BAB 2 PENGOLAHAN DATA
2.1 Tabel MRP
Berikut adalah tabel MRP dan DRP dari komponen-komponen pesawat mainan yang telah dibuat dan dihitung:
Tabel 2.1 Master Requirement Planning MRP Komponen Assembly 6 A6
Part No :
1 Description
: Assembly 6
BOM UOM :
Piece On Hand
: 75
Lead Time :
1 Order Policy
: Lot for Lot
Safety Stock :
112 Lot Size
: 97
Period Past Due
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Sept-16 Okt-16
Nov-16 Des-16
Gross Requirement 2169
1653 1546
1598 1290
1125 1105
1028 1014
965 958
1060
Scheduled Receipts PAB 1
-2094 -1516
-1413 -1459
-1100 -964
-905 -866
-813 -808
-796 -886
Net Requirement 2206
1628 1525
1571 1212
1076 1017
978 925
920 908
998
Planned Order Receipt
2231 1649
1552 1649
1261 1164
1067 1067
970 970
970 1067
Planned Order Release
2231 1649
1552 1649
1261 1164
1067 1067
970 970
970 1067
PAB 2 75
137 133
139 190
161 200
162 201
157 162
174 181
Keterangan: Jika order policy ditulis lot for lot maka tidak perlu dicari Distribution Resources Planning DRP.
Integrated Industrial Engineering Laboratory Industrial Engineering Department
6 BINUS University
Tabel 2.2 Master Requirement Planning MRP Komponen Subassembly 2
Part No :
16 Description
: Subassembly 2
BOM UOM :
Piece On Hand
: 54
Lead Time :
1 Order Policy
: Lot for Lot
Safety Stock :
170 Lot Size
: 36
Period Past Due
Jan- 16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug- 16
Sep-16 Okt-16
Nov- 16
Des-16 Gross
Requirement 2169
1653 1546
1598 1290
1125 1105
1028 1014
965 958
1060
Scheduled Receipts
PAB 1
-2115 -1464
-1354 -1404
-1110 -939
-928 -840
-810 -767
-753 -877
Net Requirement 2285
1634 1524
1574 1280
1109 1098
1010 980
937 923
1047
Planned Order Receipt
2304 1656
1548 1584
1296 1116
1116 1044
1008 972
936 1080
Planned Order Release
230 4
1656 1548
1584 1296
1116 1116
1044 1008
972 936
1080
PAB 2 54
189 192
194 180
186 177
188 204
198 205
183 203
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 7
Tabel 2.3 Master Requirement Planning MRP Komponen Assembly 5 A5
Part No :
2 Description
: Assembly 5
BOM UOM :
Piece On Hand
: 99
Lead Time :
1 Order Policy
: Lot for Lot
Safety Stock :
180 Lot Size
: 66
Period Past Due
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Nov-16
Gross Requirement
2231 1649
1552 1649
1261 1164
1067 1067
970 970
970 1067
Scheduled Receipts
PAB 1
-2132 -1405
-1307 -1438
-1049 -959
-838 -849
-763 -743
-789 -866
Net Requirement 2312
1585 1487
1618 1229
1139 1018
1029 943
923 969
1046
Planned Order Receipt
2376 1650
1518 1650
1254 1188
1056 1056
990 924
990 1056
Planned Order Release
2376 1650
1518 1650
1254 1188
1056 1056
990 924
990 1056
PAB 2 99
244 245
211 212
205 229
218 207
227 181
201 190
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 8
Tabel 2.4 Master Requirement Planning MRP Komponen Nose Cover NC
Part No :
15 Description
: Nose Cover
BOM UOM :
Piece On Hand
: 79
Lead Time :
2 Order Policy
: Least Unit Cost
Safety Stock :
58 Lot Size
: 30
Period Past Due
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-
16 Jun-
16 Jul-16
Aug-16 Sep-16
Okt-16 Nov-16
Gross Requirement
2231 1649
1552 1649
1261 1164
1067 1067
970 970
970 1067
Scheduled Receipts
2620 2551
PAB 1 -2152
-1581 1137
-512 -1203
-1077 -1004
-991 1640
670 -300
-1007
Net Requirement 2210
1639 570
1261 1135
1062 1049
358 1065
