Hubungan Beban Kerja Fisik pada Shift II dengan Kelelahan Kerja Umum pada Shift II Case Processing Summary Hubungan Beban Kerja Fisik pada Shift III dengan Kelelahan Kerja Umum pada Shift III Case Processing Summary

Sangat Berat Count 1 3 4 Expected Count .2 1.5 1.8 .6 4.0 within BebanKerjaI .0 25.0 75.0 .0 100.0 within KelelahanKerjaI .0 5.6 14.3 .0 8.3 of Total .0 2.1 6.2 .0 8.3 Total Count 2 18 21 7 48 Expected Count 2.0 18.0 21.0 7.0 48.0 within BebanKerjaI 4.2 37.5 43.8 14.6 100.0 within KelelahanKerjaI 100.0 100.0 100.0 100.0 100.0 of Total 4.2 37.5 43.8 14.6 100.0 Symmetric Measures Value Asymp. Std. Error a Approx. T b Approx. Sig. Nominal by Nominal Phi .682 .034 Cramers V .394 .034 Contingency Coefficient .563 .034 Interval by Interval Pearsons R -.137 .174 -.940 .352 c Ordinal by Ordinal Spearman Correlation -.127 .161 -.871 .388 c N of Valid Cases 48 a. Not assuming the null hypothesis. b. Using the asymptotic standard error assuming the null hypothesis. c. Based on normal approximation.

14. Hubungan Beban Kerja Fisik pada Shift II dengan Kelelahan Kerja Umum pada Shift II

15. Case Processing Summary

Cases Valid Missing Total N Percent N Percent N Percent BebanKerjaII KelelahanKerjaII 48 100.0 .0 48 100.0 BebanKerjaII KelelahanKerjaII Crosstabulation KelelahanKerjaII Total Ringan Sedang Berat BebanKerjaII Sedang Count 3 3 6 Expected Count 1.0 1.8 3.2 6.0 within BebanKerjaII .0 50.0 50.0 100.0 within KelelahanKerjaII .0 21.4 11.5 12.5 of Total .0 6.2 6.2 12.5 Berat Count 7 8 15 Expected Count 2.5 4.4 8.1 15.0 within BebanKerjaII .0 46.7 53.3 100.0 within KelelahanKerjaII .0 50.0 30.8 31.2 of Total .0 14.6 16.7 31.2 Sangat Berat Count 8 4 15 27 Expected Count 4.5 7.9 14.6 27.0 within BebanKerjaII 29.6 14.8 55.6 100.0 within KelelahanKerjaII 100.0 28.6 57.7 56.2 of Total 16.7 8.3 31.2 56.2 Total Count 8 14 26 48 Expected Count 8.0 14.0 26.0 48.0 within BebanKerjaII 16.7 29.2 54.2 100.0 within KelelahanKerjaII 100.0 100.0 100.0 100.0 of Total 16.7 29.2 54.2 100.0 Symmetric Measures Value Asymp. Std. Error a Approx. T b Approx. Sig. Nominal by Nominal Phi .471 .031 Cramers V .333 .031 Contingency Coefficient .426 .031 Interval by Interval Pearsons R -.152 .120 -1.044 .302 c Ordinal by Ordinal Spearman Correlation -.097 .141 -.659 .513 c N of Valid Cases 48 a. Not assuming the null hypothesis. b. Using the asymptotic standard error assuming the null hypothesis. c. Based on normal approximation.

