QUARTERLY REPORT
For the First Quarter of the Year 2014

Period : January 2014 to March 2014

MINISTRY
DIRECTORATE

OF
PUBLIC
WORKS
GENERAL OF HIGHWAYS

DIRECTORATE OF PLANNING
Core Team Consultant for
Western Indonesia

National Roads Improvement
IBRD Loan No. 8043-10

Project (WIN RIP)


: 03_1OICT
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
A/O /Q -1.2014
Jakarta, May 21 , 2014

No

Directorate General of Highways, MPW
JI. Patimura 20 Kebayoran Baru
Jakarta Selatan
Indonesia

Attention

: Ir. Agusta E. Sinulingga, M.T
Officer in Charge PMU WINRIP

Subject


: Quarterly Report for the 1st Quarter Year 2014

In compliance with Item No.3 (List of Documents to be delivered) of the Consultancy Contract for
Consultancy services, hereby we submit a copy of the above subject report (document attached).
The report covers the period from January 2014 to March 2014.
Very truly yours,

Oc:

'\

1.
2.
3.
4.
5.
6.
7.
8.
9.

10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

Direktur Jenderal Bina Marga
Inspektorat Jenderal, Kementrian PU
Direktur Transportasi - Bappenas
Direktur Pengelolaan Kas Negara (PKN), Kementrian Keuangan
Direktur Bina Program, Dit.Jen Bina Marga
Direktur Bina Teknik, DiUen Bina Marga
Direktur Bina Pelaksanaan Wilayah I, DJBM
Biro Perencanaan & KlN, Kementrian PU
Kasubdit Kawasan Strategis dan Andalan, Kementrian Dalam Negeri

Kasubdit Pembiayaan dan Kerjasama Luar Negeri, Dit. Bipran, DJBM
Kasubdit Wilayah I B, Direktorat Bina Pelaksana Wilayah I, DJBM
Kasubdit Wilayah I C, Direktorat Bina Pelaksana Wilayah I, DJBM
Kasubdit Wilayah I D, Direktorat Bina Pelaksana Wilayah I, DJBM
Kepala SNVT Pembinaan Administrasi dan Pelaksanaan Pengendalian
The World Bank Office
PT. Perentjana Djaja
Yongma Engineering Co, Ltd
PT. Epadascon Permata Engineering Consultant
File

PHLN

PT.PERENTJANA
OJAJAin subconsultancy withzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
;e> Yongma Engineering Co. Ltd and ~PT. EpadasconPermata Engineering Consultant
CTCOffice: JI. Ciniru VII No. 25, Kebayoran Baru, Jakarta Selatan, 12180
Phone/Fax: (021)7229823

1


Executive Summary
1.1

Current Implementation Situation
1.1.1 Civil Works
Implementation of the WINRIP Project is scheduled to be implemented into
three (3) Annual Work Programs (AWP’s).
AWP-1 original implementation is scheduled to begin with the pre-construction
activities (procurement) in mid 2011 and the actual work implementation to
start in mid 2012.
AWP-2 consist of three (3) implementation stages. The 1st stage is the
preparation of Tender Documents (construction drawings, bid document,
special specs and other related document) by Design Supervision Consultant
(DSC), 2nd stage in the procurement and the 3rd stage is the actual
implementation of the works. AWP-2 is originally scheduled to start in mid 2013
and to be implemented at the beginning of Year 2014.
AWP-3 implementation stages are of the same sequence with that of AWP-2.
The only difference is that AWP-3 is originally schedule to take-off beginning
the 1st month of the Year 2013 and to be implemented in the 1st month of the

Year 2015.
But to due some unavoidable circumstances, the original schedules incurred
delays. Actual implementation status are shown in Table 1.
Table 1
AWP

No. of
Packages

Implementation Status
as of 31 March 2014

AWP-1

4

Under construction

AWP-2


9

3 No. Procurement
1 No. Procurement preparation
4 No. DED / RSA review
1 No. DED

AWP-3

8

1 No. Procurement
2 No. Procurement preparation
5 No. DED

TOTAL

21

All 4 contract packages under AWP-1 are currently under construction by

different Contractors. Commencement of works for all the 4 packages
commended on the 2nd week of January 2014. As of the end of this reporting
quarter, all the 4 contractors are still in the process of mobilization. Other
activities done during this quarter were setting up of laboratory testing

1

building, staking out and repair and restoration of deteriorated existing
pavements. Progress status of the four (4) on-going civil work contract as of
this reporting period are shown in Table 2.
For contract packages under AWP-2 and AWP-3 which have a combined total
of 17 packages, a brief summary of the actual activities and status as of this
reporting quarter are presented in Table 3.

Table 2

Program

Contract
Package


1

2

4

Actual
Progress
Accompli
shed

Slippage

Biha - Krui

1,860%

0,812%


-1,048%

Padang
Sawah – Sp.
Empat
including Air
Gadang

2,390%

1,024%

-1,366%

Manggopoh
– Padang
Sawah

1,560%


1,020%

-0,540%

Ipuh - Bantal

0,560%

0,400%

0,160%

Name of
Road

Contractor

Jaya
Konstruksi
Manggala
Pertama Tbk
Jaya
Konstruksi
Manggala
Pertama Tbk

AWP-1
3

Target
Progress
Schedule
st
Ending 1
Quarter of
Year 2014

Jaya
Konstruksi
Manggala
Pertama Tbk
PT. Waskita
Karya and PT.
Mulya
Turangga (JO)

As the Contractors were still in the mobilization stage, most of the delay
incurred were attributed to difficulty in locating suitable base camps and quarry
sites of unlimited quantities.

2

Table 3
Brief Summary Status as of the 1st Quarter of Year 2014
Length Width

Pack.
Group
No.

1

Loan Package Name

Krui - Bha

Padang Saw ah - Sp. Ampat

(Km)

(m)

25

7

40.9

7

Estimated
Cost PIP Mar
2012 (Excl.
VAT)

DED

(IDR Milion)

Status

2
Including Air Gadang Bridge

100 m

7

Manggopoh - Padang Saw ah

32

7

Technical
Design
Review

Road
Safety
Audit

Environmental

Social

Procurement
Status
Doc
Requirem ent

Status

Doc
Requirem ent

AWP-2

Contract
Implementation
Plan
Est’d.
Start

Remarks

Duration
(Months)

Status

Budget
Allocation

Status

1.NOL WB 4
Jan 13 2.NOL
WB

APBN/
Satker PJN
Lampung

95%

NOL for AERs
issued on 22 April
2013

Oct-13

24.00

A

146,668.00

Completed

Completed

Completed

OK P2JN
1. LARAP
SPPL & AMDAL 2010 & Subdit
2.LARAP Mon
TLKJ 2011
inc Paket No 17
Report
(100%)

207,390.20

Completed

Completed

Completed

SPPL&UKL/ UPL
Bridge

OK P2JN
2010 (100%)

1.LARAP
2.LARAP
Monitoring
Report

1.NOL WB 13
Dec 12
2.Remaining
21 PAP not
yet paid

APBD /
Dinas PU
Sumbar

95%

NOL for AERs
issued on 22 April
2013

Oct-13

24.00

A

152,434.90

Completed

Completed

Completed

SPPL

OK P2JN
2010 (100%)

