BAB IV HASIL PENELITIAN DAN PEMBAHASAN 4.1 Hasil Penelitian - Pengaruh Penerapan Sanksi Perpajakan Dalam Meningkatkan Kepatuhan Wajib Pajak (Survey Terhadap WP Badan tang Terdaftar di KPP Bandung Bojonegara) - MCUrepository

BAB IV HASIL PENELITIAN DAN PEMBAHASAN

4.1 Hasil Penelitian

  Dari hasil penelitian, penulis memperoleh data jumlah pelaporan SPT Masa dan denda setiap bulan dari seluruh Wajib Pajak Badan yang terdaftar di KPP Bandung Bojonagara seperti yang tercantum dalam Tabel berikut ini:

  103

Tabel 4.1 Juli 2003 = Rp 13,100,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 16/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 16/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000 18/7/2003 50,000 10/7/2003 150,000 17/7/2003 150,000 18/7/2003 50,000 10/7/2003 150,000 17/7/2003 150,000 18/7/2003 50,000 10/7/2003 150,000 17/7/2003 150,000 18/7/2003 50,000 10/7/2003 150,000 17/7/2003 150,000 TOTAL 3,800,000 10/7/2003 150,000 17/7/2003 150,000 10/7/2003 150,000 17/7/2003 150,000

TOTAL 4,650,000 TOTAL 4,650,000

  Agustus 2003 = Rp 23,300,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 8/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000

  11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 150,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 100,000 25/8/2003 100,000 11/8/2003 150,000 13/8/2003 50,000 25/8/2003 100,000 11/8/2003 100,000 13/8/2003 50,000 25/8/2003 100,000 11/8/2003 50,000 13/8/2003 50,000 25/8/2003 100,000 11/8/2003 250,000 14/8/2003 150,000 25/8/2003 100,000 13/8/2003 150,000 25/8/2003 100,000 25/8/2003 100,000 13/8/2003 150,000 25/8/2003 100,000 25/8/2003 100,000 13/8/2003 150,000 25/8/2003 100,000 25/8/2003 100,000 13/8/2003 150,000 25/8/2003 100,000 25/8/2003 100,000 13/8/2003 150,000 25/8/2003 100,000 25/8/2003 100,000 13/8/2003 150,000 25/8/2003 100,000 25/8/2003 100,000

TOTAL 4,600,000 TOTAL 4,000,000 TOTAL 3,100,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000 25/8/2003 100,000

TOTAL 3,100,000 TOTAL 3,100,000 TOTAL 3,100,000

  

September 2003 = Rp 29,350,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  25/8/2003 100,000 2/9/2003 50,000 10/9/2003 150,000 25/8/2003 100,000 2/9/2003 50,000 10/9/2003 150,000 25/8/2003 100,000 2/9/2003 50,000 10/9/2003 150,000 25/8/2003 100,000 2/9/2003 50,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 150,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 50,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 50,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 50,000 25/8/2003 100,000 10/9/2003 150,000 10/9/2003 100,000

  TOTAL 2,300,000 10/9/2003 150,000 10/9/2003 100,000

  10/9/2003 150,000 10/9/2003 100,000 10/9/2003 150,000 15/9/2003 100,000 10/9/2003 150,000 15/9/2003 100,000 10/9/2003 150,000 15/9/2003 100,000 10/9/2003 150,000 15/9/2003 100,000 10/9/2003 150,000 15/9/2003 100,000 10/9/2003 150,000 15/9/2003 100,000

TOTAL 4,250,000 TOTAL 3,900,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000 15/9/2003 100,000

TOTAL 3,100,000 TOTAL 3,100,000 TOTAL 3,100,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 15/9/2003 100,000 17/9/2003 100,000 17/9/2003 100,000 16/9/2003 100,000 17/9/2003 100,000 18/9/2003 100,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000 16/9/2003 100,000 17/9/2003 100,000 29/9/2003 150,000

TOTAL 3,100,000 TOTAL 3,100,000 TOTAL 4,200,000

   Oktober 2003 = Rp 16,250,000 TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  29/9/2003 150,000 3/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 3/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 3/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 3/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 3/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 6/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 6/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 6/10/2003 100,000 6/10/2003 100,000 29/9/2003 150,000 6/10/2003 100,000 6/10/2003 100,000 29/9/2003 50,000 6/10/2003 100,000 6/10/2003 100,000 29/9/2003 50,000 6/10/2003 100,000 6/10/2003 100,000 29/9/2003 50,000 6/10/2003 100,000 6/10/2003 100,000

