No. Urai an Pe ke rjaan
Sat Vol
Harga Satu an Ju ml ah
Sub Total I.
PEKERJAAN PERSIAPAN 2,602,087.20
a. Pengukuran dan BOW Plank M
53.84 48,330.00
2,602,087.20 II.
PEKERJAAN TANAH 2,930,066.19
a. Galian T anah Pondasi P as. Batu M3
58.86 35,500.00
2,089,487.40 b. Galian T anah Pondasi Rollak
M3 0.63
35,500.00 22,231.88
c. Urugan T anah Kembali M3
14.87 11,833.33
175,976.57 d. Urugan Pasir Bawah Pondasi
M3 4.97
68,200.00 339,144.96
e. Urugan Pasir Bawah Lantai M3
4.45 68,200.00
303,225.38 III. PEKERJAAN PO NDASI
13,949,863.88
a. Pondasi Pas. Batu 1:3:10 M3
31.66 387,255.00 12,259,525.16
b. Pondasi Rollak Bata 1:3:10 M3
0.11 250,000.00
28,125.00 c. Rabat Beton di bawah lantai 1:3:5
M3 3.18
523,400.00 1,662,213.72
IV. PEKERJAAN BETO N 22,708,194.52
a. Sloof 1:2:3 M3
2.18 1,948,765.00
4,254,699.65 b. Kolom 1:2:3
M3 1.47
1,948,765.00 2,856,723.84
c. Ring Balok 1:2:3 M3
3.56 1,948,765.00
6,934,251.52 d. Plat T alang 1:2:3
M3 0.52
1,500,000.00 781,200.00
e. Plat meja dapur 1:2:3 M3
0.28 950,000.00
263,625.00 f. Cor Beton Car Port 1:2:3
M3 14.41
528,800.00 7,617,694.50
V. PEKERJAAN PASANGAN DAN PLESTERAN
49,393,454.63 a. Pas. Bata t ransraam 1:3
M2 19.85
76,956.20 1,527,426.66
b. Pas. Bata biasa 1:3:10 M2
300.88 68,095.00 20,488,525.74
c. Plesteran 1:3 M2
39.70 31,042.76
1,232,273.40 d. Plesteran 1:3:10
M2 601.76
24,148.40 14,531,613.63 e. Acian
M2 641.46
18,105.00 11,613,615.20 VI PEKERJAAN LANTAI
20,259,021.70
a. Pasang Lant ai Granito 60 x 60 M2
61.38 305,410.50 18,746,096.49
b. Keramik lantai KMWC 20 X 20 M2
2.14 123,638.00
264,090.77 c. Pasang Dinding Keramik Mot if 20 x 25 M2
9.38 133,138.00
1,248,834.44 VII. PEKERJAAN ATAP DAN PLAFO N
24,069,051.72
a. Rangka Atap Konstruksi Baja Ringan M2
108.07 105,900.00 11,444,613.00
b. Penutup Atap Genteng Beton Lokal M2
108.07 40,580.00
4,385,480.60 c. Bubungan Atap Beton Lokal
M 37.11
57,700.00 2,141,247.00
d. List Plank kalimantan M2
8.06 107,560.80
866,660.39 e. Penutup Plafon Gypsum
M2 63.52
82,358.00 5,231,050.73
IX. PEKERJAAN PINTU JENDELA DAN KAC A 10,369,560.00
a. Kusen PUT Alumunium Coating M
6.48 54,000.00
349,920.00 b. Kusen P.1 Alumunium Coating
M 24.00
54,000.00 1,296,000.00
c. Kusen P.2 Alumunium Coating M
4.70 54,000.00
253,800.00 d. Kusen J.1 Alumunium Coating
M 10.12
54,000.00 546,480.00
e. Kusen J.2 Alumunium Coating M
14.66 54,000.00
791,640.00 f. Kusen J.3 Alumunium Coating
M 6.60
54,000.00 356,400.00
g. Kusen J.4 Alumunium Coating M
9.08 54,000.00
490,320.00 h. Daun P int u PUT Lokal
buah 2.00
375,000.00 750,000.00
i. Daun P int u P.1 Lokal buah
5.00 375,000.00
1,875,000.00 j. Daun P int u P.2 Lokal
buah 1.00
375,000.00 375,000.00
k. Jendela kaca bening 5mm Buah
9.00 365,000.00
3,285,000.00 X.
