TECHNICAL ASSISTANCE FOR SUPPORT OF THE PROJECT IVANAGE[/ENT
UNIT
CORE TEAM CONSULTANTS (CTC}
QUARTERLY REPORT
For the First (1't) Quarter of the year 2016
Period : January 201G to March 2016
T
I
I
I
MINISTRY OF PUBLIC WORKS & HOUSING
DIRECTORATE GENERAT OF HIGHWAYS
DIRECTORATE OF PLANNING
Core Team Consultant
for
Western Indonesla National Roads Improvement pFject
(WINRIp)
IBRD Loan t{o.8043_ID
Our Ref.No.
I
I
I
t
I
I
I
I
I
I
I
I
I
t
I
Directorate General of Highways, MpWH
Jt. Patrmura 20 Kebayoran Baru
Jakarta Selatan
Indonesia
Attention :
lr. Agusta E. Slnulingga, M.T
Offfcer in charge pMU WtNRtp
Subject
In compliance with ltem No 3 (List of Documenis
To Be Delivered) of our consultancy contract,
we submit
Progress neport coverint tn" nlfi"ici".rt"r
of the year 2016 (January, February,
[,T.t"X'tNo|[j.n"tnerlv
6 reproduced and submitted in twenty (20) copies
for distribution to all concerned authori.es.
cr
3:?#3"t3r:inilffimment additional intrmation that need to be incorporatod in the Reporr, prease
This report
Team
Cc:
1.
ERA
4.
), Kementrian Keuanaan
, Dit.Jen Bina Marqa
Bina Marga
5.
6
7.
ina Marga
8.
Marga
I
U-PERA
10.
Kementrian Dalam Neoerl
11.
r Negeri
1a
IJ
14.
15.
16.
17.
18. Yongma Engineering Co, Ltd
19. r-/.r. Epadascon permata Engineering
20.
Pl
FIJC
PERENTJA|,IA DJAiA in subconsultancy
with ei
elaksana Witayah I, DJBM
etaksana Wilayah l, DJBM
etaksana Wilayah l, DJBI\,4
dan Petaksanaan pengendalian pHLN
Consultant
-
yongrna tngineeringco.
Ltd and
EpadEscon permara I ngineering consultanl
=tpT.
(ebayoran Baru, Jakart3
Setatan,
CTC Office: Jl. Ciniru Vtt No. 25,
Phane /Fax: (021) 7229823
12180
tB
E
I oI (JE
o
IJ
J
I
I
{
7
I
I
,t
{
l,;.i
I
trl
a
o
E
IG
t
I
t
I
I
I
t
T
I
..
t
-{
+ J
' t,
F
lF .J
z
-1
a--
';2
5?
:
fr.r.
4
Si
-1
'El
t
i,s
ts
s
1
U)
J
Tq
a
a<
v,7
Et
i
,1
rfia
F
I
I
I
I
2016 Quarterly Progress Report
1* Quarter : -lanuary-February-March
Table Of Contents
Executive
1.1
Current lmplementation
Situation
.........................
1
I
l
t
I
I
I
I
t
t
I
I
I
t
I
I
2
General
4
Road Safety Audit
5
............,..,.... 5
........,,,..............29
I
I
I
t
I
I
li
I
I
t
I
I
l'
I
I
I
I
t
l
2016 Quarterly progress Report
l'tQuarter : January-February-l4arch
ANNEXES
Annex P-l
Package No. 1 (Biha
Annex P-2
Package No. 2 (Pd. Sawah
Annex
Package No. 3 (Manggopoh
P-3
-
Krui)
-
Sp. Empat)
-
pd. Sawah)
Annex P-4
Package No.4 (tpuh
Annex P-5
Package No. 5 (Sp. Rampa
Annex P-6
Package No. 6 (Ps.
Annex P-7
Package No. 7 (lndrapura
-
Annex P-11
Package No. 11 (Bantal
Mukomuko)
Annex P-13
Package No. 13 (Sp. Rukis
- Tj. Kemuning)
Annex P-15
Package No. 15 (Sibolea
Bts. Tapsel)
Annex P-17
Package No. 17 (Sp. Gunung Kemala
Annex P-19
Package No. 19 (Lais
-
Bantal)
-
poriaha)
pedati- Kerkap)
-
-
-
Tapan)
Bintunan)
-
pugung Tampak)
T
I
I
I
t
I
I
t
I
I
I
I
I
I
t
I
I
I
I
2016 Quarterly Progress Report
1't Quarter : January-February-March
APPENDICES
Appendix
1
:
Disbursement and Expenditures Status
Appendix
2
:
Report At The End ofThe euarter (March 2016)
Appendix
3
:
Detailed Summary of the Project Cost Monitoring
Appendix 5
Procurement Plan for Consulting Services
Appendix 6
list of Names of Community Representative Observers
Appendix 7
Anti Corruption Action Plan (ACAp)
(CRO)
Activity Progress of Community Representative Observers (CRO)
Appendix 8
list of Appointed Third Party Monitors (TpM)
Appendix 9
Progress of Third
Appendix 10
Complaints Handling Mechanism System (CHS)
Appendix 11
Work Activities On Publication/Disclosure
Appendix 12
Environmental Safeguards
Appendix 13
Environmental Management plan {EMp) Compliance
Appendix 14
Status of Monitoring of Environmental Mitigation
Appendix 15
Overall Land Acquisition Status as of end of March 2016
Appendix 15
Status of Road Safety Audits
Appendix 17
Summary of Workshops and Trainings In 201.3 up to March 2016
Appendix 5-1
Summary of Studies and Reports (Environmental Activitv)
Appendix S-2
Summary of Studies and Reports (Social Activity)
Appendix 5-3
Community Development Activity Reports
Appendix 5-4
Community Representative Observers (CRO) Reports
Pa
rty Monitoring (TpM) Activities
I
t
I
I
I
I
I
t
I
t
I
I
I
I
I
I
I
I
I
2016 Quarterly Progress Report
1* Quafter : January-February-March
Executive Summary
1.1
Currentlmplementationsituation
1.1.1 Civll Works
lmplementation of the wrNRrp project is schedured to be impremented into three
{3)
Annual Work Programs (AWp's). The implementation starts with the
ments (detailed design drawings including associated bidding documents),
tendering stage (procurement of works) and the actual civil works construction
implementation.
The orlginal implementation schedules of the three (3) Annual work programs (AWps)
are scheduled in three (3) phases, namely ; AWp_l to start in mid_2011and
to be
completed on the last quarter of 2OL4, AWp-2 is expected to begin in mid
ZOlZ with
target date of completion by mid-2016 and AWp-3 is expected to start during the
earry
part of 2013 and to be completed during the middle part of 2017.
However, due
to
some unavoidable circumstances
the original
implementation
schedules did not materialized.
Based on the present status of the program implementation progress, a
revised
implementation schedure, the project rmprementation Timerine (as shown on page
2) is
to be implemented in order to accommodate the originaly derayed schedure into
the
remaining time frame of the WlNRlp program until the expiry date of the loan
agreement by the end of December 20u. shown on page 3 is the current construction
status of the implementation relative to the project rmplementation Timeline.
Table I
shows the present status,
Table 1 - lmplementation Status as of End of the
L
Krui- Biha
2
Padang Sawah -Sp,Empat
3
ln euarter on March
31, 2016
Completed
ManBgopoh - Padangsawah
Completed
lpuh - Bantal
5
Sp, Rampa- Poriaha
6
Ps.
7
Indrapura -Tapan
gts.Pariaman - Manggopoh
8
10
1,1,
Pedati- Kerkap
Sp. Ernpat- Sp. Air Balam
Bantal- Mukomuko
Kambang- Indrapura
Sp. Rukis - TJ.KemuninS
14
Painan'Kalrlbang
Slbolga - Ets.Tap Sel
seblat
-
lpuh
17
5p.Gn.Kefiala - Pg.Tampak
19
Lais
20
Lubok Al'rng - Siclncih
-
Bintunan
LubukAlunB - kuraijati
TOTAI:
Note i Package No.9 and package No.1B cnncelled lrom the program.
Western Indonesia National noads Improvement project
74
11
4
I
I
I
-c
I
E
6
p
,9
il
I
6t
=
(tl
OJ
E
IF
I
I
(y
i,t,l
'6
l
E,'
ni
.9
*
:.
6
,'i
o-
.:
t: i'. a ;l
:ri
L
t
a
'd
I
I
I
I
t
I
I
E
F
(l
OJ
E
c)
Bs;
;
I
;
, i,
i.ta
| ".r i
r:
;)
l:ii,.:ll
,.
il
: !:at),
!'I
Iol
9l
a!.
I
>.1
T4)
E
I
I
!i:
i:!
qJ
CJ
I
i!,
CY
q
c{l
I
T
I
I
e
I
o
I
6
!:
j'
8
ot:
T
di
T
E
z
I
3
o
0,
I
I
I
q,
3:!
G ia
3 EB
o
ru
"84:
E
lE
s
E
I
b
.
E
E"
tnF
dEi
s5i
T
3-'6 Fd
n*!!:
!*iieE
OJ
I
E
o-
I
o.
E
ET
qJ
I
6
Y
9E
_u
.i;
Rt
o-
t{o
N
olo
d
d
(o
T
c
c(J
E
T
I
I
I
E
dJ
'a
E
z|o
.s
(lJ
d<
E
a
c?
6
c)
3
2016 Quarterly Progress
I
I
I
Report
lsQuafter : January_February_March
1.1.2 Consultancy Services
Actual
signed
Moblllzation
ct-c
Jul201-2
5 Nov 2012
12 Nov 2012
DSC
Jul20L2
11Jun 2013
19Jun 20'13
Capacity Building for Djsaster
Cancelled
Slope Protection Design and
Stillto be
Management
I
t
I
Contract
Capacity Building
for
Environmental Management
Capacity Building for
Road Safety
Procured
Cancelled
Cancelled
The technical assistance for consultancy of ,.Capacity Building For Di: iaster Risk
Reduction" has been deleted, but replaced by ,Technical Assistance for Study
onSlope Stabilization Design and Management,.
T
To accommodate the new consultancy assistance, allocated funds from t lategory 3
which is originally intended for "Capacity Building for Disaster Risk Redu ction" has
I
been realigned to Category 2 to fund the implementation of ,,Slope Protection
Design and Management".
T
I
I
t
I
I
t
I
t
t
1.1.3
3oods
At the end of this reporting quarter, no goods were procured.
Western Indonesia Nationa Roads Improvement Project
4
t
I
I
I
2016 Quarterly Progress Repoft
t,2
1+
Quarter : January-February-March
Current Status of Loan
At the end of this quarter (March 2015) some usD 52.94 million of the USD 150.38 million
forcasted expenditures representing 60.L5% of the available loan had been disburseq.
Disbursement is considerably behind schedule by 39.97% of the forecast expenditures,
while 71.05% of the time has already elapsed with the main reason for the delay being the
long period waiting for the implementation of the remaining civil works contracts and slow
progress of the thirten(13) on-going construction packages.
Total disbursements during this Quarter amounted to usD 4.659 million covering the
payments for "statement of work Accomplished' (Mc) to civil works contractors of the
on-going construction packages, advance payment to contractor of contract packages g
and replinesment of special Account under category 2. Details of the Disbursemenrs
and Expenditures Status are presented in Appendix 1.
I
I
A more detailed and updated status of the loan are fully described and presented in the
Thirtenth (13'n) Quarterly Financial Report covering the 1't euarter (January, February,
l,
I
t
I
I
I
I
I
I
I
March) of the Year 2016 which is under preparation and will be submitted separately.
1.3
Current Problems and Action Required
Program
2 Nos, Under
construction completion stages.
2 Nos. Completed and provisionally handed over. lJnder
defects liability period for two (2) years.
Responsibility
Contractor
DSc and CivilWorks Project
Manager
AWP.1
I
Nos.Two (2) out of the eight (8) packages under construction
are way behind schedule with huge percentages of
negative progress slippages. Contractors of the
problematic packages shall resolve immediately the
AWP-z & AWP-3
current prroblems.
Agreementjust recently signed.
3 Nos. Contract Agree ment for signing
2 Nos. For confirmation by World Bank and Ministry to award the
2 Nos. Contract
contrad . Some
2 Nos. Cancelled
Capacity Building for
Disaster Risks Reduction
Slope Protection Design
and Management
issues are
stillto be resolved.
from the program.
Contractor and
PPK
and Dsc
POKJA
Civil work Project Manager,
DSC, POKJA and CTC
PMU and MPW
Cancelled
Stillto be procured
5ub-Directorate of
Environmental & Road
DTA.DGH
Capacity Building for
Environmental
Management
Capacity Building for
Road Safety
I
t
Activity
Cancelled
Cancelled
Western indonesla National Roads Imorovement proiect
Safe{
t
t
t
I
2016 Quarterly Progress Report
1* Quarter : January-February-March
General
2,1
ReportingRequirements
Ouarterlv Proeress Reoorts: This ls the ninth (gth) euarterly progress Report as
required and stipulated in CTC's consultancy contract andthe Loan Agreement. prior
to the production of this report, Monthly progress Reports have been prepared ano
have dealt with all aspects of the works. This report attempts to bring the situation up
20'J,6.
