WINRIP DOC QPR CTC QPR Apr Jun 2016 20160630 00401

QUARTERLY REPORT
For the Second (2nd) Quarter of the Year 2016

Period : April 2016 to June 2016

APPENDIX 1
Disbursement and Expenditures Status

Western I ndonesia National Roads I mprovement Project
Disbursement and Expenditures Status
For the Quarter ending June 30, 2016
I BRD Loan No. 8043 - I D

Appendix No.1
Loan
Cat
1

1

in USD

Detail of
Category

Loan
Allocation

Disbursement

2

3

4

Civil Works under part 1 of the project

01.
02.
03.
04.

17.
05.
11.
13.
06.
19.
15.
08.
10.
07.
12.
14.
16.
20.
21.
18.
09.

Krui - Biha
Padang Sawah - Sp.Empat/ I nc Air Gadang Brgd

Manggopoh - Padang Sawah
I puh - Bantal
Sp.Gng Kemala - Pugung Tampak
Simpang Rampa - Poriaha
Bantal - Mukomuko
Sp Rukis - Tj Kemuning
Ps. Pedati - Kerkap
Lais - Bintunan
Sibolga - Batas Tapsel
Bts.Kota Pariaman - Manggopoh
Simpang Empat - Sp.Air Balam
I ndrapura - Tapan
Kambang - I ndrapura
Painan - Kambang
Seblat - I puh, I nc Air Lalang/ Guntung Brgd
Lubuk Alung - Sicincin
Lubuk Alung - Kuraitaji
Mukomuko - Batas Sumbar * *
Rantau Tijang - Kota Agung * *


220.400.000,00

59.425.773,04

Expenditures
Cumulative
to date
6

Current
Quarter
5

Expenditures not yet
replenish
7

Remaining Amount of
Contract
8= 3-6


Remaining
Loan
Allocation
9 = 8 * 0,7

12.070.905,46

59.425.773,04

131.828.117,55

160.974.226,96

11.757.337,74
17.250.183,32
12.522.493,13
16.291.537,76
16.335.263,93
8.579.261,55

18.765.198,80
23.454.051,00
6.641.396,33
2.586.125,12
19.954.872,00
25.627.995,00

884.521,43
1.985.403,59
701.032,97
1.788.417,03
638.678,46
0,00
2.645.892,57
0,00
262.310,34
1.061.220,29
0,00
0,00


7.391.833,64
12.519.837,63
8.437.111,06
8.382.489,22
2.017.793,84
515.224,49
6.629.482,99
3.478.520,40
1.627.319,39
2.058.489,96
1.347.967,72
1.910.996,77

4.365.504,10
4.730.345,69
4.085.382,07
7.909.048,54
14.317.470,09
8.064.037,06
12.135.715,81

19.975.530,60
5.014.076,94
527.635,16
18.606.904,28

3.055.852,87
3.311.241,98
2.859.767,45
5.536.333,98
10.022.229,06
5.644.825,94
8.495.001,07
13.982.871,42
3.509.853,86
369.344,62
13.024.833,00

9.350.065,79
25.855.107,34


194.117,96
1.909.310,82

1.199.395,11
1.909.310,82

8.150.670,68
23.945.796,52

5.705.469,48
16.762.057,56

2

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 2 of the project

17.000.000,00


5.583.880,83

173.497,32

4.893.342,45

12.106.657,55

11.416.119,17

3

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 3 of the project

0,00

0,00


0,00

0,00

0,00

0,00

4

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 4 of the project

0,00

0,00

0,00

0,00

0,00

0,00

5

Unallocated

12.600.000,00

0,00

0,00

0,00

0,00

12.600.000,00

250.000.000,00

65.009.653,87

12.244.402,78

64.319.115,49

143.934.775,10

184.990.346,13

Note :

Ending Balance for Special Account Eof JUNE 2016 USD 702,303.37, include any corrections at Special Account for audit finding BPK FY 2014 amounting in USD 11,765.00

APPENDIX 2
Report At The End of The Quarter
(June 30, 2016)

A
p
n
d
e
ix 
Western Indonesia National Roads Improvement Project
Project Report Format - 2
Report for the quarter ended on 30-06-2016
Particulars

( Amount in US $ )

Bank Fund disbursed till date
Total Project Uses till date
World Bank Share @ 70% for CW
World Bank Share @ 100% for TA
World Bank Share @ 100% for IOC
Ending Balance Special Account
Funds Undisbursed to date

I
II
III
IV
V
VI
VII

65.009.653,87
85.612.752,43
59.425.773,04
4.882.872,18
10.470,28
702.303,37
184.990.346,13

Forecast for Project payments for the next 6 months
World Bank Share @ 70% for CW
World Bank Share @ 100% for TA
World Bank Share @ 100% for IOC
Fund Undisbursed for next 6 month
Net Funds required from the Bank