Planned Order Receipt
2220 1650
570 1290
1140 1080
1050 360
1080
Planned Order Release
2220 1650
570 1290
1140 1080
1050 360
1080
PAB 2 79
68 69
1137 58
87 63
76 59
1640 670
60 73
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 9
Tabel 2.5 Distribution Resources Planning DRP Metode Least Unit Cost dari Komponen Nose Cover NC
Period Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Sep-16 Okt-16
Nov-16 Demand
2220 1650
570 1290
1140 1080
1050 360
1080
Setup Cost k 100
Holding Cost h 16
Start Period 1: C1
0.05 Start Period 2:
C1 0,07
Start Period 4: C1
0,18 C2
6,85 STOP
C2 0,07
C2 11,16
STOP C3
8,27 STOP
Start Period 5: C1
0,08 Start Period 6:
C1 0,09
Start Period 7: C1
0,1 C2
7,55 STOP
C2 7,83
STOP C2
7,94 STOP
Start Period 8: C1
0,1 Start Period 11:
C1 0,28
Start Period 12: C1
0,1 C2
0,1 C2
12,07 STOP
C3 0,1
C4 12,33
STOP Order Policy
2220 1650
570 1290
1140 1080
1050 360
1080
Total Cost 900
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 10
Tabel 2.6 Master Requirement Planning MRP Komponen Sub-subassembly 1 SSA1
Part No :
17 Description
: Sub-subassembly 1
BOM UOM :
Piece On Hand
: 72
Lead Time :
1 Order Policy
: Lot for Lot
Safety Stock :
105 Lot Size
: 82
Period Past Due
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Nov-16
Gross Requirement
2304 1656
1548 1584
1296 1116
1116 1044
1008 972
936 1080
Scheduled Receipts
PAB 1
-2232 -1510
-1418 -1444
-1182 -986
-954 -932
-874 -862
-814 -910
Net Requirement 2337
1615 1523
1549 1287
1091 1059
1037 979
967 919
1015
Planned Order Receipt
2378 1640
1558 1558
1312 1148
1066 1066
984 984
984 1066
Planned Order Release
237 8
1640 1558
1558 1312
1148 1066
1066 984
984 984
1066
PAB 2 72
146 130
140 114
130 162
112 134
110 122
170 156
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 11
Tabel 2.7 Master Requirement Planning MRP Komponen Prop P
Part No : 20
Description :
Prop BOM UOM
: Piec
e
On Hand :
59 Lead Time
: 1
Order Policy :
Find the Optimal Solution
Safety Stock : 258
Lot Size :
250 Period
Past Due Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Sep-16 Okt-16
Nov-16 Gross Requirement
2304 1656
1548 1584
1296 1116
1116 1044
1008 972
936 1080
Scheduled Receipts 1465
PAB 1 -2245
-1151 -1199
182 -864
-730 -846
-640 -648
-620 -556
-636
Net Requirement 2503
1409 1457
76 1122
988 1104
898 906
878 814
894
Planned Order Receipt
2750 1500
1500 250
1250 1000
1250 1000
1000 1000
1000 1000
Planned Order Release
2750 1500
1500 250
1250 1000
1250 1000
1000 1000
1000 1000
PAB 2 59
505 349
301 432
386 270
404 360
352 380
444 364
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 12
Tabel 2.8 Distribution Resources Planning DRP Metode Silver-Meal Heuristic dari Komponen Prop P
Period Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Sep-16 Okt-16
Nov-16 Demand
2750 1500
1500 250
1250 1000
1250 1000
1000 1000
1000 1000
Setup Cost k 109
Holding Cost h 18
Start Period 1: C1
109 Start Period 2:
c1 109
Start Period 3: c1
109 C2
13554,5 STOP
c2 13554,5
STOP c2
2304.5 STOP
Start Period 4: C1
109 Start Period 5:
c1 109
Start Period 6: c1
109 C2
11304,5 STOP
c2 9054,5
STOP c2
11304.5 STOP
Start Period 7: C1
109 Start Period 8:
c1 109
Start Period 9: c1
109 C2
9054,5 STOP
c2 9054,5
STOP c2
9054.5 STOP
Start Period 10: C1
109 Start Period 11:
c1 109
Start Period 12: c1
109 STOP
C2 9054,5
STOP c2
