No. Urai an Pe ke rjaan
S at Vol
Harga Satuan Ju mlah
Sub Total I.
PEKERJAAN PERSIAPAN 390,000.00
a. Pengukuran dan BOW Plank M2
60.00 6,500.00
390,000.00 II.
PEKERJAAN TANAH 1,989,318.16
a. Galian T anah P ondasi Pas. Batu M3
43.16 27,360.00
1,180,720.80 b. Galian T anah P ondasi Rollak Bata
M3 0.63
27,360.00 17,134.20
c. Urugan T anah Kembali M3
10.95 9,120.00
99,821.23 d. Urugan Pasir Bawah Pondasi
M3 5.48
70,944.00 388,773.12
e. Urugan Pasir Bawah Lant ai M3
4.27 70,944.00
302,868.80 III. PEKERJAAN PO NDASI
7,756,336.81
a. Pondasi Pas. Batu 1:3:10 M3
17.47 353,470.00
6,174,237.23 b. Pondasi Rollak Bat a 1:3:10
M3 0.38
250,000.00 93,937.50
c. Rabat Beton di bawah lantai 1:3:5 M3
3.05 488,022.00
1,488,162.09 IV. PEKERJAAN BETO N
20,392,085.84
a. Sloof 1:2:3 M3
1.51 1,841,388.00
2,774,971.72 b. Kolom 1:2:3
M3 2.74
1,841,388.00 5,046,600.02
c. Ring Balok 1:2:3 M3
1.87 1,841,388.00
3,443,395.56 d. Plat At ap 1:2:3
M3 1.18
1,500,000.00 1,762,500.00
e. Plat meja dapur 1:2:3 M3
0.28 950,000.00
263,625.00 f. Cor Beton Car Port 1:2:3
M3 14.41
492,932.00 7,100,993.54
V. PEKERJAAN PASANGAN DAN PLES TERAN
42,849,123.92
a. Pas. Bata t ransraam 1:3 M2
20.55 69,639.25
1,431,086.59 b. Pas. Bata biasa 1:3:10
M2 281.44
61,023.50 17,174,697.93
c. Plesteran 1:3 M2
41.10 25,814.60
1,060,980.06 d. Plesteran 1:3:10
M2 562.89
19,218.00 10,817,581.58
e. Acian M2
844.33 14,644.45
12,364,777.76 VI PEKERJAAN LANTAI
9,677,216.19
a. Keramik lantai Bagian dalam 40X 40 M2
51.88 111,978.50
5,808,884.69 b. Keramik Lantai bagian Luar 40 X 40
M2 4.35
111,978.50 487,106.48
c. Keramik lantai KMWC 20 X 20 M2
4.76 108,954.50
518,895.81 d. Keramik Dinding KMWC 20 X 20
M2 24.60
116,454.50 2,864,780.70
e. Keramik Meja dapur 20 X 20 M2
-0.02 108,954.50
-2,451.48 VII. PEKERJAAN ATAP DAN PLAFO N
18,861,671.70
a. Rangka Atap Konstruksi Baja Ringan M2
84.25 109,100.00
9,191,565.90 b. Penut up At ap Genteng Beton Lokal
M2 84.25
37,897.20 3,192,801.20
c. Bubungan Atap Beton Lokal M
15.71 49,660.80
780,171.17 d. List Plank kalimantan
M2 8.06
98,434.80 793,128.56
e. Penut up Plafon Gypsum M2
60.99 80,410.00
4,904,004.88 IX. PEKERJAAN PINTU JENDELA DAN KAC A
11,864,739.95
a. Kusen PUT jati M3
0.04 9,146,470.00
378,663.86 b. Kusen P.1 jat i
M3 0.12
9,146,470.00 1,056,966.07
c. Kusen P.2 jat i M3
0.07 9,146,470.00
600,374.29 d. Kusen PL jati
M3 0.04
9,146,470.00 366,316.12
e. Kusen J.1a jati M3
0.03 9,146,470.00
256,284.09 f. Kusen J.2b jati
M3 0.14
9,146,470.00 1,275,932.57
g. Kusen J.3 jat i M3
0.03 9,146,470.00
315,004.43 h. Kusen BV jati
M3 0.01
9,146,470.00 126,221.29
i. Daun Pint u PUT jati M2
3.58 459,320.00
1,644,457.46 j. Daun Pint u P.1 jati
M2 5.36
459,320.00 2,462,552.32
k. Daun Pint u P.2 jati M2
3.57 459,320.00
1,641,701.54 l. Daun Pint u PL jat i
M2 1.19
459,320.00 544,294.20
m. Daun Jendela J.1a jati M2
0.46 459,320.00
213,308.21 n. Daun Jendela J.2b jati
M2 0.83
459,320.00 382,383.90
o. Daun Jendela J.3 jat i M2
0.68 459,320.00
312,107.94 p. Daun BV Jati
M2 0.17
