PEKERJAAN PASANGAN DAN PLES TERAN

No. Urai an Pe ke rjaan S at Vol Harga Satuan Ju mlah Sub Total I. PEKERJAAN PERSIAPAN 390,000.00 a. Pengukuran dan BOW Plank M2 60.00 6,500.00 390,000.00 II. PEKERJAAN TANAH 1,989,318.16 a. Galian T anah P ondasi Pas. Batu M3 43.16 27,360.00 1,180,720.80 b. Galian T anah P ondasi Rollak Bata M3 0.63 27,360.00 17,134.20 c. Urugan T anah Kembali M3 10.95 9,120.00 99,821.23 d. Urugan Pasir Bawah Pondasi M3 5.48 70,944.00 388,773.12 e. Urugan Pasir Bawah Lant ai M3 4.27 70,944.00 302,868.80 III. PEKERJAAN PO NDASI 7,756,336.81 a. Pondasi Pas. Batu 1:3:10 M3 17.47 353,470.00 6,174,237.23 b. Pondasi Rollak Bat a 1:3:10 M3 0.38 250,000.00 93,937.50 c. Rabat Beton di bawah lantai 1:3:5 M3 3.05 488,022.00 1,488,162.09 IV. PEKERJAAN BETO N 20,392,085.84 a. Sloof 1:2:3 M3 1.51 1,841,388.00 2,774,971.72 b. Kolom 1:2:3 M3 2.74 1,841,388.00 5,046,600.02 c. Ring Balok 1:2:3 M3 1.87 1,841,388.00 3,443,395.56 d. Plat At ap 1:2:3 M3 1.18 1,500,000.00 1,762,500.00 e. Plat meja dapur 1:2:3 M3 0.28 950,000.00 263,625.00 f. Cor Beton Car Port 1:2:3 M3 14.41 492,932.00 7,100,993.54

V. PEKERJAAN PASANGAN DAN PLES TERAN

42,849,123.92 a. Pas. Bata t ransraam 1:3 M2 20.55 69,639.25 1,431,086.59 b. Pas. Bata biasa 1:3:10 M2 281.44 61,023.50 17,174,697.93 c. Plesteran 1:3 M2 41.10 25,814.60 1,060,980.06 d. Plesteran 1:3:10 M2 562.89 19,218.00 10,817,581.58 e. Acian M2 844.33 14,644.45 12,364,777.76 VI PEKERJAAN LANTAI 9,677,216.19 a. Keramik lantai Bagian dalam 40X 40 M2 51.88 111,978.50 5,808,884.69 b. Keramik Lantai bagian Luar 40 X 40 M2 4.35 111,978.50 487,106.48 c. Keramik lantai KMWC 20 X 20 M2 4.76 108,954.50 518,895.81 d. Keramik Dinding KMWC 20 X 20 M2 24.60 116,454.50 2,864,780.70 e. Keramik Meja dapur 20 X 20 M2 -0.02 108,954.50 -2,451.48 VII. PEKERJAAN ATAP DAN PLAFO N 18,861,671.70 a. Rangka Atap Konstruksi Baja Ringan M2 84.25 109,100.00 9,191,565.90 b. Penut up At ap Genteng Beton Lokal M2 84.25 37,897.20 3,192,801.20 c. Bubungan Atap Beton Lokal M 15.71 49,660.80 780,171.17 d. List Plank kalimantan M2 8.06 98,434.80 793,128.56 e. Penut up Plafon Gypsum M2 60.99 80,410.00 4,904,004.88 IX. PEKERJAAN PINTU JENDELA DAN KAC A 11,864,739.95 a. Kusen PUT jati M3 0.04 9,146,470.00 378,663.86 b. Kusen P.1 jat i M3 0.12 9,146,470.00 1,056,966.07 c. Kusen P.2 jat i M3 0.07 9,146,470.00 600,374.29 d. Kusen PL jati M3 0.04 9,146,470.00 366,316.12 e. Kusen J.1a jati M3 0.03 9,146,470.00 256,284.09 f. Kusen J.2b jati M3 0.14 9,146,470.00 1,275,932.57 g. Kusen J.3 jat i M3 0.03 9,146,470.00 315,004.43 h. Kusen BV jati M3 0.01 9,146,470.00 126,221.29 i. Daun Pint u PUT jati M2 3.58 459,320.00 1,644,457.46 j. Daun Pint u P.1 jati M2 5.36 459,320.00 2,462,552.32 k. Daun Pint u P.2 jati M2 3.57 459,320.00 1,641,701.54 l. Daun Pint u PL jat i M2 1.19 459,320.00 544,294.20 m. Daun Jendela J.1a jati M2 0.46 459,320.00 213,308.21 n. Daun Jendela J.2b jati M2 0.83 459,320.00 382,383.90 o. Daun Jendela J.3 jat i M2 0.68 459,320.00 312,107.94 p. Daun BV Jati M2 0.17 459,320.00 78,084.40 q. Kaca Jendela J.1a bening 5mm M2 0.40 82,919.80 33,274.06 r. Kaca Jendela J.2b bening 5mm M2 1.35 82,919.80 111,606.73 s. Kaca Jendela J.3 bening 5mm M2 0.67 82,919.80 55,803.37 t . Kaca BV bening 5mm M2 0.11 82,919.80 9,403.11

X. PEKERJAAN PENGEC ETAN