  TOTAL 1,500,000 6/10/2003 100,000 6/10/2003 100,000

  6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000 6/10/2003 100,000

TOTAL 3,100,000 TOTAL 3,100,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 100,000 6/10/2003 100,000 13/10/2003 150,000 31/10/2003 50,000

  13/10/2003 150,000 13/10/2003 150,000 31/10/2003 50,000 13/10/2003 150,000 13/10/2003 150,000 31/10/2003 50,000 13/10/2003 150,000 13/10/2003 150,000 31/10/2003 50,000 13/10/2003 150,000 13/10/2003 150,000 TOTAL 1,350,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 150,000 13/10/2003 100,000 13/10/2003 150,000 22/10/2003 100,000 13/10/2003 150,000 22/10/2003 100,000 13/10/2003 150,000 31/10/2003 150,000

TOTAL 4,200,000 TOTAL 4,500,000

  

November 2003 = Rp 6,250,000 Januari 2004 = Rp 49,050,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  12/11/2003 150,000 12/11/2003 150,000 5/1/2004 50,000 12/11/2003 150,000 12/11/2003 150,000 5/1/2004 50,000 12/11/2003 150,000 12/11/2003 150,000 5/1/2004 50,000 12/11/2003 150,000 12/11/2003 150,000 5/1/2004 50,000 12/11/2003 150,000 12/11/2003 150,000 6/1/2004 100,000 12/11/2003 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 12/11/2003 50,000 6/1/2004 150,000 12/11/2003 150,000 12/11/2003 50,000 6/1/2004 150,000 12/11/2003 150,000 TOTAL 1,600,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 6/1/2004 150,000 12/11/2003 150,000 7/1/2004 50,000 12/11/2003 150,000 7/1/2004 50,000 12/11/2003 150,000 7/1/2004 50,000

TOTAL 4,650,000 TOTAL 3,900,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  7/1/2004 50,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 100,000 20/1/2004 150,000 26/1/2004 150,000 7/1/2004 100,000 20/1/2004 150,000 26/1/2004 150,000

  20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000 20/1/2004 150,000 20/1/2004 150,000 26/1/2004 150,000

TOTAL 4,450,000 TOTAL 4,650,000 TOTAL 4,650,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  26/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 100,000 27/1/2004 150,000 29/1/2004 150,000 26/1/2004 100,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 150,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 100,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 100,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 100,000 29/1/2004 150,000 27/1/2004 150,000 27/1/2004 50,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 100,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 100,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 100,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 29/1/2004 150,000 27/1/2004 150,000 29/1/2004 50,000 29/1/2004 150,000

TOTAL 4,550,000 TOTAL 3,850,000 TOTAL 4,350,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 100,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 50,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 50,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000 29/1/2004 150,000 29/1/2004 150,000 30/1/2004 150,000

TOTAL 4,650,000 TOTAL 4,650,000 TOTAL 4,400,000

  Februari 2004 = Rp 13,450,000 TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  30/1/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 TOTAL 300,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000 30/1/2004 150,000 16/2/2004 150,000

TOTAL 4,650,000 TOTAL 4,650,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  16/2/2004 150,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 150,000 TOTAL 250,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 150,000 16/2/2004 100,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 50,000 16/2/2004 150,000 16/2/2004 50,000

TOTAL 4,650,000 TOTAL 3,900,000

  Maret 2004 = Rp 10,600,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 3/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000

  23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 50,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 100,000 23/3/2004 150,000 TOTAL 2,100,000 23/3/2004 100,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000 23/3/2004 150,000

TOTAL 3,850,000 TOTAL 4,650,000

  April 2004 = Rp 8,900,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  15/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 15/04/2004 150,000 23/04/2004 150,000 23/04/2004 100,000 15/04/2004 150,000 23/04/2004 150,000 29/04/2004 100,000 15/04/2004 150,000 23/04/2004 150,000 29/04/2004 100,000 15/04/2004 150,000 23/04/2004 150,000 TOTAL 450,000 15/04/2004 50,000 23/04/2004 150,000 15/04/2004 50,000 23/04/2004 150,000 15/04/2004 50,000 23/04/2004 150,000 15/04/2004 50,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 15/04/2004 100,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000 23/04/2004 150,000