9054,5 STOP
Order Policy 2750
1500 1500
250 1250
1000 1250
1000 1000
1000 1000
1000
Total Cost 1.308
Tabel 2.9 Master Requirement Planning MRP Komponen Assembly 4 A4
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 13
Part No : 3
Description :
Assembly 4 BOM UOM
: Piece On Hand
: 75
Lead Time : 1
Order Policy :
Lot for Lot Safety Stock
: 109 Lot Size
: 79
Period Past Due
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei- 16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Gross
Requirement 2376
1650 1518
1650 1254
1188 1056
1056 990
924 990
1056
Scheduled Receipts
PAB 1
-2301 -1502
-1361 -1510
-1105 -1029
-900 -929
-813 -789
-831 -939
Net Requirement 2410
1611 1470
1619 1214
1138 1009
1038 922
898 940
1048
Planned Order Receipt
2449 1659
1501 1659
1264 1185
1027 1106
948 948
948 1106
Planned Order Release
2449 1659
1501 1659
1264 1185
1027 1106
948 948
948 1106
PAB 2 75
148 157
140 149
159 156
127 177
135 159
117 167
Tabel 2.10 Master Requirement Planning MRP Komponen Front Wheel FW
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 14
Part No :
14 Description
: Front Wheel
BOM UOM :
Piece s
On Hand :
233 Lead Time
: 2
Order Policy :
Least Unit Cost Safety Stock
: 165
Lot Size :
40 Period
Past Due Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Gross Requirement
4752 3300
3036 3300
2508 2376
2112 2112
1980 1848
1980 2112
Scheduled Receipts 1145
PAB 1 -4519
-3099 -2855
-1970 -2318
-2174 -1926
-1918 -1778
-1666 -1806
-1918
Net Requirement 4684
3264 3020
2135 2483
2339 2091
2083 1943
1831 1971
2083
Planned Order Receipt
4720 3280
3040 2160
2520 2360
2120 2120
1960 1840
2000 2120
Planned Order Release
4720 3280
3040 2160
2520 2360
2120 2120
1960 1840
2000 2120
PAB 2 233
201 181
185 190
202 186
194 202
182 174
194 202
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 15
Tabel 2.11 Distribution Resources Planning DRP Metode Least Unit Cost dari Komponen Front Wheel FW
Period Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Demand
4720 3280
3040 2160
2520 2360
2120 2120
1960 1840
2000 2120
Setup Cost k 150
Holding Cost h 12
Start Period 1: C1
0,04 Start Period 2:
C1 0,05
Start Period 3: C1
0,05 C2
4,94 STOP
C2 5,8
STOP C2
5,02 STOP
Start Period 4: C1
0,07 Start Period 5:
C1 0,06
Start Period 6: C1
0,07 C2
6,5 STOP
C2 5,84
STOP C2
5,72 STOP
Start Period 7: C1
0,08 Start Period 8:
C1 0,08
Start Period 9: C1
0,08 C2
6,04 STOP
C2 5,81
STOP C2
5,85 STOP
Start Period 10: C1
0,09 Start Period 11:
C1 0,08
Start Period 12: C1
0,08 C2
6,29 STOP
C2 6,22
STOP Order Policy
4720 3280
3040 2160
2520 2360
2120 2120
1960 1840
2000 2120
Total Cost 1.800
Tabel 2.12 Master Requirement Planning MRP Komponen Axle A
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 16
Part No :
19 Description
: Axle
BOM UOM :
Piec e
On Hand :
184 Lead Time
: 2
Order Policy :
Silver-Meal Heuristic Safety Stock
: 78
Lot Size :
500 Period
Past Due Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Gross
Requirement 2378
1640 1558
1558 1312
1148 1066
1066 984
984 984
1066
Scheduled Receipts
532
PAB 1 -2194
-1334 -1392
-1450 -762
-910 -444
-510 -494
-478 -462
-528
Net Requirement 2272
1412 1470
1528 840
988 522
588 572
556 540
606
Planned Order Receipt
2500 1500
1500 2000
1000 1000
1000 1000
1000 1000
1000 1000
Planned Order Release
2500 1500
1500 2000