VIII
IX
X
XI

37.085.577,41
25.959.904,19
455.035,97
13.060,96
158.562.345,01
26.428.001,12

Forecast for DIPA from GOI for the 6 months

XII

10.657.576,29

Mar-14

APPENDIX 3
Detailed Summary of the Project Cost Monitoring

Disbursement
Category
No
Description
1

2

Contract
Description

Procurement
Method / ii

Contract
Number / iii

Supplier/
Contractor

Nationality

Contract
Currency

Contract
Value

Amount
I nvoiced
to date

3

4

5

6

7

8

9

10

Payment realization
No. SP2D/ WA
11

6

CI VI L WORKS

CI VI L WORKS

I CB

I CB

CI VI L WORKS

I CB

CI VI L WORKS

NCB

14

Remaining amount Of Contr.
( Rp.)
( US$)
15

151401303000111

19-Jun-15

5.419.957.509,00

135.138.503.574,00

1-Jul-15

12.646.567.523,00

122.491.936.051,00

30-Jul-15

2.507.276.647,00

119.984.659.404,00

009/ 04-WI NRI P/ 26

7-Aug-15

5.850.312.175,00

114.134.347.229,00

151401303000452

11-Nov-15

571.150.974,00

113.563.196.255,00

010/ 04-WI NRI P/ 26

20-Nov-15

9.939.288.848,00

103.623.907.407,00

151401303000591

16-Dec-15

3.811.666.448,00

99.812.240.959,00

011/ 04-WI NRI P/ 26

18-Dec-15

17.230.209.100,00

82.582.031.859,00

0,00

0-Jan-00

7.744.867.686,00

74.837.164.173,00

012/ 04-WI NRI P/ 26

9-May-16

23.571.336.436,00

51.265.827.737,00

145.172.256.263,00

51.265.827.737,00

438732J

12-Dec-14
16-Dec-14

6.846.000.000,00

188.115.554.641,00

07-17/ 17-WI NRI P-AWP2/ CE/ 8043-I D/ 11-14

001A/ 17-WI NRI P/ 17

9-Mar-15

7.122.586.310,00

180.992.968.331,00

Tanggal 17 November 2014

150171302006023,00

0-Jan-00

002/ 17-WI NRI P/ 17

18-Dec-15

PT. JAYA KONSTRUKSI

Gunung Kemala

MANGGALA PRATAMA

Bantal - Muko muko

PT. HUTAMA KARYA - DAYA

07-26/ 11-WI NRI P-WP2/ CE/ A/ 8043/ 12-14

MULI A TURANGGA Jo

I NDONESI A

I NDONESI A

I DR

I DR

199.551.233.000,00

262.611.303.000,00

Sp. Rukis - Tanjung Kemuning

PT. WASKI TA KARYA

I NDONESI A

I DR

292.700.000.000,00

4.589.678.359,00

194.961.554.641,00

486.778.919,00

180.506.189.412,00

1.481.501.057,00

179.024.688.355,00

150171302006263

28-Dec-15

736.408.597,00

178.288.279.758,00

003/ 17-WI NRI P/ 17

29-Mar-16

2.241.243.558,00

176.047.036.200,00

0

0-Jan-00

436.054.136,00

175.610.982.064,00

004/ 17-WI NRI P/ 17

8-Apr-16

1.327.121.284,00

174.283.860.780,00

0

0-Jan-00

2.343.162.994,00

171.940.697.786,00

005/ 17-WI NRI P/ 17

20-Jun-16

7.131.365.636,00

164.809.332.150,00

34.741.900.850,00

164.809.332.150,00

151401303000002

3-Feb-15

5.264.693.491,00

001/ 11-WI NRI P/ 26

17-Feb-15

16.022.980.190,00

241.323.629.319,00

151401303000073

30-Apr-15

3.485.711.256,00

237.837.918.063,00

002/ 11-WI NRI P/ 26

19-May-15

257.346.609.509,00

8.133.326.264,00

229.704.591.799,00

151401303000130

3-Jul-15

1.189.179.908,00

228.515.411.891,00

003/ 11-WI NRI P/ 26

15-Jul-15

2.774.753.120,00

225.740.658.771,00

151401303000226

3-Sep-15

1.203.976.691,00

224.536.682.080,00

004/ 11-WI NRI P/ 26

16-Sep-15

2.809.278.947,00

221.727.403.133,00

151401303000421

30-Oct-15

376.793.584,00

221.350.609.549,00

005/ 11-WI NRI P/ 26

12-Nov-15

3.869.659.266,00

217.480.950.283,00

151401303000561

2-Dec-15

3.152.046.193,00

214.328.904.090,00

006/ 11-WI NRI P/ 26

15-Dec-15

11.292.672.085,00

203.036.232.005,00

151401303000592

16-Dec-15

2.716.519.950,00

200.319.712.055,00

007/ 11-WI NRI P/ 26

18-Dec-15

8.267.669.415,00

192.052.042.640,00

0,00

0-Jan-00

8.345.519.806,00

183.706.522.834,00

008/ 11-WI NRI P/ 26

28-Apr-16

25.399.408.111,00

158.307.114.723,00

0,00

0-Jan-00

3.192.299.602,00

155.114.815.121,00

009/ 11-WI NRI P/ 26

3-Jun-16

9.715.694.444,00

145.399.120.677,00

117.212.182.323,00

145.399.120.677,00

150161301001510

13-Mar-15

6.732.100.000,00

01-26/ 13-WI NRI P-WP2/ CE/ A/ 8043/ 12-14

001/ 13-WI NRI P/ 26

24-Mar-15

20.489.000.000,00

265.478.900.000,00

Tanggal 18 December 2014

150161301013494

19-Nov-15

1.407.008.900,00

264.071.891.100,00

002/ 13-WI NRI P/ 26

8

Amount ( US$)

13

001/ 17-WI NRI P/ 17

Pugung Tampak-Simpang

Tanggal 18 December 2014

7

Amount( Rp)

12

008/ 04-WI NRI P/ 26
151401303000151

5

Date of SP2D

Lais - Bintuan

PT

05-26/ 19-WI NRI P-WP2/ CE/ A/ 8043/ 02-15

RODATEKNI NDO

Tanggal 27 February 2015

PURAJAYA

I NDONESI A

I DR

44.419.760.000,00

Page 122 of 123

3-Dec-15

285.967.900.000,00

4.282.201.000,00

259.789.690.100,00

150161301015079

8-Dec-15

4.668.711.350,00

255.120.978.750,00

003/ 13-WI NRI P/ 26

18-Dec-15

14.209.121.500,00

240.911.857.250,00

15016130105955

28-Dec-15

2.622.152.950,00

238.289.704.300,00

004/ 13-WI NRI P/ 26

13-Jan-16

7.980.465.500,00

230.309.238.800,00

62.390.761.200,00

230.309.238.800,00

151401301000031

20-Mar-15

1.162.286.094,00

43.257.473.906,00

001/ 19-WI NRI P/ 26

13-Apr-15

3.537.392.460,00

39.720.081.446,00

151401301000625

20-Oct-15

1.389.046.533,00

38.331.034.913,00

002/ 19-WI NRI P/ 26

12-Nov-15

4.227.532.927,00

34.103.501.986,00

151401301000820

15-Dec-15

1.434.270.673,00

32.669.231.313,00

003/ 19-WI NRI P/ 26

15-Dec-15

4.365.171.613,00

28.304.059.700,00

16

Code Cat.
Comp.

Note

17

18

Disbursement
Category
No
Description
1

9

10

2

CI VI L WORKS

CI VI L WORKS

Contract
Description

Procurement
Method / ii

Contract
Number / iii

Supplier/
Contractor

Nationality

Contract
Currency

Contract
Value

Amount
I nvoiced
to date

3

4

5

6

7

8

9

10

Ps.Pedati - Kerkap

NCB

I CB

PT. WASKI TA KARYA

CI VI L WORKS

Amount ( US$)

13

14

Remaining amount Of Contr.
( Rp.)
( US$)
15

151401301000819

15-Dec-15

443.094.343,00

27.860.965.357,00

004/ 19-WI NRI P/ 26

19-Dec-15

1.348.548.000,00

26.512.417.357,00

0,00

0-Jan-00

3.076.823.460,00

23.435.593.897,00

005/ 19-WI NRI P/ 26

9-May-16

9.364.245.316,00

14.071.348.581,00

0,00

0-Jan-00

1.524.859.292,00

12.546.489.289,00

006/ 19-WI NRI P/ 26

24/ 6/ 2016

4.640.876.104,00

7.905.613.185,00

36.514.146.815,00

7.905.613.185,00

151401301000070

2.984.852.715,00

83.532.617.285,00

22-Apr-15

9.084.334.350,00

74.448.282.935,00

151401301000681

18-Nov-15

1.596.911.311,00

72.851.371.624,00

002/ 06-WI NRI P/ 26

ENJI NI RI NG Tbk

I NDONESI A

I DR

107.321.260.310,00

Tanggal 00 May 2015

11

Amount( Rp)

12

001/ 06-WI NRI P/ 26

PT. NUSA KONSTRUKSI

86.517.470.000,00

Date of SP2D

Tanggal 27 February 2015

Simpang Rampa - Poriaha

I DR

11

04-26/ 06-WI NRI P-WP2/ CE/ A/ 8043/ 02-15

01-09/ 05-WI NRI P-WP2/ CE/ A/ 8043/ 05-15

I NDONESI A

Payment realization
No. SP2D/ WA

Sibolga - Batas Tapsel

PT. PEMBANGUNAN

02-03/ 15-WI NRI P-WP2/ CE/ A/ 8043/ 07-15

PERUMAHAN

I CB

I NDONESI A

I DR

260.100.000.000,00

9-Apr-15

3-Dec-15

4.860.164.860,00

67.991.206.764,00

151401301000820

16-Dec-15

1.387.928.758,00

66.603.278.006,00

003/ 06-WI NRI P/ 26

18-Dec-15

4.224.131.002,00

62.379.147.004,00

0,00

0-Jan-00

1.135.953.659,00

61.243.193.345,00

004/ 06-WI NRI P/ 26

9-May-16

3.457.250.264,00

57.785.943.081,00

28.731.526.919,00

57.785.943.081,00

150041303004697

30-Jul-15

2.468.388.987,00

104.852.871.323,00

001-A/ 05-WI NRI P/ 03

5-Oct-15

7.512.488.222,00

97.340.383.101,00

150041303011347

28-Dec-15

4.595.650.107,00

92.744.732.994,00

14.576.527.316,00

92.744.732.994,00

150041302005417

20-Nov-15

5.982.300.000,00

254.117.700.000,00

001/ 15-WI NRI P/ 03

16-Nov-15

18.207.000.000,00

235.910.700.000,00

Tanggal 13 July 2015

12

13

CI VI L WORKS

CI VI L WORKS

24.189.300.000,00

235.910.700.000,00

150101302003482

15-Dec-15

4.474.646.550,00

125.225.253.450,00

01-06/ 07-WI NRI P-AWP I I / CE/ A/ 8043/ 12-15

001/ 07-WI NRI P/ 06

28-Dec-15

13.618.489.500,00

111.606.763.950,00

Tanggal 03 Desember 2015

0

0-Jan-00

002/ 07-WI NRI P/ 06

24-Jun-16

001/ 08-WI NRI P/ 06

17-Mar-16

0,00

0-Jan-00

I ndrapura - Tapan

NCB

I CB

Bts.Kota Pariaman - Manggopoh

PT. ADHI KARYA

PP - STATI KA CONSORTI UM

I NDONESI A

I NDONESI A

I DR

I DR

129.699.900.000,00

355.500.000.000,00

06-06/ 08-WI NRI P-WP2/ CE/ A/ 8043-I D/ 01-16

834.958.320,00

110.771.805.630,00

2.568.568.800,00

108.203.236.830,00

21.496.663.170,00

108.203.236.830,00

24.885.000.000,00

330.615.000.000,00

8.176.500.000,00

322.438.500.000,00

33.061.500.000,00

322.438.500.000,00

Tanggal 28 January 2016

14

Kambang - I ndrapura

I CB

02-06/ 12-WI NRI P-WP2/ CE/ A/ 8043-I D/ 01-16
Tanggal 28 January 2016

PT LANCARJAYA MANDI RI
ABADI - PT CAHAYA TUNGGAL
ABADI Jo

I NDONESI A

I DR

358.650.400.000,00

0

0-Jan-00

8.248.959.200,00

350.401.440.800,00

001/ 12-WI NRI P/ 06

28-Apr-16

25.105.528.000,00

325.295.912.800,00

33.354.487.200,00

T O T A L CIVIL WORKS

2.508.403.833.310,00

NOTES:

VAT for Loan portion is not collected
/ i:
/ ii:

This Report provides procurement information for the project from inception to the latest reporting date.
Each method in Procurement Guidelines should be shown separately

I CB :

I nternational Competitive Bidding

NCB :

National Competitive Bidding

Page 123 of 123

1.047.565.510.265,00

675.697.353.600,00

2.169.890.163.845,00

16

Code Cat.
Comp.