1. LARAP
2.LARAP Mon
Report

1.NOL WB 13
Dec 12
2.Remaining
10 PAP not
yet clear paid

APBD /
Dinas PU
Sumbar

99%

NOL for AERs
issued on 22 April
2013

Oct-13

24.00

A

SPPL OK
P2JN 2010
1. LARAP
1.NOL WB 10
(100%) &
2.LARAP Mon Dec 12 2.NOL
UKL&UPL
Report
WB
bidding
process (5%)

APBN/
Satker PJN
Bengkulu

100%

NOL for AERs
issued on 22 April
2013

Oct-13

24.00

A

AWP-1
3

Land Acquisition

4

Ipuh - Bantal

42.4

7

226,275.10

Completed

Completed

Completed

SPPL and
UKL&UPL

5

Sp. Rampa - Poriaha

11.1

6

55,126.60

Completed

Completed

Completed

UKL/UPL

OK Balai 1
2011 (100%)

1. SLARAP
2. SLARAP
Mon Report

1.NOL WB 12
Nov 13 2.
together civil
w ork

APBN/
Satker PJN
Sumut

0%

On Going

Dec-13

18.00

B

6

Ps. Pedati - Kerkap

25

7

72,018.80

Completed

Completed

Completed

UKL/UPL

OK TLKJ
2011 (100%)

1. LARAP 2.
LARAP Mon
Report

1.NOL WB 20
Nov 13 2.
under
preparation

APBN/
Satker PJN
Bengkulu

0%

Not yet started

Apr-14

18.00

D

7

Indrapura - Tapan

19.5

7

96,921.00

Completed

Completed

Completed

AMDAL

OK TLKJ Feb
2014 (100%)

1. SLARAP
2. SLARAP
Mon Report

1.Revision
LARAP by
Balai II
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Feb-15

21.00

E

8

Bts. Kota Pariaman - Manggopoh

46.8

7

183,268.80

Completed

Completed

Completed

AMDAL

OK Balai II
2013 (100)

1.Revision
1. LARAP 2.
LARAP by
LARAP Mon
P2JN Sumbar
Report
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Dec-14

24.00

E

9

Rantau Tijang - Kota Agung

42

7

149,831.50

On Going

UKL/UPL

OK TLKJ
2011 (100%)

1. LARAP 2.
LARAP Mon
Report

APBN/
Satker PJN
Lampung

0%

Not yet started

Jul-15

21.00

C

10

Sp. Empat - Sp. Air Balam

61.7

7

241,617.20

Completed

Completed

Completed

AMDAL

OK Balai II
2013 (100%)

1. LARAP 2.
1.Revision
LARAP Mon
LARAP by
Report
Balai II
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Dec-14

24.00

E

11

Bantal - Mukomuko

50.1

6

157,820.00

Completed

Completed

Completed

AMDAL

OK TLKJ
Marc 2014
(100%)

1. LARAP 2.
LARAP Mon
Report

1.NOL WB 20
Nov 13 2.
under
process L
Acq

APBN/
Satker PJN
Bengkulu

10%

On Going

Apr-14

24.00

B

12

Kambang - Indrapura

55.2

6

171,948.00

Completed

Completed

Completed

AMDAL

OK TLKJ Feb
2014 (100%)

1. SLARAP
2. Monitoring
Report

1.Revision
LARAP by
Balai II
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Feb-15

24.00

E

UKL/UPL

1.NOL WB 20
1. LARAP 2. Nov 13 2.
OK P2JN
LARAP Mon
under
2011 (100%0
Report
preparation L
Acq

APBN/
Satker PJN
Bengkulu

0%

On Going

Apr-14

21.00

B

AMDAL

OK TLKJ Feb
2014 (100%)

1. SLARAP
2. SLARAP
Mon Report

1.Revision
LARAP by
Balai II
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Jul-15

21.00

C

UKL/UPL

OK Balai 1
2011 (100%)

1. LARAP 2.
LARAP Mon
Report

1.NOL WB 28
Oct 13 2.
under
preparation

APBN/
Satker PJN
Sumut

0%

Not yet started

Apr-14

21.00

D

AMDAL

OK TLKJ
Marc 2014
(100%)

1. SLARAP 2.
SLARAP Mon
Report

1.NOL WB 20
Nov 13 2.
under
preparation

APBN/
Satker PJN
Bengkulu

0%

Not yet started

Jul-15

21.00

C

AMDAL

OK TLKJ
2011 (100%)

1. LARAP 2.
LARAP Mon
Report

1.NOL WB 12
Nov 13 2.
under
preparation

APBN/
Satker PJN
Lampung

0%

On Going

Apr-14

21.00

B

UKL/UPL

OK TLKJ
2011 (100%)

1. SLARAP
2. SLARAP
Mon Report

-

APBN/
Satker PJN
Bengkulu

0%

Not yet started

Oct-15

18.00

C

UKL/UPL

OK TLKJ
2011 (100%)

1. LARAP 2.
LARAP Mon
Report

1.NOL WB 20
Nov 13 2.
under
preparation

APBN/
Satker PJN
Bengkulu

0%

Not yet started

Oct-15

18.00

D

13

Sp. Rukis - Tj.Kemuning

56.3

7

225,481.50

Completed

14

Painan - Kambang

31.5

7

118,993.00

On going

15

Sibolga - Bts.Tap Sel

36

7

129,228.00

Completed

Seblat - Ipuh including

34.5

6

110,237.00

On Going

Air Lalang & Air Guntung Bridge

64 m

6

36.8

6

30 m

6

104,238.00

Completed

16

17

Sp.Gunung Kemala - Pg.Tampak

AWP-3

Completed

Completed

Completed

Completed

Completed

Completed

-

18

Mukomuko - Bts.Sumbar

25.8

6

69,233.00

On Going

19

Lais - Bintuan

11.6

7

37,558.00

Completed

20

Lubuk Alung - Sicincin

14.6

7

54,557.00

On Going

UKL/UPL

OK TLKJ
2011 (100%)

1. SLARAP
2. SLARAP
Mon Report

1.Revision
LARAP by
Balai II
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Oct-15

18.00

C

21

Lubuk Alung - Kurajati

16.8

7

65,788.00

On Going

UKL/UPL

OK TLKJ
2011 (100%)

1. SLARAP
2. SLARAP
Mon Report

1.Revision
LARAP by
Balai II
2. -

APBD /
Dinas PU
Sumbar

0%

Not yet started

Oct-15

18.00

C

Completed

Completed

2,776,633.60
Remarks :
A
B
C
D
E

On going Construction
Final Review of Application Evaluation Report (AER)
Detailed Engineering Design Still to be prepared
Procurement Preparation Underw ay
DED/RSA under review by Directorate of Technical Affairs

=

3 Packages in 1 study AMDAL (West Sumatera Province)

=

2 Packages in 1 study AMDAL (Bengkulu Province)

3

1.1.2 Consultancy Services
TA Consultant

Planned
Mobilization

Contract
Signed

Actual
Mobilization
12 Nov 2012

CTC

Jul 2012

5 Nov 2012

DSC

Jul 2012

11 Jun 2013 19 Jun 2013

Capacity Building for
Disaster Risks Reduction

Still to be
procured

Capacity Building for
Environmental Management

Still to be
procured

Capacity Building for Road
Safety

Still to be
procured

1.1.3 Goods
All the end of this reporting quarter, no goods were procured.

4

1.2

Current Status of Loan
At the end of March 2014 some USD 4.97 million, representing 1.99 % of
the available loan, had been disbursed. Disbursement is considerably behind
schedule as 31.02 % of the time has already elapsed with the main reason
for the delay being the long period waiting for the implementation of civil
works and slow progress of the four (4) on going construction packages.
Details of the overall loan situation are presented as a series of Forms
1A-1F, Form G-TA, Form G-10c, Form 2-A and Form 3-A and these can be
found immediately after the main discussion section of this report.