I
I
t
T
I
t
I
t
I
I
t
I
I
I
t
Financial Monitorlng ReDorts: These have been prepared for each quarter since the
beginning of 2013 with ihe first Report, issued in May 2013, covering the period
January
-
March 2013. Since that date quarterly reports have been prepared and
submitted regularly.
Report
Financlal Monitoring Report No. 1
Financial Monitoring Report No.2
Financial Monitoring Report No. 3
Pedod Covered
-
January 2013
March 2013
April 2013 -June 2013
luly 2013 - September 2013
Financial Monitgring Report No.4
Financial Monitoring Report No.5
Financial Monitoring Repon No.6
October 2013
Financlal MonitorinB Report No.7
Financial Monitoring Report No.8
Flnancial Monitoring Report No.9
July 2014
October 2014
Financial Monitoring Report No. 10
Financial Monitoring Report No, 11
Financial Monltoring Report No. 12
Financial Monitorlng Report No. 13
July 2015 -September 2015
October 2015 - December 2015
-
December 2013
March 2014
-
January 2014
April2014-June 2014
-
September 2014
-
January 2015
April 2015
December 2014
- March 2015
-
June 2015
Dste lssued
May 15,2013
August 15, 2013
November 15, 2013
February 15,2014
May 15, 2014
August 15, 2014
November 15, 2014
April 7, 2015
August 31, 2015
October 2, 2015
December 16, 2015
February 10,2016
under Preparalion
Monthlv ProEress ReDorts: These report have been prepared covering each full
month since January 2013. Subsequent reports have been submitted on a regular
January 2016
March 2016
CTC
monthly basis.
Environmental Studles and Activiw Reports: These report have been continuously
updated and submitted to PMU for submission to World Bank for Bank's issuance of No
Objection Letter (NOL). Appendix S-1 shows the summary of submitted of Reports
covering each contract package since inception of the project.
Soclal lmpact Studies and Activiw Reoorts: These report which mainly dealt with the
implementation of "Land Acquisition Resettlement Action plan', (LARAp) have been
continuously submitted to PMU for submission to World Bank for Bank's issuance of
No Objection Letter (NOL). Appendix S-2 indicates the updated summary of all
su bmitted Reports.
These Reports have been prepared and continuously submitted to the Client.
Appendix S-3 shows the summary of submitted Reports from the very first (1't)
submittal up to latest report before the Quarter ended.
ReDorts: These Reports were consolidated and reviewed by CTC as prepared and
submitted by the appointed CRO's and TPMs of the respective contract package.
Their reports were based on their actual observations and monitoring during pre-
I
I
I
I
I
I
I
I
I
t
t
I
I
I
t
I
2016 Quarterly Progr€ss Report
1$
Quarter : January-February-Marcn
bid meetings, site visit and bid openings of every contract package under procurement.
Appendix S-4 shows the updated summary of all reports which were forwarded to pMU.
2,2
loan Status
The agreed allocation of loan funds from the original loan agreement together with the %
disbursed to the end ofthe quarter date (March ZL, ZOI6I is Dresented in Table 2
Des.rlpdon
for the 16 Quare' ot
2016
220,4m/mo,m
3,369,796.03
43,986,071.ss
47 ,354,857 .5A
2t 49
17,0@,m.0o
1,299,000.co
4,284,880.83
5,5$,a808a
32€5
0
0,00
0
o
o
0
o
0
0
o
o
4t,269,952.38
52,93A,7 4a.41
21,18
Eettef ment and capacity
E)(pansion of National Roads
Part 2
2
Iot€l olsbuEed by
WB to End MaEh 31,
2016ln UsS
Amount UsS
lmFlementation Support
Part 3
3
flo.d Sedor lnstitutional
0
Cont insency for Disaster
A is
k
OdEInElLo.n
2.3
12,6m,mm
0,m
2S0,0oo,000,@
4$6At7
.O3
Financial Management
S-Curve for Financial Progress
E
E in
tl
tur6
5!34 mll(21,13*) _
10.0c
o00
l
T
I
A report at the end of the quarter (March 31, 20j.6) is presented in Appendix 2
Western Indonesia National Roads lmorovement pmiect
I
I
2016 Quarterly Progress Report
2.4
I
t
Project Cost Monitoring
A detailed summary of the project cost monitoring in tabular format is presented
2.5
as
World Bank lmplementation Review Mission and Site Visit
During this quarter period ending on March 2016, the World Bank,s Technical and
Financial Audit Consultants (TFAC) mission performed and conducted sit€ audits on
The mission visited the two (2) contract packages from February Zg, ZOf6 to March 4,
2016 in order to access the following :
.
.
The quality of works implemented by the Contractor, site management and
quality control and compliance of equipment.
The actions taken by the Design Supervision Consultant (DSC) concerning
qualiW control role.
I
.
Follow-up inspection of what actions taken up by the Contractor on the
remaining non-conformance works that we re previously inspected way back in
November 2015.
the period ended, the regular monthly progress meeting was held to review and/or
update the implementation progress and monitoring the key activities on the Agreed
Key Action Plans".
T
As
Also taken up during the meeting was the presentations of the results of the TFAC
audit reports and recommendations to rectify the non-conformance findings.
An "Agreed Key Action Plans" for progress compliance monitoring of the status of the
works on weekly, bi-monthly and monthly intervals is shown in Table 3.
Table 3 "Agreed Key Action and Plans"
Status as of end of lst Quarter
Updated Status
Action
No,
t.
2
Review
BERS
By Whom
of packages 14 and 16
.
Done
PMU and CTC
.
Mid of February
to Bank
PMU and CTC
.
Done
Inform the Bank about the steps DGH has taken/will
take in the case of the misreDresentation of facts in
the bidding of Package 8 in response to the letter
PMU and CTC
Send signed
contract extension of Package
Send signed contract extension
4
to Bank
of Package 2 and 3 to
Bank
T
5,
PMU and
CTC
.
WINRIP/265 of December 9, 2015. lf DGH is not taking
any steps, please inform as also
Inform the gank the bidding process of package 10
Western Indonesia National Roads Imorovement proiect
New Deadlines
March 29, 2016
Ban k
Submit si8ned contracts for packages 8 and 12
t
I
I
Quarter : January-February-March
Appendix 3 at the end of this report.
I
I
I
I
t
t
I
I
I
1o
.
April 1, 2016
.
AprilS, 2016
Consultation with
Legal Department
As soon as possible
onSorng
PMU and CTC
.
February 1,2016
.
April 8, 2016
I
I
I
I
2016 Quarterly Progress
Report
l*Quarter
Updated Status
No,
7.
Actlon
By Whom
Send to Bank response to letter WlNRtp /279 of
January 12, 2016 regarding the extension of bid
10.
t'
I
I
I
I
I
I
I
I
I
I
t
t
PMU and CTC
Inform the Bank about the plans regarding the Slope
PMU, CTq
Protection in Package 3
DSg WB
for
contract
modification of package 6 (40% increase)to Bank
Inform the Bank about DGH'S plans to cover the
additional drainage and slope protection
.
New Deadlines
29,20L6
Done
.
May 15, 2016
PMU and CIC
.
May 15, 2016
Bank
.
AprilS, 2016
PMU and CTC
.
Done
requirements under packaBe 19
Send a letter
11,
r|r'|arch
validilies
Send technical support documents
9.
t
I
: January_February_March
to
DGH |.eBarding
the swamp area
in
package 19
Subdit
Publish the Request
t2.
for Manitestatlon of Interest for
the slope stabilization, design, and manaBement for
the Bank's review
Construction
Once
Geotechnic
.
February 1, 2016
procurement
and Stability
system
and cTc
Send the RfP for the slope stabilization, design, and
manaBement to Bank for NOL
Send to
CTC
Send to
-15
L6.
the
Bank
the request for the extension of the
contract
the
to the contract
contract (end date December
PMU and CTC
send to the Bank an update of the environmental
monitoringtable in annex 4 includingthe information
PMU and CTC
DSC
.
Done
.
Done
.
End
of
.
End of April 2016
.
Mid-April2016
r
End of April 2016
.
End
.
2 June 2016
Feb 2016
201.6)
on the auarries
5end
the envi.onmental management and monitoring
Carry out the workshop
on HtV/
A|DS
for
new
packages
19.
PMU and CTC
Bank the resFonse related
modification to the
plans {RKPPL) for packages 5 and 17 to the Bank
18.
PMU and CTC
the Bank
approves tne e-
.
PMU and CTC
PMU
/ C'tcl
DSC
the tirst environmental management and
monitoring implementation reports tor all packages
under construction to the environmental agencies
RKPPL package
#05&17 will be
submit on mid of
Feb 2016
(PackaBe No.7)
Send
(refer
to
annex
4 or
ofApril2016
Packages
crc/DGH
.
environmental safeguard
No.2,4,6,11&19
end of April 201.6
Packages
No.1,5,7,13,15 &
for of lune
compliance table)
17
2016.
20.
Carry out environmental supervision missions jolntly
with the Environrrental Agency in order to make sure
contractors cornply
with their
management plans (RKPPL)
Vestern lndonesia tla
environmental
PMU lCtC
Bank
/
ABency
/
Env.
.
April& May 2016
I
I
I
t
2016 Quarterly Progress Report
1$
Updated Statut
No.
2L.
Action
By Whom
Request additional budget for LARAP implementatlon
t
I
I
I
I
I
I
I
I
T
I
I
.
.
March 30/ 2016
.
April 15,2016
.
Mid-April 2016
.
lMay 15,2016
.
June 30,2016
.
Done
.
Noted
.
N
.
April 15, 2016
.
March 31,2016
.
April30,2016
.
May 15, 2016
.
Noted
As soon as possible
Inform the Bank about the measures that will be taken
17
to accelerate LARAP implementation for packages 12,
13, 14 15, 20 and 21, which is risking to seriously
PMU and cTc
w6.((
Submit to the Bank additlonal IARAP document for
I
I
New Deadllnes
March 29,2016
PMU
in 2016 (DIPA revision), especially for package 13
delav the stan/imblementatidn o{ rhF
t
Quafter : January-February-March
23.
24.
PMU
package 16
Submit
the
IFR
for January to Mdrch 2015 to the Bank
Submit 2015 financial audit report to Eank
.
PMU
.
PMU and
cTc
26.
Disclose updated procurement plan after Bank
approvalin the Winrip website linked to MpW
Website
.
.
February 5, 2016
PMU
Update the newsl€tter quarterly, including the Iist of
contracti, lmplementation progress, project related
27.
workshops and number, typology and status of
r
PMU
.
Every
quarter
complaints
Send quarterly newsletterto the civil societv forum in
28,
?q
each project province in hard
electronic mailing system
Provide feedback to the formalresponse tothe
quality improvement support inspection reports TFAC
for packages 2, 3, 4 and 19
Provide
?n
copyorthrough an
a
package 1
31.
33
a
Every quarter
Bank
r
PMU/Dsc
.
PMU/DSC
formalfollow-up responseto quallty
improvement support inspectlon reports TFAC for
package 11
Regularl\/ submit the quarterly progress reports to the
nk
Ba
2.6
.
fornalfollow-up response to quality
improvement support inspection reports TFAC for
peckage 19
Provide
32.
a
r
PMU
formal follow-up response to quality
improvement support inspection reports TFACfor
Provide
.
.
PMU/Dsc
PMU
Project Steering Committee MeetinB
No Steering Committee meeting during this quarter.
Vestern Indonesia National Roads Improvement
poect
oted
.
Each calendar
I
T
I
2016 Quarterly Progress Report
1$ Quarter : January-February-Marcn
Project Management and lmplementation
3.1
Procurement Status
(A) Civil Works
T
I
t
I
I
I
t
I
t
I
I
I
I
I
I
I
Civil Works are now being implemented
in Annual Work programs {AWp) which have
All Contract Agreements for the four (4) AWP-1 contract packages were signed by the
end of 2013 with actual work commencement on January 2014.
Under the other two (2) implementation programs, AWp-2 and AWp-3, nine (9)
packages were already procured and are on-going construction, while and the other six
(6) packages are under final procurement stages.
Table 4 Shows the actual pre-construction and procurement status under the
implementation schedules AWP-2 and AWP-3
Table 4
No.
AWP.2
5
Sp. Rampa - Poriaha
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on June 18, 20L5
6
Ps. Pedati- Kerkap
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on March 11, 201.5
7
Indrapura
8
Bts-
Pa
-
Tapan
riaman
Sp. Empat
-
-
Sp.