Note

17

18

Western I ndonesia National Roads I mprovement Project
Contract Expenditure Report Goods and Works)
for the quarter ended June 30, 2016
I BRD Loan 8043 - I D

Appendix No.3
Disbursement
Category
No
Description
1

2

Contract
Description

Procurement
Method / ii

Contract
Number / iii

Supplier/
Contractor

Nationality

Contract
Currency

Contract
Value

Amount
I nvoiced
to date

3

4

5

6

7

8

9

10

Krui - Biha

PT. JAYA KONSTRUKSI

I NDONESI A

I DR

140.255.020.000,00

01-26/ 04-WI NRI P-WP1/ CE/ A/ 8043/ 11-13

MANGGALA PRATAMA

Payment realization
No. SP2D/ WA
11

Date of SP2D

Amount( Rp)

Amount ( US$)

12

13

14

Remaining amount Of Contr.
( Rp.)
( US$)
15

1. CI VI L WORKS
1

CI VI L WORKS

I CB

Tanggal 14 November 2013

590770D

27-Dec-13

3.102.911.853,00

137.152.108.147,00

001/ 01-WI NRI P/ 17

2-Jan-14

9.443.644.770,00

127.708.463.377,00

415066J

20-Jun-14

CI VI L WORKS

I CB

Padang Saw ah - Sp.Empat

PT. JAYA KONSTRUKSI

I ncluding Air Gadang Bridge

MANGGALA PRATAMA

I NDONESI A

I DR

249.348.931.000,00

127.322.624.274,00

002/ 01-WI NRI P/ 17

3-Jul-14

1.174.292.924,00

126.148.331.350,00

425690J

30-Sep-14

527.162.987,00

125.621.168.363,00

003/ 01-WI NRI P/ 17

29-Oct-14

1.604.409.090,00

124.016.759.273,00

433621J

18-Nov-14

425.049.074,00

123.591.710.199,00

004/ 01-WI NRI P/ 17

16-Dec-14

1.293.627.617,00

122.298.082.582,00

436754J

4-Dec-14

1.062.799.456,00

121.235.283.126,00

005/ 01-WI NRI P/ 17

16-Dec-14

3.234.607.041,00

118.000.676.085,00

150171302000620

26-Mar-15

760.025.552,00

117.240.650.533,00

006/ 01-WI NRI P/ 17

7-Apr-15

2.313.121.244,00

114.927.529.289,00

150171302000657

30-Mar-15

2.500.939.071,00

112.426.590.218,00

007/ 01-WI NRI P/ 17

2

385.839.103,00

7-Apr-15

7.611.553.695,00

104.815.036.523,00

150171302001652

5-Jun-15

1.658.385.311,00

103.156.651.212,00

008/ 01-WI NRI P/ 17

25-Jun-15

5.047.259.643,00

98.109.391.569,00

150171302002396

9-Jul-15

3.395.857.119,00

94.713.534.450,00

009/ 11-WI NRI P/ 17

15-Jul-15

10.335.217.319,00

84.378.317.131,00

150171302002624

28-Jul-15

1.111.274.527,00

83.267.042.604,00

010/ 01-WI NRI P/ 17

24-Jul-15

3.382.139.867,00

79.884.902.737,00

150171302003134

24-Aug-15

769.214.079,00

79.115.688.658,00

011/ 01-WI NRI P/ 17

8-Sep-15

2.341.086.329,00

76.774.602.329,00

150171302003619

15-Sep-15

2.723.498.444,00

74.051.103.885,00

012/ 01-WI NRI P/ 17

28-Sep-15

8.288.908.308,00

65.762.195.577,00

150171302004876

13-Nov-15

2.034.310.771,00

63.727.884.806,00

013/ 01-WI NRI P/ 17

16-Nov-15

6.191.380.606,00

57.536.504.200,00

150171302005381

2-Dec-15

1.329.067.062,00

56.207.437.138,00

014/ 01-WI NRI P/ 17

15-Dec-15

4.044.986.712,00

52.162.450.426,00

150171302005945

14-Dec-15

1.515.000.000,00

50.647.450.426,00

015/ 01-WI NRI P/ 17

22-Dec-15

15.900.000.000,00

34.747.450.426,00

150171302006280

29-Dec-15

5.122.768.175,00

29.624.682.251,00

015-A/ 01-WI NRI P/ 17

29-Mar-16

4.301.903.142,00

25.322.779.109,00

0

0-Jan-00

2.221.619.283,00

23.101.159.826,00

016/ 01-WI NRI P/ 17

22-Jun-16

6.761.449.993,00

16.339.709.833,00

0

0-Jan-00

1.612.932.730,00

14.726.777.103,00

017/ 01-WI NRI P/ 17

22-Jun-16

4.908.925.700,00

9.817.851.403,00

130.437.168.597,00

9.817.851.403,00

040668I

30-Dec-13

4.552.544.077,00

244.796.386.923,00

002/ 02-WI NRI P/ 06

2-Jan-14

13.855.568.930,00

230.940.817.993,00

39-06/ 02-WI NRI P-WP1/ CE/ A/ 8043-I D/ 12-13

079428I

23-Jun-14

577.715.230,00

230.363.102.763,00

Tanggal 06 December 2013

003/ 02-WI NRI P/ 06

14-Jul-14

1.225.456.548,00

229.137.646.215,00

092390I

10-Sep-14

662.017.142,00

228.475.629.073,00

004/ 02-WI NRI P/ 06

30-Sep-14

2.521.001.709,00

225.954.627.364,00

611285K

4-Nov-14

2.141.055.147,00

223.813.572.217,00

005/ 02-WI NRI P/ 06

4-Dec-14

6.536.641.989,00

217.276.930.228,00
212.479.299.919,00

Page 120 of 123

617797K

2-Dec-14

4.797.630.309,00

006/ 02-WI NRI P/ 06

16-Dec-14

14.601.483.549,00

150101302000227

13-Mar-15

3.036.091.659,00

194.841.724.711,00

007/ 02-WI NRI P/ 06

7-Apr-15

9.240.278.960,00

185.601.445.751,00
181.966.694.541,00

197.877.816.370,00

150101302000553

17-Jun-15

3.634.751.210,00

008/ 02-WI NRI P/ 06

26-May-15

11.062.286.290,00

170.904.408.251,00

150101302000291

18-Jun-15

3.423.796.910,00

167.480.611.341,00

009/ 02-WI NRI P/ 06

26-Jun-15

10.420.251.466,00

157.060.359.875,00

150101302001366

1-Jul-15

4.184.037.410,00

152.876.322.465,00

010/ 02-WI NRI P/ 06

24-Jul-15

12.734.026.900,00

140.142.295.565,00

16

Code Cat.
Comp.

Note

17

18

Disbursement
Category
No
Description
1

2

Contract
Description

Procurement
Method / ii

Contract
Number / iii

Supplier/
Contractor

Nationality

Contract
Currency

Contract
Value

Amount
I nvoiced
to date

3

4

5

6

7

8

9

10

Payment realization
No. SP2D/ WA
11

CI VI L WORKS

I CB

Manggopoh - Padang Saw ah

PT. JAYA KONSTRUKSI

40-06/ 03-WI NRI P-WP1/ CE/ A/ 8043-I D/ 12-13

MANGGALA PRATAMA

I NDONESI A

I DR

183.940.872.000,00

Tanggal 06 December 2013

CI VI L WORKS

I CB

Amount ( US$)