1.3

Current Problems and Action Required

Program
AWP-1

AWP-2 & AWP-3

Activity

Responsibility

4 no. packages Construction Stage :
mobilization, staking out, lab.testing,
& Reinstatement of Existing
Pavement

Contractor
DSC
Civil Works Project Manager

4 no. packages procurement stage
3 no. packages procurement
preparation
4 no. packages DED/RSA review

Procurement committee
Civil Works Project Manager

4 no. packages DED
Capacity Building for
Disaster Risks
Reduction

Terms of Reference

Capacity Building for
Environmental
Management

Terms of Reference

Capacity Building for
Road Safety

Terms of Reference

On-going preparation

On-going preparation

On-going preparation

5

Sub Directorate of Environment
& Road Safety, DTA - DGH
DSC
Sub-Directorate of Environment
& Road Safety - DTA - DGH
Sub-Directorate of Environment
& Road Safety, DTA - DGH
Sub-Directorate of Environment
& Road Safety, DTA - DGH

2

General
2.1

Reporting Requirements
Quarterly Progress Reports: Although the project has now been running
for quite sometime, this is the first Quarterly Progress Report as required in
the Loan Agreement. Prior to the production of this report, Monthly Progress
Reports have been prepared and have dealt with all aspects of the works.
This report attempts to bring the situation up to date by covering overall
progress up to the end of First Quarter of the Year 2014.
Financial Monitoring Reports: These have been prepared for each quarter
since the beginning of 2013 although the first one, issued in May
2013, covered the period January – March 2013. Since that date
quarterly reports have been prepared and submitted on schedule.
Financial
Financial
Financial
Financial
Financial

2.2

Report
Monitoring
Monitoring
Monitoring
Monitoring
Monitoring

Report
Report
Report
Report
Report

No. 1
No. 2
No. 3
No. 4
No. 5

Period Covered
January 2013 – March 2013
April 2013 – June 2013
July 2013 – September 2013
October 2013 – December 2013
January 2014 – March 2014

Date Issued
15 May 2013
15 August 2013
15 November 2013
15 February 2014
15 May 2014

Loan Status
The agreed allocation of loan funds from the original loan agreement
together with the % disbursed to the end of the quarter date (March
31,2014) is presented in Table 4
Table 4
Category
1

2
3
4

Totals Disbursed to
End March 2014 in % Disbursed
USD

Loan
Restructuring
Amount USD

Description
Part 1
Betterment and Capacity
Expansion of National Roads
Part 2
Implementation Support
Part 3
Road Sector Institutional
Development
Part 4
Contingency for Disaster Risk
Response

Unallocated

220,400,000

2,732,200

1.24

16,000,000

1,574,976

9.84

1,000,000

0

0

0

0

0

12,600,000

0

0

659,358

0

4,966,535

1.99

LN 8043 DA-A
Original Loan
Amount

250,000,000

Details of the overall loan status can be found in Appendix 1

6

2.3

Financial Management
S-Curve for Financial Progress
WINRIP ACTUAL PROGRESS UP TO MARCH 2014 AND FORECAST UP TO DECEMBER 2017

1,45

100,00

4,35

4,35

90,00
80,00

% Complete

70,00
60,00
50,00
40,00
30,00

Forecast March 2014
Forecast Expenditure USD
90.62 mil (36.25%)

20,00
10,00

Deviation = 34.26%
ACTUAL March 2014
Actual Expenditure USD
4.97 mil (1.99 %)

0,00

Month

A report at the end of the quarter (March 31, 2014) is presented in Appendix 2

2.4

Project Cost Monitoring
A detailed summary of the project cost monitoring in tabular format is
presented as Appendix 3 at the end of this report

2.5

Bank Mission
During the 1st Quarter of Year 2014, there was no scheduled visit from the
World Bank Mission.

2.6

Project Steering Committee Meeting
No meeting was held during the quarter.

7

3

Project Management and Implementation
3.1

Procurement Status
(A) Civil Works
Civil Works are now being implemented in Annual Work Programs (AWP)
which have been numbered AWP-1, AWP-2, and AWP-3.
All four (4) AWP-1 contract packages were signed by the end of 2013 with
actual work commencement on January 2014. During the quarter three (3)
contract packages for AWP-2 and one (1) contract package for AWP-3 are
under procurement proceedings.
(B) Services
The Core Team (CTC), Design & Supervision Consultant (DSC), and the
others Capacity Building Consultancy status are discussed in Section 3.3.
The others consultancy packages are as follows :
1) Capacity Building for Disaster Risks Reduction
2) Capacity Building for Environmental Management
3) Capacity Building for Road Safety
Finalization of the TOR draft for the above 3 consultancy Packages are being
prepared by Sub Directorate of Environment & Road Safety - Directorat of
Technical Affair - DGH

3.2

Implementation Status – Civil Works
AWP-1 Packages
All four (4) AWP-1 packages commenced their work on the following date:
Pack.
no.
1
2
3
4

Package Name
Krui - Biha
Pdg.Sawah Smp.Empat –
Manggopoh
Pdg.Sawah
Ipuh
- Bantal

Date of
COW
Contract
25 Nov 2013 8 Jan
14
6 Des 2013
6 Jan
14
6 Des 2013
6 Jan
14
14 Nov 2013 10 Jan
14

8

Construction
PHO Schedule
Period
640
730
730
730

9-Oct-15
5-Jan-16
5-Jan-16
9-Jan-16

AWP-2 & AWP-3 Packages
Application Evaluation Report (AER) for three (3) AWP-2 packages and one
(1) AWP-3 package are on-going as of end of this report period. The four (4)
contract packages are shown below.

No.
1
2
3
4

Pack
No.

Package Name
AWP-2
Sp. Rampa - Poriaha
Bantal - Mukomuko
Sp. Rukis - Tnj.Kemuning
AWP-3
Sp.Gn.Kemala - Pg.Tampak

Status

5
11
13

Prequalification Evaluation
Prequalification Evaluation
Prequalification Evaluation

17

Prequalification Evaluation

The status of the remaining packages are as follows :
Type of
Procure.

Status
No.

1
2
3
4
5
6
7
8
9
10
11
12
13

Package Name

AWP-2
Psr. Pedati - Kerkap
Indrapura - Tapan
Bts. Pariaman Manggopoh
Rantau Kijang - Kota
Agung
Sp. Empat - Sp. Air
Balam
Kembang - Indrapura
AWP-3
Painan - Kambang
Sibolga - Bts Tapsel
Seblat - Ipuh
Mukomuko - Bts.
Sumbar
Lais
- Bintunan
Lubuk Alung - Sicincin
Lubuk Alung Kuraitaji
TOTAL :

Pack.
No.

