HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6

V. PEKERJAAN LANTAI

1 Bongkaran Lantai m 3 7.35 387,414.18 2,847,494.22 2 Pas.Lantai Keramik 40 x 40 warna m 2 144.75 208,940.84 30,244,186.59 3 Pas.Lantai Keramik 20 x 20 warna m 2 2.25 181,513.34 408,405.02 4 Pas.Dinding KMWC Keramik 20 x 20 warna m 2 8.10 187,234.91 1,516,602.77 5 Pas.Dinding Pantri Keramik 20 x 20 warna m 2 2.40 187,234.91 449,363.78 Sub Jumlah V…………………………………………………………………………………….. 35,466,052.38

VI. PEKERJAAN KAYU, ATAP, PLAFOND

1 Bongkaran Atap m 2 248.27 11,504.00 2,856,098.08 2 Bongkaran Rangka plafond m 2 207.00 8,412.68 1,741,423.73 3 Pas.Woodplank Motif Urat Kayu 2x 1.8 x 20 cm m 1 63.00 66,986.05 4,220,121.15 4 Pas. Rangka Plafond Besi Hollow m 2 207.00 98,762.10 20,443,754.70 5 Pas. Plafond Gypsum 9 mm m 2 207.00 61,646.61 12,760,848.27 6 Pas. Lis Plafond Gypsum m 1 183.20 18,991.00 3,479,151.20 7 Pek.Rangka Atap Baja Ringan m 2 248.27 128,610.97 31,930,246.35 8 Pek.Atap Spandek m 2 248.27 74,856.70 18,584,672.91 9 Pek.Nok Seng m 1 29.35 35,371.36 1,038,149.42 10 Pas.Baut Moor, Angker, Beugel Ls 1.00 500,000.00 500,000.00 Sub Jumlah VI…………………………………………………………………………………….. 97,554,465.80

VII. PEKERJAAN KUSEN DAN PENGUNCI

1 Pek.Kusen Pintu Jendela Aluminium m 1 145.25 107,764.64 15,652,814.11 2 Pek. Pintu dan Jendala Kaca Rangka Aluminium m 2 22.65 439,401.25 9,952,438.31 3 Pek. Pintu Panil Kayu Klas I m 2 11.48 1,026,315.00 11,782,096.20 4 Pas. Pintu rolling door m 2 28.00 780,000.00 21,840,000.00 5 Pek.Kaca Ryband 5 mm m 2 2.14 195,617.15 418,620.70 6 Pas.Grendel Tanam Jendela Bh 43.00 45,515.00 1,957,145.00 7 Hak Angin Bh 34.00 22,081.40 750,767.60 8 Pas.Engsel Jendela Bh 86.00 30,470.20 2,620,437.20 9 Pas.Kunci Pintu 2 Kali Putar Bh 7.00 107,366.55 751,565.85 10 Pas.Engsel Pintu Psg 21.00 27,811.40 584,039.40 11 Pas.Pintu PVC bh 1.00 550,000.00 550,000.00 Sub Jumlah VII…………………………………………………………………………………….. 66,309,924.37

VIII. PEKERJAAN PENGECATAN

1 Pekerjaan Acian m 2 308.82 17,943.37 5,541,270.12 2 Pekerjaan Cat Tembok m 2 609.08 37,434.70 22,800,577.34 3 Pekerjaan Cat Plafond m 2 207.00 37,434.70 7,748,982.90 Sub Jumlah VIII…………………………………………………………………………………….. 36,090,830.36 2 NO. KETERANGAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6

IX. PEKERJAAN INSTALASI LISTRIK

X. PEKERJAAN SANITASI

XI. PEKERJAAN AKHIR

2 NO. KETERANGAN VOLUME SAT. 1 Instalasi Listrik Ttk 15. 00 2 Pasangan Lampu TL 1 x 20 Wtt Ttk 15. 00 3 Pasangan Saklar Ganda Putih Bh 10. 00 4 Pasangan Saklar Tunggal Putih Bh 4. 00 5 Pasangan Stop Kontak Putih Bh 14. 00 6 Pasangan Panel Penerangan Ls 1. 00 7 Pasangan Sekring Box Ls 1. 00 Sub Jumlah IX …………………………………………………………………………………….. 1 Pasangan Kloset Duduk Bh 1. 00 2 Pasangan Pipa PVC Diameter 12 m1 8. 00 3 Pasangan Pipa PVC Diameter 34 m1 4. 00 4 Pasangan Pipa PVC Diameter 4 m1 8. 00 5 Pasangan Kran Air 12 Bh 1. 00 6 Pasangan Floor Drain Bh 1. 00 7 Pekerjaan Bak Mandi Ls 1. 00 8 Pekerjaan Septictank Bh 1. 00 Sub Jumlah X…………………………………………………………………………………….. 1 Pembersihan Akhir Ls 1. 00 JUMLAH BIAYA PEMBANGUNAN KIOS NELAYAN DAN KLINIK KESEHATAN Sub Jumlah XI…………………………………………………………………………………….. 3 PEMBANGUNAN MUSHOLLAH HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6

I. PEKERJAAN PERSIAPAN