13

14

Remaining amount Of Contr.
( Rp.)
( US$)
15

150101302001771

4-Sep-15

2.500.030.310,00

137.642.265.255,00

16-Sep-15

7.608.787.900,00

130.033.477.355,00
125.884.666.745,00

15-Oct-15

4.148.810.610,00

012/ 02-WI NRI P/ 06

30-Oct-15

12.626.814.900,00

113.257.851.845,00

150101302002653

12-Nov-15

2.687.415.450,00

110.570.436.395,00

013/ 02-WI NRI P/ 06

20-Nov-15

8.179.090.500,00

102.391.345.895,00

150101302003211

7-Dec-15

8.378.943.700,00

94.012.402.195,00

014/ 02-WI NRI P/ 06

15-Dec-15

25.501.133.000,00

68.511.269.195,00

160101302000241

7-Mar-16

681.051.160,00

67.830.218.035,00

015/ 02-WI NRI P/ 06

14-Mar-16

2.072.764.400,00

65.757.453.635,00

0

0-Jan-00

1.572.309.670,00

64.185.143.965,00

016/ 02-WI NRI P/ 06

21-Apr-16

4.785.290.300,00

59.399.853.665,00

0

0-Jan-00

1.942.482.710,00

57.457.370.955,00

017/ 02-WI NRI P/ 06

21-Apr-16

5.911.903.900,00

51.545.467.055,00

0

0-Jan-00

1.195.703.760,00

50.349.763.295,00

018/ 02-WI NRI P/ 06

27-May-16

3.639.098.400,00

46.710.664.895,00

0

0-Jan-00

1.362.934.160,00

45.347.730.735,00

019/ 02-WI NRI P/ 06

29-Jun-16

4.154.313.564,00

41.193.417.171,00

0

0-Jan-00

2.607.201.996,00

38.586.215.175,00

020/ 02-WI NRI P/ 06

29-Jun-16

7.934.962.595,00

30.651.252.580,00

218.697.678.420,00

30.651.252.580,00
180.636.025.851,00

040667I

30-Dec-13

3.304.846.149,00

003/ 03-WI NRI P/ 06

2-Jan-14

10.058.227.410,00

079428I

12-Jun-14

874.188.600,00

169.703.609.841,00

004/ 03-WI NRI P/ 06

30-Jun-14

1.854.339.454,00

167.849.270.387,00

170.577.798.441,00

092449I

10-Sep-14

005/ 03-WI NRI P/ 06

16-Oct-14

2.142.280.848,00

165.254.757.598,00

611286K

4-Nov-14

1.056.538.775,00

164.198.218.823,00

006/ 03-WI NRI P/ 06

4

Amount( Rp)

12

011/ 02-WI NRI P/ 06
150101302002244

3

Date of SP2D

3-Dec-14

452.231.941,00

3.242.758.578,00

167.397.038.446,00

160.955.460.245,00

617798K

2-Dec-14

2.598.814.340,00

158.356.645.905,00

007/ 03-WI NRI P/ 06

10-Dec-14

7.909.434.949,00

150.447.210.956,00

150101302000275

24-Mar-15

2.035.856.558,00

148.411.354.398,00

008/ 03-WI NRI P/ 06

7-Apr-15

6.196.085.177,00

142.215.269.221,00

150101302000536

5-May-15

3.747.867.347,00

138.467.401.874,00

009/ 03-WI NRI P/ 06

26-May-15

11.406.552.794,00

127.060.849.080,00

150101302000921

18-Jun-15

2.327.836.290,00

124.733.012.790,00

010/ 03-WI NRI P/ 06

26-Jun-15

7.084.719.142,00

117.648.293.648,00

150101302001367

31-Jul-15

2.547.451.480,00

115.100.842.168,00

011/ 03-WI NRI P/ 06

27-Jul-15

7.753.113.200,00

107.347.728.968,00

150101302001811

8-Sep-15

2.368.489.630,00

104.979.239.338,00

012/ 03-WI NRI P/ 06

16-Sep-15

7.208.446.700,00

97.770.792.638,00

150101302002228

13-Oct-15

3.814.452.020,00

93.956.340.618,00

013/ 03-WI NRI P/ 06

16-Oct-15

11.609.201.800,00

82.347.138.818,00

150101302002681

13-Nov-15

2.138.953.770,00

80.208.185.048,00

014/ 03-WI NRI P/ 06

20-Nov-15

6.509.859.300,00

73.698.325.748,00

150101302003186

14-Dec-15

5.079.605.660,00

68.618.720.088,00

015/ 03-WI NRI P/ 06

15-Dec-15

15.459.669.400,00

53.159.050.688,00

160101302000268

10-Mar-16

982.207.180,00

52.176.843.508,00

016/ 03-WI NRI P/ 06

14-Mar-16

2.989.326.200,00

49.187.517.308,00

0,00

0-Jan-00

1.329.094.560,00

47.858.422.748,00

017/ 03-WI NRI P/ 06

21-Apr-16

4.045.070.400,00

43.813.352.348,00
42.116.325.408,00

0,00

0-Jan-00

1.697.026.940,00

018/ 03-WI NRI P/ 06

9-May-16

5.164.864.600,00

36.951.460.808,00

146.989.411.192,00

36.951.460.808,00

I puh - Bantal

PT. WASKI TA KARYA - DAYA

254931Y

16-Dec-13

4.299.545.250,00

01-26/ 04-WI NRI P-WP1/ CE/ A/ 8043/ 11-13

MULI A TURANGGA JO

004/ 04-WI NRI P/ 26

23-May-14

13.085.572.500,00

179.052.966.250,00

Tanggal 14 November 2013

SARI , Jo

141401303000328

18-Dec-14

3.574.973.901,00

175.477.992.349,00

005/ 04-WI NRI P/ 26

I NDONESI A

I DR

196.438.084.000,00

Page 121 of 123

192.138.538.750,00

17-Dec-14

8.341.605.771,00

167.136.386.578,00

151401303000013

18-Mar-15

3.116.950.024,00

164.019.436.554,00

006/ 04-WI NRI P/ 26

7-Apr-15

7.272.883.390,00

156.746.553.164,00

151401303000069

22-Apr-15

4.856.427.624,00

151.890.125.540,00

007/ 04-WI NRI P/ 26

4-May-15

11.331.664.457,00

140.558.461.083,00

16

Code Cat.
Comp.

Note

17

18

APPENDIX 4
Procurement Management of Civil Works

APPENDIX 4
WESTERN INDONESIA NATIONAL ROAD IMPROVEMENT PROJECT
PROCUREMENT MANAGEMENT FOR CIVIL WORK
As of June 30. 2016

Package
No.

Contract No.

Sub - Project

Type of Work

Estimated Cost
EE (Incl. VAT)

IDR (x10 )

Design

PQ Document

Submission
Submission
NOL Date
Date
Date

WB NOL
Date

Evalt.Qualification
Report

Invitation for Submission
Preof
Submissio
qualification
n Date
Application

WB NOL
Date

Notification

Bidding Document

of

Submission
Date
Qualification

WB NOL

Bid Evaluation Report

Invitation for
Bids
Date

Bid Opening Date
Submission Date

WB NOL
Date

Contractor

Contract
Signature
Date

Category Procureme
Contract nt Method

Contract Price (IDR 106)
including Tax
Original

Addendum

World Bank
Financing
Ratio (%)

AWP - 1
10-17/01-WINRIP-WP1/CE/A/8043-ID/11-13

Krui - Biha
Lampung Province.

Capacity
Expansion

163.534,85 25-Jan-11

21-Feb-11

02-Nov-11

28-Dec-11

30-Dec-11

28-Feb-12

25-Jan-13

28-Mar-13

17-May-13

27-Jun-12

31-Oct-12

27-May-13

18-Jul-13

10-Sep-13

18-Sep-13

PT. Jaya Konstruksi
Manggala Pratama, Tbk.

25-Nov-13

Civil Work

ICB

134.909,21

2

39-06/02-WINRIP-WP1/CE/A/8043-ID/12-13

Padang Sawah - Sp.Empat (incl.
Air Gadang Bridge), West
Sumatera Province.

Capacity
Expansion

228.772,24 25-Jan-11

21-Feb-11

02-Nov-11

28-Dec-11

30-Dec-11

28-Feb-12

25-Jan-13

28-Mar-13

17-May-13

27-Jun-12

31-Oct-12

27-May-13

18-Jul-13

10-Sep-13

18-Sep-13

PT. Jaya Konstruksi
Manggala Pratama, Tbk.

06-Dec-13

Civil Work

ICB

197.936,70

226.713,22

70,00

3

40-06/03-WINRIP-WP1/CE/A/8043-ID/12-13

Manggopoh - Padang Sawah, West
Sumatera Province

Capacity
Expansion

167.678,40 25-Jan-11

21-Feb-11

02-Nov-11

28-Dec-11

30-Dec-11

28-Feb-12

25-Jan-13

28-Mar-13

17-May-13

27-Jun-12

31-Oct-12

27-May-13

18-Jul-13

10-Sep-13

18-Sep-13

PT. Jaya Konstruksi
Manggala Pratama, Tbk.

06-Dec-13

Civil Work

ICB

143.688,96

165.157,77

70,00

Ipuh - Bantal, Bengkulu Province

Capacity
Expansion

PT. Waskita Karya - PT.
14-Nov-13
Daya Mulia Turangga, J.O.

Civil Work

ICB

186.936,75

01-03/05-WINRIP-WP2/CE/A/8043/03-15

Simpang Rampa - Poriaha, North
Sumatera Province.