Ma
Air Balam
Procured. Under construction since the
issuance of Notice To Proceed (NTP) on
December 10, 2015
Procured. Under construction since the
issuance of Notice To Proceed (NTP) on March
Revised Bid Evaluation Report (BER) and award
of Contract has been issued No Objection Letter
(NOL) on February 22, 2016 by the World Bank.
Announcement and notification of awafd bv the
Ministry is still pending due to some issues that
are
Bantal - Mukomuko
Kambang
-
Ind
ra
pura
Western Indonesia National Roads Improvement project
stillto be |."r:iu"1
___
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on February 23,
Signing of Contract Agreement by the
contracting parties was executed in January 28,
2016. Bank issued NOL and Form 384 on March
2016
I
]
l
2016 Quarterly Progres
1s Quafter : January-February-
Yla
I
I
I
I
I
Sp. Rukis
-
Tj. Kemuning
Procured. Under construction since the
issuance of Notice To Proceed on July 22,
201,5
AWP-3
Bid Evaluation Report {BER) as well as the
Painan
-
fecommenoalton IoI award ot contract has
been forwarded to World Bank on March 21,
Kambang
2016 for request of issuance of No Objection
Letter {NOLl.
ocured. Under construction since the issuance
Notice To Proceed (NTP) on November 20,
1sl
l
sed Bid Eval'ration Report has been
bmitted to World Bank on March 21, 2016,
me issues are still to be resolved prior ta
uance of NOL,
77
. Sp.Gn.Kernala
-
Pg.
Tampak
.**a.
Una.,
""*tru"tion
of NoticeTo Proceed
(NTP)on
l
rin"" tn" isru"ni"
]
September4,
i
cured. Under construction since the issuance
Notice To Proceed (NTP) on March 11, 2015
ntract
has
l
I
I
issued No Objection Letter (NOL) on
h 23, 2016 by the WrnO U:nO:_
]
Evaluation Report {BER) and
ommendation for award of contract has
issued No Objection Letter (NOL) on
h 23, 2016 by the World Bank.
l
I
I
Note : Packages No,g and No.18 are cancelled from the program.
Presented in Appendix 4 is the current status of procurement management.
(B) Services
The Core Team (CTC), Design & Supervision Consultant (DSC), and the others Capacity
Building Consultancv status are discussed in Section 3.4.
3,2
lmplementation Status
-
Civil Works
As of end of this reporting quarter ending (March 2016), there are currently eleven {11)
contract packages that are under construction. Construction implementation of two (2)
contract packages under AWP-I. program have recently been completed with the
issuance of "Taking Over Certificates" (TOC) and are now currently under defects liability
period for twenty four (24) months effective on the dav the TOC were issued.Details of
each contract package are shown ln Table 5.
I
Western Indonesia National Roads Improvement
project
!2
rch
I
I
t
I
I
I
I
t
t
I
t
I
I
I
I
o
F
-
a)
6
d
E
o)
E
o
-tr
lz
ti
ts
o
E
E
a
!
o
cl
3
g-j
.e
Cfl
z
,E
dJ
c
oc
0
E
5
IN
3
I
(u
3
I
I
I
I
I
I
li
I
I
T
I
T
I
t
I
I
I
l
t
2016 Quarterly Progress Repoft
lst Quarter : January-February-March
Activities done during this month were repair and restoration of deteriorated existing
pavements, roadway excavation, embankment formation, spreading of granular
pavement for roadway widening, asphalt paving, structural works, construction of stone
masonry side ditches, stockpiling of raw material, production of crush aggregates, other
minor works, bridge construction and finalization of ',Field Engineering,,surveys.
The four (4) contract packages under implementation program AWp-1 were not
from 15 to 125 calendar days were granted extending the completion dates at the
earliest on January L0, 2015 and the latest on April !9,20f6.
Physically, two (2)
ofthe contract
packages has already been fully completed and
recently handed and taken over by the Client, while the two (2) other packages are about
to be completed next month (April 2016).
Under the implementation program AWp-2 and AWp-3, there are currently eight (8)
contract packages that are on-going construction implementation and one (1) contract
package have just been issued Notice To Proceed (NTp) to commence works. physical
progress of two (2) of the packages are lagging far behind schedule with negative
sfippages of -42.77y" and -57.87% while progress for the other six (G) packages are still
slightly on or behind schedule.
Generally, with the exception of the two (2) contract packages with huge negative
slippages, the civil works implementation is fairly in the right direction.
Progress status of the thirteen (13) on-going civil works contracts as of this reporting
period are shown in Table 5.
Following are brief status of the thlrteen (13) on-going construction contract packages
Package No.
:
1: Blha - Krui
The contract package is substantially completed on January 20, 2016 and provisionally
handed over to the Employeer.
Taking Over Certificate of the Works has been issued by the Engineer on the same day of
the Provisional Hand over (PHo) which is also the starting date for "Defects Notification
Period" until after t\lvo (2) years reckoned from the issuance of the
TOC.
A more detailed previous status of this package is presented in ANNEX p-l Executlve
Summary Report.
Package No. 2 : Padang Sawah
-
Sp. Empat (tncluding Air Gadang Bridgel
As the end of this reporting period, the overall work progress based on the revised
schedule is 96.83% with at least 3% of the works still to be done until the revised expiry
of the comDletion time.
To date, the remaining 25 calendar days left from the revised extended construction
perlod is more than enough for the contractor to complete the remainins works until the
Western Indonesia National Roads Improvement project
74
I
I
I
I
I
I
I
I
I
I
I
I
t
I
I
-c
P
io
=a
o
l
{.t
T
c(!
f
c(q
o
.G
E
0)
'd
E
q.)
E
(U
soE
tg
tf,
I
E
6
.F
(E
z.
.a
l3
o
o
E
c
c
IN
=
o
E
a
In
(u
I
I
I
I
I
I
lr
I
I
I
t
t
l'
I
I
I
I
I
I
2016 Quarterly Progress Report
1$
quarter : January-February-March
revised take over date on April 19, Z016, but this will depend with the progress and
completion of Air Gadang Bridge.
With regard to the construction of Air Gadang Bridge, all the 20 pre-cast girders required
were launched in place and two (2) spans out ofthe four (4) spans of bridge deck has
been casted as of end of this quarter endinB March 2016. Construction of approach
roads are also on-going during the period.
ANNEX P-2 Executlve Summary Report present a more detailed status of the Contract
Package.
Package No. 3 : Manggopoh
-
Padang Sawah
The contract packages is substantially completed some few days before the target date
of compfetion on March 20,2016and provisionally handed over to the Employeer on
March 1Z 2016.
Taking Over Certificate of the
Work
has been issued by the Engineer on the same day
of
the Provisional Hand Over (PHO) which is also the starting date for,,Defects Noflfication
Period" until after two (2) years reckoned from the issuance ofthe TOC.
A more detailed status of the project progress are shown in ANNEX p-3 ,,Executive
Summary Reporf
.
Package No. 4 : lpuh
-
Bantal
Although the Contractor has been granted time extension of completion from January 9,
2016 to April 11., 2016, the current status of this contract package still remain in critical
situation with respect to the revised completion date.
Durihg this quarter ending March 2016, the actual overall progress is 91.02%
8.38% ofthe work still to be completed.
with still
Based on the Contractor's performance during the course of the contract, it seems
doubtful that the remaining 8.38% of the works can be completed on the target date of
completion, considering that only 17 calendar days are remainlng to complete the
balance of the works.
Shown in ANNEX P4 "Executive Summary Report,' showing the details and status of the
project.
Western Indonesia ltational Roads ImDrwement prolect
t
I
I
T
2016 Quarterly Progress Report
1s
Package No. 5 : Sp. Rampa
-
Quarter : January-February-March
Poriaha
To date, since the commencement of works started nine (9) and half months ago, the
actuaf physical work progress is only 10.11% against scheduled work progress of SZ.Ba%.
The delayed works further accumulated to -42.77%atthe end of this month.
with only 48% or eight (8) months of contract time are left and a huse deflcit of unfinish
attained unless drastic actions from the part of the Contractor will be enforced.
I
t
I
I
I
t
t
t
I
I
t
t
t
t
I
Other problem that hampered the slow progress of the works which shall be addressed
immediately by the concerned authorities is the unexpected ROW problems wherein
some improvements such as trees and other obstructions exist along the alignment.
Considering that the current problems are resolved anwime soon and in order
Contractor
for the
to catch-up with the schedule to meet the completion date, at least 11%
progress per month have to be achieved.
ANNEX P-5 "Executive Summary Report" shows the Contractor,s progress Schedule.
Package No. 6 : Kerkap
-
Ps. Pedati
Based on the original progress schedule ending on the quarter month of March 2016, the
actuaf overall physical work accomplished is 27.55% out of 85.30% schedule or -57.81%
negative slippage.
Work during the whole 1* quarter were very minimal and were
mainly focused on Asphalt Pavement and Routine Maintenance Work items-
the period ended,72% of the works still remain to be done while 84% of the contract
tirne have already elapsed and based on the Contra€tor,s performance and average
progress per month during the past 13 months, completion date on June 2, 2016 is not
As
possible.
The major work item which conributed
to the huge negative slippage is the Aspahalt
Pavement. To date only 9.10% out of the 70.65% component of whole works has been
accomplis hed.
However, in the event that the recently concluded ,,Field Engineering,, results with
proposed 90 calendar days time extension will be formally approved, the completion
date will be moved forward to August 31, 2016.
ANNEX P-6 "Executive Summary Report" shows the complete details
of the contract
package.
Package No. 7: Indrapura
-
Tapan
The contract package just recently commenced on December lO, 201,6.
During the period from the issuance of Notice To proceed (NTp) until end of this quarter,
contractor concentrated on the preparation for mobilization at site and finalization of
the Field Engineering.
Western Indonesia National Roads Improvement prol:e€t
17
I
t
I
I
2016 Quarterly Progress Repoft
1" Quarter : January-February-March
During the period only small percentages
of the General, Structure and Routine
Maintenance works have been done accumulating to just 0.14% progress for the whole
month
ANNEX P-T "Executive Summary
Reporf shows the complete details of the contract
package.
Package No. 8 : Bts. Kota Pariaman - Manggopoh
Notice To Proceed (NTP) to commence the works has been issued on March 23, ZOf6.
I
I
I
I
I
I
T
T
t
I
I
t
I
t
I
At the time of the preparation of this Report, there is still no work schedule {S-Curve)
submitted by the Contractor.
Package No. 11 : Bantal - Mukomuko
the revised schedule due to approval of the results of "Field Engineering,,, the
actual overall progress attained by the Contractor up to end of this period is 3a.a7%
Based on
against 43.85%.
At the end of the 13th month of the contract period, Contractor,s performance with
respect to their work progress seem to be satisfactory as the negative slippage have
been minimized to a single digit. In other words, the Contractor have no difficulty in
compf eting the works on or before the target date completion February II,2Ol7 .
For more details of the Contract Package, refer to ANNEX p-11 ,'Executive Summary
Report".
Package No. 13 : Sp. Rukis
- Tj. Kemuning
The current work progress showed sign of slowing down for the past three (3) months as
onlv 0.24yo prcgress has been achieved during this period.
At the end of the month, the overall work accomplished is L4.62% of the 26.94%
schedule at month's end. The negative slippage suddenly dropped from -5.99% in the
preceeding month to -12.32% this month.
The negative slippage is still manageable at the moment, provided the Contractor will
take immediate actions on problems that are hampering the work progress. Barring any
unforseen circumstances that will disrupt or interrupt the construction implementation,
it is expected that the project can be completed on-tirne or even ahead of the schedule.
Details
ofthe work
progress are shown in ANNEX P-13 "Executive Summary Reports',.
Package No. 15: Sibolga
-
Bts. Tapsel
The contract package just recently comm enced on November 20, ZOLS.
During the period from the issuance of Notice To Proceed (NTP) until end of this month,
Contractor concentrated on the preparation for mobilization at site
Western Indonesia National Roads ImDrovement Proiect
.
I
I
I
I
I
I
t
I
I
I
I
I
l
I
I
I
I
t
I
2016 Quarterly Progress Report
1* Quarter : January-February-March
At the end of this reporting quarter (March 31, 2016) actual overall progress achieved is
of the
5.57% schedule. During the whole quarter, the Contractor mainly
concentrated on mobilization to site and minor roadworks on Drainage, Earthworks,
L.69%
Structures and Reinstatement and Minor Works-
Detailed and work progress
"Executive Summary Reporf .
of the contract
package
are shown in ANNEX
p-15
The current status of the sub-project is fairly being implemented as evidenced by not
incurrring any negative slippage since the Contractor commenced works way back in
September 4, 2015.
