Appendix 5A Proposal draft reviews – subjects checklist

92 Appendix 5A Proposal draft reviews – subjects checklist

C Proposal draft ontr Proposal draft review subjects

review objective

act

1. Customer requirements have 1.1 The functional requirements.

rev

been clarified and documented 1.2 The customer’s operating environment (hardware, data communication system, operating system, etc.).

iew

1.3 The required interfaces with other software packages and instrument firmware, etc. 1.4 The performance requirements, including workloads as defined by the number of users and the characteristics of use. 1.5 The system’s reliability. 1.6 The system’s usability, as realized in the required training time for an operator to achieve the required productivity. The total of training and instruction efforts to be carried out by the supplier, including number of trainees and instructed stuff, locations and duration. 1.7 The number of software installations to be performed by the supplier, including locations. 1.8 The warranty period, extent of supplier liability, and method of providing support. 1.9 Proposals for maintenance service provision extending beyond the warranty period, and its conditions.

1.10 Completion of all the tender requirements, including information about the project team, certification and other documents, etc.

2. Alternative approaches for 2.1 Integrating reused and purchased software. carrying out the project have

2.2 Partners.

been examined 2.3 Customer’s undertaking to perform in-house development of some project tasks. 2.4 Subcontractors. 2.5 Adequate comparison of alternatives.

3. Formal aspects of the 3.1 A coordination and joint control committee, relationship between the

including its procedures. customer and the software

3.2 The list of documentation that has to be delivered. firm have been specified

3.3 The customer’s responsibilities re provision of facilities, data, and answers to the team’s inquiries. 3.4 Indication of the required phase approval by the customer and the approval procedure. 3.5 Customer participation (extent and procedures) in progress reviews, design reviews, and testing. 3.6 Procedures for handling customer change requests during development and maintenance stages, including method of costing introduction of changes. 3.7 Criteria for project completion, method of approval, and acceptance. 3.8 Procedures for handling customer complaints and problems detected after acceptance, including non-conformity to specifications detected after the warranty period.

Proposal draft

Proposal draft review subjects

review objective

Appendi

3.9 Conditions for granting bonuses for earlier project completion and penalties for delays.

3.10 Conditions to be complied with, including financial arrangements if part of or the entire project is

cancelled or temporarily halted upon the customer’s

initiative. (Issues include the expected damages to the firm if such actions are taken at various stages of

P ropos

the project.)

3.11 Service provision conditions during warranty period. 3.12 Software maintenance services and conditions,

including customer’s obligation to update his

version of the software as per supplier’s demands.

ra ft

4. Identification of 4.1 Risks re software modules or parts that require development risks

re

substantial acquisition of new professional

views

capabilities.

4.2 Risks re possibility of not obtaining needed hardware and software components according to schedule.

– subj

5. Adequate estimation of 5.1 Man-days required for each project phase and their resources and timetable

cost. Do the estimates include spare resources to

ects

cover for corrections following design reviews, tests, and so forth? 5.2 Do the estimates of man-days include the required

chec

work to prepare the required documentation, especially the documentation to be delivered to the customer?

kl

t is

5.3 Manpower resources needed to fulfill warranty

obligations and their cost. 5.4 Does the project schedule include time required for reviews, tests, etc. and making the required corrections?

6. Examination of the firm’s

6.1 Professional pool of knowledge.

capacity to perform the project 6.2 Availability of specialized staff (on schedule and in

the required numbers). 6.3 Availability of computer resources and other development (including testing) facilities (on schedule and in the required numbers). 6.4 Ability to cope with the customer requirements demanding use of special development tools or software development standards. 6.5 Warranty and long-term software maintenance service obligations.

7. Examination of customer’s 7.1 Financial capability, including contract payments capacity to fulfill his

and additional internal investments. commitments

7.2 Supply of all the facilities, data and responses to staff queries as they arise. 7.3 Recruitment and training of new and existing staff. 7.4 Capacity to complete all task commitments on time and to the requisite quality.

94 Proposal draft

Proposal draft review subjects

5 review objective

C ontr

8. Definition of partner and 8.1 Allocation of responsibility for completion of tasks subcontractor participation

by the partners, subcontractors, or the customer,

act

conditions including schedule and method of coordination. 8.2 Allocation of payments, including bonuses and

rev

penalties, among partners.

8.3 iew Subcontractor payment schedule, including bonuses

and penalties. 8.4 Quality assurance of work performed by subcontractors, partners and the customer, including participation in SQA activities (e.g., quality planning, reviews, tests).