Capacity
Expansion

6

04-26/06-WINRIP-WP2/CE/A/8043/02-15

Ps. Pedati - Kerkap, Bengkulu
Province

Capacity
Expansion

92.127,40

21-Nov-13

7

01-06/07-WINRIP-AWP II/CE/A/8043/12-15

Indrapura - Tapan, West Sumatera
Province

Capacity
Expansion

178.600,23

18-Dec-14

8

06-06/08-WINRIP-WP2/CE/A/8043-ID/01-16

Bts.Kota Pariaman - Manggopoh,
West Sumatera Province

Capacity
Expansion

379.034,45

18-Dec-14

9

Rantau Tijang - Kota Agung,
Lampung Province
(proposed change to Biha Bengkunat, Lampung Province)

Capacity
Expansion

149.831,00

10

Simpang Empat - Sp.Air Balam,
West Sumatera Province

Capacity
Expansion

515.842,21

18-Dec-14

22-Dec-14

Bantal - Mukomuko, Bengkulu
Province

Capacity
Expansion

246.499,55

07-Nov-13

06-Aug-14

Kambang - Indrapura, West
Sumatera Province

Capacity
Expansion

451.810,58

18-Dec-14

22-Dec-14

Sp Rukis - Tj Kemuning, Bengkulu
Province.

Capacity
Expansion

316.304,67

07-Nov-13

06-Aug-14

1

4

01-26/04-WINRIP-WP1/CE/A/8043-ID/11-13

247.105,24 25-Jan-11

21-Feb-11

02-Nov-11

28-Dec-11

30-Dec-11

28-Feb-12

25-Jan-13

28-Mar-13

17-May-13

27-Jun-12

31-Oct-12

27-May-13

18-Jul-13

10-Sep-13

18-Sep-13

18-Nov-14

27-Jan-15

PT. Nusa Konstruksi
Enjiniring, TBK

4-May-15

Civil Work

ICB

107,321,260

NA

PT. Waskita Karya

3-Mar-15

Civil Work

NCB

86,517,470

154.073,02

196.438,08

70,00

70,00

AWP - 2
5

11

02-26/11-WINRIP-AWP2/CE/A/8043.ID/12-14

12

02-06/07-WINRIP-AWP II/CE/A/8043/01-16

13

01-26/13-WINRIP-AWP2/CE/A/8043.ID/12-14

152.870,49

07-Nov-13

22-Jul-14

07-Nov-13

18-Jul-14

22-Jul-14

11-Aug-14

22-Sep-14

N/A (Bank
Post Review)

19-Nov-14

24-Nov-14

29 Des 2014

22-Dec-14

12-May-15

26-May-15

28-May-15

13-Aug-15

9-Oct-15

12-Oct-15

PT. Adhi Karya (Persero)
Tbk.

3-Dec-15

Civil Work

NCB

129.699,90

70,00

22-Dec-14

12-May-15

26-May-15

28-May-15

13-Aug-15

9-Oct-15

9-Dec-15

PT. PP (Persero), Tbk. - PT.
Statika Mitra Sarana, J.O.

28-Jan-16

Civil Work

ICB

355.500,00

70,00

Civil Work

NCB

70,00

Civil Work

ICB

70,00

07-Nov-13

07-Nov-13

18-Nov-13

18-Nov-13

18-Nov-13

23-Dec-13

23-Dec-13

23-Dec-13

10-Feb-14

10-Feb-14

10-Feb-14

9-Jun-14

16-Jun-14

16-Jun-14

15-Jul-14

25-Jun-14

25-Jun-14

22-Jul-14

11-Jul-14

11-Jul-14

70,00

118.444,16

70,00

12-May-15

26-May-15

28-May-15

13-Aug-15

9-Oct-15

22-Feb-16

21-Jul-14

6-Aug-14

22-Aug-14

3-Oct-14

4-Nov-14

13-Nov-14

PT. Hutama Karya (Persero)
- PT. Daya Mulia Turangga

18-Dec-14

Civil Work

ICB

228.899,72

12-May-15

26-May-15

28-May-15

13-Aug-15

9-Oct-15

PT. Lancarjaya Mandiri
26-Nov-15 Abadi - PT. Cahaya Tunggal
Abadi, J.O.

28-Jan-16

Civil Work

ICB

358.950,42

21-Jul-14

6-Aug-14

22-Aug-14

3-Oct-14

4-Nov-14

18-Nov-14

PT. Waskita Karya (Persero)
Tbk

18-Dec-14

Civil Work

ICB

22-Oct-15

2-Nov-15

5-Jan-16

22-Mar-16

4-Apr-16

KSO Yasa - Conbloc

1-Jun-16

Civil Work

NCB

214.327,43

70,00

23-Dec-14

12-Jan-15

23-Feb-15

29-Apr-15

7-May-15

PT. PP (Persero), Tbk.

13-Jul-15

Civil Work

ICB

260.100,00

70,00

22-Oct-15

22-Oct-15

19-Nov-15

11-Jan-16

Civil Work

NCB

7-Jan-14

4-Jul-14

15-Aug-14

10-Oct-14

Civil Work

ICB

Civil Work

NCB

Civil Work

NCB

33.689,45

262.611,30

70,00

70,00

292,700.00

70,00

AWP - 3
14

03-06/14-WINRIP-AWPIII/CE/A/8043/6-16

Painan - Kambang, West Sumatera
Province

Capacity
Expansion

267.588,30

15

02-03/15-WINRIP-WP2/CE/A/8043/07-15

Sibolga - Batas Tapsel, North
Sumatera Province

Capacity
Expansion

376.479,38

Seblat - Ipuh, (incl. Air Lalang & Air
Guntung Bridge), Bengkulu
Province

Capacity
Expansion

269.559,20

Sp.Gng Kemala - Pugung Tampak,
Lampung Province

Capacity
Expansion

255.269,25

Mukomuko - Batas Sumbar,
Bengkulu Province

Capacity
Expansion

69.233,00

Lais - Bintunan, Bengkulu Province

Capacity
Expansion

35.886,28

Betterment

131.302,20

Capacity
Expansion

164.629,30

16

17

07-17/17-WINRIP-AWP2/CE/A/8043.ID/11-14

18

19

05-26/19-WINRIP-WP2/CE/A/8043/02-15

20

14-06/20-WINRIP-AWPIII/CE/A/8043/06-16

Lubuk Alung - Sicincin, West
Sumatera Province

21

15-06/21-WINRIP-AWPIII/CE/A/8043/06-16

Lubuk Alung - Kuraitaji, West
Sumatera Province

22-Oct-15

30-Dec-13

28-Feb-14

18-Dec-14

22-Oct-15

30-Sep-13

10-Oct-13

30-Sep-13

10-Oct-13

11-Nov-13

30-Dec-13

28-Feb-14

13-Jun-14

25-Jun-14

19-Dec-14

N/A (Bank
Post Review)

21-Nov-13

14-Oct-14

NA

PT. Jaya Kostruksi
Manggala Pratama, Tbk

17-Nov-14

PT. Rodateknindo Purajaya 03 Maret 2015

70,00

199.551,23

70,00

70,00

19-Nov-14

24-Nov-14

19-Dec-14

22-Oct-15

22-Oct-15

2-Nov-15

5-Jan-16

22-Mar-16

23-Mar-16 PT. Nindya Karya (Persero)

1-Jun-16

Civil Work

NCB

113.818,30

70,00

22-Oct-15

22-Oct-15

2-Nov-15

5-Jan-16

22-Mar-16

23-Mar-16

1-Jun-16

Civil Work

NCB

126.301,99

70,00

PT. Multi Structure

44.419,76

70,00

APPENDIX 5
Procurement Plan for Consulting Services

APPENDIX 5

Procurement Plan of Implementation Support and Road Sector Institutional Development
Western Indonesia National Roads Improvement Project (WINRIP)
Name of Executing Agency: Directorate General of Highways , Ministry of Public Works.
Ref.
No.

Contract Description

Project Cost (US$)

Allocated

Original

Addendum

3.497.984

USD 1,339,925. +
IDR 23,934,595,000.
(Addendum 3)

2

Implementation Support

a

Core Team Consultant (Project Management,
Technical Assistant, Enviromental & Social
Aspect and Road safety Audit)

5.000.000

b

Design and Supervision Consultant (Design
AWP-2 & 3 and Construction Supervision of Civil
Works Project)

10.000.000

c

Technical Assistance for Development of Slope
Stabilization, Design and Management of
Western Indonesia Roads
TOTAL

Contract
(US$)

1.000.000

6.070.722

STATUS June 30, 2016
Procurement
Method

Review by
Bank
(Prior/Post)

Schedule

EOI
Preparation
advertised in Submission
of Draft
WB NOL to RFP
MPW
RFP to WB
REOI
Website