15. Hubungan Beban Kerja Fisik pada Shift III dengan Kelelahan Kerja Umum pada Shift III

16. Case Processing Summary

Cases Valid Missing Total N Percent N Percent N Percent BebanKerjaIII KelelahanKerjaIII 48 100.0 .0 48 100.0 BebanKerjaIII KelelahanKerjaIII Crosstabulation KelelahanKerjaIII Total Normal Ringan Sedang Berat BebanKerjaIII Normal Count 5 5 2 12 Expected Count 2.0 6.2 3.0 .8 12.0 within BebanKerjaIII 41.7 41.7 16.7 .0 100.0 within KelelahanKerjaIII 62.5 20.0 16.7 .0 25.0 of Total 10.4 10.4 4.2 .0 25.0 Ringan Count 1 8 8 17 Expected Count 2.8 8.9 4.2 1.1 17.0 within BebanKerjaIII 5.9 47.1 47.1 .0 100.0 within KelelahanKerjaIII 12.5 32.0 66.7 .0 35.4 of Total 2.1 16.7 16.7 .0 35.4 Sedang Count 1 8 1 10 Expected Count 1.7 5.2 2.5 .6 10.0 within BebanKerjaIII 10.0 80.0 .0 10.0 100.0 within KelelahanKerjaIII 12.5 32.0 .0 33.3 20.8 of Total 2.1 16.7 .0 2.1 20.8 Berat Count 1 4 2 2 9 Expected Count 1.5 4.7 2.2 .6 9.0 within BebanKerjaIII 11.1 44.4 22.2 22.2 100.0 within KelelahanKerjaIII 12.5 16.0 16.7 66.7 18.8 of Total 2.1 8.3 4.2 4.2 18.8 Total Count 8 25 12 3 48 Expected Count 8.0 25.0 12.0 3.0 48.0 within BebanKerjaIII 16.7 52.1 25.0 6.2 100.0 within KelelahanKerjaIII 100.0 100.0 100.0 100.0 100.0 of Total 16.7 52.1 25.0 6.2 100.0 Symmetric Measures Value Asymp. Std. Error a Approx. T b Approx. Sig. Nominal by Nominal Phi .644 .018 Cramers V .372 .018 Contingency Coefficient .542 .018 Interval by Interval Pearsons R .269 .144 1.892 .065 c Ordinal by Ordinal Spearman Correlation .230 .151 1.604 .115 c N of Valid Cases 48 a. Not assuming the null hypothesis. b. Using the asymptotic standard error assuming the null hypothesis. c. Based on normal approximation.

16. Perbedaan Beban Kerja Fisik antara Shift I, Shift II, Shift III

Dokumen yang terkait

Pengujian mesin pengering dengan bahan bakar biomassa untuk mengeringkan gabah tanpa blower

8 57 90

Perbedaan Kelelahan Kerja Pada Operator SPBU Antara Shift Pagi Dan Shift Malam Di SPBU 14203163 Tanjung Morawa Tahun 2009.

75 296 64

Bahan Bakar Dalam Pembuatan Dapur Crucible Untuk Peleburan Aluminium Berkapasitas 50kg Menggunakan Bahan Bakar Batu Bara

2 56 98

Model Goal Programming Untuk Menentukan Persediaan Optimal Bahan Bakar Minyak (BBM) Di PT. Pertamina Region I Medan

25 129 57

Penerapan Metode Theory Of Constraint untuk Mengoptimalkan Stasiun Kerja Bottleneck di PT Asahan Crumb Rubber

17 105 148

ANALISIS TEORI ANTRIAN PADA STASIUN PENGISIAN BAHAN BAKAR UMUM (SPBU) GAJAH MADA JEMBER

4 71 63

Kelelahan Kerja antara Shift I, Shift II, dan Shift III pada Operator Pompa Bensin (Studi pada Stasiun Pengisian Bahan Bakar untuk Umum (SPBU) di Kabupaten Jember) (The Occupational Fatigue among Shift I, Shift II, and Shift III of the Gasoline Operators

0 10 6

SKRIPSI Perbedaan Kelelahan Kerja Pada Tenaga Kerja Shift Pagi, Shift Siang dan Shift Malam di Bagian Process PT. Iskandar Indah Printing Textile Surakarta.

0 1 16

PERBEDAAN TINGKAT KELELAHAN KERJA PADA TENAGA KERJA ANTARA SHIFT PAGI, SHIFT SORE, DAN SHIFT Perbedaan Tingkat Kelelahan Kerja Pada Tenaga Kerja Antara Shift Pagi, Shift Sore, Dan Shift Malam Di Bagian Weaving Pt. Iskandar Indah Printing Textile Surakart

0 2 13

PERBEDAAN TINGKAT KELELAHAN KERJA PADA TENAGA KERJA ANTARA SHIFT PAGI, SHIFT SORE, DAN SHIFT Perbedaan Tingkat Kelelahan Kerja Pada Tenaga Kerja Antara Shift Pagi, Shift Sore, Dan Shift Malam Di Bagian Weaving Pt. Iskandar Indah Printing Textile Surakart

0 2 20