PEKERJAAN KUSEN DAN PENGUNCI PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK PEKERJAAN SANITASI PEKERJAAN AKHIR PEKERJAAN PERSIAPAN

V. PEKERJAAN LANTAI

1 Pas.Lantai Keramik 40 x 40 warna m 2 31.67 208,940.84 6,617,156.40 2 Dinding Keramik 20 x 20 warna m 2 10.45 187,234.91 1,956,604.81 3 Pas.Rabat Beton Tumbuk m 3 18.52 924,471.95 17,124,687.28 Sub Jumlah V…………………………………………………………………………………….. 25,698,448.50

VI. PEKERJAAN KUSEN, ATAP, PLAFOND

1 Pas.Woodplank Motif Urat Kayu 2x 1.8 x 20 cm m 1 36.40 66,986.05 2,438,292.22 2 Pas. Rangka Plafond Besi Hollow m 2 50.41 98,762.10 4,978,597.46 3 Pas. Plafond Gypsum 9 mm m 2 50.41 61,646.61 3,107,605.61 4 Pas. Lis Plafond Gypsum m 1 40.00 18,991.00 759,640.00 5 Pek.Kuda-Kuda Baja ringan m 2 56.69 128,610.97 7,290,956.08 6 Pek.Atap Spandek m 2 56.69 74,856.70 4,243,626.32 7 Pek.Nok Zincalum m 1 22.00 63,944.26 1,406,773.72 8 Pas.Baut Moor, Angker, Beugel Ls 1.00 500,000.00 500,000.00 Sub Jumlah VI…………………………………………………………………………………….. 24,725,491.41

VII. PEKERJAAN KUSEN DAN PENGUNCI

1 Pek.Kusen Pintu Jendela Aluminium m 1 70.56 107,764.64 7,603,873.07 2 Pek. Pintu dan Jendala Kaca Rangka Aluminium m 2 7.40 439,401.25 3,251,569.25 3 Pek. Ventilasi Profil bh 6.00 250,000.00 1,500,000.00 4 Pas. Roster bh 20.00 35,000.00 700,000.00 5 Pekerjaan Teralis Besi m 2 2.16 750,000.00 1,620,000.00 6 Pas.Grendel Tanam Jendela Bh 4.00 45,515.00 182,060.00 7 Hak Angin Bh 8.00 22,081.40 176,651.20 8 Pas.Engsel Jendela Bh 8.00 30,470.20 243,761.60 9 Pas.Kunci Pintu 2 Kali Putar Bh 2.00 107,366.55 214,733.10 10 Pas.Engsel Pintu Psg 12.00 27,811.40 333,736.80 Sub Jumlah VII…………………………………………………………………………………….. 15,826,385.02

VIII. PEKERJAAN PENGECATAN

1 Pekerjaan Acian m 2 163.06 17,943.37 2,925,845.17 2 Pekerjaan Cat Tembok m 2 163.06 37,434.70 6,104,102.18 3 Pekerjaan Cat Plafond m 2 50.41 37,434.70 1,887,083.23 Sub Jumlah VIII…………………………………………………………………………………….. 10,917,030.58

IX. PEKERJAAN INSTALASI LISTRIK

1 Instalasi Listrik Ttk 4.00 198,824.00 795,296.00 2 Pasangan Lampu TL 1 x 20 Wtt Ttk 4.00 170,000.00 680,000.00 3 Pasangan Saklar Ganda Putih Bh 1.00 115,080.00 115,080.00 4 Pasangan Saklar Tunggal Putih Bh 2.00 57,540.00 115,080.00 5 Pasangan Stop Kontak Putih Bh 1.00 57,540.00 57,540.00 6 Pasangan Panel Penerangan Ls 1.00 2,500,000.00 2,500,000.00 7 Pasangan Sekring Box Ls 1.00 120,000.00 120,000.00 Sub Jumlah IX …………………………………………………………………………………….. 4,382,996.00

X. PEKERJAAN SANITASI

1 Pasangan Pipa PVC Diameter 12 m1 8.00 34,547.60 276,380.80 2 Pasangan Pipa PVC Diameter 34 m1 4.00 34,547.60 138,190.40 3 Pasangan Kran air 12 Bh 6.00 34,547.60 207,285.60 Sub Jumlah X…………………………………………………………………………………….. 414,571.20

XI. PEKERJAAN AKHIR

1 Pembersihan Akhir Ls 1.00 550,000.00 550,000.00 Sub Jumlah XI…………………………………………………………………………………….. 550,000.00 JUMLAH BIAYA PEMBANGUNAN MUSHOLLAH 138,276,000.51 4 PEMBANGUNAN MESS PENGINAPAN NELAYAN HARGA SATUAN JUMLAH HARGA Rp. Rp. 1 3 4 5 6

I. PEKERJAAN PERSIAPAN

1 Pengukuran dan Pemasangan Bowplank m 2 1.00 700,000.00 700,000.00 2 Administrasi dan Pelaporan Ls 1.00 500,000.00 500,000.00 Sub Jumlah I……………………………………………………………………………………… 1,200,000.00

II. PEKERJAAN TANAH