TOTAL 3,800,000 TOTAL 4,650,000

  Mei 2004 = Rp 9,750,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 50,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 100,000 11/5/2004 150,000 11/5/2004 150,000 TOTAL 450,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000 11/5/2004 150,000

TOTAL 4,650,000 TOTAL 4,650,000

  Juli 2004 = Rp 6,350,000 Agustus 2004 = Rp 3,850,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  2/7/2004 50,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 50,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 50,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 50,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 50,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 50,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 100,000 16/08/2004 100,000 7/7/2004 150,000 7/7/2004 100,000 16/08/2004 100,000 7/7/2004 150,000 TOTAL 1,800,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000 7/7/2004 150,000 16/08/2004 100,000

TOTAL 4,550,000 TOTAL 3,100,000

  September 2004 = Rp 2,750,000 Januari 2005 = Rp 10,400,000 TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  16/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 16/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 16/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 16/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 16/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 18/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 18/08/2004 100,000 7/9/2004 150,000 6/1/2005 150,000 30/08/2004 50,000 7/9/2004 100,000 6/1/2005 150,000

  TOTAL 750,000 7/9/2004 100,000 6/1/2005 150,000

  7/9/2004 100,000 6/1/2005 150,000 7/9/2004 100,000 6/1/2005 150,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 100,000 6/1/2005 50,000 7/9/2004 50,000 6/1/2005 50,000 7/9/2004 50,000 6/1/2005 100,000 7/9/2004 50,000 6/1/2005 100,000 7/9/2004 50,000 6/1/2005 100,000 7/9/2004 50,000 6/1/2005 100,000 7/9/2004 50,000 6/1/2005 100,000

  29/09/2004 100,000 6/1/2005 100,000 29/09/2004 100,000 6/1/2005 100,000

  TOTAL 2,750,000 11/1/2005 500,000

  25/01/2005 150,000 25/01/2005 150,000 25/01/2005 150,000

  TOTAL 3,750,000

  

Februari 2005 = Rp 20,000,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  25/01/2005 150,000 25/01/2005 150,000 15/02/2005 600,000 25/01/2005 150,000 25/01/2005 150,000 21/02/2005 50,000 25/01/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 100,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 100,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 100,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 100,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 100,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 50,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 50,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 50,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 50,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 50,000 21/02/2005 150,000 25/01/2005 150,000 25/01/2005 50,000 21/02/2005 150,000 25/01/2005 150,000 28/01/2005 600,000 21/02/2005 150,000 25/01/2005 150,000 TOTAL 2,000,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000 25/01/2005 150,000 21/02/2005 150,000

TOTAL 4,650,000 TOTAL 5,000,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  21/02/2005 150,000 24/02/2005 150,000 25/02/2005 150,000 21/02/2005 150,000 24/02/2005 100,000 25/02/2005 150,000 21/02/2005 150,000 24/02/2005 100,000 25/02/2005 150,000 21/02/2005 150,000 24/02/2005 100,000 25/02/2005 150,000 21/02/2005 150,000 24/02/2005 50,000 25/02/2005 150,000 21/02/2005 100,000 25/02/2005 50,000 25/02/2005 150,000 24/02/2005 150,000 25/02/2005 150,000 25/02/2005 150,000 24/02/2005 150,000 25/02/2005 150,000 25/02/2005 150,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000 24/02/2005 150,000 25/02/2005 150,000 28-02-2005 100,000

TOTAL 4,600,000 TOTAL 4,300,000 TOTAL 3,500,000

  Maret 2005 = Rp 27,850,000 TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 1/3/2005 100,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 2/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 3/3/2005 50,000 28-02-2005 100,000 1/3/2005 100,000 3/3/2005 50,000

  TOTAL 2,600,000 1/3/2005 100,000 3/3/2005 50,000

  1/3/2005 100,000 3/3/2005 50,000 1/3/2005 100,000 3/3/2005 50,000 1/3/2005 100,000 3/3/2005 50,000 1/3/2005 100,000 3/3/2005 50,000

TOTAL 3,100,000 TOTAL 2,400,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  3/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 3/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 50,000 4/3/2005 150,000 8/3/2005 100,000 4/3/2005 50,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 50,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 50,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 50,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 50,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 50,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 8/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000 4/3/2005 150,000 8/3/2005 100,000 9/3/2005 100,000