Overall progress to date is 6.15% against 6.10% schedule, or the progress is slighty ahead
of schedule by +0.06%.
lf Contractor can maintain the trend of their monthly progress, there is no reason that
the works could not be completed on or before the target date of completion on August
23, zoL7.
ANNEX P-17 "Executlve Summary Report'' shows the complete details and work
progress of the project.
Package No. 19 : Lais
-
Bintunan
on corrected revised progress schedule by incorporating the results ,,Field
Engineering:'and 125 calendar days time extension, the progress of work have
Based
considerably improved as compared in the previous months.
At the end of the period, the total overall progress attained is 80.18% against 79.68%
schedule or +1.10% ahead ofschedule.
Complete details
ofthe contract
package are shown in ANNEX p-19,,Executive Summary
Reporf'.
Western Indonesla National Roads Imorovement Proiect
19
I
I
I
t
2016 Quarterly Progress Report
l{
I
I
I
I
I
To date, amendements and/or variation orders for six (6) on-going construction contract
packages were already processed and approved by Pejabat Pembuat Komitmen (PPK), the
authorize Office to approve financial disbursement.
The approved variations orders were due to the following reasons
:
Change of PPK Sub Project Manager.
Contract amount revision due
results.
to Technical Justification of Field Engineering
d)
Revision of time for completion (time extension).
e)
Contract amount revision due
to contract price adjustment (escalation of unit
rates).
f)
Change of Contracto/s authorize representative.
In regards with additive cost variations, original cost of the six (5) on-going construction
contract packages increases bv Rp. L64,77L,L73,000, while the variation orders for the
other contract packages are still under evaluation by DSC and PPK which is expected that
the resulls will increases the respective original contract amounts.
ln anticipation of future claims for varied works by the Contractors, a revised costs of
additional 11% of the Original Cost for each contract package covered by AWP-I has been
considered and 5% cost increases for packages under AWP-2 and AWP-3 to cover any
Variation Orders that may arise during the implementation of the Works,
Presented in Table 7 are details of Variation Orders for the four (4) sub-projects under
AWP-I and two (2) contract packages covered by AWP-2 and AWP-3
l'
I
I
t
I
I
I
Quarter : January-February-lvlarch
Variation Order Details
b)
I
I
1$
Western Indonesia National Roads Improvement Project
I
I
II
I
2016 Quarterly Progress Repoft
Table
Package
No.
Original Contract
Amount
(Rpl
1* Quarter : January-February-March
7
-
Details of Amendments (Variation Orders)
Amend
Variation +/-
No,
{Rp)
Revised Contract
Amount
Vatiance
%
(Rp)
I
Reason FoI
Change
rme
Extension
'|
1
I
t
734,909,27I,0O0
+19,163,804,000
3
0
0
2
197,936,699,000
T
I
I
I
I
I
I
I
I
2
3
143,688,963,000
L7
1_9
224,899,777,000
3s,689,452,000
Reason For Change
c
+74.2O
B
+14.24
D
0
0
2
3
0
0
l-97,936,699,000
197,936,699,000
197,936,699,000
4
+28,776,518,000
226,7).3,277 ,000
5
0
6
+5I,472,232,000
L
0
2
3
0
F
o
B
C
226,71,3,277 ,000
249344,93L,OOO
+25.97
E
o
o
0
A
0
143,688,963,000
143,588,963,000
143,688,963,000
+21,468,809,000
1,65,L57,772,000
+74.94
c
0
165,L57,712,000
I83,940,a12,0AO
+24.O1
E
o
+5.08
c
L
0
2
+9,501,334,000
0
186,936,750,000
196,438,084,000
196,438,084,000
196,438,084,000
0
1
0
+14.54
+74.54
+40,251,909,000
186,936,750,000
+74.2O
L
5
4
154,073,015,000
154,073,0L5,000
l-54,073,015,000
+74,94
105
D
F
B
7q
D
+5.08
+5.08
B
90
D
0
224,599,717.O00
+33,711,586,000
262,61'r.303 ,ooo
+].l.73
c
7
0
B
+10,730,308,000
33,689,452,000
44,479,7 60,000
0
2
r31.85
B
125
CD
I
- Change of Engineer's Tea m Leader from V. Thiagarajah to Johnson Villar,
B - Change of PPK sub Project Manager.
C - Contract amount revision due to TechnicalJustification of Field Engineering resuits.
A
- Revision
- Contract
of time for cornpletion (time extension).
amount revision due to contfact price adjustments (escalation).
F -Change of Contractor's authorize representative.
D
E
T
t
I
lw-esternlndonesiaNationJicoa-risimprovernentero;ect
2I
t
T
t
I
I
I
li
t
I
I
I
I
l'
I
I
I
t
I
I
2016 Quarterly Progress Repoft
3.4
1o
Consultancy Services
Technical Asslstance for Core Team Consultant
Management Unlt.
(CTC)
Quarter : January-February-March
to Support the Prolect
lead Consultant: PT. Pe]entjana Djaja
Contract No. 06-20/CTC[A/LN/8043/1112 was signed on 5 Nov 2012 between
the Ministry of Public Works, Directorate of Plan
DGH and PT.
Yongma Engineering Co. Ltd, PT. Epadascon Permata Engineering Consultant, JV and the
work commenced on 12 November2012.
CTC
Amendrnent No.l
to original
contract was signed on October 25,2013 to accommodate
the increase in staffing requirements with the following increase in cost.
Amendment No. 2 is officially approved. Proposed amendment to the Original Contract
and Amendment No. 1 are additional man-months for professional and technical staff for
international and local, replacement of foreign and local consultants and modification to
various reimbursables to match with the actual reouirements.
Amendment No. 3 has already been approved. The amendment covers the extension of
services of several local professional and sub-professional staff beyond the end of their
respective dates of completion assignment covered by Amendment No. 2 which will end
on March 6, 2015.
Amendment No.4 to the current
CTC
Contract (Original Contract and Amendements 1, 2
to expire or completed on December
the same date as the expiry/closing date ofthe loan agreement.
and 3) was signed on March
4
2016 and
31., 20L7,
the current progress of the Project, services of professional international and
Iocal staff as well as local sub-professional staff have been extended beyond their
Based on
respective dates of assignment engagement covered by Amendment No. 3.
The amendment covers the reouirements of CTC are as follows
:
Consultancy services time extension
Additional/Modif ication to TOR/Terms of Reference
a
Adjustment
of input
schedule
for
Professional Staff, Sub Professional and
Supporting Staff
Amendment to the Team Composition
Amendment of the Staffing Schedule
Modification to the Provisional Sums
Adjustment of Remuneration paid in foreign currency and local currency
Adjustment to the reimbursable expenses
Amendment to Clause 6.1(b) of the Special Condition of Contract
Western Indonesia Nabbnal Roads Imorovement Proiect
2015 Quarterly Progress
I
Report
1$euarter: January-February-March
Presented in Tabl€ 8 is the current status of cTc contract,
Table
T
Descrlptlon
I
I
USD
Orlginal Contract including 10% VAT
L,4p,4A70
23,ss6,940,000
Amendment No,l includins 10% VAT
L.447,517
24,664,792,500
Combine Variance Against OriB ina I Contract
Ir
I
I
I
I
I
I
I
I
I
I
T
I
I
I
IDR
Amendment No. 2 including 10% VAT
+4.7204
r,5o9,r77
Variance Against Original Contract
24,704,544,150
+4,87%
+7,4604
Combine Variance Against Original Contract
+5.gLo/.
Amendment No.3 including 10% VAT
Variance Against Origina I Contract
L,473,917
26,328,0s4500
+4,95o/6
+lL.760/0
Combine Variance Against Origina I Contract
+9,29%
Amendment No, 4 including 10% VAT
1,918,158
40,874,769,529
Variance Aga inst Original Contract
+36.58%
+73,53%
Combine Variance Against Original Contract
i
Note
+@.72%
Combine variance (USD+IDR) is based on l. USD = Rp. 9,558 exchange rate used during the
time of signing the original Contract Agreement.
Technical Assistance for Design & Supervision Consultant {DSC}
lead Consultant: Renardet 5.A
Contract No. KU.03.01/PPK-PR/W|NR|P/BXI0T/VV2OB was signed on 11 jun 20j.3
between the Ministry of Public Works, Head of Regional Office for National Roads
lmplementatlon, DGH and Renardet S.A. PT Cipta Strada, PT. Daya Creasi Mitravasa, pT.
Seecons and PT. Yodya Karya (Persero)Joint Venture and mobilized on 19 June 2013.
DSC
Table 9 shows the current status of DSC contract.
Table 9
Note
I
1) DraftAddendum
2)
WesLern Indonesia National
No.1 is stillsubject to approval by DGH with World Bank concuffence and
issuance of No Objection Letter (NOL).
Figures with asterisk (*)are tentative pending approval ofAddendumNo.l
Improvement Project
I
t
I
t
2016 Quafterly Progress Report
1s
Quafter : January-February-March
Technical Assirtance for Capacity Bulldlng for Disaster Risks Reductlon
Lead Consultant:
be replaced by another "Technical Assistance for Slope protection
Design and Managemenf' which will be implemented under Category 2 of the Loan
For deletion and
to
Agreement.
Environmental Management
I
I
I
I
t
I
I
I
I
t
I
t
T
I
I
[ead Consultant:
Cancelled.
Technical Assistance for Capaclty Building for Road Safety
Lead Consultant:
Cancelled,
Procurement Plan for consulting services is presented in Appendix
3.5
S.
lmplementation of the Anti-Corruption Action plan
Communlty Representetive Officers (CRO)
To date, the selection of Comrnunity Representative Observers (CRO) has been LOO%
completed for all the nineteen (19) contract packages with the last selection procees was
!7,
in Padang for Contract packages 14, Z0 and 21. The
overalltotal numbers of appointed CRO's are thirty eight (38) individuals who were mostly
conducted on November
ZO75
professional lecturers from different colleges or universities nearby to the projects,
All these thirty eight (38)
CROS discharged
their duties as independent observers for
nineteen (19) Contract Packages during the procurement activities.
A complete list of CROs appointed with their corresponding credentials can be found in
Appendix 5.
Appendix 7 shows the activities of the
CROs since
the inception of the project.
Third Party Monitors (TpM)
During this 1" Quarter of 2015 (January
-
February
-
March) there six (6) appointments of
Third Party Monitors, however, their tralning is still to be scheduled. To date a total of
fourty eight (48) appointments have been approved.
with their respective occupations and professional affiliations are
shown in Appendix 8, while Appendix 9 shows the past to present activities/progress of
List of appointed TPM
thC TPM,
Weslern Indonesia National Roads Imorovement Prolect
24
I
t
I
I
2016 Quarterly Progress Report
1s Quarter : lanuary-February-March
Complaint Handllng System (CHS)
The WINRIP website has been online, and available for reporting all aspects of the Anti-
Corruption Action Plan including the registering of complaints by the general public. The
website can be accessed at the URL address http://www.winripibrd.com.
The CHS application has been completed. The application was put in sub-domain of
http://chs.winrip-ibrd.com. Appendix 10 and Appendix 11 show the Work Plan on
System and Work Activities on Publication/Disclosures.
I
I
l.
I
I
I
I
t
I
I
I
t
t
t
I
CHS
The CHS team has been monitoring public complain via SiPP and WINRIP website.
During this Quarter three (3) complains were monitored, specially on the procurement of
civil works contracts. Details of previous complains and action made by the concerned
authorities are shown in Appendlx 10.
3,6
lmplementation of the Environmental Management Plan and IARAP
A project category is assigned to each package as either Category
4
B
or
C
depending on
the likely degree of influence on environmental issues with a brief explanation
A project is one which will
as
follows:
a
significant negative impact on the
environment and may have an influence on areas outside the actual project area. A
Category
have
project classified as such requires an AMDAL (ANDAI. RKL/RPL) study.
Category B project is one which affects the people or the environment to some extent but
with a smaller impact than a Category A. The required environmental analysis is
a
UKVUPL study only.
Category
C project has minimal effect on the people or environment and
an
environmental analysis is not required. SPPL are used to handle any minor problem which
mav arise.
Details
of
packages
that require environmental and social safeguard are given
in
Appendix 13 and the followlng Table 10 provides a summary ofthe work invotved in the
21 WINRIP packages.
All the twenty one (21) packages require environmental impact investigations and studres
which need the approval by Environmental Agency {BLH).