459,320.00 78,084.40
q. Kaca Jendela J.1a bening 5mm M2
0.40 82,919.80
33,274.06 r. Kaca Jendela J.2b bening 5mm
M2 1.35
82,919.80 111,606.73
s. Kaca Jendela J.3 bening 5mm M2
0.67 82,919.80
55,803.37 t . Kaca BV bening 5mm
M2 0.11
82,919.80 9,403.11
X. PEKERJAAN PENGEC ETAN
7,255,255.64
a. Pek. Cat Dinding Baru M2
529.15 11,397.20
6,030,794.19 b. Pek. Cat P lafon Baru
M2 60.99
11,397.20 695,086.74
c. Pek. Cat Kayu bidang baru M2
23.90 22,145.40
529,374.71 XI. PEKERJAAAN INSTALASI LISTRIK
3,664,075.00
a. Lampu Gantung Dengan Instalasi T itik
12.00 101,300.00
1,215,600.00 b. Sakelar T unggal
T itik 6.00
27,500.00 165,000.00
c. Sakelar Dobel T itik
3.00 31,500.00
94,500.00 d. Stop Kontak Dengan Instalasi
T itik 4.00
31,500.00 126,000.00
e. Meteran Listrik T itik
1.00 2,000,000.00
2,000,000.00 f. Panel
T itik 1.00
62,975.00 62,975.00
XII. PEKERJAAN SANITER DAN INSTALASI AIR 7,504,339.62
Closet Duduk Unit
2.00 194,312.00
388,624.00 Floor Drain
Unit 2.00
15,640.00 31,280.00
Kran Air Biasa Unit
2.00 20,690.00
41,380.00 Kran Air St ainless
Unit 3.00
39,690.00 119,070.00
Bak cuci st ainless steel Unit
1.00 150,000.00
150,000.00 Saluran air Bersih D. 1 PVC
M 5.47
17,775.02 97,229.36
Saluran air Bersih D. 34 PVC M
14.00 14,907.52
208,705.28 Saluran air Bersih D. 12 PVC
M 6.00
13,008.77 78,052.62
Saluran Air Kot or D. 3 PVC M
8.00 76,866.94
614,935.52 Saluran Kotoran tinja D.4 P VC
M 13.00
107,479.44 1,397,232.72
Pipa Hawa D.2 GI M
2.00 173,915.06
347,830.12 Septic T ank
Unit 1.00
2,000,000.00 2,000,000.00
Resapan Unit
1.00 2,000,000.00
2,000,000.00 Bak Kontrol
Unit 3.00
10,000.00 30,000.00
RENC ANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TYPE. 60 NT
LAMPIRAN I-11
No Urai an Pe k e rjaan
Vol Sat
Harga Satu an Juml ah Harga Total Harga
I. PEKERJAAN PERSIAPAN
1,805,450.00
1 Pembersihan lokasi
126.50 m2
7,500.00 948,750.00
2 Pemasangan Bouwplank
13.00 m1
65,900.00 856,700.00
II. PEKERJAAN TANAH DAN URUGAN
1,694,207.80
1 Galian tanah biasa sedalam 1 meter
31.70 m3
31,750.00 1,006,475.00
2 Urugan pasir bawah pondasi
4.30 m3
105,590.00 454,037.00
3 Urugan pasir bwh lantai
1.16 m3
110,680.00 128,388.80
4 Urugan tanah kembali
7.90 m3
13,330.00 105,307.00
III. PEKERJAAN PASANGAN 25,635,946.60
1 Pasangan astampeng
8.70 m3
237,110.00 2,062,857.00
2 Memasang pondasi batu belah
18.40 m3
463,220.00 8,523,248.00
3 Pasangan bat a merah 1Pc : 6ps
198.35 m2
64,960.00 12,884,816.00 4
Pasangan t asram 1Pc : 3Ps 30.12
m2 71,880.00
2,165,025.60 IV. PEKERJAAN PLES TERAN
23,279,055.00
1 Plesteran dinding 1P c : 6Ps
456.90 m2
31,790.00 14,524,851.00 2
Acian 456.90
m2 19,160.00
8,754,204.00 V.
PEKERJAAN BETO N 17,224,570.00
1 Membuat sloof 1520
1.60 m3
4,770,670.00 7,633,072.00
2 Kolom prakt is KP 1111
68.00 m1
66,820.00 4,543,760.00
3 Ring balok
26.60 m1
89,160.00 2,371,656.00
4 Plat beton bertulang t= 8cm
0.26 m3
5,576,900.00 1,449,994.00
5 Rabatan Bawah lantai 3 cm
1.80 m3
681,160.00 1,226,088.00
VI. PEKERJAAN KUSEN, PINTU DAN JENDELA 16,337,627.55