TOTAL 3,250,000 TOTAL 3,550,000 TOTAL 3,100,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 9/3/2005 100,000 21/03/2005 150,000 22/03/2005 150,000

  21/03/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 100,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 150,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 100,000 21/03/2005 150,000 21/03/2005 150,000 22/03/2005 100,000 21/03/2005 150,000 21/03/2005 150,000 23-03-2005 100,000 21/03/2005 150,000 22/03/2005 50,000 23-03-2005 100,000 21/03/2005 150,000 22/03/2005 150,000 TOTAL 4,300,000

TOTAL 3,600,000 TOTAL 4,550,000

  April 2005 = Rp 23,500,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 TOTAL 1,650,000 13/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 13/04/2005 150,000 14/04/2005 150,000 14/04/2005 50,000 14/04/2005 150,000 14/04/2005 50,000 14/04/2005 150,000 14/04/2005 50,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000 14/04/2005 150,000

TOTAL 4,350,000 TOTAL 4,650,000

  Mei 2005 = Rp 6,000,000 Juni 2005 = Rp 500,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 50,000 23-05-2005 100,000 23-05-2005 100,000 16-06-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 TOTAL 500,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 23-05-2005 100,000 TOTAL 2,900,000 23-05-2005 100,000

  TOTAL 3,100,000

  

Agustus 2005 = Rp 4,050,000 September 2005 = Rp 350,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  12/8/2005 150,000 12/8/2005 50,000 7/9/2005 50,000 12/8/2005 50,000 12/8/2005 50,000 7/9/2005 50,000 12/8/2005 100,000 12/8/2005 50,000 7/9/2005 50,000 12/8/2005 100,000 24/08/2005 50,000 7/9/2005 50,000 12/8/2005 150,000 24/08/2005 50,000 7/9/2005 50,000 12/8/2005 150,000 24-08-2005 50,000 7/9/2005 50,000 12/8/2005 150,000 24-08-2005 50,000 7/9/2005 50,000 12/8/2005 150,000 24-08-2005 50,000 TOTAL 350,000 12/8/2005 150,000 24-08-2005 50,000 12/8/2005 150,000 24-08-2005 50,000 12/8/2005 150,000 30-08-2005 50,000 12/8/2005 150,000 TOTAL 550,000 12/8/2005 50,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 100,000 12/8/2005 150,000 12/8/2005 150,000 12/8/2005 50,000 12/8/2005 50,000 12/8/2005 50,000 12/8/2005 50,000 12/8/2005 50,000 12/8/2005 50,000 12/8/2005 50,000 12/8/2005 50,000

  TOTAL 3,500,000

  Oktober 2005 = Rp 29,750,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  19/10/2005 100,000 25-10-2005 200,000 26-10-2005 300,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 100,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 300,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 150,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 300,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 250,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 50,000 20/10/2005 50,000 25-10-2005 300,000 26-10-2005 100,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 100,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 250,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 100,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 200,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 50,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 50,000 25-10-2005 300,000 25-10-2005 200,000 26-10-2005 300,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 150,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 250,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 50,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 250,000 25-10-2005 300,000 25-10-2005 150,000 26-10-2005 50,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 150,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 50,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 200,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 300,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 250,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 100,000 25-10-2005 300,000 25-10-2005 300,000 26-10-2005 300,000 25-10-2005 300,000 26-10-2005 50,000 26-10-2005 250,000 25-10-2005 300,000 26-10-2005 100,000 26-10-2005 250,000 25-10-2005 300,000 26-10-2005 100,000 26-10-2005 250,000 25-10-2005 300,000 26-10-2005 150,000 26-10-2005 150,000

TOTAL 7,350,000 TOTAL 8,150,000 TOTAL 5,600,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  26-10-2005 150,000 26-10-2005 100,000 26-10-2005 100,000 26-10-2005 50,000 26-10-2005 200,000 26-10-2005 300,000 26-10-2005 100,000 26-10-2005 300,000 26-10-2005 50,000 26-10-2005 150,000 26-10-2005 50,000 26-10-2005 100,000 26-10-2005 100,000 26-10-2005 100,000 26-10-2005 100,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 100,000 26-10-2005 250,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 100,000 26-10-2005 50,000 26-10-2005 200,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 200,000 TOTAL 1,000,000 26-10-2005 100,000 26-10-2005 300,000 26-10-2005 100,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 100,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 100,000 26-10-2005 50,000 26-10-2005 100,000 26-10-2005 150,000 26-10-2005 300,000 26-10-2005 250,000 26-10-2005 100,000 26-10-2005 150,000 26-10-2005 250,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 300,000 26-10-2005 250,000 26-10-2005 150,000 26-10-2005 50,000 26-10-2005 200,000 26-10-2005 100,000 26-10-2005 250,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 50,000 26-10-2005 150,000 26-10-2005 200,000 26-10-2005 250,000 26-10-2005 100,000 26-10-2005 200,000 26-10-2005 200,000 26-10-2005 50,000 26-10-2005 150,000