Actual

Schedule
QCBS

QCBS

05-Dec-10

23-Jan-11

12-Feb-11

Submission

WB NOL

12-Mar-11

02-Apr-11

Date of
Receipt of
Proposals

23-Apr-12

Technical Evaluation
Report
Submission

WB NOL

04-Jun-12

22-Jul-12

Opening of
Financial
Proposal

05-Aug-12

Final
Evaluation
Report

Negotiation & Draft Contract

Submission

Submission

WB NOL

12-Aug-12

15-Sep-12

29-Sep-12

Contract
Sign

Service Start
date

22-Okt-12

12-Nov-12
40

26-Nop-10

07-Jun-11

30-Jan-12

07-Mar-12

09-Des-11

06-Mar-12

20-Mar-14

30-Apr-12

14-Jun-12

29-Jun-12

27-Agust-12

03-Sep-12

21-Sep-12

12-Okt-12

05-Nop-12

16-Nop-12

Schedule

11-Dec-11

08-Jan-12

27-Feb-12

26-Mar-12

07-May-12

28-May-12

08-Oct-12

22-Oct-12

05-Nov-12

12-Nov-12

19-Nov-12

26-Nov-12

01-Apr-13

18-Apr-13

02-May-13

Actual

26-Nop-10

07-Jun-11

02/04/2012

10-Agust-12

20-Jan-12

23-Mei-12

31-Agust-14

23-Okt-12

20-Des-12

21-Feb-13

05-Mar-13

13-Mar-13

25-Mar-13

19-Apr-13

11-Jun-13

25-Jun-13

Schedule

24-Jun-16

15-Jul-16

01-Aug-16

08-Aug-16

18-Aug-16

26-Aug-16

29-Aug-16

28-Sep-16

21-Oct-16

04-Nov-16

21-Nov-16

25-Nov-16

05-Dec-16

16-Dec-16

13-Jan-17

23-Jan-17

Actual

24-Jun-16

15-Jul-16

Prior
Prior

Period (Month)

Original

Prior
Actual

QCBS

14-Nov-10

Evaluation and Short List

The issuance
RFP to the
shortlisted
firms

42

11

Consultant

Remarks

Addendu
m

PT. Perentjana
Djaja, Yongma
Eng. Co. Ltd
and PT.
Epadascon
Renardet S.A.,
PT. Cipta
Strada, PT.
Daya Creasi
Mitrayasa, PT.

Loan
reallocation

APPENDIX 6
List of Names of Community Representative Observers
(CRO)

1

2

3

Lampung

01 Krui - Biha

West
Sumatera

Pd. Sawah 02
Simp. Empat

West
Sumatera

Manggopoh 03
Pd. Sawah

5

6

Bengkulu

Lampung

North
Sumatera

04 Ipuh - Bantal

Sp. Gunung
Kemala 17
Pugung
Tampak

Sp. Rampa 05
Poriaha

1

Ir. Lukman Muizzi

2

Ir. Wahidin

1 Ir. Masril Syukur, M.Sc
2 Darwizal Daoed, MT
1

Ir. Jafril Tanjung, MT.,DR.,
Eng

2 Prof. Dr. Ir. Zaidir,MS

2 Ir. Zainuddin Muchtar,MT

1

Ir. Yohanes Martono Hadi,
MT

2 Ofik Taufik Purwadi, ST.,MT
1

Medis Sejahtera Surbakti,
ST., MT

2 Josep Admika Ginting, ST

!"#$ %&&'($$
Jl. Poltek Grya Mitra A-5 RT

BBPJN III Office, Jl. H. 07/RW 02, Bukit Lama,
May 23, May 23,
M. Noerdin Pandji Palembang
2013
2013
No. 78 Palembang Perum Politeknik Negeri
Sriwijaya

May 27, May 27, BBPJN II Office, Jl. Jati
2013
2013
No. 109 Padang


08127118508

lukgriya@yahoo.com

08127853585

weseedo@yahoo.com

Jl. Handayani I No. 11, Steba,
081267170435
Padang

symasril@gmail.com

Komplek Pelangi Indah Blok
C4/4, Kuranji, Padang

08126603921

darwizaldaoed@ft.unan
d.ac.id

Jl. Banuaran Gg. Mesjid Raya
08126623930
No. 47, Padang

jafriltanjung@ft.unan.ac
.id

May 27, May 27, BBPJN II Office, Jl. Jati
2013
2013
No. 109 Padang
Komp. Cendana Perak Kopi
Blok A-9, Padang

08126622012

Jl. Anggrek Raya No. 629,

081377924368
BBPJN III Office, Jl. H. Palembang
May 23, May 23,
M. Noerdin Pandji Jl. Putri Kembang Dadar No.
2013
2013
No. 78 Palembang 110, B. Sibuntang,
08179766579
Palembang

Jl. Bungur No. 3/4 Blok TC 1,

Satker PJN II Office, Jl. Way Halim Permai, Tanjung 0816414590
July 17, July 17, Wolter Mongonsidi Karang, Bandar Lampung
2014
2014
No. 220 B, Bandar
Lampung

Aug 20, Aug 20,
2014
2014

BBPJN I Office, Jl.
Sakti Lubis No. 1,
Medan



E

zaidir2000@yahoo.com
vanza_71@yahoo.com

./012 0334567
Lecturer of Muhammadiyah
Palembang University

May
17,
Lecturer of Politeknik Negeri 2013
Sriwijaya
Head Admission of
Procurement Construction
May
Committee of Andalas
20,
University
2013
Lecturer of Andalas
University
Lecturer of Andalas
University
Head of Procurement
Services Unit of Andalas
University
Lecturer of Indo Global
Mandiri University

zainuddin_muchtar@ya
hoo.co.id

May
17,
Lecturer of Politeknik Negeri 2013
Sriwijaya

martono_kat@yahoo.co
.id

Lecturer of Lampung
University

Jl. Z.A. Pagar Alam No. 26,
Bandar Lampung

081279647013

ofik.t.p@gmail.com

Jl. Perpustakaan No. 1,
University of North
Sumatera.

Lecturer of Lampung
University

081396565879

medissurbakti@yahoo.c
om

Lecturer of University of
North Sumatera

Jl. Industri No. 75, Tanjung
Morawa.

0811638886

Page 1 of 9

May
20,
2013

gintingjosep@yahoo.co
m

Trainer of Engineering
Learning and Training
Center Medan

June
10,
2013

July
Nov
Sept 18,
18,
12,
2013
2013
2013

June
10,
2013

July
Nov
Sept 18,
18,
26,
2013
2013
2013

June July
10, 18,
2013 2013

Sept 18,
2013

Nov
26,
2013

June July
10, 18,
2013 2013

Sept 18, Oct 28,
2013
2013

June
Aug
July 18,
Oct 14, Oct 16,
25,
15,
2014
2014
2014
2014
2014

Des 16,
2013

Aug
21,
2014

Sept
22,
2014

NCB

Feb.
02,
2015

Bid Opening






1 Sartika Nisumanti, ST.,MT
4




Reports Related
to CRO's Activity

Pre-Bid
Meeting

Name of Selected CRO

Announcement
of Bid Winner






 

CRO's Involvement in Bidding
Process
No Objection
Letter from World
Bank




!"#$ )*+,-+

Date of Bid
Opening

Province

N
o

No

!" 8(9(-+:)*,*&;',:*:*<







Date of Pre-Bid
Meeting and Site
Visit

Package

Date of Invitation to Bid

=>>?@ABC 6.A List of Names of Community Representative Observers (CRO)

9

Bengkulu

Bengkulu

Sp. Rukis 13 Tanjung
Kemuning

Pasar Pedati 06
Kerkap

2 Rendesti Nofy Yelizar, ST

1 Muhammad Fauzi, ST., MT

2 Hot Maria Angelina, ST

10

11

12

Bengkulu

19 Lais - Bintunan

North
SUmatera

Sibolga - Batas
15
Tapsel

West
Sumatera

Indrapura 07
Tapan

1 Hesti Aulia Sari, ST
2

Agung Febrianto, ST

1

Ernie Shinta Y. Sitanggang,
ST., MT

2 Ir. M. Koster Silaen, MT
1 Ir. Riswandi, M.Si
2 Apwiddhal, ST.,MT

Nov
14,
2014

Aug
Sept 8, Oct 3, Nov 18,
22,
2014 2014 2014
2014

Nov
28,
2014

rendeztnofyyelizar@gm
ail.com

Assisstant of Lecturer of
Bengkulu University

smaknae13@yahoo.co
m

Assisstant of Lecturer of
Bengkulu University

fauzi70_ros@yahoo.co
m

Lecturer of Bengkulu
University

Satker PJN I Bengkulu, , Pematang Gubernur, Muara 081367690429
Nov 27, Nov 27,
Jl. Ir. Rustandi
Bangkahulu, Bengkulu.
2014
2014 Sugianto Km. 12+225,
Jl. Beo No. 60 Rt. 05 Rw. 02,
Pulau Baai, Bengkulu
085788095319
Perumnas Lingkar Barat,

fauzi70_ros@yahoo.co
m

Lecturer of Bengkulu
University

smaknae13@yahoo.co
m

Assisstant of Lecturer of
Bengkulu University

Satker PJN I Bengkulu, Jl. Mahakam Raya No. 27 Rt.
9 Rw. 3, Kota Bengkulu.
Nov 27, Nov 27,
Jl. Ir. Rustandi
085266724618
2014
2014 Sugianto Km. 12+225,
Dwi Tunggal RT 02/RW 003,
Pulau Baai, Bengkulu
085366851999

hestiauliasari24@gmail.
com

Assisstant of Lecturer of
Bengkulu University

agungfebrianto87@gma
il.com

Assisstant of Lecturer of
Bengkulu University

081264881193

ernie_sitanggang@yaho
o.co.id

081376506226

koster_laen@yahoo.co
m

Lecturer of Politeknik Negeri
Feb
Medan
Jan 9, Jan 26,
May. 7,
23,
2015 2015
2015
Lecturer of Politeknik Negeri
2015
Medan

Jun.
12,
2015

08126713602

ihsan.riswandi@yahoo.c
o.id

081374698872

widdpoli@yahoo.com

Lecturer of Politeknik Negeri
Aug
Jun 1, Jun 15,
Oct 12,
Padang
13,
2015 2015
2015
Lecturer of Politeknik Negeri
2015
Padang

Nov
13,
2015

Bengkulu Utara.