DED

Re-plc
undeci
ded

NCB

ICB

C


C
C

-

*
*

-



C

-

*

-



*

-

10



C

-

*

12



C

-

-

*

C


C

-

C



C


-

4



4

*
*
*
*
*
*

2

6
7

Procur Review
e.
DED/R
Prepr.
SA


8
9

14
15
16
18
19
20
21

-




3


-

Legend : C – Completed
√ – On Going
* – Procurement Type
● – Replacement

9

9

*
-

4

3.3

Variation Order Details
There are still no Variation Orders initiated by either the DSC Consultant or
the Contractors of the four (4) civil works contract of the on-going contract
packages as it is too early and the current activities are mainly mobilization
and minor roadwork items.

3.4

Consultancy Services
Technical Assistance for Core Team Consultant (CTC) to Support the
Project Management Unit.

Lead Consultant: PT. Perentjana Djaja
CTC Contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 Nov
2012 between the Ministry of Public Works , Directorate of Planning,
DGH and PT. Perentjana Djaja, Yongma Engineering Co. Ltd, PT.
Epadascon Permata Engineering Consultant, JV and the work commenced
on 12 November 2012.
Amendment No.1 to this contract dated 25 October 2013 was signed to
accommodate the increase in staffing requirements with the following
increase in cost.
Draft Amendment No. 2 is under preparation for submission and discussion
with PMU. Proposed amendment to the Original Contract and Amendment
No. 1 are additional professional and technical staff for international and
local, replacement of foreign and local consultants and modification to
various reinbursables to match with the actual requirements.

Form of Currency

USD

IDR

Original Contract

1,276,700

22,415,400,000

Amendment No. 1 (Exc VAT)

1,315,925

22,426,175,000

131,592

2,242,617,500

Total Amendment No.1 (inc VAT)

1,447,517

24,668,792,500

Variance

+ 13,38 %

+ 10,05 %

VAT 10% (GOI Portion)

Technical Assistance for Design & Supervision Consultant (DSC)
Lead Consultant: Renardet S.A
DSC Contract No. KU.03.01/PPK-PR/WINRIP/Bx/01/VI/2013 was signed on
11 Jun 2013 between the Ministry of Public Works, Head of Regional Office
for National Roads Implementation, DGH and Renardet S.A. PT Cipta Strada,
PT. Daya Creasi Mitrayasa, PT. Seecons and PT. Yodya Karya (Persero)
Joint Venture and mobilized on 19 June 2013

10

Form of Currency
Original Contract (exc. VAT)

USD

IDR

820,600,00

51,818,705,000

VAT 10% (GOI Portion)

82,060,00

5,181,870,500

Total

902,660,00

57,000,575,500

Technical Assistance for Capacity Building for Disaster Risks Reduction
• Lead Consultant : Still to be Procured
• Draft Terms of Reference still to be prepared.

Technical Assistance for Capacity Building for Environmental
Management
• Lead Consultant : Still to be Procured
• Draft Terms of Reference still to be prepared.

Technical Assistance for Capacity Building for Road Safety
• Lead Consultant : Still to be Procured
• Draft Terms of Reference still to be prepared.

3.5

Implementation of the Anti-Corruption Ac ti on Plan
Community Representative Officers (CRO)
CROs have been appointed for AWP-1 packages and those appointed for
the AWP-1 packages attended the bid opening meetings in Packages 1
and 4 and Packages 2 and 3 in Palembang and Padang, respectively. All
CROs are university staff members as prioritized in the PMM and have
had extensive training sessions.

Third Party Monitors (TPM)
Third Party Monitors have been appointed on March 5, 2014 for Package 1,
March 7, 2014 for Packages 2 and 3 and for Package 5 on March 10, 2014.

Documentation
The WINRIP website, which will be available for reporting all aspects of the
Anti-Corruption A c t i o n Plan including the registering of complaints by
the general public, is still under development although already running on
http://winrip-ibrd.com.

11

3.6

Implementation of the Environmental Management Plan
Sets of forms consisting of 7 pages have been provided to Design Supervision
Consultant (DSC) for monitoring the implementation of Environmental
Management Plan. These forms are to be filled up by the DSC Environmental
Specialist in monitoring Contractor’s compliance with the Environmental
Management Plan.

4

Workshops & Training
During the reporting period (January 2014 to March 2014) there was no workshop or
training conducted. However, three (3) separate training / workshop courses have
already been conducted in Bandung, Jakarta and Tanjung Pandan way back a years
ago.
A review of the WINRIP Project Management Manual (PMM) has been prepared
and an updated final draft sent to PMU is scheduled end of April 2013. This draft
is still awaiting review and approval by the Directorate of Technical Affairs prior to
being issued as a final version. The Project Management Manual (PMM) is
expected to be finalized soon.

12

Table Of Contents
1

Executive Summary...................................................................................................... 1
1.1

Current Implementation Situation........................................................................ 1
1.1.1 Civil Works............................................................................................... 1
1.1.2 Consultancy Services ............................................................................. 3
1.1.3 Goods...................................................................................................... 4

2

3

4

1.2

Current Status of Loan ....................................................................................... 5

1.3

Current Problems and Action Required .............................................................. 5

General........................................................................................................................ 6
2.1

Reporting Requirements .................................................................................... 6

2.2

Loan Status ....................................................................................................... 6

2.3

Financial Management ....................................................................................... 7

2.4

Project Cost Monitoring ...................................................................................... 7

2.5

Bank Mission ...................................................................................................... 7

2.6

Project Steering Committee Meeting .................................................................. 7

Project Management and Implementation ................................................................... 8
3.1

Procurement Status............................................................................................ 8

3.2

Implementation Status – Civil Works.................................................................. 8

3.3

Variation Order Details.......................................................................................10

3.4

Consultancy Services ........................................................................................10

3.5

Implementation of the Anti-Corruption A ct i o n Plan .........................................11

3.6

Implementation of the Environmental Management Plan ....................................12

Workshops & Training ................................................................................................12

APPENDIX

7

APPENDIX 1
Details of The Overall Loan Status

Western I ndonesia National Roads I mprovement Project
Disbursement and Expenditures Status
For the Quarter ending March 31, 2014
I BRD Loan No. 8043 - I D
Appendix - 1
in USD
Loan
Cat

Detail of
Category

Loan
Allocation

Disbursement

1

2

3

4

1

Civil Works under part 1 of the project

01.
02.
03.
04.
17.
05.
11.
13.
06.
19.
15.
08.
10.
07.
12.
14.
16.
20.
21.
18.
09.