Nine (9) of the twenty one (21) packages are categorized under "Category A" projects
wherein AMDAL,/EIA studies are required and have to be approved by World Bank. The
nine (9) packages are covered only by five (5) AMDAT/ElA studies as some single study
covers a combination of two (2) or three (3) sub-projects as indicated in Table 10. While
2L social studies (SLARAP and IARAP) require the approval of the World Bank. All the 22
environmental studies for the twenty one (21) sub-proje
I
I
I
I
I
I
I
l
t
I
t
I
I
I
I
I
I
I
I
TECHNICAL ASSISTANCE FOR SUPPORT OF THE PROJECT IVANAGE[/ENT
UNIT
CORE TEAM CONSULTANTS (CTC}
QUARTERLY REPORT
For the First (1't) Quarter of the year 2016
Period : January 201G to March 2016
T
I
I
I
MINISTRY OF PUBLIC WORKS & HOUSING
DIRECTORATE GENERAT OF HIGHWAYS
DIRECTORATE OF PLANNING
Core Team Consultant
for
Western Indonesla National Roads Improvement pFject
(WINRIp)
IBRD Loan t{o.8043_ID
Our Ref.No.
I
I
I
t
I
I
I
I
I
I
I
I
I
t
I
Directorate General of Highways, MpWH
Jt. Patrmura 20 Kebayoran Baru
Jakarta Selatan
Indonesia
Attention :
lr. Agusta E. Slnulingga, M.T
Offfcer in charge pMU WtNRtp
Subject
In compliance with ltem No 3 (List of Documenis
To Be Delivered) of our consultancy contract,
we submit
Progress neport coverint tn" nlfi"ici".rt"r
of the year 2016 (January, February,
[,T.t"X'tNo|[j.n"tnerlv
6 reproduced and submitted in twenty (20) copies
for distribution to all concerned authori.es.
cr
3:?#3"t3r:inilffimment additional intrmation that need to be incorporatod in the Reporr, prease
This report
Team
Cc:
1.
ERA
4.
), Kementrian Keuanaan
, Dit.Jen Bina Marqa
Bina Marga
5.
6
7.
ina Marga
8.
Marga
I
U-PERA
10.
Kementrian Dalam Neoerl
11.
r Negeri
1a
IJ
14.
15.
16.
17.
18. Yongma Engineering Co, Ltd
19. r-/.r. Epadascon permata Engineering
20.
Pl
FIJC
PERENTJA|,IA DJAiA in subconsultancy
with ei
elaksana Witayah I, DJBM
etaksana Wilayah l, DJBM
etaksana Wilayah l, DJBI\,4
dan Petaksanaan pengendalian pHLN
Consultant
-
yongrna tngineeringco.
Ltd and
EpadEscon permara I ngineering consultanl
=tpT.
(ebayoran Baru, Jakart3
Setatan,
CTC Office: Jl. Ciniru Vtt No. 25,
Phane /Fax: (021) 7229823
12180
tB
E
I oI (JE
o
IJ
J
I
I
{
7
I
I
,t
{
l,;.i
I
trl
a
o
E
IG
t
I
t
I
I
I
t
T
I
..
t
-{
+ J
' t,
F
lF .J
z
-1
a--
';2
5?
:
fr.r.
4
Si
-1
'El
t
i,s
ts
s
1
U)
J
Tq
a
a<
v,7
Et
i
,1
rfia
F
I
I
I
I
2016 Quarterly Progress Report
1* Quarter : -lanuary-February-March
Table Of Contents
Executive
1.1
Current lmplementation
Situation
.........................
1
I
l
t
I
I
I
I
t
t
I
I
I
t
I
I
2
General
4
Road Safety Audit
5
............,..,.... 5
........,,,..............29
I
I
I
t
I
I
li
I
I
t
I
I
l'
I
I
I
I
t
l
2016 Quarterly progress Report
l'tQuarter : January-February-l4arch
ANNEXES
Annex P-l
Package No. 1 (Biha
Annex P-2
Package No. 2 (Pd. Sawah
Annex
Package No. 3 (Manggopoh
P-3
-
Krui)
-
Sp. Empat)
-
pd. Sawah)
Annex P-4
Package No.4 (tpuh
Annex P-5
Package No. 5 (Sp. Rampa
Annex P-6
Package No. 6 (Ps.
Annex P-7
Package No. 7 (lndrapura
-
Annex P-11
Package No. 11 (Bantal
Mukomuko)
Annex P-13
Package No. 13 (Sp. Rukis
- Tj. Kemuning)
Annex P-15
Package No. 15 (Sibolea
Bts. Tapsel)
Annex P-17
Package No. 17 (Sp. Gunung Kemala
Annex P-19
Package No. 19 (Lais
-
Bantal)
-
poriaha)
pedati- Kerkap)
-
-
-
Tapan)
Bintunan)
-
pugung Tampak)
T
I
I
I
t
I
I
t
I
I
I
I
I
I
t
I
I
I
I
2016 Quarterly Progress Report
1't Quarter : January-February-March
APPENDICES
Appendix
1
:
Disbursement and Expenditures Status
Appendix
2
:
Report At The End ofThe euarter (March 2016)
Appendix
3
:
Detailed Summary of the Project Cost Monitoring
Appendix 5
Procurement Plan for Consulting Services
Appendix 6
list of Names of Community Representative Observers
Appendix 7
Anti Corruption Action Plan (ACAp)
(CRO)
Activity Progress of Community Representative Observers (CRO)
Appendix 8
list of Appointed Third Party Monitors (TpM)
Appendix 9
Progress of Third
Appendix 10
Complaints Handling Mechanism System (CHS)
Appendix 11
Work Activities On Publication/Disclosure
Appendix 12
Environmental Safeguards
Appendix 13
Environmental Management plan {EMp) Compliance
Appendix 14
Status of Monitoring of Environmental Mitigation
Appendix 15
Overall Land Acquisition Status as of end of March 2016
Appendix 15
Status of Road Safety Audits
Appendix 17
Summary of Workshops and Trainings In 201.3 up to March 2016
Appendix 5-1
Summary of Studies and Reports (Environmental Activitv)
Appendix S-2
Summary of Studies and Reports (Social Activity)
Appendix 5-3
Community Development Activity Reports
Appendix 5-4
Community Representative Observers (CRO) Reports
Pa
rty Monitoring (TpM) Activities
I
t
I
I
I
I
I
t
I
t
I
I
I
I
I
I
I
I
I
2016 Quarterly Progress Report
1* Quafter : January-February-March
Executive Summary
1.1
Currentlmplementationsituation
1.1.1 Civll Works
lmplementation of the wrNRrp project is schedured to be impremented into three
{3)
Annual Work Programs (AWp's). The implementation starts with the
ments (detailed design drawings including associated bidding documents),
tendering stage (procurement of works) and the actual civil works construction
implementation.
The orlginal implementation schedules of the three (3) Annual work programs (AWps)
are scheduled in three (3) phases, namely ; AWp_l to start in mid_2011and
to be
completed on the last quarter of 2OL4, AWp-2 is expected to begin in mid
ZOlZ with
target date of completion by mid-2016 and AWp-3 is expected to start during the
earry
part of 2013 and to be completed during the middle part of 2017.
However, due
to
some unavoidable circumstances
the original
implementation
schedules did not materialized.
Based on the present status of the program implementation progress, a
revised
implementation schedure, the project rmprementation Timerine (as shown on page
2) is
to be implemented in order to accommodate the originaly derayed schedure into
the
remaining time frame of the WlNRlp program until the expiry date of the loan
agreement by the end of December 20u. shown on page 3 is the current construction
status of the implementation relative to the project rmplementation Timeline.
Table I
shows the present status,
Table 1 - lmplementation Status as of End of the
L
Krui- Biha
2
Padang Sawah -Sp,Empat
3
ln euarter on March
31, 2016
Completed
ManBgopoh - Padangsawah
Completed
lpuh - Bantal
5
Sp, Rampa- Poriaha
6
Ps.
7
Indrapura -Tapan
gts.Pariaman - Manggopoh
8
10
1,1,
Pedati- Kerkap
Sp. Ernpat- Sp. Air Balam
Bantal- Mukomuko
Kambang- Indrapura
Sp. Rukis - TJ.KemuninS
14
Painan'Kalrlbang
Slbolga - Ets.Tap Sel
seblat
-
lpuh
17
5p.Gn.Kefiala - Pg.Tampak
19
Lais
20
Lubok Al'rng - Siclncih
-
Bintunan
LubukAlunB - kuraijati
TOTAI:
Note i Package No.9 and package No.1B cnncelled lrom the program.
Western Indonesia National noads Improvement project
74
11
4
I
I
I
-c
I
E
6
p
,9
il
I
6t
=
(tl
OJ
E
IF
I
I
(y
i,t,l
'6
l
E,'
ni
.9
*
:.
6
,'i
o-
.:
t: i'. a ;l
:ri
L
t
a
'd
I
I
I
I
t
I
I
E
F
(l
OJ
E
c)
Bs;
;
I
;
, i,
i.ta
| ".r i
r:
;)
l:ii,.:ll
,.
il
: !:at),
!'I
Iol
9l
a!.
I
>.1
T4)
E
I
I
!i:
i:!
qJ
CJ
I
i!,
CY
q
c{l
I
T
I
I
e
I
o
I
6
!:
j'
8
ot:
T
di
T
E
z
I
3
o
0,
I
I
I
q,
3:!
G ia
3 EB
o
ru
"84:
E
lE
s
E
I
b
.
E
E"
tnF
dEi
s5i
T
3-'6 Fd
n*!!:
!*iieE
OJ
I
E
o-
I
o.
E
ET
qJ
I
6
Y
9E
_u
.i;
Rt
o-
t{o
N
olo
d
d
(o
T
c
c(J
E
T
I
I
I
E
dJ
'a
E
z|o
.s
(lJ
d<
E
a
c?
6
c)
3
2016 Quarterly Progress
I
I
I
Report
lsQuafter : January_February_March
1.1.2 Consultancy Services
Actual
signed
Moblllzation
ct-c
Jul201-2
5 Nov 2012
12 Nov 2012
DSC
Jul20L2
11Jun 2013
19Jun 20'13
Capacity Building for Djsaster
Cancelled
Slope Protection Design and
Stillto be
Management
I
t
I
Contract
Capacity Building
for
Environmental Management
Capacity Building for
Road Safety
Procured
Cancelled
Cancelled
The technical assistance for consultancy of ,.Capacity Building For Di: iaster Risk
Reduction" has been deleted, but replaced by ,Technical Assistance for Study
onSlope Stabilization Design and Management,.
T
To accommodate the new consultancy assistance, allocated funds from t lategory 3
which is originally intended for "Capacity Building for Disaster Risk Redu ction" has
I
been realigned to Category 2 to fund the implementation of ,,Slope Protection
Design and Management".
T
I
I
t
I
I
t
I
t
t
1.1.3
3oods
At the end of this reporting quarter, no goods were procured.
Western Indonesia Nationa Roads Improvement Project
4
t
I
I
I
2016 Quarterly Progress Repoft
t,2
1+
Quarter : January-February-March
Current Status of Loan
At the end of this quarter (March 2015) some usD 52.94 million of the USD 150.38 million
forcasted expenditures representing 60.L5% of the available loan had been disburseq.
Disbursement is considerably behind schedule by 39.97% of the forecast expenditures,
while 71.05% of the time has already elapsed with the main reason for the delay being the
long period waiting for the implementation of the remaining civil works contracts and slow
progress of the thirten(13) on-going construction packages.
Total disbursements during this Quarter amounted to usD 4.659 million covering the
payments for "statement of work Accomplished' (Mc) to civil works contractors of the
on-going construction packages, advance payment to contractor of contract packages g
and replinesment of special Account under category 2. Details of the Disbursemenrs
and Expenditures Status are presented in Appendix 1.
I
I
A more detailed and updated status of the loan are fully described and presented in the
Thirtenth (13'n) Quarterly Financial Report covering the 1't euarter (January, February,
l,
I
t
I
I
I
I
I
I
I
March) of the Year 2016 which is under preparation and will be submitted separately.
1.3
Current Problems and Action Required
Program
2 Nos, Under
construction completion stages.
2 Nos. Completed and provisionally handed over. lJnder
defects liability period for two (2) years.
Responsibility
Contractor
DSc and CivilWorks Project
Manager
AWP.1
I
Nos.Two (2) out of the eight (8) packages under construction
are way behind schedule with huge percentages of
negative progress slippages. Contractors of the
problematic packages shall resolve immediately the
AWP-z & AWP-3
current prroblems.
Agreementjust recently signed.
3 Nos. Contract Agree ment for signing
2 Nos. For confirmation by World Bank and Ministry to award the
2 Nos. Contract
contrad . Some
2 Nos. Cancelled
Capacity Building for
Disaster Risks Reduction
Slope Protection Design
and Management
issues are
stillto be resolved.
from the program.