Jl. Beo No. 60 Rt. 05 Rw. 02,

Sept 1,
2014

Perumnas Lingkar Barat,
085788095319
Satker PJN I Bengkulu,
Bengkulu.
Sept 1,
Jl. Ir. Rustandi
2014 Sugianto Km. 12+225, Jl. Unib Permai Blok 1 No. 50
Pulau Baai, Bengkulu , Pematang Gubernur, Muara 081367690429
Bangkahulu, Bengkulu.

Jl. Unib Permai Blok 1 No. 50

Bengkulu.

Curup Utara - Bengkulu.

Dec 16, Dec 16,
2014
2014

Jun 12,
2015

BBPJN I Office, Jl.
Sakti Lubis No. 1,
Medan

Jl. Eka Surya Perumahan
Taman Monaco Blok E No.
17, Medan Johor.
Jl. Pintu Air IV No. 296/41
Komplek Politeknik Negeri
Medan.
Jl. Lubuk Bayu No. 1 Kurau

Jun 12, BBPJN II Office, Jl. Jati Pagang Nanggalo, Padang.
2015
No. 109 Padang
Jl. Garuda No. 1 Air Tawar
Timur, Padang.

Page 2 of 9

Nov
24,
2014

Dec 5,
2014

Dec
29,
2014

NCB

Feb 12,
2015

Nov
24,
2014

Dec 5,
2014

Dec
29,
2014

NCB

Feb 12,
2015

Bid Opening

Aug
Sept 8, Oct 3, Nov 13,
22,
2014 2014 2014
2014

Assisstant of Lecturer of
Bengkulu University

Satker PJN I Bengkulu, Jl. Mahakam Raya No. 27 Rt. 085266724618
9 Rw. 3, Kota Bengkulu.
Jl. Ir. Rustandi
Sept 1,
2014 Sugianto Km. 12+225,
Jl. R.A. Kartini Rt. 7 No. 01,
Pulau Baai, Bengkulu
081373447043

Reports Related
to CRO's Activity

Pre-Bid
Meeting

Email

Date of Bid
Opening

Telp.

Date of Pre-Bid
Meeting and Site
Visit

Location

CRO's Occupation

hestiauliasari24@gmail.
com

Sept 1,
2014

1 Hot Maria Angelina

2 Muhammad Fauzi, ST., MT

CRO's Address

CRO's Involvement in Bidding
Process
Announcement
of Bid Winner

8

Bengkulu

1 Hesti Aulia Sari, ST

CRO's Contact

No Objection
Letter from World
Bank

7

Bantal 11
Mukomuko

Training Date

D

Name of
Package

Name of Selected CRO

Selection Date

Province
N
oPackage

No

CRO Selection and Training

Date of Invitation to Bid

Package

19

16 Seblat - Ipuh

14

West
Sumatera

Painan Kambang

Lubuk Alung 20
Sicincin

Lubuk Alung 21
Kuraitaji

2 Ir. Afrizal Naumar, MT
1 Syaiful Amri, SST.,MT
2 B. Army, ST.,MT
1 Besperi, ST., MT
2 Anggi Nidya Sari, ST., MT
1

M. Nursyaifi Yulius, MT
(Mgt)

2 Ir. Alzahri, MT
1 Ir. Riswandi, M.Si
2 Syaiful Amri, SST.,MT
1

Ir. Jafril Tanjung, MT.,DR.,
Eng

2 T. Ophiyandri, PhD

Jun 12,
2015

Jun 12, BBPJN II Office, Jl. Jati No. 43, Padang.
2015
No. 109 Padang
Taman Bamaran Indah Blok

Nov. 4,
2015

Satker PJN I Bengkulu,
Nov. 4,
Jl. Ir. Rustandi
2015 Sugianto Km. 12+225,
Pulau Baai, Bengkulu

Jl. Bandes Parak Sigarang No.
Jl. Ulak Karang, Padang.

Jl. Andalas Gg. Sarga Indah
P No. 3. Padang

082388122008

alzahri@ymail.com

081363428468

heldiensten@yahoo.co.i
d

081363435968

syaifulamri.sarga@gmai
l.com

085274352715

barm663@gmail.com

Jl. Halmahera RT 2 RW 3 No.
082180708080
5, Bengkulu.
Jl. Gadih Rantih Ujung No.

Nov. 17, Nov. 17, BBPJN II Office, Jl. Jati 20B, Padang.
2015
2015
No. 109 Padang
Komp. Polamas Blok W5,
Padang.

Jl. Lubuk Bayu No. 1 Kurau

Nov. 17, Nov. 17, BBPJN II Office, Jl. Jati Pagang Nanggalo, Padang.
2015
2015
No. 109 Padang

Jl. Andalas Gg. Sarga Indah
No. 43, Padang.
Jl. Banuaran Gg. Mesjid Raya

Nov. 17, Nov. 17, BBPJN II Office, Jl. Jati No. 47, Padang
2015
2015
No. 109 Padang
Jl. Belibis Blok C No. 17, Air
Tawar - Padang.

Page 3 of 9

Lecturer of Bung Hatta
University
Lecturer of Bung Hatta
University
Lecturer of Bung Hatta
University

081363418758

Jl. WR. Supratman, Kandang
081272341194
Limun - Bengkulu.

Lecturer of Bung Hatta
University

besperimt@yahoo.co.id
angginidya@yahoo.com

08126608128

nursyaifi@gmail.com

082388122008

alzahri@ymail.com

08126713602

ihsan.riswandi@yahoo.c
o.id

081363435968

syaifulamri.sarga@gmai
l.com

08126623930

jafriltanjung@ft.unand.
ac.id

0811665723

t.ophiyandri@yahoo.co.
uk

Dec 9,
2015

Jan 5,
2016

May
Aug
Jun 15,
Feb 22,
28,
13,
2015
2016
2015
2015

Bid Opening

May
Aug
Jun 15,
28,
13,
2015
2015
2015

Pre-Bid
Meeting

Announcement
of Bid Winner

Jun 12, BBPJN II Office, Jl. Jati I 3,Kuranji, Padang.
2015
No. 109 Padang

nursyaifi@gmail.com

No Objection
Letter from World
Bank

Jun 12,
2015

Padang.

08126608128

Date of Pre-Bid
Meeting and Site
Visit

Location

Jun 12, BBPJN II Office, Jl. Jati 20B, Padang.
2015
No. 109 Padang
Komp. Polamas Blok W5,

Waiting for NOL and
Announcement of Bid
Winner

1 Ir. Drs. Heldi, M.Si

Jl. Gadih Rantih Ujung No.

Jun 12,
2015

Email

Reports Related
to CRO's Activity

Lecturer of Politeknik Negeri
Padang

May
Aug
Jun 15,
Nov 26, Dec 29,
28,
13,
2015
Lecturer of Politeknik Negeri 2015 2015 2015 2015
Padang
Lecturer of Bengkulu
University

Oct 22, Nov 5,
2015 2015

Nov
19,
2015

Nov 2,
2015

Nov
18,
2015

Jan 5,
2016

Lecturer of Politeknik Negeri
Padang
Nov 2,
2015
Lecturer of Politeknik Negeri
Padang

Nov
18,
2015

Jan 5, Mar 23, May 3.
2016 2016
2016

Nov 2,
2015

Nov
18,
2015

Jan 5, Mar 23, May 3.
2016 2016
2016

Lecturer of Bengkulu
University

Lecturer of Bung Hatta
University
Lecturer of Bung Hatta
University

Lecturer of Andalas
University
Lecturer of Andalas
University

Apr 4. May 3.
2016
2016

Waiting for NOL and
Announcement of Bid
Winner

Bengkulu

17

18

Sp. Empat Sp. Air Balam

Kambang 12
Indrapura

15

16

10

Telp.