220,400,000.00

2,732,200.92

Krui - Biha
Padang Sawah - Sp.Empat/ I nc Air Gadang Brgd
Manggopoh - Padang Sawah
I puh - Bantal
Sp.Gng Kemala - Pugung Tampak
Simpang Rampa - Poriaha
Bantal - Mukomuko
Sp Rukis - Tj Kemuning
Ps. Pedati - Kerkap
Lais - Bintunan
Sibolga - Batas Tapsel
Bts.Kota Pariaman - Manggopoh
Simpang Empat - Sp.Air Balam
I ndrapura - Tapan
Kambang - I ndrapura
Painan - Kambang
Seblat - I puh, I nc Air Lalang/ Guntung Brgd
Lubuk Alung - Sicincin
Lubuk Alung - Kuraitaji
Mukomuko - Batas Sumbar * *
Rantau Tijang - Kota Agung * *

Expenditures
Cumulative
to date
6

Current
Quarter
5

Expenditures not yet
replenish
7

Remaining Amount of
Contract
8

Remaining
Loan
Allocation
9= 3-( 4+ 6-7+ 8)

2,732,200.92

2,732,200.92

55,089,351.03

217,667,799.08

773,498.63
1,134,865.17
823,837.12
0.00

773,498.63
1,134,865.17
823,837.12
0.00

10,983,839.11
16,115,318.15
11,698,656.01
16,291,537.76

7,688,687.38
11,280,722.71
8,189,059.21
11,404,076.43

2

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 2 of the project

16,000,000.00

1,574,976.48

6,688.69

1,574,976.48

14,425,023.52

14,425,023.52

3

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 3 of the project

1,000,000.00

0.00

0.00

0.00

0.00

1,000,000.00

4

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 4 of the project

0.00

0.00

0.00

0.00

0.00

0.00

5

Unallocated

12,600,000.00

0.00

0.00

0.00

0.00

12,600,000.00

250,000,000.00

4,307,177.40

2,738,889.61

4,307,177.40

69,514,374.55

245,692,822.60

Note :

APPENDIX 2
Report At The End of The Quarter
(March 31, 2014)

Appendix 2
Western Indonesia National Roads Improvement Project
Project Report Format - 2
Report for the quarter ended on 31-03-14
Particulars

( Amount in US $ )

Bank Fund disbursed till date
Total Project Uses till date
World Bank Share @ 70% for CW
World Bank Share @ 100% for TA
World Bank Share @ 100% for IOC
Funds Undisbursed to date

I
II
III
IV
V
VI

4,966,535.92
6,419,854.71
2,738,889.61
1,501,920.44
73,056.04
245,033,464.08

Forecast for Project payments for the next 6 months
World Bank Share @ 70% for CW
World Bank Share @ 100% for TA
World Bank Share @ 100% for IOC
Fund Undisbursed for next 6 month
Net Funds required from the Bank

VII
VIII
IX
X

12,163,101.27
9,570,557.02
420.80
150.10
235,462,336.16
9,571,127.92

Forecast for DIPA from GOI for the 6 months

XI

2,591,973.35

APPENDIX 3
Detailed Summary of the Project Monitoring

Western I ndonesia National Roads I mprovement Project
Contract Expenditure Report Goods and Works)
for the quarter ended March 31, 2014
I BRD Loan 8043 - I D
Appendix - 3
Disbursement
Category
No
Description
1

2

Contract
Description

Procurement
Method / ii

Contract
Number / iii

Supplier/
Contractor

Nationality

Contract
Currency

Contract
Value

Amount
I nvoiced
to date

3

4

5

6

7

8

9

10

Krui - Biha

PT. JAYA KONSTRUKSI

I NDONESI A

I DR

134,909,211,000.00

01-26/ 04-WI NRI P-WP1/ CE/ A/ 8043/ 11-13

MANGGALA PRATAMA

Payment realization
No. SP2D/ WA
11

Date of SP2D

Amount( Rp)

Amount ( US$)

12

13

14

Remaining amount Of Contr.
( Rp.)
( US$)
15

1. CI VI L WORKS
1

CI VI L WORKS

I CB

590770D

27-Dec-13

3,102,911,853.00

131,806,299,147.00

001/ 01-WI NRI P/ 17

2-Jan-14

9,443,644,770.00

122,362,654,377.00

Tanggal 14 November 2013

2

CI VI L WORKS

I CB

Padang Saw ah - Sp.Empat

PT. JAYA KONSTRUKSI

I ncluding Air Gadang Bridge

MANGGALA PRATAMA

I NDONESI A

I DR

197,936,699,000.00

12,546,556,623.00

122,362,654,377.00

040668I

30-Dec-13

4,552,544,077.00

193,384,154,923.00

002/ 02-WI NRI P/ 06

2-Jan-14

13,855,568,930.00

179,528,585,993.00

39-06/ 02-WI NRI P-WP1/ CE/ A/ 8043-I D/ 12-13
Tanggal 06 December 2013

3

CI VI L WORKS

Manggopoh - Padang Saw ah

PT. JAYA KONSTRUKSI

40-06/ 03-WI NRI P-WP1/ CE/ A/ 8043-I D/ 12-13

MANGGALA PRATAMA

I CB

I NDONESI A

I DR

143,688,963,000.00

18,408,113,007.00

179,528,585,993.00

040667I

30-Dec-13

3,304,846,149.00

140,384,116,851.00

003/ 03-WI NRI P/ 06

2-Jan-14

10,058,227,410.00

130,325,889,441.00

13,363,073,559.00

130,325,889,441.00

254931Y

16-Dec-13

Tanggal 06 December 2013

4

CI VI L WORKS

I puh - Bantal

PT. WASKI TA KARYA - DAYA

01-26/ 04-WI NRI P-WP1/ CE/ A/ 8043/ 11-13

MULI A TURANGGA JO

Tanggal 14 November 2013

SARI , Jo

I CB

I NDONESI A

I DR

186,936,750,000.00

4,299,545,250.00

4,299,545,250.00

T O T A L CIVIL WORKS
NOTES:

VAT for Loan portion is not collected
/ i:

This Report provides procurement information for the project from inception to the latest reporting date.

/ ii:

Each method in Procurement Guidelines should be shown separately

I CB :

I nternational Competitive Bidding

NCB :

National Competitive Bidding

NS :

National Shoping

DC :

Direct Contracting

663,471,623,000.00

48,617,288,439.00

182,637,204,750.00

182,637,204,750.00

614,854,334,561.00

16

Code Cat.
Comp.

Note

17

18

FORMS
1A–1F, G-TA, G-10c, 2-A, 3-A

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Form 1 - A

Project Sources and Uses of Funds
For the Quarter ending March 31, 2014
I BRD Loan No. 8043 - I D
Actual

1

Planned

Variance in %

Current
Quarter

Year
To date

Cumulative
To date

Current
Quarter

Year
To date

Cumulative
To date

Current
Quarter

Year
To date

Cumulative
To date

2

3

4

5

6

7

8=2/5

9 =3/6

10 =4/7

Source of Fund
0,00

0,00

15.259.847.329,00

21.025.966.800,00

21.025.966.800,00

83.279.545.940,00

0,00%

0,00%

18,32%

The World Bank

33.438.441.110,00

33.438.441.110,00

50.170.473.484,00

16.807.290.000,00

16.807.290.000,00

161.786.464.584,00

198,95%

198,95%

31,01%

Total Sources of Funds

33.438.441.110,00

33.438.441.110,00

65.430.320.813,00

37.833.256.800,00

37.833.256.800,00

245.066.010.524,00

88,38%

88,38%

26,70%

33.357.441.110,00

33.357.441.110,00

48.617.288.439,00

36.495.792.456,00

36.495.792.456,00

226.689.041.180,00

0,00%

0,00%

21,45%

81.000.000,00

81.000.000,00

16.813.032.374,00

1.337.464.344,00

1.337.464.344,00

18.376.969.344,00

0,00%

0,00%

91,49%

Goods, Non Consulting Services,
Consulting Services and I ncremental
Operating Cost under part 3 of the project

0,00

0,00

0,00

0,00

0,00

0,00

# DI V/ 0!

# DI V/ 0!

# DI V/ 0!

Goods, Non Consulting Services,
Consulting Services and I ncremental
Operating Cost under part 4 of the project

0,00

0,00

0,00

0,00

0,00

0,00

# DI V/ 0!

# DI V/ 0!

# DI V/ 0!

Non Bank Finance ( Rupiah Murni)

