Ruang Terbuka Hijau Fasilitas Umum (2)

RENCANA PEMBIAYAAN RTPLP TAHUN 2015 - 2020
KAWASAN PRIORITAS PLPBK

KELURAHAN PURANGI, KEC. SENDANA, KOTA PALOPO
No
(1)

A
1

Sektor/Program

Rincian Kegiatan

Lokasi

Volume

Satuan

RENCANA

PEMBIAYAAN

(2)

(3)

(4)

(5)

(6)

(8)

1 Talud+Normalisasi

RT.02/RW.05-RT.02/RW.06

1170


Meter

325,000,000

3 Jembatan

RT.02/RW.05-RT.02/RW.08

4

Unit

60,000,000

PENATAAN LINGKUNGAN PERMUKIMAN
Penataan Bantaran Sungai

2 Jalan Setapak (Paving Blok)
4 Penerangan Sungai
5 Penghijauan Sempadan Sungai

6 Papan Informasi & Aturan Bersama

2

Ruang Terbuka Hijau

1 Taman Bermain

Pembangunan Jalan Kawasan

54,000,000

Unit

8,000,000

Unit

5,850,000


50,000,000
55,000,000

Taman Lingkar Kaw. Sentra Pertanian
4
Terpadu

RT.02/RW.05

2

Unit

100,000,000

RT.01/RW.06

1

Unit


50,000,000

1 PAUD+Taman Bermain
2 Posyandu

1 Jalan Setapak Samping Sungai(J1)
2 Pembentukan Badan Jalan (J2)

4 Jalan Setapak (J4)

RT.01/RW.06

RT.02/RW.06

RT.02/RW.06

1

1


1

Unit

Unit

Unit

RT.02/RW.05

1

Unit

RT.01/RW.06

250

Meter


90

Meter

RT.01/RW.06-RT.01/RW.05
RT.01/RW.05
RT.01/RW.05

400
180

7 Jalan Setapak (J7)

RT.01/RW.06

195

Meter


Pembentukan Badan Jalan Samping Sungai
9
(J9)

Pembentukan Badan Jalan & Jalan Setapak
10
(J10)
11 Jalan Setapak (J11)

12 Pembentukan Badan Jalan (J12)

Pengembangan Jalan Kaw. Sentra Pertanian
13
Terpadu (J13)
14 Jalan Setapak (J14)

