PEKERJAAAN INS TALASI LISTRIK 3,996,975.00 PEKERJAAN SANITER DAN INSTALASI AIR 7,403,090.55

No. Urai an Pe ke rjaan Sat Vol Harga Satu an Ju ml ah Sub Total I. PEKERJAAN PERSIAPAN 2,602,087.20 a. Pengukuran dan BOW Plank M 53.84 48,330.00 2,602,087.20 II. PEKERJAAN TANAH 2,930,066.19 a. Galian T anah Pondasi P as. Batu M3 58.86 35,500.00 2,089,487.40 b. Galian T anah Pondasi Rollak M3 0.63 35,500.00 22,231.88 c. Urugan T anah Kembali M3 14.87 11,833.33 175,976.57 d. Urugan Pasir Bawah Pondasi M3 4.97 68,200.00 339,144.96 e. Urugan Pasir Bawah Lantai M3 4.45 68,200.00 303,225.38 III. PEKERJAAN PO NDASI 13,949,863.88 a. Pondasi Pas. Batu 1:3:10 M3 31.66 387,255.00 12,259,525.16 b. Pondasi Rollak Bata 1:3:10 M3 0.11 250,000.00 28,125.00 c. Rabat Beton di bawah lantai 1:3:5 M3 3.18 523,400.00 1,662,213.72

IV. PEKERJAAN BETO N 22,708,194.52

a. Sloof 1:2:3 M3 2.18 1,948,765.00 4,254,699.65 b. Kolom 1:2:3 M3 1.47 1,948,765.00 2,856,723.84 c. Ring Balok 1:2:3 M3 3.56 1,948,765.00 6,934,251.52 d. Plat T alang 1:2:3 M3 0.52 1,500,000.00 781,200.00 e. Plat meja dapur 1:2:3 M3 0.28 950,000.00 263,625.00 f. Cor Beton Car Port 1:2:3 M3 14.41 528,800.00 7,617,694.50

V. PEKERJAAN PASANGAN DAN PLESTERAN

49,393,454.63 a. Pas. Bata t ransraam 1:3 M2 19.85 76,956.20 1,527,426.66 b. Pas. Bata biasa 1:3:10 M2 300.88 68,095.00 20,488,525.74 c. Plesteran 1:3 M2 39.70 31,042.76 1,232,273.40 d. Plesteran 1:3:10 M2 601.76 24,148.40 14,531,613.63 e. Acian M2 641.46 18,105.00 11,613,615.20 VI PEKERJAAN LANTAI 20,259,021.70 a. Pasang Lant ai Granito 60 x 60 M2 61.38 305,410.50 18,746,096.49 b. Keramik lantai KMWC 20 X 20 M2 2.14 123,638.00 264,090.77 c. Pasang Dinding Keramik Mot if 20 x 25 M2 9.38 133,138.00 1,248,834.44 VII. PEKERJAAN ATAP DAN PLAFO N 24,069,051.72 a. Rangka Atap Konstruksi Baja Ringan M2 108.07 105,900.00 11,444,613.00 b. Penutup Atap Genteng Beton Lokal M2 108.07 40,580.00 4,385,480.60 c. Bubungan Atap Beton Lokal M 37.11 57,700.00 2,141,247.00 d. List Plank kalimantan M2 8.06 107,560.80 866,660.39 e. Penutup Plafon Gypsum M2 63.52 82,358.00 5,231,050.73

IX. PEKERJAAN PINTU JENDELA DAN KAC A 10,369,560.00

a. Kusen PUT Alumunium Coating M 6.48 54,000.00 349,920.00 b. Kusen P.1 Alumunium Coating M 24.00 54,000.00 1,296,000.00 c. Kusen P.2 Alumunium Coating M 4.70 54,000.00 253,800.00 d. Kusen J.1 Alumunium Coating M 10.12 54,000.00 546,480.00 e. Kusen J.2 Alumunium Coating M 14.66 54,000.00 791,640.00 f. Kusen J.3 Alumunium Coating M 6.60 54,000.00 356,400.00 g. Kusen J.4 Alumunium Coating M 9.08 54,000.00 490,320.00 h. Daun P int u PUT Lokal buah 2.00 375,000.00 750,000.00 i. Daun P int u P.1 Lokal buah 5.00 375,000.00 1,875,000.00 j. Daun P int u P.2 Lokal buah 1.00 375,000.00 375,000.00 k. Jendela kaca bening 5mm Buah 9.00 365,000.00 3,285,000.00 X. PEKERJAAN PENGEC ETAN 8,446,382.18 a. Pek. Cat Dinding Baru M2 601.76 12,696.00 7,639,983.05 b. Pek. Cat P lafon Baru M2 63.52 12,696.00 806,399.14