1000 1000
1000 1000
1000 1000
1000 1000
PAB 2 184
306 166
108 550
238 90
556 490
506 522
538 472
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 17
Tabel 2.13 Distribution Resources Planning DRP Metode Silver-Meal Heuristic dari Komponen Axle A
Period Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Demand
2500 1500
1500 2000
1000 1000
1000 1000
1000 1000
1000 1000
Setup Costk 264
Holding Costh 30
Start Period 1: C1
264 Start Period 2:
C 1 264
Start Period 3: C1
264 C2
22632 STOP
C2 22632
STOP C2
30132 STOP
Start Period 4: C1
264 Start Period 5:
C1 264
Start Period 6: C1
264 C2
15132 STOP
C2 15132
STOP C2
15132 STOP
Start Period 7: C1
264 Start Period 8:
C1 264
Start Period 9: C1
264 C2
15132 STOP
C2 15132
STOP C2
15132 STOP
Start Period 10: C1
264 Start Period 11:
C1 264
Start Period 12: C1
264 C2
15132 STOP
C2 15132
STOP Order Policy
2500 1500
1500 2000
1000 1000
1000 1000
1000 1000
1000 1000
Total Cost 3.168
Tabel 2.14 Master Requirement Planning MRP Komponen Engine E
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 18
Part No : 18
Description :
Engine BOM UOM
: Piec
e
On Hand :
206 Lead Time
: 1 Order Policy
: Part Period Balancing
Safety Stock : 200
Lot Size :
50 Period
Past Due Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Gross Requirement
2378 1640
1558 1558
1312 1148
1066 1066
984 984
984 1066
Scheduled Receipts 2135
1322
PAB 1 -2172
-1412 -1320
-1328 -1090
-938 1281
1537 553
-431 -765
-831
Net Requirement 2372
1612 1520
1528 1290
1138 631
965 1031
Planned Order Receipt
2400 1650
1550 1550
1300 1150
650 1000
1050
Planned Order Release
2400 1650
1550 1550
1300 1150
650 1000
1050
PAB 2 206
228 238
230 222
210 212
1281 1537
553 219
235 219
Tabel 2.15 Distribution Resources Planning DRP Metode Part Period Balancing dari Komponen Engine E
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 19
Period Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Sep-16
Okt-16 Demand
2400 1650
1550 1550
1300 1150
650 1000
1050
Setup Costk 144
Holding Costh 49
Start Period 1: C1
Start Period 2: C1
Start Period 3: C1
C2 80850
STOP C2
75950 STOP
C2 75950
STOP Start Period 4:
C1 Start Period 5:
C1 Start Period 6:
C1 C2
63700 STOP
C2 56350
STOP C2
C3 C4
C5 31850
STOP Start Period 10:
C1 Start Period 11:
C1 Start Period 12:
C1 C2
49000 STOP
C2 51450
STOP Order Policy
2400 1650
1550 1550
1300 1150
650 1000
1050
Total Cost 1.296
Tabel 2.16 Master Requirement Planning MRP Komponen Assembly 3 A3
Part No : 4
Description :
Assembly 3
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 20
BOM UOM : Piece
On Hand :
99 Lead Time
: 1 Order Policy
: Lot for Lot
Safety Stock : 172
Lot Size :
93 Period
Past Due Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-
16 Sep-16
Gross Requirement
2449 1659
1501 1659
1264 1185
1027 1106
948 948
948 1106
Scheduled Receipts
PAB 1
-2350 -1405
-1325 -1403
-1086 -969
-787 -870
-702 -720
-738 -914
Net Requirement 2522
1577 1497
1575 1258
1141 959
1042 874
892 910
1086
Planned Order Receipt
2604 1581
1581 1581
1302 1209
1023 1116
930 930
930 1116
Planned Order Release
2604 1581
1581 1581
1302 1209
1023 1116
930 930
930 1116
PAB 2 99
254 176
256 178
216 240
236 246
228 210
192 202
Tabel 2.17 Master Requirement Planning MRP Komponen Subassembly 1 SA1
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 21