15 Jalan Setapak Samping Sungai (J15)
16 Pengaspalan Jalan (J16)
5


Hunian

1 Rehab Rumah

6

Penataan Pedestrian

1 Pengecatan Drainase

485

Meter

RT.02/RW.06

330

Meter


RT.02/RW.06

152

Meter

RT.02/RW.06

60

Meter

15,200,000
6,000,000

Meter

57,640,000

Meter


15,500,000

Meter

2,367,000,000

RT.02/RW.05

RT.02/RW.06

RT.02/RW.06

Jl. Opu Tohalide

Jl. Opu Tohalide
Jl. Opu Tohalide

155

Meter

34

Unit

255,000,000

Meter

24,950,000

1578

121
998

454

100
2
4

Unit

Meter

Pohon
Unit
Unit

454

Meter

Jl. Opu Tohalide

2

Unit

Jl. Opu Tohalide

Jl. Opu Tohalide

3 Lampu Pekarangan

Semua RT

Semua RT

7,260,000

635

Jl. Opu Tohalide

1 Lampu Jalan Utama

SUB TOTAL A

21,780,000

440

Jl. Opu Tohalide

2 Lampu Jalan Lingkungan

32,000,000

RT.02/RW.05

5 Rambu Jalan
7 Papan Informasi & Aturan Bersama
8 Tugu Penanda Kawasan Prioritas

8,500,000

19,500,000

Meter

Jl. Opu Tohalide

6 Marka Jalan

13,000,000

110

3 Penghijauan Sempadan Jalan
4 Halte

9,000,000

RT.02/RW.05

Semua RT

2 Trotoar

Meter

RT.01/RW.06

Semua RT

2 Pagar Seragam

25,000,000

18,000,000

Meter

8 Pembentukan Badan Jalan (J8)

10,000,000

Meter

130
85

75,000,000

25,000,000

26,400,000

RT.01/RW.06

RT.01/RW.06

50,000,000

Meter

5 Jalan Setapak Samping Sungai (J5)
6 Jalan Setapak (J6)

Penerangan Kawasan

1

Unit

Pohon

Unit

3 Jalan Setapak (J3)

7

RT.02/RW.05

4

80,000,000

1

3 Rehab Posyandu
4

RT.02/RW.05-RT.02/RW.10

27

117

Meter

RT.02/RW.06

5 Taman lingkar + Kolam Sumur Tua

Fasilitas Umum

RT.02/RW.05-RT.02/RW.09

RT.02/RW.05-RT.02/RW.09

585

2 Taman Bermain dan Lap. Bulutangkis
3 Taman Bermain

3

RT.02/RW.05-RT.02/RW.07

2

63,500,000

121,000,000

68,100,000
5,000,000

20,000,000
2,000,000

6810000

Unit

2,000,000

8

Unit

40,000,000

121

Unit

60,500,000

19

Unit

3,000,000

38,000,000

4,299,490,000

B
1

PENYEHATAN LINGKUNGAN PERMUKIMAN

Pengelolahan Sampah

1 Bank Sampah

RT.02/RW.06

2 Tempat Sampah

2

3

SPAL

Pembangunan Drainase

Semua RT

1 Perpipaan SPAL

Semua RT

3 Bidang Peresapan

Semua RT

2 Bak Penyaring

12 Saluran Drainase (d12)
13 Saluran Drainase (d13)

14 Saluran Drainase (d14)
15 Saluran Drainase (d15)
16 Riol (r1)
17 Riol (r2)

1 Jamban Keluarga

2 Rehab MCK Umum

RT.01/RW.06

290

Meter

58,000,000

RT.01/RW.06

200

Meter

40,000,000

RT.01/RW.06
RT.02/RW.06

RT.01/RW.06-RT.01/RW.05
RT.01/RW.05

430
327

426

185

Meter
Meter

Meter

Meter

154

Meter

RT.02/RW.05

160

Meter

RT.02/RW.05

299

Meter

RT.02/RW.05

162

Meter

32,400,000

RT.02/RW.05

1116

Meter

223,200,000

RT.01/RW.06

92

Meter

6,900,000

RT.02/RW.05

RT.02/RW.05

RT.02/RW.05-RT.02/RW.06

51

82

1205
68

135

Meter

Meter

Meter

Meter

Meter

48,000,000

RT.01/RW.06

1

Unit

10,000,000

Unit

7

108

108

Unit

Unit

Rumah

SUB TOTAL D

3,000,000

70,000,000

54,000,000

162,000,000
286,000,000

Unit

2 Media Sosialisasi Bencana

11,775,000

1,476,675,000

1

1 Sosialisasi Bencana

5,100,000

10,125,000

Unit

1

Batas Purangi Sendana

Sosialisasi

241,000,000

12

3 Jembatan

3

16,400,000

Semua RT

Meter

1 Talud

59,800,000

11,475,000

Meter

250

Longsor Sungai Salangka

10,200,000

Meter

157

Batas Purangi Sendana

2

30,800,000

32,000,000

153

1 Talud+Bronjong

4 Reling Pengaman

20,200,000

RT.02/RW.06

SUB TOTAL C

2 Normalisasi Sungai

37,000,000

RT.02/RW.06-RT.02/RW.05

Semua RT

PENANGULANGAN BENCANA

65,400,000

85,200,000

Meter

Semua RT

3 Sambungan PDAM

86,000,000

101

Semua RT

2 Wadah Penyaring

4,500,000

RT.01/RW.05

RT.02/RW.06

1 Sumur Bor

13,800,000

Unit

SUB TOTAL B

PENGEMBANGAN AIR MINUM

Longsor Batas Kelurahan

Paket

3,200,000

30,000,000

15

RT.01/RW.05

3 MCK Umum

1

69

8,000,000

242,000,000

RT.02/RW.06

20 Riol (r5)

Unit

7,000,000

24,200,000

Unit

RT.01/RW.06

18 Riol (r3)
19 Riol (r4)

D

Unit

3 Saluran Drainase (d3)

Saluran Drainase Kaw. Sentra Pertanian
11
Terpadu (d11)

