan Toke di Kecamatan Datuk Bandar dan Teluk Nibung
No Nelayan
Responden Biaya Tetaptahun
Rp Biaya
melauttahunRp Biaya
Produksitahun Rp
1 15,649,999.80 83,100,000.00
98,749,999.80 2 15,916,666.20
82,500,000 98,416,666.20
3 21,767,856.48 93,240,000.00
115,007,856.48 4 20,325,000.00
91,500,000.00 111,825,000.00
5 16,930,158.60 67,500,000.00
84,430,158.60 6 17,322,726.60
68,700,000.00 86,022,726.60
7 20,039,999.76 73,800,000.00
93,839,999.76 8
Nelayan toke kapal 5 GT
Datuk Bandar 17,166,666.60 71,400,000.00
88,566,666.60
Total 145,119,074.04
631,740,000.00 776,859,074.04
Rata-Rata 18,139,884.26 78,967,500.00
97,107,384.26 9 19,277,777.40
88,200,000.00 107,477,777.40
10 15,375,000.00 102,300,000.00
117,675,000.00 11 21,291,666.60
80,400,000.00 101,691,666.60
12 18,914,285.40 97,200,000.00
116,114,285.40 13 15,276,428.16
84,240,000.00 99,516,428.16
14 Nelayan toke kapal
5-9 GT Datuk Bandar
18,114,285.00 111,300,000.00 129,414,285.00
Total 108,249,442.56
563,640,000.00 671,889,442.56
Rata-Rata 18,041,573.76 93,940,000.00
111,981,573.76 15 13,810,000.32
65,040,000.00 78,850,000.32
16 13,618,181.28 65,040,000.00
78,658,181.28 17 16,676,190.00
67,200,000.00 83,876,190.00
18 16,321,428.48 69,120,000.00
85,441,428.48 19 18,666,666.66
81,600,000.00 100,266,666.66
20 12,690,908.64 59,040,000.00
71,730,908.64 21 19,457,142.60
66,600,000.00 86,057,142.60
22 18,000,000.00 81,300,000.00
99,300,000.00 23 19,553,571.00
90,300,000.00 109,853,571.00
24 13,599,999.84 65,760,000.00
79,359,999.84 25
Nelayan toke kapal 5 GT Teluk
Nibung 16,977,777.60 82,500,000.00
99,477,777.60
Total 179,371,866.42
793,500,000.00 972,871,866.42
Rata-Rata 16,306,533.31 72,136,363.64
88,442,896.95 26 15,015,000.00
70,800,000.00 85,815,000.00
27 20,238,094.80 106,200,000.00
126,438,094.80 28 19,725,000.00
62,700,000.00 82,425,000.00
29 17,901,586.80 112,200,000.00
130,101,586.80 30
Nelayan toke kapal 5-9 GT Teluk
Nibung 14,433,333.12 76,320,000.00
90,753,333.12
Total 87,313,014.72
428,220,000.00 515,533,014.72
Rata-Rata 17,462,602.94 85,644,000.00
103,106,602.94
Deasy Yunawati : Analisis Pendapatan Dan Sistem Pembagian Hasil Nelayan Bermotor 5 GT dan 5-9 GT Studi Kasus : Kecamatan Datuk Bandar dan Kecamatan Teluk Nibung Kotamadya Tanjung Balai, Propinsi
Sumatera Utara, 2008 USU Repository © 2008
Lampiran 18. Faktor-faktor Yang Mempengaruhi Pendapatan Nelayan Toke di Kecamatan Datuk bandar dan Kecamatan Teluk Nibung
N0 Nelayan
Responden Pengalaman
nelayan tahun X1
Lama Melauthari
X2 Ukuran
kapal X3 Frekuensi
melauttriptahun X4
Pendapatan nelayan tokeRp
Y
1 Nelayan toke
kapal 35 240
4 60
78,499,999.80 2
5 GT 10
300 4
60 72,741,666.60
3 Datuk Bandar
20 288
3 72
63,636,071.76 4
25 240
4 60
80,363,500.00 5
29 300
3 60
58,884,920.40 6
27 300
4 60
94,088,636.40 7
33 288
4 72
133,169,999.80 8
35 240
4 60
93,266,666.40
Total 214
2196 30
504 674,651,461.16
Rata-Rata 26.75 274.5
3.75 63 84,331,432.65