Part No : 11
Description :
Subassembly 1 BOM UOM
: Piece On Hand
: 80
Lead Time : 1
Order Policy :
Lot for Lot Safety Stock
: 159 Lot Size
: 58
Period Past Due
Okt-15 Nov-
15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-
16 Sep-16
Gross Requirement
2449 1659
1501 1659
1264 1185
1027 1106
948 948
948 1106
Scheduled Receipts
PAB 1
-2369 -1476
-1295 -1446
-1086 -995
-862 -924
-770 -732
-752 -930
Net Requirement 2528
1635 1454
1605 1245
1154 1021
1083 929
891 911
1089
Planned Order Receipt
2552 1682
1508 1624
1276 1160
1044 1102
986 928
928 1102
Planned Order Release
255 2
1682 1508
1624 1276
1160 1044
1102 986
928 928
1102
PAB 2 80
183 206
213 178
190 165
182 178
216 196
176 172
Tabel 2.18 Master Requirement Planning MRP Komponen Assembly 2 A2
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 22
Part No : 5
Description :
Assembly 2 BOM UOM
: Piece On Hand
: 165
Lead Time : 1
Order Policy :
Lot for Lot Safety Stock
: 174 Lot Size
: 12
Period Past Due
Sep-15 Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Gross Requirement 2604
1581 1581
1581 1302
1209 1023
1116 930
930 930
1116
Scheduled Receipts PAB 1
-2439 -1404
-1401 -1398
-1128 -1029
-840 -936
-750 -756
-750 -942
Net Requirement 2613
1578 1575
1572 1302
1203 1014
1110 924
930 924
1116
Planned Order Receipt
2616 1584
1584 1572
1308 1212
1020 1116
924 936
924 1116
Planned Order Release
2616 1584
1584 1572
1308 1212
1020 1116
924 936
924 1116
PAB 2 165
177 180
183 174
180 183
180 180
174 180
174 174
Tabel 2.19 Master Requirement Planning MRP Komponen Tail Rudder TR
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 23
Part No : 10
Description :
Tail Rudder BOM UOM
: Piece On Hand
: 78
Lead Time : 2
Order Policy :
Find the Optimal Solution Safety Stock
: 78 Lot Size
: 30
Period Past Due
Sep-15 Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Gross Requirement 2604
1581 1581
1581 1302
1209 1023
1116 930
930 930
1116
Scheduled Receipts 656
PAB 1 -2526
-1497 -1488
-1479 -1221
-1110 -933
-373 -823
-823 -823
-1009
Net Requirement 2604
1575 1566
1557 1299
1188 1011
451 901
901 901
1087
Planned Order Receipt
2610 1590
1590 1560
1320 1200
1020 480
930 930
930 1110
Planned Order Release
2610 1590 1590
1560 1320
1200 1020
480 930
930 930
1110
PAB 2 78
84 93
102 81
99 90
87 107
107 107
107 101
Tabel 2.20 Distribution Resources Planning DRP Metode Silver-Meal Heuristic dari Komponen Tail Rudder TR
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 24
Period Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Demand
2610 1590
1590 1560
1320 1200
1020 480
930 930
930 1110
Setup Costk 154
Holding Costh 20
Start Period 1: C1
154 Start Period 2:
C 1 154
Start Period 3: c1
154 C2
15977 STOP
C2 15977
STOP c2
15677 STOP
Start Period 4: C1
154 Start Period 5:
C1 154
Start Period 6: c1
154 C2
13277 STOP
C2 12077
STOP c2
10277 STOP
Start Period 7: C1
154 Start Period 8:
C1 154
Start Period 9: c1
154 C2
4877 STOP
C2 9377
STOP c2
9377 STOP
Start Period 10: C1
154 Start Period 11:
C1 154
Start Period 12: c1
154 C2
9377 STOP
C2 11177
STOP Order Policy
2610 1590
1590 1560
1320 1200
1020 480
930 930
930 1110
Total Cost 1.848
Tabel 2.21 Master Requirement Planning MRP Komponen Rear Wheel RW
Part No : 12
Description :
Rear Wheel
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 25
BOM UOM : Piece