Sarana Air Minum

1

1 Saluran Drainase (d1)

9 Saluran Drainase (d9)
10 Saluran Drainase (d10)

1

Unit

121

2 Saluran Drainase (d2)

Unit

Unit

4

Semua RT

7 Saluran Drainase (d7)
Pembangunan dan Rehab Saluran Drainase
8
(d8)

C

16

5 Motor Sampah

5 Saluran Drainase (d5)
6 Saluran Drainase (d6)

Jamban

Semua RT

Semua RT

4 Saluran Drainase (d4)

4

121

3 Bak Sampah Komunal
4 Alat Pembuat Biopori

1

Semua RT

Batas Purangi Sendana

250

Meter

1,675,000,000
16,500,000
-

Batas Purangi Sendana

100

Meter

100,000,000

RT.02/RW.06

1270

Meter

3,429,000,000

Semua RT

1

Paket

5,000,000

Semua RT

1

Paket

3,000,000

5,228,500,000

E

PENGEMBANGAN SOSIAL

1

Pendidikan Formal

1 Program Paket B

Semua RT

1

Paket

10,000,000

2

Pendidikan Nonformal

1 Pelatihan Menjahit

Semua RT

3

Kelompok

15,000,000

3 Pelatihan Meubel

Semua RT

1

Kelompok

10,000,000

3

4

F

Kesehatan

Kelembagaan

Semua RT

2 Program Paket C

2 Bantuan Mesin Jahit

Semua RT

1 Penyuluhan Kesehatan Lingkungan

Penyuluhan KB, Kesehatan ibu hamil dan
2 balita.
1 Peningkatan Kapasitas Kelembagaan Kawasan

1

3

Paket

Kelompok

Paket

5,000,000

1

Paket

5,000,000

1

Paket

5,000,000
96,000,000

1

Ekonomi Kawasan

1 Modal Usaha Pengembangan Pertanian

Semua RT

3

Kelompok

2

Ekonomi Rumah Tangga

1 Pelatihan Pembuatan Makanan Ringan

Semua RT

1

Paket

G

PENGEMBANGAN PERTANIAN

1

Kebun Percontohan

2 Modal Usaha Rumah Tangga

1 Pemanfaatan Lahan Pekarangan

Pendidikan Pertanian

Unit

10,000,000

1

RT.02/RW.05

SUB TOTAL G

1

Semua RT

6 Media Pembibitan Jamur

JUMLAH TOTAL

10,000,000

121

RT.02/RW.05

Pelatihan Pembuatan Pupuk dan Obat
2
Hama

Unit

Semua RT

4 Traktor Kebun

1 Penyuluhan Pertanian

2
1

Semua RT

5 Alat Pertanian

20,000,000

RT.02/RW.05

2 Bantuan Bibit
3 Pupuk

10,000,000

100,000,000

Unit

120

RT.02/RW.06

5 Kumbung Jamur

3

Kelompok

1

RT.02/RW.05

RT.02/RW.05 & RT.01/RW.05

4 Rumah Kompos

Bantuan Pertanian

4

75,000,000

185,000,000
RT.02/RW.05

2 Pemagaran

3 Rumah Bibit

2

Semua RT

SUB TOTAL F
1 Balai Pertanian

36,000,000

1

SUB TOTAL E

PENGEMBANGAN EKONOMI

10,000,000

Semua RT

Meter

Unit

Paket

6,000,000

50,000,000

121,000,000

1

Paket

2

Unit

60,000,000

Unit

10,000,000

1

1

Paket

Paket

10,000,000
5,000,000

20,000,000

Semua RT

1

Paket

20,000,000

Semua RT

1

Paket

10,000,000
352,000,000
11,923,665,000