HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3
4 5
6
V. PEKERJAAN LANTAI
1 Bongkaran Lantai
m
3
7.35 387,414.18
2,847,494.22 2
Pas.Lantai Keramik 40 x 40 warna m
2
144.75 208,940.84
30,244,186.59 3
Pas.Lantai Keramik 20 x 20 warna m
2
2.25 181,513.34
408,405.02 4
Pas.Dinding KMWC Keramik 20 x 20 warna m
2
8.10 187,234.91
1,516,602.77 5
Pas.Dinding Pantri Keramik 20 x 20 warna m
2
2.40 187,234.91
449,363.78
Sub Jumlah V…………………………………………………………………………………….. 35,466,052.38
VI. PEKERJAAN KAYU, ATAP, PLAFOND
1 Bongkaran Atap
m
2
248.27 11,504.00
2,856,098.08 2
Bongkaran Rangka plafond m
2
207.00 8,412.68
1,741,423.73 3
Pas.Woodplank Motif Urat Kayu 2x 1.8 x 20 cm m
1
63.00 66,986.05
4,220,121.15 4
Pas. Rangka Plafond Besi Hollow m
2
207.00 98,762.10
20,443,754.70 5
Pas. Plafond Gypsum 9 mm m
2
207.00 61,646.61
12,760,848.27 6
Pas. Lis Plafond Gypsum m
1
183.20 18,991.00
3,479,151.20 7
Pek.Rangka Atap Baja Ringan m
2
248.27 128,610.97
31,930,246.35 8
Pek.Atap Spandek m
2
248.27 74,856.70
18,584,672.91 9
Pek.Nok Seng m
1
29.35 35,371.36
1,038,149.42 10
Pas.Baut Moor, Angker, Beugel Ls
1.00 500,000.00
500,000.00
Sub Jumlah VI…………………………………………………………………………………….. 97,554,465.80
VII. PEKERJAAN KUSEN DAN PENGUNCI
1 Pek.Kusen Pintu Jendela Aluminium
m
1
145.25 107,764.64
15,652,814.11 2
Pek. Pintu dan Jendala Kaca Rangka Aluminium m
2
22.65 439,401.25
9,952,438.31 3
Pek. Pintu Panil Kayu Klas I m
2
11.48 1,026,315.00
11,782,096.20 4
Pas. Pintu rolling door m
2
28.00 780,000.00
21,840,000.00 5
Pek.Kaca Ryband 5 mm m
2
2.14 195,617.15
418,620.70 6
Pas.Grendel Tanam Jendela Bh
43.00 45,515.00
1,957,145.00 7
Hak Angin Bh
34.00 22,081.40
750,767.60 8
Pas.Engsel Jendela Bh
86.00 30,470.20
2,620,437.20 9
Pas.Kunci Pintu 2 Kali Putar Bh
7.00 107,366.55
751,565.85 10
Pas.Engsel Pintu Psg
21.00 27,811.40
584,039.40 11
Pas.Pintu PVC bh
1.00 550,000.00
550,000.00
Sub Jumlah VII…………………………………………………………………………………….. 66,309,924.37
VIII. PEKERJAAN PENGECATAN
1 Pekerjaan Acian
m
2
308.82 17,943.37
5,541,270.12 2
Pekerjaan Cat Tembok m
2
609.08 37,434.70
22,800,577.34 3
Pekerjaan Cat Plafond m
2
207.00 37,434.70
7,748,982.90
Sub Jumlah VIII…………………………………………………………………………………….. 36,090,830.36
2
NO. KETERANGAN
VOLUME SAT.
HARGA SATUAN JUMLAH HARGA Rp.
Rp.
1 3
4 5
6
IX. PEKERJAAN INSTALASI LISTRIK
X. PEKERJAAN SANITASI
XI. PEKERJAAN AKHIR
2
NO. KETERANGAN
VOLUME SAT.
1 Instalasi Listrik
Ttk 15.
00 2
Pasangan Lampu TL 1 x 20 Wtt Ttk
15. 00
3 Pasangan Saklar Ganda Putih
Bh 10.
00 4
Pasangan Saklar Tunggal Putih Bh
4. 00
5 Pasangan Stop Kontak Putih
Bh 14.
00 6
Pasangan Panel Penerangan Ls
1. 00
7 Pasangan Sekring Box
Ls 1.
00
Sub Jumlah IX ……………………………………………………………………………………..
1 Pasangan Kloset Duduk
Bh 1.
00 2
Pasangan Pipa PVC Diameter 12 m1
8. 00
3 Pasangan Pipa PVC Diameter 34
m1 4.
00 4
Pasangan Pipa PVC Diameter 4 m1
8. 00
5 Pasangan Kran Air 12
Bh 1.
00 6
Pasangan Floor Drain Bh
1. 00
7 Pekerjaan Bak Mandi
Ls 1.
00 8
Pekerjaan Septictank Bh
1. 00
Sub Jumlah X……………………………………………………………………………………..
1 Pembersihan Akhir
Ls 1.
00
JUMLAH BIAYA PEMBANGUNAN KIOS NELAYAN DAN KLINIK KESEHATAN
Sub Jumlah XI……………………………………………………………………………………..
3 PEMBANGUNAN MUSHOLLAH
HARGA SATUAN JUMLAH HARGA Rp.
Rp.
1 3
4 5
6
I. PEKERJAAN PERSIAPAN