On Hand :
57 Lead Time
: 1 Order Policy
: Wagner-Whitin Method
Safety Stock : 200
Lot Size :
10 Period
Past Due Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Gross Requirement
2552 1682
1508 1624
1276 1160
1044 1102
986 928
928 1102
Scheduled Receipts 2056
PAB 1 -2495
-1477 -1305
-1419 -1075
-955 -839
-901 -777
-725 1333
231
Net Requirement 2695
1677 1505
1619 1275
1155 1039
1101 977
925
Planned Order Receipt
2700 1680
1510 1620
1280 1160
1040 1110
980 930
Planned Order Release
2700 1680
1510 1620
1280 1160
1040 1110
980 930
PAB 2 57
205 203
205 201
205 205
201 209
203 205
1333 231
Tabel 2.22 Distribution Resources Planning DRP Metode Wagner-Whitin dari Komponen Rear Wheel RW
Period Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Setup Cost
k Holding Cost
h
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 26
Demand 2700
1680 1510
1620 1280
1160 1040
1110 980
930 133
15
1 133
25333 70633
143533 220333
307333 400933
517483 635083
760633 760633
760633
2 133
45433 118333
195133 282133
375733 492283
609883 735433
735433 735433
3 133
73033 149833
236833 330433
446983 564583
690133 690133
690133
4 133
76933 163933
257533 374083
491683 617233
617233 617233
5 133
87133 180733
297283 414883
540433 540433
540433
6 133
93733 210283
327883 453433
453433 453433
7 133
116683 234283
359833 359833
359833
8 133
117733 243283
243283 243283
9 133
125683 125683
125683
10 133
133 133
11 133
133
12 133
Tabel 2.22 Distribution Resources Planning DRP Metode Wagner-Whitin dari Komponen Rear Wheel RW lanjutan
1 2
3 4
5 6
7 8
9 10
11 12
1 133
25333 70633
143533 220333
307333 400933
517483 635083
760633 760633
760633
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 27
2 266
45566 118466
195266 282266
375866 492416
610016 735566
735566 735566
3 399
73299 150099
237099 330699
447249 564849
690399 690399
690399
4 532
77332 164332
257932 374482
492082 617632
617632 617632
5 665
87665 181265
297815 415415
540965 540965
540965
6 798
94398 210948
328548 454098
454098 454098
7 931
117481 235081
360631 360631
360631
8 1064
118664 244214
244214 244214
9 1197
126747 126747
126747
10 1330
1330 1330
11 1463
1463
12 1596
Min 133
266 399
532 665
798 931
1064 1197
1330 1463
1596
Total Cost 1.596
Tabel 2.23 Master Requirement Planning MRP Komponen Rear Wheel Mount RM
Part No : 13
Description :
Rear Wheel Mount BOM UOM
: Piece On Hand
: 25
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 28
Lead Time : 1
Order Policy :
Least Unit Cost Safety Stock
: 150 Lot Size
: 10
Period Past Due
Sep-15 Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Aug-16
Gross Requirement 2552
1682 1508
1624 1276
1160 1044
1102 986
928 928
1102
Scheduled Receipts 1568
PAB 1 -2527
-1529 -1357
-1471 -1117
-1007 -891
-943 -829
791 -137
-949
Net Requirement 2677
1679 1507
1621 1267
1157 1041
1093 979
287 1099
Planned Order Receipt
2680 1680
1510 1630
1270 1160
1050 1100
980 290
1100
Planned Order Release
2680 1680
1510 1630
1270 1160
1050 1100
980 290
1100
PAB 2 25
153 151
153 159
153 153
159 157
151 791
153 151
Tabel 2.24 Distribution Resources Planning DRP Metode Least Unit Cost dari Komponen Rear Wheel Mount RM
Period Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Aug-16 Demand
2680 1680
1510 1630
1270 1160
1050 1100
980 290
1100
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 29