TOTAL 3,300,000 TOTAL 4,350,000

  November 2005 = Rp 14,150,000 Desember 2005 = Rp 400,000

TANGGAL SANKSI TANGGAL SANKSI TANGGAL SANKSI

  23-11-2005 300,000 23-11-2005 300,000 28/12/2005 150,000 23-11-2005 300,000 23-11-2005 300,000 28/12/2005 150,000 23-11-2005 300,000 23-11-2005 300,000 28/12/2005 100,000 23-11-2005 300,000 23-11-2005 300,000 TOTAL 400,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 100,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 50,000 23-11-2005 100,000 23-11-2005 300,000 23-11-2005 300,000 TOTAL 5,250,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 300,000 23-11-2005 100,000 23-11-2005 300,000 23-11-2005 300,000

  TOTAL 8,900,000

Tabel 4.2 MASA Jumlah Jumlah SSP Prosentase Prosentase No PAJAK WP Efektif Lapor Tidak lapor Kepatuhan Denda Sanksi Tahun 2003

  16 Oktober 3263 1585 1678 48.57% 0.00%

  29 November 3493 1701 1792 48.70% 14150000 10.33%

  28 Oktober 3477 1685 1792 48.46% 29750000 21.72%

  27 September 3479 1688 1791 48.52% 350000 0.25%

  26 Agustus 3464 1698 1766 49.02% 4050000 2.96%

  

25 Juli 3448 1653 1795 47.94% 0.00%

Dokumen yang terkait

Pengaruh Penerapan Hukum Pajak Dan Sanksi Perpajakan Terhadap Kepatuhan Wajib Pajak (Survey Pada Wajib Pajak Orang Pribadi Di KPP Pratama Bandung Tegallega)

0 18 44

Pengaruh Penerapan Self Assessment System Dan Administrasi Pajak Terhadap Kepatuhan Wajib Pajak (Survey Pada WP Orang Pribadi Di KPP Pratama Sumedang)

1 22 71

Pengaruh Sanksi Perpajakan dan Administrasi Perpajakan Terhadap Upaya Penggelapan Pajak (Survey Pada KPP Pratama Bandung Karees)

3 36 96

Pengaruh Manajemen Laba dan Sanksi Perpajakan Terhadap Kepatuhan Perpajakan (Survey Pada Wajib Pajak Badan di KPP Pratama Soreang)

2 7 41

Pengaruh Kualitas Teknologi Informasi dan Keadilan Tarif Pajak Terhadap Kepatuhan Perpajakan (Survey Terhadap Wajib Pajak Orang Pribadi di KPP Pratama Bandung Karees)

8 42 60

Pengaruh Pemahaman Akuntansi Pajak dan Penerapan Sistem Administrasi Perpajakan Modern Terhadap Kepatuhan Perpajakan (Survey Pada Wajib Pajak Badan di KPP Madya Bandung)

7 67 102

Pengaruh Penerapan Self Assessment System Dan Pemeriksaan Pajak Terhadap Tingkat Kepatuhan Wajib Pajak (Survey Pada WP Badan Di KPP Pratama Bandung Tegallega)

0 2 1

Pengaruh Penerapan Sistem Administrasi Perpajakan Modern Dan keadilan Sanksi Perpajakan Terhadap Kepatuhan Wajib Pajak

6 37 148

Pengaruh Kualitas Pelayanan Pajak Dan Pemeriksaan Pajak Terhadap Kepatuhan Pajak (Survey Pada Wajib Pajak Badan Di KPP Pratama Bandung Tegallega)

0 9 44

Pengaruh Pemeriksaan Pajak Dan Pengetahuan Wajib Pajak Terhadap Kepatuhan Wajib Pajak (Survey Pada Wajib Pajak Badan Di KPP Pratama Bandung Cicadas)

3 75 107