3 PEMBANGUNAN MUSHOLLAH
HARGA SATUAN JUMLAH HARGA Rp.
Rp.
1 3
4 5
6
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bowplank
Ls 1.00
700,000.00 700,000.00
2 Administrasi dan Pelaporan
Ls 1.00
500,000.00 500,000.00
Sub Jumlah I……………………………………………………………………………………… 1,200,000.00
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi
m
3
9.10 27,616.00
251,305.60 2
Timbunan Kembali Pondasi m
3
3.20 13,232.68
42,344.58 3
Timbunan Pasir Bawah Lantai Pondasi m
3
6.25 387,414.18
2,420,176.38 4
Timbunan Tanah Bawah Lantai m
3
6.33 179,260.00
1,135,432.84
Sub Jumlah II…………………………………………………………………………………….. 3,849,259.40
III. PEKERJAAN PONDASI
1 Pas.Pondasi Batu Gunung 1 : 5
m
3
4.70 606,212.08
2,849,196.78 2
Pondasi Pas. Batu Bata m
2
38.57 110,931.86
4,278,919.17
Sub Jumlah III…………………………………………………………………………………….. 7,128,115.95
IV. PEKERJAAN DINDING DAN BETON STRUKTUR
1 Pas.Dinding Batu Merah 1 : 5
m
2
69.63 101,294.89
7,053,163.19 2
Pas.Dinding Transram 1 : 2 m
2
12.90 110,931.86
1,431,020.99 3
Pas.Plesteran Dinding kolom 1 : 5 m
2
163.06 35,619.75
5,808,156.44 4
Pas.Batu Alam m
2
2.00 1,686,334.91
3,372,669.82 5
Pek. Kolom Beton 1515 m
2
1.46 5,003,083.78
7,324,889.88 6
Pek.Sloef Beton 1520 m
3
0.84 3,806,217.56
3,197,222.75 7
Pek. Balok Beton 1520 m
3
1.34 3,836,946.24
5,122,323.23 8
Pek.Dak Beton m
3
2.22 3,667,873.33
8,133,875.90 9
Pas. Plesteras Saluran Keliling m
2
38.03 35,619.75
1,354,440.99 10
Pek. Acian Saluran m
2
38.03 17,943.37
682,296.47
Sub Jumlah IV…………………………………………………………………………………….. 43,480,059.66
2
NO. KETERANGAN
VOLUME SAT.
V. PEKERJAAN LANTAI
1 Pas.Lantai Keramik 40 x 40 warna
m
2
31.67 208,940.84
6,617,156.40 2
Dinding Keramik 20 x 20 warna m
2
10.45 187,234.91
1,956,604.81 3
Pas.Rabat Beton Tumbuk m
3
18.52 924,471.95
17,124,687.28
Sub Jumlah V…………………………………………………………………………………….. 25,698,448.50
VI. PEKERJAAN KUSEN, ATAP, PLAFOND
1 Pas.Woodplank Motif Urat Kayu 2x 1.8 x 20 cm
m
1
36.40 66,986.05
2,438,292.22 2
Pas. Rangka Plafond Besi Hollow m
2
50.41 98,762.10
4,978,597.46 3
Pas. Plafond Gypsum 9 mm m
2
50.41 61,646.61
3,107,605.61 4
Pas. Lis Plafond Gypsum m
1
40.00 18,991.00
759,640.00 5
Pek.Kuda-Kuda Baja ringan m
2
56.69 128,610.97
7,290,956.08 6
Pek.Atap Spandek m
2
56.69 74,856.70
4,243,626.32 7
Pek.Nok Zincalum m
1
22.00 63,944.26
1,406,773.72 8
Pas.Baut Moor, Angker, Beugel Ls
1.00 500,000.00
500,000.00
Sub Jumlah VI…………………………………………………………………………………….. 24,725,491.41