Setup Cost k 100
Holding Cost h 19
Start Period 1: C1
0,04 Start Period 2:
C1 0,06
Start Period 3: C1
0,07 C2
7,35 STOP
C2 9,03
STOP C2
9,9 STOP
Start Period 4: C1
0,07 Start Period 5:
C1 0,08
Start Period 6: C1
0,09 C2
8,36 STOP
C2 9,12
STOP C2
9,08 STOP
Start Period 7: C1
0,1 Start Period 8:
C1 0,1
Start Period 9: C1
0,11 C2
9,77 STOP
C2 9
STOP C2
0,11 C3
4,42 STOP
Start Period 11: C1
0,35 Start Period 12:
C1 0,1
C2 15,11
STOP Order Policy
2680 1680
1510 1630
1270 1160
1050 1100
980 290
1100
Total Cost 1.100
Tabel 2.25 Master Requirement Planning MRP Komponen Assembly 1 A1
Part No : 6
Description :
Assembly 1 BOM UOM
: Piece On Hand
: 200
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 30
Lead Time : 1
Order Policy :
Lot for Lot Safety Stock
: 122 Lot Size
: 46
Period Past Due
Aug-15 Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Gross Requirement 2616
1584 1584
1572 1308
1212 1020
1116 924
936 924
1116
Scheduled Receipts PAB 1
-2416 -1424
-1444 -1406
-1150 -1074
-898 -956
-776 -792
-796 -992
Net Requirement 2538
1546 1566
1528 1272
1196 1020
1078 898
914 918
1114
Planned Order Receipt
2576 1564
1610 1564
1288 1196
1058 1104
920 920
920 1150
Planned Order Release
257 6
1564 1610
1564 1288
1196 1058
1104 920
920 920
1150
PAB 2 200
160 140
166 158
138 122
160 148
144 128
124 158
Tabel 2.26 Master Requirement Planning MRP Komponen Rear Flap RF
Part No : 9
Description :
Rear Flap BOM UOM
: Pieces On Hand
: 169
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 31
Lead Time : 2
Order Policy :
Silver-Meal Heuristic Safety Stock
: 200 Lot Size
: 20
Period Past Due
Aug-15 Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Jul-16
Gross Requirement 5232
3168 3168
3144 2616
2424 2040
2232 1848
1872 1848
2232
Scheduled Receipts 2050
815
PAB 1 -5063
-2951 -2959
-2943 -2399
-173 -1833
-2025 -1633
-850 -1638
-2030
Net Requirement 5263
3151 3159
3143 2599
373 2033
2225 1833
1050 1838
2230
Planned Order Receipt
5280 3160
3160 3160
2600 380
2040 2240
1840 1060
1840 2240
Planned Order Release
5280 3160
3160 3160
2600 380
2040 2240
1840 1060
1840 2240
PAB 2 169
217 209
201 217
201 207
207 215
207 210
202 210
Tabel 2.27 Distribution Resources Planning DRP Metode Silver-Meal Heuristic dari Komponen Rear Flap RF
Period Aug-15
Sep-15 Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Jul-16 Demand
5280 3160
3160 3160
2600 380
2040 2240
1840 1060
1840 2240
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 32
Setup Cost k 99
Holding Cost h 22
Start Period 1: C1
99 Start Period 2:
C1 99
Start Period 3: C1
99 C2
34809.,5 STOP
C2 34809,5
STOP C2
34809,5 STOP
Start Period 4: C1
99 Start Period 5:
C1 99
Start Period 6: C1
99 C2
28649,5 STOP
C2 4229,5
STOP C2
22489,5 STOP
Start Period 7: C1
99 Start Period 8:
C1 99
Start Period 9: C1
99 C2
24689,5 STOP
C2 20289,5
STOP C2
11709,5 STOP
Start Period 10: C1
99 Start Period 11:
C1 99
Start Period 12: C1
99 C2
20289,5 STOP
C2 24689,5
STOP Order Policy
5280 3160
3160 3160
2600 2440
2040 2220
1860 1860
1860 2220
Total Cost 1.188
Tabel 2.28 Master Requirement Planning MRP Komponen Main Body MB
Part No : 7
Descriptio n
: Main Body
BOM UOM : Piece
On Hand :
56
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 33
Lead Time : 1
Order Policy :
Part Period Balancing Safety Stock
: 111 Lot Size
