PEKERJAAN INSTALASI LISTRIK PEKERJAAN AKHIR PEKERJAAN PENDAHULUAN PEKERJAAN PENGASAPALAN JALAN PEKERJAAN AKHIR

HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6 2 SAT. NO. KETERANGAN VOLUME

VI. PEKERJAAN INSTALASI LISTRIK

1 Pengadaan dan Pemasangan Lampu Jalan 20.00 Bh 7,025,000.00 140,500,000.00 Tiang Pipa Octogonal, Tinggi = 9 m, Terpasang 40,000,000.00 Lengkap + Lampu Mercury Type SON 250 2 Pengadaan dan Pemasangan Lampu Sorot 2.00 Unit 20,000,000.00 Tiang Pipa Octogonal, Tinggi = 9 m, Terpasang Lengkap + Lampu Mercury untuk Stadion 4 buah 3 Kabel Tanam NYY 4 x 6 mm + Galian 677.00 m1 65,100.00 44,072,700.00 4 Pasangan Panel Kompleks dan Dudukan Panel 1.00 unit 4,500,000.00 4,500,000.00 Sub Jumlah VI. ........................................................................................ 229,072,700.00

VII. PEKERJAAN AKHIR

1 Pembersihan Akhir 1.00 Ls 1,000,000.00 1,000,000.00 Sub Jumlah VII. ....................................................................................... 1,000,000.00 JUMLAH BIAYA PEMBANGUNAN SITE ENVIRONMENT DAN FASILITAS DARAT 3,614,417,671.92 2 HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6

I. PEKERJAAN PENDAHULUAN

1 Mobilisasi dan Demobilisasi Alat 1.00 ls 24,635,000.00 24,635,000.00 2 PemeliharaAn dan Pengaturan Lalu Lintas 1.00 ls 3,000,000.00 3,000,000.00 3 Administrasi dan Pelaporan 1.00 ls 4,000,000.00 4,000,000.00 Sub Jumlah I. ............................................................................................ 31,635,000.00

II. PEKERJAAN PENGASAPALAN JALAN

1 Lapisan Pondasi Klas A 511.63 m 3 526,303.13 269,273,522.01 2 Lapisan Pondasi Klas B 451.32 m 3 463,381.16 209,133,186.89 3 Lataston Lapis Pondasi HRS-Base = 4 cm 441.08 ton 345,074.50 152,205,459.49 4 Aspal Minyak 28.61 ton 12,150,000.00 347,611,500.00 5 Bahan Pengisi Filler Tambahan 7,153.00 Kg 1,218.00 8,712,354.00 6 Bahan Anti Pengelupasan anti stripping agent 85.80 Kg 54,000.00 4,633,200.00 Sub Jumlah II. ........................................................................................... 991,569,222.39

III. PEKERJAAN AKHIR

1 Pembersihan Akhir 1.00 Ls 2,500,000.00 2,500,000.00 Sub Jumlah III. .......................................................................................... 2,500,000.00 JUMLAH BIAYA PENATAAN JALAN LINGKUNGAN KOMPLEKS TPI 1,025,704,222.39 2 NO. KETERANGAN VOLUME SAT. PENATAAN JALAN LINGKUNGAN KOMPLEKS TPI 3 PEMBANGUNAN DERMAGA HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6

I. PEKERJAAN PENDAHULUAN