Contractor and
PPK
and Dsc
POKJA
Civil work Project Manager,
DSC, POKJA and CTC
PMU and MPW
Cancelled
Stillto be procured
5ub-Directorate of
Environmental & Road
DTA.DGH
Capacity Building for
Environmental
Management
Capacity Building for
Road Safety
I
t
Activity
Cancelled
Cancelled
Western indonesla National Roads Imorovement proiect
Safe{
t
t
t
I
2016 Quarterly Progress Report
1* Quarter : January-February-March
General
2,1
ReportingRequirements
Ouarterlv Proeress Reoorts: This ls the ninth (gth) euarterly progress Report as
required and stipulated in CTC's consultancy contract andthe Loan Agreement. prior
to the production of this report, Monthly progress Reports have been prepared ano
have dealt with all aspects of the works. This report attempts to bring the situation up
20'J,6.
I
I
t
T
I
t
I
t
I
I
t
I
I
I
t
Financial Monitorlng ReDorts: These have been prepared for each quarter since the
beginning of 2013 with ihe first Report, issued in May 2013, covering the period
January
-
March 2013. Since that date quarterly reports have been prepared and
submitted regularly.
Report
Financlal Monitoring Report No. 1
Financial Monitoring Report No.2
Financial Monitoring Report No. 3
Pedod Covered
-
January 2013
March 2013
April 2013 -June 2013
luly 2013 - September 2013
Financial Monitgring Report No.4
Financial Monitoring Report No.5
Financial Monitoring Repon No.6
October 2013
Financlal MonitorinB Report No.7
Financial Monitoring Report No.8
Flnancial Monitoring Report No.9
July 2014
October 2014
Financial Monitoring Report No. 10
Financial Monitoring Report No, 11
Financial Monltoring Report No. 12
Financial Monitorlng Report No. 13
July 2015 -September 2015
October 2015 - December 2015
-
December 2013
March 2014
-
January 2014
April2014-June 2014
-
September 2014
-
January 2015
April 2015
December 2014
- March 2015
-
June 2015
Dste lssued
May 15,2013
August 15, 2013
November 15, 2013
February 15,2014
May 15, 2014
August 15, 2014
November 15, 2014
April 7, 2015
August 31, 2015
October 2, 2015
December 16, 2015
February 10,2016
under Preparalion
Monthlv ProEress ReDorts: These report have been prepared covering each full
month since January 2013. Subsequent reports have been submitted on a regular
January 2016
March 2016
CTC
monthly basis.
Environmental Studles and Activiw Reports: These report have been continuously
updated and submitted to PMU for submission to World Bank for Bank's issuance of No
Objection Letter (NOL). Appendix S-1 shows the summary of submitted of Reports
covering each contract package since inception of the project.
Soclal lmpact Studies and Activiw Reoorts: These report which mainly dealt with the
implementation of "Land Acquisition Resettlement Action plan', (LARAp) have been
continuously submitted to PMU for submission to World Bank for Bank's issuance of
No Objection Letter (NOL). Appendix S-2 indicates the updated summary of all
su bmitted Reports.
These Reports have been prepared and continuously submitted to the Client.
Appendix S-3 shows the summary of submitted Reports from the very first (1't)
submittal up to latest report before the Quarter ended.
ReDorts: These Reports were consolidated and reviewed by CTC as prepared and
submitted by the appointed CRO's and TPMs of the respective contract package.
Their reports were based on their actual observations and monitoring during pre-
I
I
I
I
I
I
I
I
I
t
t
I
I
I
t
I
2016 Quarterly Progr€ss Report
1$
Quarter : January-February-Marcn
bid meetings, site visit and bid openings of every contract package under procurement.
Appendix S-4 shows the updated summary of all reports which were forwarded to pMU.
2,2
loan Status
The agreed allocation of loan funds from the original loan agreement together with the %
disbursed to the end ofthe quarter date (March ZL, ZOI6I is Dresented in Table 2
Des.rlpdon
for the 16 Quare' ot
2016
220,4m/mo,m
3,369,796.03
43,986,071.ss
47 ,354,857 .5A
2t 49
17,0@,m.0o
1,299,000.co
4,284,880.83
5,5$,a808a
32€5
0
0,00
0
o
o
0
o
0
0
o
o
4t,269,952.38
52,93A,7 4a.41
21,18
Eettef ment and capacity
E)(pansion of National Roads
Part 2
2
Iot€l olsbuEed by
WB to End MaEh 31,
2016ln UsS
Amount UsS
lmFlementation Support
Part 3
3
flo.d Sedor lnstitutional
0
Cont insency for Disaster
A is
k
OdEInElLo.n
2.3
12,6m,mm
0,m
2S0,0oo,000,@
4$6At7
.O3
Financial Management
S-Curve for Financial Progress
E
E in
tl
tur6
5!34 mll(21,13*) _
10.0c
o00
l
T
I
A report at the end of the quarter (March 31, 20j.6) is presented in Appendix 2
Western Indonesia National Roads lmorovement pmiect
I
I
2016 Quarterly Progress Report
2.4
I
t
Project Cost Monitoring
A detailed summary of the project cost monitoring in tabular format is presented
2.5
as
World Bank lmplementation Review Mission and Site Visit
During this quarter period ending on March 2016, the World Bank,s Technical and
Financial Audit Consultants (TFAC) mission performed and conducted sit€ audits on
The mission visited the two (2) contract packages from February Zg, ZOf6 to March 4,
2016 in order to access the following :
.
.
The quality of works implemented by the Contractor, site management and
quality control and compliance of equipment.
The actions taken by the Design Supervision Consultant (DSC) concerning
qualiW control role.
I
.
Follow-up inspection of what actions taken up by the Contractor on the
remaining non-conformance works that we re previously inspected way back in
November 2015.
the period ended, the regular monthly progress meeting was held to review and/or
update the implementation progress and monitoring the key activities on the Agreed
Key Action Plans".
T
As
Also taken up during the meeting was the presentations of the results of the TFAC
audit reports and recommendations to rectify the non-conformance findings.
An "Agreed Key Action Plans" for progress compliance monitoring of the status of the
works on weekly, bi-monthly and monthly intervals is shown in Table 3.
Table 3 "Agreed Key Action and Plans"
Status as of end of lst Quarter
Updated Status
Action
No,
t.
2
Review
BERS
By Whom
of packages 14 and 16
.
Done
PMU and CTC
.
Mid of February
to Bank
PMU and CTC
.
Done
Inform the Bank about the steps DGH has taken/will
take in the case of the misreDresentation of facts in
the bidding of Package 8 in response to the letter
PMU and CTC
Send signed
contract extension of Package
Send signed contract extension
4
to Bank
of Package 2 and 3 to
Bank
T
5,
PMU and
CTC
.
WINRIP/265 of December 9, 2015. lf DGH is not taking
any steps, please inform as also
Inform the gank the bidding process of package 10
Western Indonesia National Roads Imorovement proiect
New Deadlines
March 29, 2016
Ban k
Submit si8ned contracts for packages 8 and 12
t
I
I
Quarter : January-February-March
Appendix 3 at the end of this report.
I
I
I
I
t
t
I
I
I
1o
.
April 1, 2016
.
AprilS, 2016
Consultation with
Legal Department
As soon as possible
onSorng
PMU and CTC
.
February 1,2016
.
April 8, 2016
I
I
I
I
2016 Quarterly Progress
Report
l*Quarter
Updated Status
No,
7.
Actlon
By Whom
Send to Bank response to letter WlNRtp /279 of
January 12, 2016 regarding the extension of bid
10.
t'
I
I
I
I
I
I
I
I
I
I
t
t
PMU and CTC
Inform the Bank about the plans regarding the Slope
PMU, CTq
Protection in Package 3
DSg WB
for
contract
modification of package 6 (40% increase)to Bank
Inform the Bank about DGH'S plans to cover the
additional drainage and slope protection
.
New Deadlines
29,20L6
Done
.
May 15, 2016
PMU and CIC
.
May 15, 2016
Bank
.
AprilS, 2016
PMU and CTC
.
Done
requirements under packaBe 19
Send a letter
11,
r|r'|arch
validilies
Send technical support documents
9.
t
I
: January_February_March
to
DGH |.eBarding
the swamp area
in
package 19
Subdit
Publish the Request
t2.
for Manitestatlon of Interest for
the slope stabilization, design, and manaBement for
the Bank's review
Construction
Once
Geotechnic
.
February 1, 2016
procurement
and Stability
system
and cTc
Send the RfP for the slope stabilization, design, and
manaBement to Bank for NOL
Send to
CTC
Send to
-15
L6.
the
Bank
the request for the extension of the
contract
the
to the contract
contract (end date December
PMU and CTC
send to the Bank an update of the environmental
monitoringtable in annex 4 includingthe information
PMU and CTC
DSC
.
Done
.
Done
.
End
of
.
End of April 2016
.
Mid-April2016
r
End of April 2016
.
End
.
2 June 2016
Feb 2016
201.6)
on the auarries
5end
the envi.onmental management and monitoring
Carry out the workshop
on HtV/
A|DS
for
new
packages
19.
PMU and CTC
Bank the resFonse related
modification to the
plans {RKPPL) for packages 5 and 17 to the Bank
18.
PMU and CTC
the Bank
approves tne e-
.
PMU and CTC
PMU
/ C'tcl
DSC
the tirst environmental management and
monitoring implementation reports tor all packages
under construction to the environmental agencies
RKPPL package
#05&17 will be
submit on mid of
Feb 2016
(PackaBe No.7)
Send
(refer
to
annex
4 or
ofApril2016
Packages
crc/DGH
.
environmental safeguard
No.2,4,6,11&19
end of April 201.6
Packages
No.1,5,7,13,15 &
for of lune
compliance table)
17
2016.
20.
Carry out environmental supervision missions jolntly
with the Environrrental Agency in order to make sure
contractors cornply
with their
management plans (RKPPL)
Vestern lndonesia tla
environmental
PMU lCtC
Bank
/
ABency
/
Env.
.
April& May 2016
I
I
I
t
2016 Quarterly Progress Report
1$
Updated Statut
No.
2L.
Action
By Whom
Request additional budget for LARAP implementatlon
t
I
I
I
I
I
I
I
I
T
I
I
.
.
March 30/ 2016
.
April 15,2016
.
Mid-April 2016
.
lMay 15,2016
.
June 30,2016
.
Done
.
Noted
.
N
.
April 15, 2016
.
March 31,2016
.
April30,2016
.
May 15, 2016
.
Noted
As soon as possible
Inform the Bank about the measures that will be taken
17
to accelerate LARAP implementation for packages 12,
13, 14 15, 20 and 21, which is risking to seriously
PMU and cTc
w6.((
Submit to the Bank additlonal IARAP document for
I
I
New Deadllnes
March 29,2016
PMU
in 2016 (DIPA revision), especially for package 13
delav the stan/imblementatidn o{ rhF
t
Quafter : January-February-March
23.
24.
PMU
package 16
Submit
the
IFR
for January to Mdrch 2015 to the Bank
Submit 2015 financial audit report to Eank
.
PMU
.
PMU and
cTc
26.
Disclose updated procurement plan after Bank
approvalin the Winrip website linked to MpW
Website
.
.
February 5, 2016
PMU
Update the newsl€tter quarterly, including the Iist of
contracti, lmplementation progress, project related
27.
workshops and number, typology and status of
r
PMU
.
Every
quarter
complaints
Send quarterly newsletterto the civil societv forum in
28,
?q
each project province in hard
electronic mailing system
Provide feedback to the formalresponse tothe
quality improvement support inspection reports TFAC
for packages 2, 3, 4 and 19
Provide
?n
copyorthrough an
a
package 1
31.
33
a
Every quarter
Bank
r
PMU/Dsc
.
PMU/DSC
formalfollow-up responseto quallty
improvement support inspectlon reports TFAC for
package 11
Regularl\/ submit the quarterly progress reports to the
nk
Ba
2.6
.
fornalfollow-up response to quality
improvement support inspection reports TFAC for
peckage 19
Provide
32.
a
r
PMU
formal follow-up response to quality
improvement support inspection reports TFACfor
Provide
.
.
PMU/Dsc
PMU
Project Steering Committee MeetinB
No Steering Committee meeting during this quarter.
Vestern Indonesia National Roads Improvement
poect
oted
.
Each calendar
I
T
I
2016 Quarterly Progress Report
1$ Quarter : January-February-Marcn
Project Management and lmplementation
3.1
Procurement Status
(A) Civil Works
T
I
t
I
I
I
t
I
t
I
I
I
I
I
I
I
Civil Works are now being implemented
in Annual Work programs {AWp) which have
All Contract Agreements for the four (4) AWP-1 contract packages were signed by the
end of 2013 with actual work commencement on January 2014.
Under the other two (2) implementation programs, AWp-2 and AWp-3, nine (9)
packages were already procured and are on-going construction, while and the other six
(6) packages are under final procurement stages.
Table 4 Shows the actual pre-construction and procurement status under the
implementation schedules AWP-2 and AWP-3
Table 4
No.
AWP.2
5
Sp. Rampa - Poriaha
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on June 18, 20L5
6
Ps. Pedati- Kerkap
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on March 11, 201.5
7
Indrapura
8
Bts-
Pa
-
Tapan
riaman
Sp. Empat
-
-
Sp.