0,00

0,00

0,00

0,00

0,00

0,00

0,00%

0,00%

0,00%

Unallocated

0,00

0,00

0,00

0,00

0,00

0,00

0,00%

0,00%

0,00%

33.438.441.110,00

33.438.441.110,00

65.430.320.813,00

37.833.256.800,00

37.833.256.800,00

245.066.010.524,00

88,38%

88,38%

26,70%

GOI : APBN

Uses of Fund ( by Category)
Civil W orks under part 1 of the project

Goods, Non Consulting Services,
Consulting Services and I ncremental
Operating Cost under part 2 of the project

Total Uses of Fund
Note :

FMR-WI NRI P-Q1-14.xls

Page 1

21:0513/05/2014

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Cummulative Uses of Funds by Project Activity
For the Quarter ending March 31, 2014
I BRD Loan No. 8043 - I D

Form 1 - B

I n I DR

Project Activities

Current Quarter
GOI
APBN

1

1

Civil W orks under part 1 of the project

2

0,00

Year to date

WB

TOTAL

3

4

33.357.441.110,00

GOI
APBN
5

33.357.441.110,00

0,00

Cummulative To date

WB

TOTAL

6

7

33.357.441.110,00

GOI
APBN
8

33.357.441.110,00

15.259.847.329,00

WB

TOTAL

9

10

33.357.441.110,00

48.617.288.439,00

01. Krui - Biha

0,00

9.443.644.770,00

9.443.644.770,00

0,00

9.443.644.770,00

9.443.644.770,00

3.102.911.853,00

9.443.644.770,00

12.546.556.623,00

02. Padang Sawah - Sp.Empat/ Inc Air Gadang Brgd

0,00

13.855.568.930,00

13.855.568.930,00

0,00

13.855.568.930,00

13.855.568.930,00

4.552.544.077,00

13.855.568.930,00

18.408.113.007,00

03. Manggopoh - Padang Sawah

0,00

10.058.227.410,00

10.058.227.410,00

0,00

10.058.227.410,00

10.058.227.410,00

3.304.846.149,00

10.058.227.410,00

13.363.073.559,00

04. Ipuh - Bantal

0,00

0,00

0,00

0,00

0,00

0,00

4.299.545.250,00

0,00

4.299.545.250,00

17. Sp.Gng Kemala - Pugung Tampak

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

05. Simpang Rampa - Poriaha

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

11. Bantal - Mukomuko

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

13. Sp Rukis - Tj Kemuning

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

06. Ps. Pedati - Kerkap

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

19. Lais - Bintunan

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

15. Sibolga - Batas Tapsel

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

08. Bts.Kota Pariaman - Manggopoh

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

10. Simpang Empat - Sp.Air Balam

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

07. Indrapura - Tapan

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

12. Kambang - Indrapura

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

14. Painan - Kambang

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

16. Seblat - Ipuh, Inc Air Lalang/ Guntung Brgd

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

20. Lubuk Alung - Sicincin

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

21. Lubuk Alung - Kuraitaji

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

18. Mukomuko - Batas Sumbar * *

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

09. Rantau Tijang - Kota Agung * *

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

2

Goods, Non Consulting Services, Consulting Services
and I ncremental Operating Cost under part 2 of the
project

0,00

81.000.000,00

81.000.000,00

0,00

81.000.000,00

81.000.000,00

0,00

16.813.032.374,00

16.813.032.374,00

3

Goods, Non Consulting Services, Consulting Services
and I ncremental Operating Cost under part 3 of the
project

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

4

Goods, Non Consulting Services, Consulting Services
and I ncremental Operating Cost under part 4 of the
project

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

5

Unallocated

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

0,00

TOTAL

FMR-WINRIP-Q1-14.xls

-

33.438.441.110,00

33.438.441.110,00

-

Page 1 of 1

33.438.441.110,00

33.438.441.110,00

15.259.847.329,00

50.170.473.484,00

65.430.320.813,00

13/05/2014-21:07

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Project Cash Forecash
For the Quarter ending March 31, 2014
IBRD Loan No. 8043 - ID

Form 1 - C

in I DR 000's
(a)
Cash Requirement
Disbursement

Category

1

1

Civil W orks under part 1 of the proj ect

01. Krui - Biha
02. Padang Sawah - Sp.Empat/ I nc Air Gadang Brgd
03. Manggopoh - Padang Sawah
04. I puh - Bantal
17. Sp.Gng Kemala - Pugung Tampak
05. Simpang Rampa - Poriaha
11. Bantal - Mukomuko
13. Sp Rukis - Tj Kemuning
06. Ps. Pedati - Kerkap
19. Lais - Bintunan
15. Sibolga - Batas Tapsel
08. Bts.Kota Pariaman - Manggopoh
10. Simpang Empat - Sp.Air Balam
07. I ndrapura - Tapan
12. Kambang - I ndrapura
14. Painan - Kambang
16. Seblat - I puh, I nc Air Lalang/ Guntung Brgd
20. Lubuk Alung - Sicincin
21. Lubuk Alung - Kuraitaji
18. Mukomuko - Batas Sumbar * *
09. Rantau Tijang - Kota Agung * *

(b)
Cash Requirement

( c )= (a)+ (b)
Total Cash

(d)
GOI

(e)
WB

(f)
WB

for

for

Requirement for

Quarter ending

Quarter ending

six mos. Ending

Cash Requirement

30-Jun-14

30-Sep-14

30-Sep-14

30-Sep-14

30-Sep-14

30-Sep-14

(I DR)

(I DR)

(I DR)

(I DR)

(I DR)

(I USD)

2

3

5

6

7

8

Cash Requirement for Six mos. Ending

for Six mos. Ending

35.891.729,70

107.675.189,10

143.566.918,80

43.070.075,64

100.496.843,16

9.571.127,92

3.735.750,00
6.031.484,40
3.179.574,60
4.458.838,80
1.650.000,00
1.787.398,50
2.058.166,50
2.727.662,10
1.640.578,80
900.000,00
2.273.208,75
1.772.986,35
1.767.358,35
540.097,95
1.368.624,60
0,00
0,00
0,00
0,00
0,00
0,00

11.207.250,00
18.094.453,20
9.538.723,80
13.376.516,40
4.950.000,00
5.362.195,50
6.174.499,50
8.182.986,30
4.921.736,40
2.700.000,00
6.819.626,25
5.318.959,05
5.302.075,05
1.620.293,85
4.105.873,80
0,00
0,00
0,00
0,00
0,00
0,00

14.943.000,00
24.125.937,60
12.718.298,40
17.835.355,20
6.600.000,00
7.149.594,00
8.232.666,00
10.910.648,40
6.562.315,20
3.600.000,00
9.092.835,00
7.091.945,40
7.069.433,40
2.160.391,80
5.474.498,40
0,00
0,00
0,00
0,00
0,00
0,00

4.482.900,00
7.237.781,28
3.815.489,52
5.350.606,56
1.980.000,00
2.144.878,20
2.469.799,80
3.273.194,52
1.968.694,56
1.080.000,00
2.727.850,50
2.127.583,62
2.120.830,02
648.117,54
1.642.349,52
0,00
0,00
0,00
0,00
0,00
0,00

