Tugas Akhir Perencanaan Struktur Mall 3 Lantai RAB
BAB 10 Rekapitulasi
251
10.3. Rekapitulasi Penulangan Pelat Lantai
TIPE PLAT
Berdasarkan perhitungan Penerapan di lapangan
Tulangan Lapangan Tulangan Tumpuan
Tulangan Lapangan Tulangan Tumpuan
Arah x mm
Arah y mm
Arah x mm
Arah y mm
Arah x mm
Arah y mm
Arah x mm
Arah y mm
A 10
–240 10
–240 10
–170 10
–240 10
–240 10
–240 10
–170 10
–240 B
10 –240
10 –240
10 –170
10 –240
10 –240
10 –240
10 –170
10 –240
C 10
–240 10
–240 10
–170 10
–240 10
–240 10
–240 10
–170 10
–240 D
10 –240
10 –240
10 –170
10 –240
10 –240
10 –240
10 –170
10 –240
10.4. Rekapitulasi Penulangan Balok Anak
No. As Balok
Anak Tulangan
Tumpuan Tulangan
Lapangan Tulangan Geser
Tumpuan Tulangan Geser
Lapamgan
1. A-
A’ 4 D 16 mm
3 D 16 mm Ø 8
– 190 mm Ø 8
– 250 mm 2.
B- B’
4 D 16 mm 3 D 16 mm
Ø 8 – 190 mm
Ø 8 – 250 mm
3. C-
C’ 4 D 16 mm
3 D 16 mm Ø 8
– 190 mm Ø 8
– 250 mm 4.
D- D’
4 D 16 mm 3 D 16 mm
Ø 8 – 190 mm
Ø 8 – 250 mm
5. E-
E’ 4 D 16 mm
3 D 16 mm Ø 8
– 190 mm Ø 8
– 250 mm
commit to user
Tugas Akhir Perencanaan Struktur Mall 3 Lantai RAB
BAB 10 Rekapitulasi
252
10.5. Rekapitulasi Penulangan Balok
10.6. Rekapitulasi Penulangan Kolom
No Jenis Kolom
Tulangan Lentur Tulangan
Geser 1.
Kolom 500 x 500
4 D 22
Ø 8 – 120 mm
10.7. Rekapitulasi Penulangan Pondasi
No. Jenis Pondasi
Tulangan Lentur Tulangan Geser
1. Pondasi P1 350 x 350
D 19 – 100 mm
Ø 10 – 200 mm
No. Jenis Balok
Tulangan Tumpuan
Tulangan Lapangan
Tulangan Geser
1.
Ring Balk 250 x 400
6 D 22 5 D 22
Ø 10 – 100
2.
Balok Memanjang 300 x 600
7 D 25 6 D 25
Ø 10 – 90
3.
Balok Melintang 350 x 600
8 D 25 4 D 25
Ø 10 – 400
5.
Sloof 200 x 350
5 D 19 2 D 19
Ø 10 – 260
commit to user
Tugas Akhir Perencanaan Struktur Mall 3 Lantai RAB
BAB 10 Rekapitulasi
253
10.8. Rekapitulasi Rencana Anggaran Biaya
NO. JENIS PEKERJAAN
JUMLAH HARGA Rp
A PEKERJAAN PERSIAPAN
205,928,496.8 B
PEKERJAAN TANAH 544,693,611.36
C PEKERJAAN PONDASI
124,415,991.38 D
PEKERJAAN BETON 4,248,812,965.00
E PEKERJAAN PASANGAN DINDING
239,555,711.40 F
PEKERJAAN KUSEN DAN PINTU 79,410,403.39
G PEKERJAAN ATAP
1,037,844,705,32 H
PEKERJAAN PLAFON 107,525,000.00
I PEKERJAAN KERAMIK
118,911,190.60 J
INSTALASI AIR 31,971,835.50
K INSTALASI LISTRIK
28,800,000.00 L
PEKERJAAN PENGECATAN 49,097,915.52
M PEKERJAAN LAIN - LAIN
200,000,000.00 JUMLAH
10,065,853,854.89
JASA KONSTRUKSI 10
1006585385
JUMLAH
11,072,439,240.37
PPN 10
1107243924
JUMLAH TOTAL 12,179,683,164.41
DIBULATKAN
Rp.
12,200,000,000.00
Terbilang : Dua belas milyar dua ratus juta rupiah
commit to user
Perencanaan Struktur Mall 3 Lantai RAB
BAB 11 Kesimpulan
254
BAB 11 KESIMPULAN