Ma
Air Balam
Procured. Under construction since the
issuance of Notice To Proceed (NTP) on
December 10, 2015
Procured. Under construction since the
issuance of Notice To Proceed (NTP) on March
Revised Bid Evaluation Report (BER) and award
of Contract has been issued No Objection Letter
(NOL) on February 22, 2016 by the World Bank.
Announcement and notification of awafd bv the
Ministry is still pending due to some issues that
are
Bantal - Mukomuko
Kambang
-
Ind
ra
pura
Western Indonesia National Roads Improvement project
stillto be |."r:iu"1
___
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on February 23,
Signing of Contract Agreement by the
contracting parties was executed in January 28,
2016. Bank issued NOL and Form 384 on March
2016
I
]
l
2016 Quarterly Progres
1s Quafter : January-February-
Yla
I
I
I
I
I
Sp. Rukis
-
Tj. Kemuning
Procured. Under construction since the
issuance of Notice To Proceed on July 22,
201,5
AWP-3
Bid Evaluation Report {BER) as well as the
Painan
-
fecommenoalton IoI award ot contract has
been forwarded to World Bank on March 21,
Kambang
2016 for request of issuance of No Objection
Letter {NOLl.
ocured. Under construction since the issuance
Notice To Proceed (NTP) on November 20,
1sl
l
sed Bid Eval'ration Report has been
bmitted to World Bank on March 21, 2016,
me issues are still to be resolved prior ta
uance of NOL,
77
. Sp.Gn.Kernala
-
Pg.
Tampak
.**a.
Una.,
""*tru"tion
of NoticeTo Proceed
(NTP)on
l
rin"" tn" isru"ni"
]
September4,
i
cured. Under construction since the issuance
Notice To Proceed (NTP) on March 11, 2015
ntract
has
l
I
I
issued No Objection Letter (NOL) on
h 23, 2016 by the WrnO U:nO:_
]
Evaluation Report {BER) and
ommendation for award of contract has
issued No Objection Letter (NOL) on
h 23, 2016 by the World Bank.
l
I
I
Note : Packages No,g and No.18 are cancelled from the program.
Presented in Appendix 4 is the current status of procurement management.
(B) Services
The Core Team (CTC), Design & Supervision Consultant (DSC), and the others Capacity
Building Consultancv status are discussed in Section 3.4.
3,2
lmplementation Status
-
Civil Works
As of end of this reporting quarter ending (March 2016), there are currently eleven {11)
contract packages that are under construction. Construction implementation of two (2)
contract packages under AWP-I. program have recently been completed with the
issuance of "Taking Over Certificates" (TOC) and are now currently under defects liability
period for twenty four (24) months effective on the dav the TOC were issued.Details of
each contract package are shown ln Table 5.
I
Western Indonesia National Roads Improvement
project
!2
rch
I
I
t
I
I
I
I
t
t
I
t
I
I
I
I
o
F
-
a)
6
d
E
o)
E
o
-tr
lz
ti
ts
o
E
E
a
!
o
cl
3
g-j
.e
Cfl
z
,E
dJ
c
oc
0
E
5
IN
3
I
(u
3
I
I
I
I
I
I
li
I
I
T
I
T
I
t
I
I
I
l
t
2016 Quarterly Progress Repoft
lst Quarter : January-February-March
Activities done during this month were repair and restoration of deteriorated existing
pavements, roadway excavation, embankment formation, spreading of granular
pavement for roadway widening, asphalt paving, structural works, construction of stone
masonry side ditches, stockpiling of raw material, production of crush aggregates, other
minor works, bridge construction and finalization of ',Field Engineering,,surveys.
The four (4) contract packages under implementation program AWp-1 were not
from 15 to 125 calendar days were granted extending the completion dates at the
earliest on January L0, 2015 and the latest on April !9,20f6.
Physically, two (2)
ofthe contract
packages has already been fully completed and
recently handed and taken over by the Client, while the two (2) other packages are about
to be completed next month (April 2016).
Under the implementation program AWp-2 and AWp-3, there are currently eight (8)
contract packages that are on-going construction implementation and one (1) contract
package have just been issued Notice To Proceed (NTp) to commence works. physical
progress of two (2) of the packages are lagging far behind schedule with negative
sfippages of -42.77y" and -57.87% while progress for the other six (G) packages are still
slightly on or behind schedule.
Generally, with the exception of the two (2) contract packages with huge negative
slippages, the civil works implementation is fairly in the right direction.
Progress status of the thirteen (13) on-going civil works contracts as of this reporting
period are shown in Table 5.
Following are brief status of the thlrteen (13) on-going construction contract packages
Package No.
:
1: Blha - Krui
The contract package is substantially completed on January 20, 2016 and provisionally
handed over to the Employeer.
Taking Over Certificate of the Works has been issued by the Engineer on the same day of
the Provisional Hand over (PHo) which is also the starting date for "Defects Notification
Period" until after t\lvo (2) years reckoned from the issuance of the
TOC.
A more detailed previous status of this package is presented in ANNEX p-l Executlve
Summary Report.
Package No. 2 : Padang Sawah
-
Sp. Empat (tncluding Air Gadang Bridgel
As the end of this reporting period, the overall work progress based on the revised
schedule is 96.83% with at least 3% of the works still to be done until the revised expiry
of the comDletion time.
To date, the remaining 25 calendar days left from the revised extended construction
perlod is more than enough for the contractor to complete the remainins works until the
Western Indonesia National Roads Improvement project
74
I
I
I
I
I
I
I
I
I
I
I
I
t
I
I
-c
P
io
=a
o
l
{.t
T
c(!
f
c(q
o
.G
E
0)
'd
E
q.)
E
(U
soE
tg
tf,
I
E
6
.F
(E
z.
.a
l3
o
o
E
c
c
IN
=
o
E
a
In
(u
I
I
I
I
I
I
lr
I
I
I
t
t
l'
I
I
I
I
I
I
2016 Quarterly Progress Report
1$
quarter : January-February-March
revised take over date on April 19, Z016, but this will depend with the progress and
completion of Air Gadang Bridge.
With regard to the construction of Air Gadang Bridge, all the 20 pre-cast girders required
were launched in place and two (2) spans out ofthe four (4) spans of bridge deck has
been casted as of end of this quarter endinB March 2016. Construction of approach
roads are also on-going during the period.
ANNEX P-2 Executlve Summary Report present a more detailed status of the Contract
Package.
Package No. 3 : Manggopoh
-
Padang Sawah
The contract packages is substantially completed some few days before the target date
of compfetion on March 20,2016and provisionally handed over to the Employeer on
March 1Z 2016.
Taking Over Certificate of the
Work
has been issued by the Engineer on the same day
of
the Provisional Hand Over (PHO) which is also the starting date for,,Defects Noflfication
Period" until after two (2) years reckoned from the issuance ofthe TOC.
A more detailed status of the project progress are shown in ANNEX p-3 ,,Executive
Summary Reporf
.
Package No. 4 : lpuh
-
Bantal
Although the Contractor has been granted time extension of completion from January 9,
2016 to April 11., 2016, the current status of this contract package still remain in critical
situation with respect to the revised completion date.
Durihg this quarter ending March 2016, the actual overall progress is 91.02%
8.38% ofthe work still to be completed.
with still
Based on the Contractor's performance during the course of the contract, it seems
doubtful that the remaining 8.38% of the works can be completed on the target date of
completion, considering that only 17 calendar days are remainlng to complete the
balance of the works.
Shown in ANNEX P4 "Executive Summary Report,' showing the details and status of the
project.
Western Indonesia ltational Roads ImDrwement prolect
t
I
I
T
2016 Quarterly Progress Report
1s
Package No. 5 : Sp. Rampa
-
Quarter : January-February-March
Poriaha
To date, since the commencement of works started nine (9) and half months ago, the
actuaf physical work progress is only 10.11% against scheduled work progress of SZ.Ba%.
The delayed works further accumulated to -42.77%atthe end of this month.
with only 48% or eight (8) months of contract time are left and a huse deflcit of unfinish
attained unless drastic actions from the part of the Contractor will be enforced.
I
t
I
I
I
t
t
t
I
I
t
t
t
t
I
Other problem that hampered the slow progress of the works which shall be addressed
immediately by the concerned authorities is the unexpected ROW problems wherein
some improvements such as trees and other obstructions exist along the alignment.
Considering that the current problems are resolved anwime soon and in order
Contractor
for the
to catch-up with the schedule to meet the completion date, at least 11%
progress per month have to be achieved.
ANNEX P-5 "Executive Summary Report" shows the Contractor,s progress Schedule.
Package No. 6 : Kerkap
-
Ps. Pedati
Based on the original progress schedule ending on the quarter month of March 2016, the
actuaf overall physical work accomplished is 27.55% out of 85.30% schedule or -57.81%
negative slippage.
Work during the whole 1* quarter were very minimal and were
mainly focused on Asphalt Pavement and Routine Maintenance Work items-
the period ended,72% of the works still remain to be done while 84% of the contract
tirne have already elapsed and based on the Contra€tor,s performance and average
progress per month during the past 13 months, completion date on June 2, 2016 is not
As
possible.
The major work item which conributed
to the huge negative slippage is the Aspahalt
Pavement. To date only 9.10% out of the 70.65% component of whole works has been
accomplis hed.
However, in the event that the recently concluded ,,Field Engineering,, results with
proposed 90 calendar days time extension will be formally approved, the completion
date will be moved forward to August 31, 2016.
ANNEX P-6 "Executive Summary Report" shows the complete details
of the contract
package.
Package No. 7: Indrapura
-
Tapan
The contract package just recently commenced on December lO, 201,6.
During the period from the issuance of Notice To proceed (NTp) until end of this quarter,
contractor concentrated on the preparation for mobilization at site and finalization of
the Field Engineering.
Western Indonesia National Roads Improvement prol:e€t
17
I
t
I
I
2016 Quarterly Progress Repoft
1" Quarter : January-February-March
During the period only small percentages
of the General, Structure and Routine
Maintenance works have been done accumulating to just 0.14% progress for the whole
month
ANNEX P-T "Executive Summary
Reporf shows the complete details of the contract
package.
Package No. 8 : Bts. Kota Pariaman - Manggopoh
Notice To Proceed (NTP) to commence the works has been issued on March 23, ZOf6.
I
I
I
I
I
I
T
T
t
I
I
t
I
t
I
At the time of the preparation of this Report, there is still no work schedule {S-Curve)
submitted by the Contractor.
Package No. 11 : Bantal - Mukomuko
the revised schedule due to approval of the results of "Field Engineering,,, the
actual overall progress attained by the Contractor up to end of this period is 3a.a7%
Based on
against 43.85%.
At the end of the 13th month of the contract period, Contractor,s performance with
respect to their work progress seem to be satisfactory as the negative slippage have
been minimized to a single digit. In other words, the Contractor have no difficulty in
compf eting the works on or before the target date completion February II,2Ol7 .
For more details of the Contract Package, refer to ANNEX p-11 ,'Executive Summary
Report".
Package No. 13 : Sp. Rukis
- Tj. Kemuning
The current work progress showed sign of slowing down for the past three (3) months as
onlv 0.24yo prcgress has been achieved during this period.
At the end of the month, the overall work accomplished is L4.62% of the 26.94%
schedule at month's end. The negative slippage suddenly dropped from -5.99% in the
preceeding month to -12.32% this month.
The negative slippage is still manageable at the moment, provided the Contractor will
take immediate actions on problems that are hampering the work progress. Barring any
unforseen circumstances that will disrupt or interrupt the construction implementation,
it is expected that the project can be completed on-tirne or even ahead of the schedule.
Details
ofthe work
progress are shown in ANNEX P-13 "Executive Summary Reports',.
Package No. 15: Sibolga
-
Bts. Tapsel
The contract package just recently comm enced on November 20, ZOLS.
During the period from the issuance of Notice To Proceed (NTP) until end of this month,
Contractor concentrated on the preparation for mobilization at site
Western Indonesia National Roads ImDrovement Proiect
.
I
I
I
I
I
I
t
I
I
I
I
I
l
I
I
I
I
t
I
2016 Quarterly Progress Report
1* Quarter : January-February-March
At the end of this reporting quarter (March 31, 2016) actual overall progress achieved is
of the
5.57% schedule. During the whole quarter, the Contractor mainly
concentrated on mobilization to site and minor roadworks on Drainage, Earthworks,
L.69%
Structures and Reinstatement and Minor Works-
Detailed and work progress
"Executive Summary Reporf .
of the contract
package
are shown in ANNEX
p-15
The current status of the sub-project is fairly being implemented as evidenced by not
incurrring any negative slippage since the Contractor commenced works way back in
September 4, 2015.
