HARGA SATUAN JUMLAH HARGA Rp.
Rp.
1 3
4 5
6 2
SAT. NO.
KETERANGAN VOLUME
VI. PEKERJAAN INSTALASI LISTRIK
1 Pengadaan dan Pemasangan Lampu Jalan
20.00 Bh
7,025,000.00 140,500,000.00
Tiang Pipa Octogonal, Tinggi = 9 m, Terpasang 40,000,000.00
Lengkap + Lampu Mercury Type SON 250 2
Pengadaan dan Pemasangan Lampu Sorot 2.00
Unit 20,000,000.00
Tiang Pipa Octogonal, Tinggi = 9 m, Terpasang Lengkap + Lampu Mercury untuk Stadion 4 buah
3 Kabel Tanam NYY 4 x 6 mm + Galian
677.00 m1
65,100.00 44,072,700.00
4 Pasangan Panel Kompleks dan Dudukan Panel
1.00 unit
4,500,000.00 4,500,000.00
Sub Jumlah VI. ........................................................................................ 229,072,700.00
VII. PEKERJAAN AKHIR
1 Pembersihan Akhir
1.00 Ls
1,000,000.00 1,000,000.00
Sub Jumlah VII. ....................................................................................... 1,000,000.00
JUMLAH BIAYA PEMBANGUNAN SITE ENVIRONMENT DAN FASILITAS DARAT
3,614,417,671.92
2 HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3
4 5
6
I. PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Alat
1.00 ls
24,635,000.00 24,635,000.00
2 PemeliharaAn dan Pengaturan Lalu Lintas
1.00 ls
3,000,000.00 3,000,000.00
3 Administrasi dan Pelaporan
1.00 ls
4,000,000.00 4,000,000.00
Sub Jumlah I. ............................................................................................ 31,635,000.00
II. PEKERJAAN PENGASAPALAN JALAN
1 Lapisan Pondasi Klas A
511.63 m
3
526,303.13 269,273,522.01
2 Lapisan Pondasi Klas B
451.32 m
3
463,381.16 209,133,186.89
3 Lataston Lapis Pondasi HRS-Base = 4 cm
441.08 ton
345,074.50 152,205,459.49
4 Aspal Minyak
28.61 ton
12,150,000.00 347,611,500.00
5 Bahan Pengisi Filler Tambahan
7,153.00 Kg
1,218.00 8,712,354.00
6 Bahan Anti Pengelupasan anti stripping agent
85.80 Kg
54,000.00 4,633,200.00
Sub Jumlah II. ........................................................................................... 991,569,222.39
III. PEKERJAAN AKHIR
1 Pembersihan Akhir
1.00 Ls
2,500,000.00 2,500,000.00
Sub Jumlah III. .......................................................................................... 2,500,000.00
JUMLAH BIAYA PENATAAN JALAN LINGKUNGAN KOMPLEKS TPI
1,025,704,222.39