10.460.100,00
16.888.156,32
8.902.808,88
12.484.748,64
4.620.000,00
5.004.715,80
5.762.866,20
7.637.453,88
4.593.620,64
2.520.000,00
6.364.984,50
4.964.361,78
4.948.603,38
1.512.274,26
3.832.148,88
0,00
0,00
0,00
0,00
0,00
0,00

996.200,00
1.608.395,84
847.886,56
1.189.023,68
440.000,00
476.639,60
548.844,40
727.376,56
437.487,68
240.000,00
606.189,00
472.796,36
471.295,56
144.026,12
364.966,56
0,00
0,00
0,00
0,00
0,00
0,00

1.498,61

4.495,83

5.994,44

0,00

5.994,44

570,90

2

Goods, Non Consulting Services, Consulting Services and
I ncremental Operating Cost under part 2 of the proj ect

3

Goods, Non Consulting Services, Consulting Services and
I ncremental Operating Cost under part 3 of the project

0,00

0,00

0,00

0,00

0,00

0,00

4

Goods, Non Consulting Services, Consulting Services and
I ncremental Operating Cost under part 4 of the proj ect

0,00

0,00

0,00

0,00

0,00

0,00

5

Unallocated

35.891.729,70

107.675.189,10

143.566.918,80

43.070.075,64

100.496.843,16

9.571.127,92

Total

FMR-WINRIP-Q1-14.xls

Page 1 of 1

13/05/2014-21:22

CTC

WINRIP

Form 1 - D

Western I ndonesia National Roads I mprovement Project
Loan I BRD No. 8043-I D
Special Account Activity Statement
for the Reporting Period of January - March 2014
Bank Indonesia Account No: 601.306.411.980

in USD
Part I
1. Cummulative advances to end of current reporting period
2. Cummulative expenditures to end of last reporting period
3. Outstanding advances to be accounted (1-2)

2.234.335,00
1.568.287,79
666.047,21

Part I I
4.
5.
6.
7.
8.

Opening SA balance at beginning of reporting period (as of January 01, 2014)
*)
Add/ Substract:Cummulative adjustments (if any)
Advances from the World Bank during reporting period
add 5 and 6
Outstanding advances to be accounted for (4+ 7)

9. Closing SA balance at end of current reporting (as of March 31, 2013)
**)
10. Add/ substract; cummulative adjusment (if any)
11.
Expenditures for current reporting period
12. Add 10+ 11
13. Add 9+ 12
14. Difference (if any) 8-13

639.627,21
26.420,00
26.420,00
666.047,21
659.358,52
6.688,69
6.688,69
666.047,21

***)

-

Part I I I
15. Total Forecasted amount to be paid by World Bank
16. Less: Closing SA balance after adjustment
17.
Cummulative adjustment (if any)
18. Add 16+ 17

659.358,52
659.358,52
****)

659.358,52
-

19. Cash requirement from WB for next six months (15-18)

Rounding
===================
* Explanation for item 5 (if not zero):

Amount (+ / -)

Remarks

* * Explanation for item 10 (if not Zero):

Amount (+ / -)

Remarks

* * * Explanation for item 14 (if not Zero):

Amount (+ / -)

Remarks

Amount (+ / -)

* * * * Explanation for item 17 (if not Zero):

Remarks

-

FMR-WINRIP-Q1-14.xls

Page 1 of 1

13/05/2014-21:09

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Disbursement and Expenditures Status
For the Quarter ending March 31, 2014
I BRD Loan No. 8043 - I D

Form 1 - E
in USD

Loan
Cat
1

1

Detail of
Category

Loan
Allocation

Disbursement

2

3

4

Civil Works under part 1 of the project

01.
02.
03.
04.
17.
05.
11.
13.
06.
19.
15.
08.
10.
07.
12.
14.
16.
20.
21.
18.
09.

220.400.000,00

2.732.200,92

Krui - Biha
Padang Sawah - Sp.Empat/ I nc Air Gadang Brgd
Manggopoh - Padang Sawah
I puh - Bantal
Sp.Gng Kemala - Pugung Tampak
Simpang Rampa - Poriaha
Bantal - Mukomuko
Sp Rukis - Tj Kemuning
Ps. Pedati - Kerkap
Lais - Bintunan
Sibolga - Batas Tapsel
Bts.Kota Pariaman - Manggopoh
Simpang Empat - Sp.Air Balam
I ndrapura - Tapan
Kambang - I ndrapura
Painan - Kambang
Seblat - I puh, I nc Air Lalang/ Guntung Brgd
Lubuk Alung - Sicincin
Lubuk Alung - Kuraitaji
Mukomuko - Batas Sumbar * *
Rantau Tijang - Kota Agung * *

Expenditures
Cumulative
to date
6

Current
Quarter
5

Expenditures not yet
replenish
7

Remaining Amount of
Contract
8

Remaining
Loan
Allocation
9= 3-( 4+ 6-7+ 8)

2.732.200,92

2.732.200,92

55.089.351,03

217.667.799,08

773.498,63
1.134.865,17
823.837,12
0,00

773.498,63
1.134.865,17
823.837,12
0,00

10.983.839,11
16.115.318,15
11.698.656,01
16.291.537,76

7.688.687,38
11.280.722,71
8.189.059,21
11.404.076,43

2

Goods, Non Consult ing Services, Consult ing
Services and I ncremental Operating Cost under
part 2 of t he project

16.000.000,00

1.574.976,48

6.688,69

1.574.976,48

14.425.023,52

14.425.023,52

3

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 3 of the project

1.000.000,00

0,00

0,00

0,00

0,00

1.000.000,00

4

Goods, Non Consult ing Services, Consult ing
Services and I ncremental Operating Cost under
part 4 of t he project

0,00

0,00

0,00

0,00

0,00

0,00

5

Unallocat ed

12.600.000,00

0,00

0,00

0,00

0,00

12.600.000,00

250.000.000,00

4.307.177,40

2.738.889,61

4.307.177,40

69.514.374,55

245.692.822,60

Note :

FMR-WINRIP-Q1-14.xls

Page 1 of 1

13/05/2014-21:10

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Summary Statement

Form 1 - F

Expenditures for Contracts Subject to Prior Review
For the Quarter ending March 31, 2014
I BRD Loan No. 8043 - I D
Disbursement Category :
1. CI VI L W ORKS
No.

1

APBN

Number/

Amount

Dat e

Rp.

3

4

5

Krui - Biha

134.909.211.000,00

PT. JAYA KONSTRUKSI

01-26/ 04-WI NRI P-WP1/ CE/ A/ 8043/ 11-13

Original Contract
Value

MANGGALA PRATAMA

2

1

Tanggal 14 Novem ber 2013

Bor.Ref WB ( PLN)

SP2D GOI

Reference Cont ract

Comp

Name

SPM - $
Amount

Number/

Amount

Bor.Ref No/

Amount

Dat e

Rp.

Dat e

Rp.

Value Dat e

Rp.

6

7

8

9

10

11

001/ 01-WINRIP/ 17
2-Jan-14

0,00
2

Padang Saw ah - Sp.Empat
I ncluding Air Gadang Bridge
39-06/ 02-WI NRI P-WP1/ CE/ A/ 8043-I D/ 12-13

Charge t o WB
SPM- RP

Number/

197.936.699.000,00

PT. JAYA KONSTRUKSI

002/ 02-WINRIP/ 06

Original Contract
Value

MANGGALA PRATAMA

2-Jan-14

Dat e/
Page/ No.

