An occupational health and safety plan is documented, effectively All staff, workers, smallholders and contractors are appropriately trained. Aspects of plantation and mill management, including replanting, that have

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 14.05 Issue 00 Rev. 1 15of 34 4.6.9 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 27 point 4.6.9 Conclusion : conform 4.6.10 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 28 point 4.6.10 Conclusion : conform 4.6.11 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 28 point 4.6.11 The company has conducted medical check up as reported by HIPERKES Provinsi Kalimantan Barat on 15 December 2015. There were indications that some workers affected by chemical and experience hearing deficiency and the company has made some action plans to follow up the result of medical check up. The result of action plan will be evaluated again in the next surveillance audit Conclusion : based on documented corrective action proposed by Company to this major nonconformity, the status of this criterium is degraded to observation as a point of attention for next surveillance audit. Conclusion : Observation 4.6.12 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 28 point 4.6.12 Conclusion : conform

4.7 An occupational health and safety plan is documented, effectively

communicated and implemented 4.7.1 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 28 point 4.7.1 Conclusion : conform 4.7.2 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 29 point 4.7.2 Conclusion : conform SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 14.05 Issue 00 Rev. 1 16of 34 4.7.3 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 29 point 4.7.3 Conclusion : conform 4.7.4 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 29 point 4.7.4 Conclusion : conform 4.7.5 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 30 point 4.7.5 Conclusion : conform 4.7.6 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 30 point 4.7.6 Conclusion : conform 4.7.7 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 30 point 4.7.5 Conclusion : conform

4.8 All staff, workers, smallholders and contractors are appropriately trained.

4.8.1 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 30 point 4.8.1 Conclusion : conform 4.8.2 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 31 point 4.8.2 Conclusion : conform 5 ENVIRONMENTAL RESPONSIBILITY AND CONSERVATION OF NATURAL RESOURCES AND BIODIVERSITY

5.1 Aspects of plantation and mill management, including replanting, that have

environmental impacts are identified, and plans to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate 5.1.1 SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES Sucofindo ICS FRM 14.05 Issue 00 Rev. 1 17of 34 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 31 point 5.1.1 Conclusion : conform 5.1.2 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 31 point 5.1.2 Conclusion : conform 5.1.3 See SGS report 3932 – ID – PT HSL – Paku Juang – GP 7003A page 32 point 5.1.3 Conclusion : conform

5.2 The status of rare, threatened or endangered species and high conservation