3 PEMBANGUNAN DERMAGA
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3
4 5
6
I. PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran
1.00 ls
2,000,000.00 2,000,000.00
2 Mobilisasi dan Demobilisasi Alat
1.00 ls
346,500,000.00 346,500,000.00
3 Pembuatan Direksi Keet + Kelengkapan
30.00 m2
5,540,678.70 166,220,361.00
4 Pembuatan Gudang + Bedeng Kerja
20.00 m2
1,218,886.10 24,377,722.00
5 Listrik Kerja
1.00 ls
2,500,000.00 2,500,000.00
6 Administrasi dan Dokumentasi
1.00 ls
3,500,000.00 3,500,000.00
7 Papan Nama Proyek digital printing lapis
1.00 bh
300,000.00 300,000.00
tripleks 6 mm + tiang kayu 8
Pejaga Malam 1.00
Ls 2,500,000.00
2,500,000.00
Sub Jumlah I. ................................................................................................. 547,898,083.00
II. PENGADAAN TIANG PANCANG
1 Pengadaan tiang pancang dia. 40 cm,
26.00 bh
6,892,335.61 179,200,725.95
panjang 9 meter tiang bawah 2
Pengadaan tiang pancang dia. 40 cm, 52.00
bh 6,892,335.61
358,401,451.91 panjang 9 meter tiang atas
Sub Jumlah II. ................................................................................................ 537,602,177.86
III. PEKERJAAN PEMANCANGAN
1 Handling Tiang Pancang ke Titik Pancang
702.00 m
123,481.99 86,684,357.69
2 Pemancangan Tiang
624.00 m
518,312.17 323,426,793.97
3 Penyambungan Tiang
52.00 bh
530,052.50 27,562,730.00
4 Memotong Pangkal Tiang
26.00 bh
549,650.00 14,290,900.00
Sub Jumlah III. ............................................................................................... 451,964,781.67
IV. PEKERJAAN BETON
1 Beton pengisi tiang pancang
1.19 m3
7,166,700.68 8,528,373.81
2 Pile Caps - 80x80x70
11.65 m3
5,986,433.46 69,741,949.82
3 Balok 4070 - Memanjang
27.72 m3
6,134,185.66 170,039,626.48
4 Balok 4070 - Melintang
16.02 m3
6,134,185.66 98,245,117.52
5 Plat Lantai, tebal rata-rata 25 Cm
51.38 m3
6,545,455.15 336,305,485.80
6 Balok tepi lisplank 2560
17.33 m3
6,182,147.02 107,105,697.19
7 Balok fender
8.84 m3
6,134,185.66 54,226,201.23
8 Pek. Kanstin Beton K. 300
1.44 m3
5,591,068.91 8,051,139.23
9 Bollard beton
7.00 Bh
1,068,256.84 7,477,797.86
10 Pek. Besi Stek Poer
742.00 kg
23,047.26 17,101,066.18
11 Pek. Tes Kubus Beton
30.00 bh
150,000.00 4,500,000.00
12 Pengecatan Kanstin
21.32 m2
37,434.70 798,107.80
Sub Jumlah IV. ............................................................................................... 882,120,562.92
2
VOLUME KETERANGAN
NO. SAT.
HARGA SATUAN JUMLAH HARGA
Rp. Rp.
1 3
4 5
6 2
VOLUME KETERANGAN
NO. SAT.
V. PEKERJAAN FASILITAS DERMAGA FINISHING