Tot al I nvoice

Amount

Rp

US $

14= 7+ 11

15

US $
12

13

9.443.644.770,00

773.498,63

9.443.644.770,00

9.443.644.770,00

773.498,63

9.443.644.770,00

13.855.568.930,00

1.134.865,17

13.855.568.930,00

13.855.568.930,00

1.134.865,17

13.855.568.930,00

10.058.227.410,00

823.837,12

10.058.227.410,00

10.058.227.410,00

823.837,12

10.058.227.410,00

Tanggal 06 Decem ber 2013

0,00
3

Manggopoh - Padang Saw ah

143.688.963.000,00

PT. JAYA KONSTRUKSI

40-06/ 03-WI NRI P-WP1/ CE/ A/ 8043-I D/ 12-13

Original Contract
Value

MANGGALA PRATAMA

Tanggal 06 Decem ber 2013

003/ 03-WINRIP/ 06
02-Jan-14

0,00

I puh - Bantal

186.936.750.000,00

PT. WASKI TA KARYA - DAYA

01-26/ 04-WI NRI P-WP1/ CE/ A/ 8043/ 11-13

Original Contract
Value

MULI A TURANGGA JO

4

Tanggal 14 Novem ber 2013

SARI , Jo

0,00
TOTAL

FMR-WI NRI P-Q1-14.xls

0,00

33.357.441.110,00

0,00

Page 1 of 1

0,00

2.732.200,92

0,00

33.357.441.110,00

13/ 05/ 2014-21: 12

CTC

WI NRI P

Western I ndonesia National Roads I mprovement Project
Summary Statement

Expenditures for Contracts Subject to Prior Review ( SOE)
For the Quarter ending March 31 2014
I BRD Loan No. 8043 - I D

Form G - TA

Disbursement Category :
2. Goods, Non Consulting Services, Consulting Services and I ncremental Operating Cost under part 2 of the project

No.

1

Number/

Amount

Date

Rp./ USD

3

4

2

SP2D WB (PLN)

SP2D GOI

Reference Contract

Comp

APBN
Name
5

SPM - $

Reference SA (RKBI)

Total Invoice

SPM-RP

Number/

Amount

Number/

Amount

Number/

Amount

Date

Rp.

Date

Rp.

Date

Rp.

6

7

8

9

10

11

Date/ Page/ No.

Amount

Rp

USD

14= 7+ 11

15

US $
12

13,00

1

0,00

2

0,00

3

0,00

0,00

FMR-WINRIP-Q1-14.xls

1 of 1

0,00

0,00

13/05/201421:17

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project

Form G - IOC

Summary Statement

Expenditures for Contracts Not Subject to Prior Review ( SOE)
For the Quarter ending December 31 2013
I BRD Loan No. 8043 - I D
Disbursement Category :
2. Goods, Non Consulting Services, Consulting Services and I ncremental Operating Cost under part 2 of the project

No.

1

Number/

Amount

Date

Rp./ USD

3

4

2

1

IOC

SP2D WB (PLN)

SP2D GOI

Reference Contract

Comp

APBN
Name
5

SPM - $

Reference SA (RKBI)

Total Invoice

SPM-RP

Number/

Amount

Number/

Amount

Number/

Amount

Date

Rp.

Date

Rp.

Date

Rp.

6

7

8

9

10

11

326371H

Bendahara Pengeluaran SNVT
Pembinaan Admin dan P2

Date/ Page/ No.

Amount

Rp

USD

14= 7+ 11

15

US $
12

13,00

81.000.000,00

6.688,69

81.000.000,00

81.000.000,00

6.688,69

81.000.000,00

31-Des-13

FMR-WINRIP-Q1-14.xls

Page 1 of 1

13/05/2014-21:13

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Output Monitoring Report
Form 2 - A

Unit of Output by Project Activity
For the Quarter ending March 31, 2014
I BRD Loan 8043 - I D

in I DR
Project Activities
Cat

No
Package

Description

1

2

3

1

2

3

4

5

FMR-WINRIP-Q1-14.xls

Civil W orks under part 1 of the proj ect

Actual
Cumulative
To- Date
4

Cumulative
To- Date
(% )

Planned
Cumulative
To- Date

5

6

48.617.288.439

Cumulative
To- Date
(% )
7

Variance
Cumulative
Cumulative
To- Date
To- Date
(% )
8= 6-4

9= 7-5

Contract Value
10

97.434.931.450,00

1

Krui - Biha

12.546.556.623,00

9,30%

25.943.000.000,00

19,23%

-13.396.443.377,00

-9,93%

134.909.211.000,00

2

Padang Sawah - Sp.Empat/ I nc Air Gadang Brgd

18.408.113.007,00

9,30%

27.160.833.050,00

13,72%

-8.752.720.043,00

-4,42%

197.936.699.000,00

3

Manggopoh - Padang Sawah

13.363.073.559,00

9,30%

18.423.070.250,00

12,82%

-5.059.996.691,00

-3,52%

143.688.963.000,00

4

I puh - Bantal

4.299.545.250,00

2,30%

25.908.028.150,00

13,86%

-21.608.482.900,00

-11,56%

186.936.750.000,00

17

Sp.Gng Kemala - Pugung Tampak

0,00

0,00%

0,00

5

Simpang Rampa - Poriaha

0,00

0,00%

0,00

11

Bantal - Mukomuko

0,00

0,00%

0,00

13

Sp Rukis - Tj Kemuning

0,00

0,00%

0,00

6

Ps. Pedati - Kerkap

0,00

0,00%

0,00

19

Lais - Bintunan

0,00

0,00%

0,00

15

Sibolga - Batas Tapsel

0,00

0,00%

0,00

8

Bts.Kota Pariaman - Manggopoh

0,00

0,00%

0,00

10

Simpang Empat - Sp.Air Balam

0,00

0,00%

0,00

7

I ndrapura - Tapan

0,00

0,00%

0,00

12

Kambang - I ndrapura

0,00

0,00%

0,00

14

Painan - Kambang

0,00

0,00%

0,00

16

Seblat - I puh, I nc Air Lalang/ Guntung Brgd

0,00

0,00%

0,00

20

Lubuk Alung - Sicincin

0,00

0,00%

0,00

21

Lubuk Alung - Kuraitaji

0,00

0,00%

0,00

18

Mukomuko - Batas Sumbar * *

0,00

0,00%

0,00

9

Rantau Tijang - Kota Agung * *

0,00%

16.813.032.374,00

10,01%

168.000.000.000,00

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 2 of the proj ect

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 3 of the proj ect

Goods, Non Consulting Services, Consulting
Services and I ncremental Operating Cost under
part 4 of the proj ect
Unallocated

16.813.032.374,00

10,01%

0,00

0,00

0,00

0,00%

0,00

0,00%

0,00

0,00%

0,00

0,00

0,00%

0,00

0,00%

0,00

0,00%

0,00

65.430.320.813,00

7,87%

97.434.931.450,00

11,72%

- 32.004.610.637,00

-48,91%

831.471.623.000,00

Page 1 of 1

13/05/2014-21:25

CTC

WINRIP

Western I ndonesia National Roads I mprovement Project
Contract Expenditure Report Goods and Works)
for the quarter ended March 31, 2014
I BRD Loan 8043 - I D
Disbursement
Category
No
Description
1

2

Contract
Description

Procurement
Method / ii

Contr