Capacity building of Capacity building of Capacity building of Capacity building of Operation aspects Operation aspects Operational aspects Operational aspects
9 9
45 45
20.2 Capacity building of 20.2 Capacity building of
operators operators
General principles General principles
Waste should be compacted in thin layers Waste should be compacted in thin layers
~ 30 cm up to 2 m. ~ 30 cm up to 2 m.
thick thick
Compacted waste should be covered on daily basis Compacted waste should be covered on daily basis
No biodegradable waste should be deposited in water No biodegradable waste should be deposited in water
Open burning of waste should not be permitted Open burning of waste should not be permitted
Inspections for vermin should be frequent and measures taken Inspections for vermin should be frequent and measures taken
to prevent infestations to prevent infestations
10 10
45 45
20.2 Capacity building of 20.2 Capacity building of
operators operators
General principles General principles
Litter should be collected regularly from around the site Litter should be collected regularly from around the site
Drainage ditches should be kept free of blockages Drainage ditches should be kept free of blockages
Site acces roads should be regurarly inspected and if Site acces roads should be regurarly inspected and if
necessary necessary
repaired repaired
Keep records of all waste deliveries to the site Keep records of all waste deliveries to the site
Environmental monitoring should be performed on routine Environmental monitoring should be performed on routine
basis basis
Public should be excluded from the site for their own safety Public should be excluded from the site for their own safety
11 11
45 45
20.3 Operation aspects 20.3 Operation aspects
CoveringFilling CoveringFilling
Three general ways of landfilling depending upon Three general ways of landfilling depending upon
topography and landscape: topography and landscape:
1.
Trench
2.
Ramp
3.
Area
12 12
45 45
20.3 Operational aspects 20.3 Operational aspects
Trench landfilling Trench landfilling
13 13
45 45
3.4.3 Operational aspects 3.4.3 Operational aspects
Ramp landfilling Ramp landfilling
14 14
45 45
3.4.3 Operational aspects 3.4.3 Operational aspects
Area landfilling Area landfilling
15 15
45 45
3.4.3 Operational aspects 3.4.3 Operational aspects
Settlement Settlement
… …
can compromise the after use, especially when can compromise the after use, especially when
uneven uneven
settlement damages the final cover settlement damages the final cover
Speed and amount vary with initial compaction Speed and amount vary with initial compaction
MSW can reach a density of 1.0 tonne per m³ MSW can reach a density of 1.0 tonne per m³
Waste placement 0.5 tonne per m³: 50 expected Waste placement 0.5 tonne per m³: 50 expected
Compaction to 0.8 tonne per m³: 25 expected Compaction to 0.8 tonne per m³: 25 expected
16 16
45 45
Waste acceptance requires: Waste acceptance requires:
access roads
reception facilities office including heating, lighting, drinking water, toilet and wash facilities
registration facilities volumetric estimation or weighbridge, administration system
3.4.3 Operational aspects 3.4.3 Operational aspects
Basic landfill site infrastructure Basic landfill site infrastructure
17 17
45 45
20.3 Operational aspects 20.3 Operational aspects
Basic landfill site infrastructure Basic landfill site infrastructure
18 18
45 45
20.3 Operational aspects 20.3 Operational aspects