: 1
Period Past Due
Jul-15 Aug-15
Sep-15 Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Gross Requirement 2576
1564 1610
1564 1288
1196 1058
1104 920
920 920
1150
Scheduled Receipts PAB 1
-2520 -1453
-1499 -1453
-1177 -1085
-947 -993
-809 -809
-809 -1039
Net Requirement 2631
1564 1610
1564 1288
1196 1058
1104 920
920 920
1150
Planned Order Receipt
2631 1564
1610 1564
1288 1196
1058 1104
920 920
920 1150
Planned Order Release
2631 1564
1610 1564
1288 1196
1058 1104
920 920
920 1150
PAB 2 56
111 111
111 111
111 111
111 111
111 111
111 111
Tabel 2.29 Distribution Resources Planning DRP Metode Part Period Balancing dari Komponen Main Body MB
Period Jul-15
Aug-15 Sep-15
Okt-15 Nov-15
Des-15 Jan-16
Feb-16 Mar-16
Apr-16 Mei-16
Jun-16 Demand
2631 1564
1610 1564
1288 1196
1058 1104
920 920
920 1150
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 34
Setup Cost k 200
Holding Cost h 36
Start Period 1: C1
Start Period 2: C1
Start Period 3: C1
C2 56304
STOP C2
57960 STOP
C2 56304
STOP Start Period 4:
C1 Start Period 5:
C1 Start Period 6:
C1 C2
46368 STOP
C2 43056
STOP C2
38088 STOP
Start Period 7: C1
Start Period 8: C1
Start Period 9: C1
C2 39744
STOP C2
33120 STOP
C2 33120
STOP Start Period 10:
C1 Start Period 11:
C1 Start Period 12:
C1 C2
33120 STOP
C2 41400
STOP C2
Demand 2631
1564 1610
1564 1288
1196 1058
1104 920
920 920
1150
Total Cost 2.400
Tabel 2.30 Master Requirement Planning MRP Komponen Front Flap FF
Part No : 8
Description :
Front Flap BOM UOM
: Pieces On Hand
: 300
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 35
Lead Time : 1
Order Policy :
Find the Optimal Solution Safety Stock
: 350 Lot Size
: 100
Period Past Due
Jul-15 Aug-15
Sep-15 Okt-15
Nov-15 Des-15
Jan-16 Feb-16
Mar-16 Apr-16
Mei-16 Jun-16
Gross Requirement 10304
6256 6440
6256 5152
4784 4232
4416 3680
3680 3680
4600
Scheduled Receipts 862
PAB 1 -10004
-5860 -6000
-5856 -4708
-4392 -3824
-4040 -3320
-2438 -3318
-4218
Net Requirement 10354
6210 6350
6206 5058
4742 4174
4390 3670
2788 3668
4568
Planned Order Receipt
10400 6300
6400 6300
5100 4800
4200 4400
3700 2800
3700 4600
Planned Order Release
10400 6300
6400 6300
5100 4800
4200 4400
3700 2800
3700 4600
PAB 2 300
396 440
400 444
392 408
376 360
380 362
382 382
Tabel 2.31 Distribution Resources Planning DRP Metode Silver-Meal Heuristic dari Komponen Front Flap FF
Period Jul-15
Aug-15 Sep-15
Oct-15 Nov-15
Dec-15 Jan-16
Feb-16 Mar-16
Apr-16 May-
16 Jun-16
Demand 10400
6300 6400
6300 5100
4800 4200
4400 3700
2800 3700
4600
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 36
Setup Costk 163
Holding Costh 24
Start Period 1: C1
163 Start Period 2:
C1 163
Start Period 3: C1
163 C2
75681,5 STOP
C2 76881,5
STOP C2
75681,5 STOP
Start Period 4: C1
163 Start Period 5:
C1 163
Start Period 6: C1
163 C2
61281,5 STOP
C2 57681,5
STOP C2
50481,5 STOP
Start Period 7: C1
163 Start Period 8:
C1 163
Start Period 9: C1
163 C2
52881,5 STOP
C2 44481,5
STOP C2
33681,5 STOP
Start Period 10: C1
163 Start Period 11:
C1 163
Start Period 12: C1
163 STOP
C2 44481,5
STOP C2
55281,5 STOP
Order Policy 10400
6300 6400
6300 5100
4800 4200
4400 3700
2800 3700
4600
Total Cost 1,956
Integrated Industrial Engineering Laboratory Industrial Engineering Department
BINUS University 37
Production Operation Analysis ISYE6101
2.2 Contoh Perhitungan MRP