9. Definition and protection of 9.1 Securing proprietary rights to software purchased software proprietary rights

from others. 9.2 Securing proprietary rights to data files purchased from others. 9.3 Securing proprietary rights to future reuse of software developed in custom-made projects. 9.4 Securing proprietary rights to software (including data files) developed by the firm (the supplier) and his subcontractors during the development period and while in regular use by the client.

Appendix 5B Contract draft review – subjects checklist

Contract draft Contract draft review subjects review objective

1. No unclarified issues remain 1.1 Supplier’s obligations as defined in the contract in the contract draft

draft and its appendices. 1.2 Customer’s obligations as defined in the contract draft and its appendices.

2. All understandings reached 2.1 Understandings about the project’s functional subsequent to the proposal

requirements.

are correctly documented 2.2 Understandings about financial issues, including payment schedule, bonuses, penalties, etc. 2.3 Understandings about the customer’s obligations. 2.4 Understandings about partner and subcontractor obligations, including the supplier’s agreements with external parties.

3. No “new” changes, additions, 3.1 The contract draft is complete; no contract section or or omissions have entered the

appendix is missing.

contract draft 3.2 No changes, omissions and additions have been entered into the agreed document, regarding the financial issues, the project schedule, or the customer and partners’ obligations.

ch a p t e r 6

Development and quality plans

Chapter outline

6.1 Development plan and quality plan objectives

6.2 Elements of the development plan

6.3 Elements of the quality plan 101

6.4 Development and quality plans for small projects and for internal projects

6.4.1 Development plans and quality plans for small projects 104

6.4.2 Development plans and quality plans for internal projects

105 Summary

106 Selected bibliography

108 Review questions

109 Topics for discussion

110 Appendix 6A: Software development risks and software

risk management 112 6A.1 Software development risks

112 6A.2 Risk management activities and measures

113 6A.3 The risk management process

Dokumen yang terkait

ALOKASI WAKTU KYAI DALAM MENINGKATKAN KUALITAS SUMBER DAYA MANUSIA DI YAYASAN KYAI SYARIFUDDIN LUMAJANG (Working Hours of Moeslem Foundation Head In Improving The Quality Of Human Resources In Kyai Syarifuddin Foundation Lumajang)

1 46 7

Anal isi s L e ve l Pe r tanyaan p ad a S oal Ce r ita d alam B u k u T e k s M at e m at ik a Pe n u n jang S MK Pr ogr a m Keahl ian T e k n ologi , Kese h at an , d an Pe r tani an Kelas X T e r b itan E r lan gga B e r d asarkan T ak s on om i S OL O

2 99 16

Analisis Pengaruh Banking Service Quality Dimensions (BSQ) Terhadap Kepuasan Nasabah PT. Bank Jatim Cabang Jember (Analysis Effect of Banking Service Quality Dimensions (BSQ) Toward Bank Customer Satisfaction on PT. Bank Jatim Branch Jember )

2 40 6

Analisis Perbedaan Kualitas Pelayanan KB antara Puskesmas Tekung dan Puskesmas Randuagung di Kabupaten Lumajang (Analysis Difference of Quality Family Planning Services inTekung and Randuagung Primary Health Care, Lumajang Regency)

0 12 8

Hubungan antara Kualitas Pelayanan Poli KIA/KB dengan Derajat Kesehatan Ibu dan Anak di 2 Puskesmas di Kabupaten Jember (The Correlation between Service Quality of Maternal and Child Healthcare/Family Planning Polyclinic and Degree of Maternal and Child H

0 18 6

I M P L E M E N T A S I P R O G R A M P E N Y A L U R A N B E R A S U N T U K K E L U A R G A M I S K I N ( R A S K I N ) D A L A M U P A Y A M E N I N G K A T K A N K E S E J A H T E R A A N M A S Y A R A K A T M I S K I N ( S t u d i D e s k r i p t i f

0 15 18

Mekanisme pengajuan klaim produk individu asuransi jiwa pada PT. MAA Life Assurance Syariah

6 85 87

Laporan Realisasi Anggaran N e r a c a C

0 11 4

HUBUNGAN DUKUNGAN KELUARGA DENGAN Quality of Life (QOL) PADA KEJADIAN STROKE Relationship Of Family Support With Quality of Life (QOL) Stroke Occurrence

0 1 7

PENGARUH KOSENTRASI SARI KUNYIT PUTIH (Curcuma zediaria) TERHADAP KUALITAS TELUR ASIN DITINJAU DARI AKTIVITAS ANTIOKSIDAN, TOTAL FENOL, KADAR PROTEIN DAN KADAR GARAM The Addition of White Turmeric (Curcuma zedoaria) Concentrated Base on Quality Antioxidan

1 1 8