Symmetric Measures
Value Asymp. Std. Error
a
Approx. T
b
Approx. Sig. Nominal by Nominal
Phi .373
.669 Cramers V
.216 .669
Contingency Coefficient .350
.669 Interval by Interval
Pearsons R -.055
.142 -.372
.712
c
Ordinal by Ordinal Spearman Correlation
-.024 .145
-.164 .870
c
N of Valid Cases 48
a. Not assuming the null hypothesis. b. Using the asymptotic standard error assuming the null hypothesis.
c. Based on normal approximation.
4. Hubungan Status Gizi dengan Kelelahan Kerja Umum pada Shift I
5. Case Processing Summary
Cases Valid
Missing Total
N Percent
N Percent
N Percent
StatusGizi KelelahanKerjaI 48
100.0 .0
48 100.0
StatusGizi KelelahanKerjaI Crosstabulation
KelelahanKerjaI Total
Normal Ringan
Sedang Berat
StatusGizi Kekurangan BB
Count 5
1 6
Expected Count .2
2.2 2.6
.9 6.0
within StatusGizi .0
83.3 16.7
.0 100.0
within KelelahanKerjaI .0
27.8 4.8
.0 12.5
of Total .0
10.4 2.1
.0 12.5
Normal Count
2 12
14 3
31 Expected Count
1.3 11.6
13.6 4.5
31.0 within StatusGizi
6.5 38.7
45.2 9.7
100.0 within KelelahanKerjaI
100.0 66.7
66.7 42.9
64.6 of Total
4.2 25.0
29.2 6.2
64.6 Praobesberisiko
Count 1
6 4
11 Expected Count
.5 4.1
4.8 1.6
11.0 within StatusGizi
.0 9.1
54.5 36.4
100.0 within KelelahanKerjaI
.0 5.6
28.6 57.1
22.9 of Total
.0 2.1
12.5 8.3
22.9 Total
Count 2
18 21
7 48
Expected Count 2.0
18.0 21.0
7.0 48.0
within StatusGizi 4.2
37.5 43.8
14.6 100.0
within KelelahanKerjaI 100.0
100.0 100.0
100.0 100.0
of Total 4.2
37.5 43.8
14.6 100.0
Symmetric Measures
Value Asymp. Std. Error
a
Approx. T
b
Approx. Sig. Nominal by Nominal
Phi .523
.041 Cramers V
.370 .041
Contingency Coefficient .463
.041 Interval by Interval
Pearsons R .443
.097 3.349
.002
c
Ordinal by Ordinal Spearman Correlation
.463 .100
3.542 .001
c
N of Valid Cases 48
a. Not assuming the null hypothesis. b. Using the asymptotic standard error assuming the null hypothesis.
c. Based on normal approximation.
5. Hubungan Status Gizi dengan Kelelahan Kerja Umum pada Shift II
6. Case Processing Summary
Cases Valid
Missing Total
N Percent
N Percent
N Percent
StatusGizi KelelahanKerjaII 48
100.0 .0
48 100.0
StatusGizi KelelahanKerjaII Crosstabulation
KelelahanKerjaII Total
Ringan Sedang
Berat StatusGizi
Kekurangan BB Count
1 3
2 6
Expected Count 1.0
1.8 3.2
6.0 within StatusGizi
16.7 50.0
33.3 100.0
within KelelahanKerjaII 12.5
21.4 7.7
12.5 of Total
2.1 6.2
4.2 12.5
Normal Count
7 11
13 31
Expected Count 5.2
9.0 16.8
31.0 within StatusGizi
22.6 35.5
41.9 100.0
within KelelahanKerjaII 87.5
78.6 50.0
64.6 of Total
14.6 22.9
27.1 64.6
Praobesberisiko Count
11 11
Expected Count 1.8
3.2 6.0
11.0 within StatusGizi
.0 .0
100.0 100.0
within KelelahanKerjaII .0
.0 42.3
22.9 of Total
.0 .0
22.9 22.9
Total Count
8 14
26 48
Expected Count 8.0
14.0 26.0
48.0 within StatusGizi
16.7 29.2
54.2 100.0
within KelelahanKerjaII 100.0
100.0 100.0
100.0 of Total
16.7 29.2
54.2 100.0
Symmetric Measures
Value Asymp. Std. Error
a
Approx. T
b
Approx. Sig. Nominal by Nominal
Phi .513
.013 Cramers V
.362 .013
Contingency Coefficient .456
.013 Interval by Interval
Pearsons R .383
.100 2.816
.007
c
Ordinal by Ordinal Spearman Correlation
.427 .103
3.206 .002
c
N of Valid Cases 48
a. Not assuming the null hypothesis. b. Using the asymptotic standard error assuming the null hypothesis.
c. Based on normal approximation.
6. Hubungan Status Gizi dengan Kelelahan Kerja Umum pada Shift III