Overall progress to date is 6.15% against 6.10% schedule, or the progress is slighty ahead
of schedule by +0.06%.
lf Contractor can maintain the trend of their monthly progress, there is no reason that
the works could not be completed on or before the target date of completion on August
23, zoL7.
ANNEX P-17 "Executlve Summary Report'' shows the complete details and work
progress of the project.
Package No. 19 : Lais
-
Bintunan
on corrected revised progress schedule by incorporating the results ,,Field
Engineering:'and 125 calendar days time extension, the progress of work have
Based
considerably improved as compared in the previous months.
At the end of the period, the total overall progress attained is 80.18% against 79.68%
schedule or +1.10% ahead ofschedule.
Complete details
ofthe contract
package are shown in ANNEX p-19,,Executive Summary
Reporf'.
Western Indonesla National Roads Imorovement Proiect
19
I
I
I
t
2016 Quarterly Progress Report
l{
I
I
I
I
I
To date, amendements and/or variation orders for six (6) on-going construction contract
packages were already processed and approved by Pejabat Pembuat Komitmen (PPK), the
authorize Office to approve financial disbursement.
The approved variations orders were due to the following reasons
:
Change of PPK Sub Project Manager.
Contract amount revision due
results.
to Technical Justification of Field Engineering
d)
Revision of time for completion (time extension).
e)
Contract amount revision due
to contract price adjustment (escalation of unit
rates).
f)
Change of Contracto/s authorize representative.
In regards with additive cost variations, original cost of the six (5) on-going construction
contract packages increases bv Rp. L64,77L,L73,000, while the variation orders for the
other contract packages are still under evaluation by DSC and PPK which is expected that
the resulls will increases the respective original contract amounts.
ln anticipation of future claims for varied works by the Contractors, a revised costs of
additional 11% of the Original Cost for each contract package covered by AWP-I has been
considered and 5% cost increases for packages under AWP-2 and AWP-3 to cover any
Variation Orders that may arise during the implementation of the Works,
Presented in Table 7 are details of Variation Orders for the four (4) sub-projects under
AWP-I and two (2) contract packages covered by AWP-2 and AWP-3
l'
I
I
t
I
I
I
Quarter : January-February-lvlarch
Variation Order Details
b)
I
I
1$
Western Indonesia National Roads Improvement Project
I
I
II
I
2016 Quarterly Progress Repoft
Table
Package
No.
Original Contract
Amount
(Rpl
1* Quarter : January-February-March
7
-
Details of Amendments (Variation Orders)
Amend
Variation +/-
No,
{Rp)
Revised Contract
Amount
Vatiance
%
(Rp)
I
Reason FoI
Change
rme
Extension
'|
1
I
t
734,909,27I,0O0
+19,163,804,000
3
0
0
2
197,936,699,000
T
I
I
I
I
I
I
I
I
2
3
143,688,963,000
L7
1_9
224,899,777,000
3s,689,452,000
Reason For Change
c
+74.2O
B
+14.24
D
0
0
2
3
0
0
l-97,936,699,000
197,936,699,000
197,936,699,000
4
+28,776,518,000
226,7).3,277 ,000
5
0
6
+5I,472,232,000
L
0
2
3
0
F
o
B
C
226,71,3,277 ,000
249344,93L,OOO
+25.97
E
o
o
0
A
0
143,688,963,000
143,588,963,000
143,688,963,000
+21,468,809,000
1,65,L57,772,000
+74.94
c
0
165,L57,712,000
I83,940,a12,0AO
+24.O1
E
o
+5.08
c
L
0
2
+9,501,334,000
0
186,936,750,000
196,438,084,000
196,438,084,000
196,438,084,000
0
1
0
+14.54
+74.54
+40,251,909,000
186,936,750,000
+74.2O
L
5
4
154,073,015,000
154,073,0L5,000
l-54,073,015,000
+74,94
105
D
F
B
7q
D
+5.08
+5.08
B
90
D
0
224,599,717.O00
+33,711,586,000
262,61'r.303 ,ooo
+].l.73
c
7
0
B
+10,730,308,000
33,689,452,000
44,479,7 60,000
0
2
r31.85
B
125
CD
I
- Change of Engineer's Tea m Leader from V. Thiagarajah to Johnson Villar,
B - Change of PPK sub Project Manager.
C - Contract amount revision due to TechnicalJustification of Field Engineering resuits.
A
- Revision
- Contract
of time for cornpletion (time extension).
amount revision due to contfact price adjustments (escalation).
F -Change of Contractor's authorize representative.
D
E
T
t
I
lw-esternlndonesiaNationJicoa-risimprovernentero;ect
2I
t
T
t
I
I
I
li
t
I
I
I
I
l'
I
I
I
t
I
I
2016 Quarterly Progress Repoft
3.4
1o
Consultancy Services
Technical Asslstance for Core Team Consultant
Management Unlt.
(CTC)
Quarter : January-February-March
to Support the Prolect
lead Consultant: PT. Pe]entjana Djaja
Contract No. 06-20/CTC[A/LN/8043/1112 was signed on 5 Nov 2012 between
the Ministry of Public Works, Directorate of Plan
DGH and PT.
Yongma Engineering Co. Ltd, PT. Epadascon Permata Engineering Consultant, JV and the
work commenced on 12 November2012.
CTC
Amendrnent No.l
to original
contract was signed on October 25,2013 to accommodate
the increase in staffing requirements with the following increase in cost.
Amendment No. 2 is officially approved. Proposed amendment to the Original Contract
and Amendment No. 1 are additional man-months for professional and technical staff for
international and local, replacement of foreign and local consultants and modification to
various reimbursables to match with the actual reouirements.
Amendment No. 3 has already been approved. The amendment covers the extension of
services of several local professional and sub-professional staff beyond the end of their
respective dates of completion assignment covered by Amendment No. 2 which will end
on March 6, 2015.
Amendment No.4 to the current
CTC
Contract (Original Contract and Amendements 1, 2
to expire or completed on December
the same date as the expiry/closing date ofthe loan agreement.
and 3) was signed on March
4
2016 and
31., 20L7,
the current progress of the Project, services of professional international and
Iocal staff as well as local sub-professional staff have been extended beyond their
Based on
respective dates of assignment engagement covered by Amendment No. 3.
The amendment covers the reouirements of CTC are as follows
:
Consultancy services time extension
Additional/Modif ication to TOR/Terms of Reference
a
Adjustment
of input
schedule
for
Professional Staff, Sub Professional and
Supporting Staff
Amendment to the Team Composition
Amendment of the Staffing Schedule
Modification to the Provisional Sums
Adjustment of Remuneration paid in foreign currency and local currency
Adjustment to the reimbursable expenses
Amendment to Clause 6.1(b) of the Special Condition of Contract
Western Indonesia Nabbnal Roads Imorovement Proiect
2015 Quarterly Progress
I
Report
1$euarter: January-February-March
Presented in Tabl€ 8 is the current status of cTc contract,
Table
T
Descrlptlon
I
I
USD
Orlginal Contract including 10% VAT
L,4p,4A70
23,ss6,940,000
Amendment No,l includins 10% VAT
L.447,517
24,664,792,500
Combine Variance Against OriB ina I Contract
Ir
I
I
I
I
I
I
I
I
I
I
T
I
I
I
IDR
Amendment No. 2 including 10% VAT
+4.7204
r,5o9,r77
Variance Against Original Contract
24,704,544,150
+4,87%
+7,4604
Combine Variance Against Original Contract
+5.gLo/.
Amendment No.3 including 10% VAT
Variance Against Origina I Contract
L,473,917
26,328,0s4500
+4,95o/6
+lL.760/0
Combine Variance Against Origina I Contract
+9,29%
Amendment No, 4 including 10% VAT
1,918,158
40,874,769,529
Variance Aga inst Original Contract
+36.58%
+73,53%
Combine Variance Against Original Contract
i
Note
+@.72%
Combine variance (USD+IDR) is based on l. USD = Rp. 9,558 exchange rate used during the
time of signing the original Contract Agreement.
Technical Assistance for Design & Supervision Consultant {DSC}
lead Consultant: Renardet 5.A
Contract No. KU.03.01/PPK-PR/W|NR|P/BXI0T/VV2OB was signed on 11 jun 20j.3
between the Ministry of Public Works, Head of Regional Office for National Roads
lmplementatlon, DGH and Renardet S.A. PT Cipta Strada, PT. Daya Creasi Mitravasa, pT.
Seecons and PT. Yodya Karya (Persero)Joint Venture and mobilized on 19 June 2013.
DSC
Table 9 shows the current status of DSC contract.
Table 9
Note
I
1) DraftAddendum
2)
WesLern Indonesia National
No.1 is stillsubject to approval by DGH with World Bank concuffence and
issuance of No Objection Letter (NOL).
Figures with asterisk (*)are tentative pending approval ofAddendumNo.l
Improvement Project
I
t
I
t
2016 Quafterly Progress Report
1s
Quafter : January-February-March
Technical Assirtance for Capacity Bulldlng for Disaster Risks Reductlon
Lead Consultant:
be replaced by another "Technical Assistance for Slope protection
Design and Managemenf' which will be implemented under Category 2 of the Loan
For deletion and
to
Agreement.
Environmental Management
I
I
I
I
t
I
I
I
I
t
I
t
T
I
I
[ead Consultant:
Cancelled.
Technical Assistance for Capaclty Building for Road Safety
Lead Consultant:
Cancelled,
Procurement Plan for consulting services is presented in Appendix
3.5
S.
lmplementation of the Anti-Corruption Action plan
Communlty Representetive Officers (CRO)
To date, the selection of Comrnunity Representative Observers (CRO) has been LOO%
completed for all the nineteen (19) contract packages with the last selection procees was
!7,
in Padang for Contract packages 14, Z0 and 21. The
overalltotal numbers of appointed CRO's are thirty eight (38) individuals who were mostly
conducted on November
ZO75
professional lecturers from different colleges or universities nearby to the projects,
All these thirty eight (38)
CROS discharged
their duties as independent observers for
nineteen (19) Contract Packages during the procurement activities.
A complete list of CROs appointed with their corresponding credentials can be found in
Appendix 5.
Appendix 7 shows the activities of the
CROs since
the inception of the project.
Third Party Monitors (TpM)
During this 1" Quarter of 2015 (January
-
February
-
March) there six (6) appointments of
Third Party Monitors, however, their tralning is still to be scheduled. To date a total of
fourty eight (48) appointments have been approved.
with their respective occupations and professional affiliations are
shown in Appendix 8, while Appendix 9 shows the past to present activities/progress of
List of appointed TPM
thC TPM,
Weslern Indonesia National Roads Imorovement Prolect
24
I
t
I
I
2016 Quarterly Progress Report
1s Quarter : lanuary-February-March
Complaint Handllng System (CHS)
The WINRIP website has been online, and available for reporting all aspects of the Anti-
Corruption Action Plan including the registering of complaints by the general public. The
website can be accessed at the URL address http://www.winripibrd.com.
The CHS application has been completed. The application was put in sub-domain of
http://chs.winrip-ibrd.com. Appendix 10 and Appendix 11 show the Work Plan on
System and Work Activities on Publication/Disclosures.
I
I
l.
I
I
I
I
t
I
I
I
t
t
t
I
CHS
The CHS team has been monitoring public complain via SiPP and WINRIP website.
During this Quarter three (3) complains were monitored, specially on the procurement of
civil works contracts. Details of previous complains and action made by the concerned
authorities are shown in Appendlx 10.
3,6
lmplementation of the Environmental Management Plan and IARAP
A project category is assigned to each package as either Category
4
B
or
C
depending on
the likely degree of influence on environmental issues with a brief explanation
A project is one which will
as
follows:
a
significant negative impact on the
environment and may have an influence on areas outside the actual project area. A
Category
have
project classified as such requires an AMDAL (ANDAI. RKL/RPL) study.
Category B project is one which affects the people or the environment to some extent but
with a smaller impact than a Category A. The required environmental analysis is
a
UKVUPL study only.
Category
C project has minimal effect on the people or environment and
an
environmental analysis is not required. SPPL are used to handle any minor problem which
mav arise.
Details
of
packages
that require environmental and social safeguard are given
in
Appendix 13 and the followlng Table 10 provides a summary ofthe work invotved in the
21 WINRIP packages.
All the twenty one (21) packages require environmental impact investigations and studres
which need the approval by Environmental Agency {BLH).
Nine (9) of the twenty one (21) packages are categorized under "Category A" projects
wherein AMDAL,/EIA studies are required and have to be approved by World Bank. The
nine (9) packages are covered only by five (5) AMDAT/ElA studies as some single study
covers a combination of two (2) or three (3) sub-projects as indicated in Table 10. While
2L social studies (SLARAP and IARAP) require the approval of the World Bank. All the 22
environmental studies for the twenty one (21) sub-proje