XI. PEKERJAAAN INS TALASI LISTRIK 3,996,975.00

a. Lampu Gant ung Dengan Instalasi T itik 10.00 101,300.00 1,013,000.00 b. Sakelar T unggal T itik 5.00 27,500.00 137,500.00 c. Sakelar Dobel T itik 3.00 31,500.00 94,500.00 d. Stop Kontak Dengan Instalasi T itik 6.00 31,500.00 189,000.00 e. Meteran List rik T itik 1.00 2,500,000.00 2,500,000.00 f. Panel T itik 1.00 62,975.00 62,975.00

XII. PEKERJAAN SANITER DAN INSTALASI AIR 7,403,090.55

Closet Duduk Unit 1.00 246,970.00 246,970.00 Floor Drain Unit 1.00 17,500.00 17,500.00 Kran Air Biasa Unit 2.00 22,550.00 45,100.00 Kran Air Stainless Unit 3.00 41,550.00 124,650.00 Bak cuci st ainless steel Unit 1.00 150,000.00 150,000.00 Saluran air Bersih D. 1 PVC M 5.47 19,173.50 104,879.05 Saluran air Bersih D. 34 PVC M 10.00 16,306.00 163,060.00 Saluran air Bersih D. 12 PVC M 6.00 14,407.25 86,443.50 Saluran Air Kotor D. 3 P VC M 8.00 80,014.50 640,116.00 Saluran Kotoran tinja D.4 PVC M 13.00 110,627.00 1,438,151.00 Pipa Hawa D.2 GI M 2.00 178,110.50 356,221.00 Septic T ank Unit 1.00 2,000,000.00 2,000,000.00 Resapan Unit 1.00 2,000,000.00 2,000,000.00 Bak Kontrol Unit 3.00 10,000.00 30,000.00 RENC ANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TYPE. 60 GA LAMPIRAN I-10 No. Urai an Pe ke rjaan S at Vol Harga Satuan Ju mlah Sub Total I. PEKERJAAN PERSIAPAN 390,000.00 a. Pengukuran dan BOW Plank M2 60.00 6,500.00 390,000.00 II. PEKERJAAN TANAH 1,989,318.16 a. Galian T anah P ondasi Pas. Batu M3 43.16 27,360.00 1,180,720.80 b. Galian T anah P ondasi Rollak Bata M3 0.63 27,360.00 17,134.20 c. Urugan T anah Kembali M3 10.95 9,120.00 99,821.23 d. Urugan Pasir Bawah Pondasi M3 5.48 70,944.00 388,773.12 e. Urugan Pasir Bawah Lant ai M3 4.27 70,944.00 302,868.80 III. PEKERJAAN PO NDASI 7,756,336.81 a. Pondasi Pas. Batu 1:3:10 M3 17.47 353,470.00 6,174,237.23 b. Pondasi Rollak Bat a 1:3:10 M3 0.38 250,000.00 93,937.50 c. Rabat Beton di bawah lantai 1:3:5 M3 3.05 488,022.00 1,488,162.09 IV. PEKERJAAN BETO N 20,392,085.84 a. Sloof 1:2:3 M3 1.51 1,841,388.00 2,774,971.72 b. Kolom 1:2:3 M3 2.74 1,841,388.00 5,046,600.02 c. Ring Balok 1:2:3 M3 1.87 1,841,388.00 3,443,395.56 d. Plat At ap 1:2:3 M3 1.18 1,500,000.00 1,762,500.00 e. Plat meja dapur 1:2:3 M3 0.28 950,000.00 263,625.00 f. Cor Beton Car Port 1:2:3 M3 14.41 492,932.00 7,100,993.54

V. PEKERJAAN PASANGAN DAN PLES TERAN