PEKERJAAN PENGEC ETAN PEKERJAAN SANITER DAN INSTALASI AIR 7,504,339.62 PEKERJAAN PERSIAPAN PEKERJAAN TANAH DAN URUGAN PEKERJAAN PASANGAN 25,635,946.60

No. Urai an Pe ke rjaan S at Vol Harga Satuan Ju mlah Sub Total I. PEKERJAAN PERSIAPAN 390,000.00 a. Pengukuran dan BOW Plank M2 60.00 6,500.00 390,000.00 II. PEKERJAAN TANAH 1,989,318.16 a. Galian T anah P ondasi Pas. Batu M3 43.16 27,360.00 1,180,720.80 b. Galian T anah P ondasi Rollak Bata M3 0.63 27,360.00 17,134.20 c. Urugan T anah Kembali M3 10.95 9,120.00 99,821.23 d. Urugan Pasir Bawah Pondasi M3 5.48 70,944.00 388,773.12 e. Urugan Pasir Bawah Lant ai M3 4.27 70,944.00 302,868.80 III. PEKERJAAN PO NDASI 7,756,336.81 a. Pondasi Pas. Batu 1:3:10 M3 17.47 353,470.00 6,174,237.23 b. Pondasi Rollak Bat a 1:3:10 M3 0.38 250,000.00 93,937.50 c. Rabat Beton di bawah lantai 1:3:5 M3 3.05 488,022.00 1,488,162.09 IV. PEKERJAAN BETO N 20,392,085.84 a. Sloof 1:2:3 M3 1.51 1,841,388.00 2,774,971.72 b. Kolom 1:2:3 M3 2.74 1,841,388.00 5,046,600.02 c. Ring Balok 1:2:3 M3 1.87 1,841,388.00 3,443,395.56 d. Plat At ap 1:2:3 M3 1.18 1,500,000.00 1,762,500.00 e. Plat meja dapur 1:2:3 M3 0.28 950,000.00 263,625.00 f. Cor Beton Car Port 1:2:3 M3 14.41 492,932.00 7,100,993.54

V. PEKERJAAN PASANGAN DAN PLES TERAN

42,849,123.92 a. Pas. Bata t ransraam 1:3 M2 20.55 69,639.25 1,431,086.59 b. Pas. Bata biasa 1:3:10 M2 281.44 61,023.50 17,174,697.93 c. Plesteran 1:3 M2 41.10 25,814.60 1,060,980.06 d. Plesteran 1:3:10 M2 562.89 19,218.00 10,817,581.58 e. Acian M2 844.33 14,644.45 12,364,777.76 VI PEKERJAAN LANTAI 9,677,216.19 a. Keramik lantai Bagian dalam 40X 40 M2 51.88 111,978.50 5,808,884.69 b. Keramik Lantai bagian Luar 40 X 40 M2 4.35 111,978.50 487,106.48 c. Keramik lantai KMWC 20 X 20 M2 4.76 108,954.50 518,895.81 d. Keramik Dinding KMWC 20 X 20 M2 24.60 116,454.50 2,864,780.70 e. Keramik Meja dapur 20 X 20 M2 -0.02 108,954.50 -2,451.48 VII. PEKERJAAN ATAP DAN PLAFO N 18,861,671.70 a. Rangka Atap Konstruksi Baja Ringan M2 84.25 109,100.00 9,191,565.90 b. Penut up At ap Genteng Beton Lokal M2 84.25 37,897.20 3,192,801.20 c. Bubungan Atap Beton Lokal M 15.71 49,660.80 780,171.17 d. List Plank kalimantan M2 8.06 98,434.80 793,128.56 e. Penut up Plafon Gypsum M2 60.99 80,410.00 4,904,004.88 IX. PEKERJAAN PINTU JENDELA DAN KAC A 11,864,739.95 a. Kusen PUT jati M3 0.04 9,146,470.00 378,663.86 b. Kusen P.1 jat i M3 0.12 9,146,470.00 1,056,966.07 c. Kusen P.2 jat i M3 0.07 9,146,470.00 600,374.29 d. Kusen PL jati M3 0.04 9,146,470.00 366,316.12 e. Kusen J.1a jati M3 0.03 9,146,470.00 256,284.09 f. Kusen J.2b jati M3 0.14 9,146,470.00 1,275,932.57 g. Kusen J.3 jat i M3 0.03 9,146,470.00 315,004.43 h. Kusen BV jati M3 0.01 9,146,470.00 126,221.29 i. Daun Pint u PUT jati M2 3.58 459,320.00 1,644,457.46 j. Daun Pint u P.1 jati M2 5.36 459,320.00 2,462,552.32 k. Daun Pint u P.2 jati M2 3.57 459,320.00 1,641,701.54 l. Daun Pint u PL jat i M2 1.19 459,320.00 544,294.20 m. Daun Jendela J.1a jati M2 0.46 459,320.00 213,308.21 n. Daun Jendela J.2b jati M2 0.83 459,320.00 382,383.90 o. Daun Jendela J.3 jat i M2 0.68 459,320.00 312,107.94 p. Daun BV Jati M2 0.17 459,320.00 78,084.40 q. Kaca Jendela J.1a bening 5mm M2 0.40 82,919.80 33,274.06 r. Kaca Jendela J.2b bening 5mm M2 1.35 82,919.80 111,606.73 s. Kaca Jendela J.3 bening 5mm M2 0.67 82,919.80 55,803.37 t . Kaca BV bening 5mm M2 0.11 82,919.80 9,403.11

