2 PEMBANGUNAN KIOS NELAYAN DAN KLINIK KESEHATAN
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3
4 5
6
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan bowplank
Ls 1.00
700,000.00 700,000.00
2 Administrasi dan Pelaporan
Ls 1.00
1,000,000.00 1,000,000.00
Sub Jumlah I……………………………………………………………………………………… 1,700,000.00
II. PEKERJAAN TANAH
1 Galian Tanah Pondasi
m
3
20.48 27,616.00
565,437.60 2
Timbunan Kembali Pondasi m
3
8.77 13,232.68
116,050.60 3
Timbunan Pasir Bawah Lantai dan Pondasi m
3
7.61 387,414.18
2,946,284.84
Sub Jumlah II…………………………………………………………………………………….. 3,627,773.04
III. PEKERJAAN PONDASI
1 Pas.Pondasi Batu Gunung 1 : 5
m
3
13.68 606,212.08
8,292,981.25 2
Beton Lantai Kerja 1 : 3 : 5 m
3
5.20 924,471.95
4,809,103.08 3
Pas. Pondasi Batu Merah m
2
81.63 110,931.86
9,054,813.07 4
Plesteran Saluran Samping m
2
84.89 39,554.00
3,357,739.06 5
Pek. Acian Saluran m
2
84.89 17,943.37
1,523,212.29
Sub Jumlah III…………………………………………………………………………………….. 27,037,848.76
IV. PEKERJAAN DINDING DAN BETON STRUKTUR
1 Pas.Dinding Batu Merah 1 : 5
m
2
147.89 101,294.89
14,980,501.28 2
Pas.Dinding Transram 1 : 2 m
2
13.04 110,931.86
1,446,551.45 3
Pas.Plesteran Dinding 1 : 5 m
2
308.82 35,619.75
11,000,091.20 4
Pas.Batu Alam m
2
7.26 1,686,334.91
12,242,791.45 5
Pek.Sloef Beton 1520 m
3
1.73 5,515,231.11
9,513,773.66 6
Pek.Kolom Beton 1515 m
3
1.71 5,515,231.11
9,431,045.20 7
Pek.Ring Balk 1520 m
3
1.73 5,515,231.11
9,513,773.66 8
Pek. Meja Pantri m
3
0.09 5,515,231.11
496,370.80 9
Pek. Dinding Partisi Gypsum T.9 mm m
2
150.13 96,000.31
14,412,334.54
Sub Jumlah IV…………………………………………………………………………………….. 83,037,233.25
2
NO. KETERANGAN
VOLUME SAT.
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3
4 5
6
V. PEKERJAAN LANTAI
1 Bongkaran Lantai
m
3
7.35 387,414.18
2,847,494.22 2
Pas.Lantai Keramik 40 x 40 warna m
2
144.75 208,940.84
30,244,186.59 3
Pas.Lantai Keramik 20 x 20 warna m
2
2.25 181,513.34
408,405.02 4
Pas.Dinding KMWC Keramik 20 x 20 warna m
2
8.10 187,234.91
1,516,602.77 5
Pas.Dinding Pantri Keramik 20 x 20 warna m
2
2.40 187,234.91
449,363.78
Sub Jumlah V…………………………………………………………………………………….. 35,466,052.38
VI. PEKERJAAN KAYU, ATAP, PLAFOND