PEKERJAAN PENGEC ETAN 8,446,382.18
a. Pek. Cat Dinding Baru M2
601.76 12,696.00
7,639,983.05 b. Pek. Cat P lafon Baru
M2 63.52
12,696.00 806,399.14
XI. PEKERJAAAN INS TALASI LISTRIK 3,996,975.00
a. Lampu Gant ung Dengan Instalasi T itik
10.00 101,300.00
1,013,000.00 b. Sakelar T unggal
T itik 5.00
27,500.00 137,500.00
c. Sakelar Dobel T itik
3.00 31,500.00
94,500.00 d. Stop Kontak Dengan Instalasi
T itik 6.00
31,500.00 189,000.00
e. Meteran List rik T itik
1.00 2,500,000.00
2,500,000.00 f. Panel
T itik 1.00
62,975.00 62,975.00
XII. PEKERJAAN SANITER DAN INSTALASI AIR 7,403,090.55
Closet Duduk Unit
1.00 246,970.00
246,970.00 Floor Drain
Unit 1.00
17,500.00 17,500.00
Kran Air Biasa Unit
2.00 22,550.00
45,100.00 Kran Air Stainless
Unit 3.00
41,550.00 124,650.00
Bak cuci st ainless steel Unit
1.00 150,000.00
150,000.00 Saluran air Bersih D. 1 PVC
M 5.47
19,173.50 104,879.05
Saluran air Bersih D. 34 PVC M
10.00 16,306.00
163,060.00 Saluran air Bersih D. 12 PVC
M 6.00
14,407.25 86,443.50
Saluran Air Kotor D. 3 P VC M
8.00 80,014.50
640,116.00 Saluran Kotoran tinja D.4 PVC
M 13.00
110,627.00 1,438,151.00
Pipa Hawa D.2 GI M
2.00 178,110.50
356,221.00 Septic T ank
Unit 1.00
2,000,000.00 2,000,000.00
Resapan Unit
1.00 2,000,000.00
2,000,000.00 Bak Kontrol
Unit 3.00
10,000.00 30,000.00
RENC ANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TYPE. 60 GA
LAMPIRAN I-10
No. Urai an Pe ke rjaan
S at Vol
Harga Satuan Ju mlah
Sub Total I.
PEKERJAAN PERSIAPAN 390,000.00
a. Pengukuran dan BOW Plank M2
60.00 6,500.00
390,000.00 II.
PEKERJAAN TANAH 1,989,318.16
a. Galian T anah P ondasi Pas. Batu M3
43.16 27,360.00
1,180,720.80 b. Galian T anah P ondasi Rollak Bata
M3 0.63
27,360.00 17,134.20
c. Urugan T anah Kembali M3
10.95 9,120.00
99,821.23 d. Urugan Pasir Bawah Pondasi
M3 5.48
70,944.00 388,773.12
e. Urugan Pasir Bawah Lant ai M3
4.27 70,944.00
302,868.80 III. PEKERJAAN PO NDASI
7,756,336.81
a. Pondasi Pas. Batu 1:3:10 M3
17.47 353,470.00
6,174,237.23 b. Pondasi Rollak Bat a 1:3:10
M3 0.38
250,000.00 93,937.50
c. Rabat Beton di bawah lantai 1:3:5 M3
3.05 488,022.00
1,488,162.09 IV. PEKERJAAN BETO N
20,392,085.84
a. Sloof 1:2:3 M3
1.51 1,841,388.00
2,774,971.72 b. Kolom 1:2:3
M3 2.74
1,841,388.00 5,046,600.02
c. Ring Balok 1:2:3 M3
1.87 1,841,388.00
3,443,395.56 d. Plat At ap 1:2:3
M3 1.18
1,500,000.00 1,762,500.00
e. Plat meja dapur 1:2:3 M3
0.28 950,000.00
263,625.00 f. Cor Beton Car Port 1:2:3
M3 14.41
492,932.00 7,100,993.54
V. PEKERJAAN PASANGAN DAN PLES TERAN