Under Process

West
Sumatera

2 Ir. Alzahri, MT

CRO's Occupation

Under Process

14

M. Nursyaifi Yulius, MT
(Mgt)

CRO's Address

CRO's Involvement in Bidding
Process

Under Process

13

1

CRO's Contact

Date of Bid
Opening

Bts. Pariaman 08
Manggopoh

Training Date

E

Name of
Package

Name of Selected CRO

Selection Date

Province
N
oPackage

No

CRO Selection and Training

Date of Invitation to Bid

Package

Appendix 6.B List of Appointed CRO and their Occupation
o
N

Province

No. of
package

Name of Package

1

Lampung

01

Krui - Biha

2

F. G.r Lukman Muizzi
2. Ir. Wahidin

Pd. Sawah - Simp. 1. Ir. Masril Syukur, M.Sc
Empat
2. Darwizal Daoed, MT.,DR.,Eng

03

Manggopoh - Pd. 1. Ir. Jafril Tanjung,MT.,DR.Eng
Sawah
2. Prof. Dr. Zaidir, MS

Lecturer of Politeknik Negeri Sriwijaya

Head Admission of Procurement Construction Committee of Andalas University
Lecturer of Andalas University
Lecturer of Andalas University
Head of Procurement Services Unit of Andalas University

1. Sartika Nisumanti, ST.,MT

Lecturer of Indo Global Mandiri University

2. Ir. Zainuddin Muchtar, MT

Lecturer of Politeknik Negeri Sriwijaya

4

Bengkulu

04

5

Lampung

17

6

North Sumatera

05

Sp. Rampa Poriaha

11

Bantal - Mukomuko

8

13

Sp. Rukis - Tanjung 1. Hot Maria Angelina, ST
Kemuning
2. Muhammad Fauzi, ST., MT

Lecturer of Bengkulu University

9

06

Pasar Pedati Kerkap

1. Muhammad Fauzi, ST., MT

Lecturer of Bengkulu University

2. Hot Maria Angelina, ST

Assisstant of Lecturer of Bengkulu University

19

Lais - Bintunan

1. Hesti Aulia Sari, ST

Assisstant of Lecturer of Bengkulu University

2. Agung Febrianto, ST

Assisstant of Lecturer of Bengkulu University

15

Sibolga - Batas
Tapsel

1. Ernie Shinta Y. Sitanggang, ST., MT

Lecturer of Politeknik Negeri Medan

2. Ir. M. Koster Silaen, MT

Lecturer of Politeknik Negeri Medan

7
Bengkulu

10
11

Bengkulu

North Sumatera

Ipuh - Bantal

Occupation of Appointed CRO
Lecturer of Muhammadiyah Palembang University

02
West Sumatera

3

Name of Appointed CRO

Sp. Gunung Kemala - 1. Ir. Yohanes Martono Hadi, MT
Pugung Tampak 2. Ofik Taufik Purwadi, ST.,MT

Lecturer of Lampung University
Lecturer of Lampung University

1. Medis Sejahtera Surbakti, ST., MT

Lecturer of University of North Sumatera

2. Josep Admika Ginting, ST

Trainer

1. Hesti Aulia Sari, ST

Assisstant of Lecturer of Bengkulu University

2. Rendesti Nofy Yelizar, ST

Assisstant of Lecturer of Bengkulu University
Assisstant of Lecturer of Bengkulu University

Page 4 of 9

No. of
package

Name of Package

12

07

Indrapura - Tapan

13

08

Bts. Pariaman Manggopoh

o
N

Province

West Sumatera

10

15

12

Kambang Indrapura

16

Seblat - Ipuh

14

Painan - Kambang

20
21

Bengkulu

17
18
19

West Sumatera

H. I.r Riswandi, M.Si

Occupation of Appointed CRO
Leturer of Politeknik Negeri Padang

2. Apwiddhal, ST.,MT

Leturer of Politeknik Negeri Padang

1. M. Nursyaifi Yulius, MT (Mgt)

Lecturer of Bung Hatta University

2. Ir. Alzahri, MT

Lecturer of Bung Hatta University

Sp. Empat - Sp. Air 1. Ir. Drs. Heldi, M.Si
Balam
2. Ir. Afrizal Naumar, MT

14

16

Name of Appointed CRO

Lecturer of Bung Hatta University
Lecturer of Bung Hatta University

1. Syaiful Amri, SST.,MT

Leturer of Politeknik Negeri Padang

2. B. Army, ST.,MT

Leturer of Politeknik Negeri Padang

1. Besperi, ST., MT

Lecturer of Bengkulu University

2. Anggi Nidya Sari, ST., MT

Lecturer of Bengkulu University

1. M. Nursyaifi Yulius, MT (Mgt)

Lecturer of Bung Hatta University

Ir. Alzahri, MT

Lecturer of Bung Hatta University

Lubuk Alung Sicincin

2. Ir. Riswandi, M.Si

Leturer of Politeknik Negeri Padang

1. Syaiful Amri, SST.,MT

Leturer of Politeknik Negeri Padang

Lubuk Alung Kuraitaji

1. Ir. Jafril Tanjung, MT.,DR.Eng

Lecturer of Andalas University of Padang

2. T. Ophiyandri, PhD

Lecturer of Andalas University of Padang

Page 5 of 9

Appendix 6.C CRO Selection and Training Process
N
o

Province

No. of
Name of Package
Package

1

Lampung

01

Krui - Biha

2

West
Sumatera

02

Pd. Sawah Simp. Empat

3

West
Sumatera

03

4

Bengkulu

04

J

Lampung

17

6

North
Sumatera

Manggopoh - Pd.
Sawah

Ipuh - Bantal

Selection
Date

Training
Date

Location

Remarks

May 23,
2013

May 23,
2013

BBPJN III Office, Jl. H. M. Noerdin Pandji No. 78
Palembang

Attended by 6 candidates, 2 candidates from Politeknik Negeri Sriwijaya, 1 candidate from
Muhammadiyah Palembang University, 2 candidates from Indo Global Mandiri Palembang University,
and 1 candidate from Palembang University. For Package number 01, a Primary CRO selected from
Muhammadiyah Palembang University and a Secondary CRO selected from Politeknik Negeri
Sriwijaya. CRO Training was held directly after the selection process.

May 27,
2013

May 27,
2013

BBPJN II Office, Jl. Jati No. 109 Padang

May 23,
2013

May 23,
2013

BBPJN III Office, Jl. H. M. Noerdin Pandji No. 78
Palembang

SP. Gunung
Kemala - Pugung July 17, 2014
Tampak

July 17,
2014

05

Sp. Rampa Poriaha

Aug 20, 2014

Aug 20,
2014

11

Bantal Mukomuko

Sept 1, 2014

Sept 1,
2014

8

13

Sp. Rukis Tanjung
Kemuning

Sept 1, 2014

Sept 1,
2014

9

06

Pasar Pedati Kerkap

7
Bengkulu

Bengkulu
10

19

Lais - Bintunan

Nov 27, 2014

Nov 27,
2014

Attended by 4 candidates from Andalas University. For Package number 02, a Primary CRO and a
Secondary CRO selected from Andalas University. CRO Training was held directly after the selection
process.
Attended by 4 candidates from Andalas University. For Package number 03, a Primary CRO and a
Secondary CRO selected from Andalas University. CRO Training was held directly after the selection
process.
Attended by 6 candidates, 2 candidates from Politeknik Negeri Sriwijaya, 1 candidate from
Muhammadiyah Palembang University, 2 candidates from Indo Global Mandiri Palembang University,
and 1 candidate from Palembang University. For Package number 04, a Primary CRO selected from
Indo Global Mandiri University and a Secondary CRO selected from Politeknik Negeri Sriwijaya. CRO
Training was held directly after the selection process.

Satker PJN II Office, Jl. Wolter Mongonsidi No. 220 B, Attended by 2 candidates from Lampung University, 1 candidate be the Primary CRO and another be
Bandar Lampung
the Secondary CRO. CRO Training was held directly after the selection process.

BBPJN I Office, Jl. Sakti Lubis No. 1, Medan

Satker PJN I Bengkulu, Jl. Ir. Rustandi Sugianto Km.
12+225, Pulau Baai, Bengkulu

Satker PJN I Bengkulu, Jl. Ir. Rustandi Sugianto Km.
12+225, Pulau Baai, Bengkulu

Page 6 of 9

Attended by 2 candidates, one from University of North Sumatera and another from Engineering
Learning and Training Center (ELTC). The Primary CRO is the one from University of North Sumatera,
and the Secondary CRO is the one from ELTC. CRO Training was held directly after the selection
process.
Attended by 4 candidates from Bengkulu University. For Package number 11, a Primary CRO and a
Secondary CRO selected from Bengkulu University. CRO Training was held directly after the selection
process.
Attended by 4 candidates from Bengkulu University. For Package number 13, a Primary CRO and a
Secondary CRO selected from Bengkulu University. CRO Training was held directly after the selection
process.
Attended by 4 candidates from Bengkulu University. For Package number 06, a Primary CRO and a
Secondary CRO selected from Bengkulu University. CRO Training was held directly a