X. PEKERJAAN PENGEC ETAN

7,255,255.64 a. Pek. Cat Dinding Baru M2 529.15 11,397.20 6,030,794.19 b. Pek. Cat P lafon Baru M2 60.99 11,397.20 695,086.74 c. Pek. Cat Kayu bidang baru M2 23.90 22,145.40 529,374.71 XI. PEKERJAAAN INSTALASI LISTRIK 3,664,075.00 a. Lampu Gantung Dengan Instalasi T itik 12.00 101,300.00 1,215,600.00 b. Sakelar T unggal T itik 6.00 27,500.00 165,000.00 c. Sakelar Dobel T itik 3.00 31,500.00 94,500.00 d. Stop Kontak Dengan Instalasi T itik 4.00 31,500.00 126,000.00 e. Meteran Listrik T itik 1.00 2,000,000.00 2,000,000.00 f. Panel T itik 1.00 62,975.00 62,975.00

XII. PEKERJAAN SANITER DAN INSTALASI AIR 7,504,339.62

Closet Duduk Unit 2.00 194,312.00 388,624.00 Floor Drain Unit 2.00 15,640.00 31,280.00 Kran Air Biasa Unit 2.00 20,690.00 41,380.00 Kran Air St ainless Unit 3.00 39,690.00 119,070.00 Bak cuci st ainless steel Unit 1.00 150,000.00 150,000.00 Saluran air Bersih D. 1 PVC M 5.47 17,775.02 97,229.36 Saluran air Bersih D. 34 PVC M 14.00 14,907.52 208,705.28 Saluran air Bersih D. 12 PVC M 6.00 13,008.77 78,052.62 Saluran Air Kot or D. 3 PVC M 8.00 76,866.94 614,935.52 Saluran Kotoran tinja D.4 P VC M 13.00 107,479.44 1,397,232.72 Pipa Hawa D.2 GI M 2.00 173,915.06 347,830.12 Septic T ank Unit 1.00 2,000,000.00 2,000,000.00 Resapan Unit 1.00 2,000,000.00 2,000,000.00 Bak Kontrol Unit 3.00 10,000.00 30,000.00 RENC ANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TYPE. 60 NT LAMPIRAN I-11 No Urai an Pe k e rjaan Vol Sat Harga Satu an Juml ah Harga Total Harga

I. PEKERJAAN PERSIAPAN

1,805,450.00 1 Pembersihan lokasi 126.50 m2 7,500.00 948,750.00 2 Pemasangan Bouwplank 13.00 m1 65,900.00 856,700.00

II. PEKERJAAN TANAH DAN URUGAN

1,694,207.80 1 Galian tanah biasa sedalam 1 meter 31.70 m3 31,750.00 1,006,475.00 2 Urugan pasir bawah pondasi 4.30 m3 105,590.00 454,037.00 3 Urugan pasir bwh lantai 1.16 m3 110,680.00 128,388.80 4 Urugan tanah kembali 7.90 m3 13,330.00 105,307.00

III. PEKERJAAN PASANGAN 25,635,946.60

1 Pasangan astampeng 8.70 m3 237,110.00 2,062,857.00 2 Memasang pondasi batu belah 18.40 m3 463,220.00 8,523,248.00 3 Pasangan bat a merah 1Pc : 6ps 198.35 m2 64,960.00 12,884,816.00 4 Pasangan t asram 1Pc : 3Ps 30.12 m2 71,880.00 2,165,025.60 IV. PEKERJAAN PLES TERAN 23,279,055.00 1 Plesteran dinding 1P c : 6Ps 456.90 m2 31,790.00 14,524,851.00 2 Acian 456.90 m2 19,160.00 8,754,204.00 V. PEKERJAAN BETO N 17,224,570.00 1 Membuat sloof 1520 1.60 m3 4,770,670.00 7,633,072.00 2 Kolom prakt is KP 1111 68.00 m1 66,820.00 4,543,760.00 3 Ring balok 26.60 m1 89,160.00 2,371,656.00 4 Plat beton bertulang t= 8cm 0.26 m3 5,576,900.00 1,449,994.00 5 Rabatan Bawah lantai 3 cm 1.80 m3 681,160.00 1,226,088.00

VI. PEKERJAAN KUSEN, PINTU DAN JENDELA 16,337,627.55