Key decisions 1 Key decisions 1
Technical resources and skills available? Technical resources and skills available?
Required skills: waste management, civil engineering, Required skills: waste management, civil engineering,
hydrogeology, geotechnical engineering, hydrology hydrogeology, geotechnical engineering, hydrology
Acquisition options: building in municipal organisation, Acquisition options: building in municipal organisation,
contracting to consultants, outsourcing to waste management contracting to consultants, outsourcing to waste management
contractors contractors
Financial resources made available? Financial resources made available?
20.1 Management 20.1 Management
4 4
45 45
Key decisions 2 Key decisions 2
Type of equipment to be used for placement and Type of equipment to be used for placement and
compaction? compaction?
Specialised equipment compactor: high density, saves volume, but higher investment and maintenance cost
Common equipment agriculture, road construction: lower density, but cheaper and easier to service
5 5
45 45
Equipment Equipment
6 6
45 45
Key decisions 3 Key decisions 3
Scavengers allowed on site? Scavengers allowed on site?
Health and safety hazards exist for both scavengers
and landfill employees
Informal recycling is disruptive to landfill operation due to interference with the work and fires
7 7
45 45
20.2 Capacity building of operators 20.2 Capacity building of operators
Disposal plan Disposal plan
Key element of design Key element of design
Describes appropriate sequence of filling to achieve final Describes appropriate sequence of filling to achieve final
land form land form
Purpose is to minimise environmental impact and at the Purpose is to minimise environmental impact and at the
same time minimise necessary construction works same time minimise necessary construction works
8 8
45 45
20.2 Capacity building of operators 20.2 Capacity building of operators
Disposal plan cont’d Disposal plan cont’d
… …
can be achieved by: can be achieved by:
minimising area being filled 12-18 months minimising area being filled 12-18 months
accelerating restoration of filled parts accelerating restoration of filled parts
minimising double handling of excavated material minimising double handling of excavated material
allowing progressive installation of gas and water controls allowing progressive installation of gas and water controls
permitting optimum development of access and haul permitting optimum development of access and haul
roads roads
9 9
45 45
20.2 Capacity building of 20.2 Capacity building of