Model Manajemen Air Tanah Berkelanjutan dengan Adanya Ketidakpastian

  Agenda 21 Indonesia, 1997. Strategi Nasional untuk Pembangunan Berkelanjutan Kantor Mentri Negara Lingkungan Hidup. Aguado.,E.,N. dan Remson I. 1974. Groundwater hydraulic in aquifer menegement, J.

  Hidral. Div, Am, Soc, Civ, Eng. HYI-100: 103-118.

  Aguado.,E.,N.Remson I. 1980. Groundwater management with fixed charges. J, Water Resour Planning Manager, Div, Am, Soc, Civ, Eng. WR2-106:375-382. Aguado.,E.,N. dan Remson I. Pikul MF, Thomas, WA, 174. Optimal pumping for

  

aquiferdewatering J. Hydraul, Div , Am, Soc, Civ, Eng. HY7-100: 860-877

  Aguado.,E.,N. dan Remson I, 1977. Sensitivity analysis in aquifer studies, Water Resour,

  Res 13(4). 733-738, 1974

  Allan Astorga, Andreas Mende, dan Detlev Neumann (2006), Strategi for Groundwater

  Management Indeveloping Countries : A Case Study in Northen Costa Rica,

  109-110, Journal of Hydrology, journal homepage : www.elsevier.com/locate/jhydrol Allan, Calow, 2001. Perspectives on Groundwater Management .

   Alley.W M, Aguado E, dan Remson I, 1976. Aquifer management under tansient and steady state coditions, Water Resources. Bull. 12: 963-972 Alley, William M., Thomas E. Reilly, and O. Lehn Frank. 1999a. Sustainability of ground-water resources. U.S. Geological Survey Circular 1186. 7 p.

  Almasri ,2007. Nitrate Contamintaion of Groundwater : A conseptual management Framework environtmental Assessment Reviewww.elsevier.com/locate/eiar. Almasri MN, Kaluarachchi JJ. Multi-criteria decision analysis for the optimal

  management of nitrate contamination of aquifers . J Environ Manag 2005b;74:365–81.

  Amlan Das dan Bitthin D, 2001. Aplication of Optimization Techniques Groundwater Quantity and Quality Management . Andricevic R, 1990. A real-time Approach to Management and Monitoring of Groundwater Hydrolics . . Water Resour. Res. 26: 2747-2755.

  Andricevic R , Kitanidis P K, 1990. Optimasitation of the Pumping Schedule in Aquifer

  www.elsevier.com/locate/jhydrol Cameron, Clark, Andidjunuddin, 1982 Peta Geologi Lembar Medan, Skala 1:250.000.

   bithin@iitk.ac.in Chung, F.I.; Archer, M.C.; De Vries, J.J. (1989). Network flow algorithma applied to

  Groundwater Remediation: application of constrained optimal control algorithm. Water Resour. Res. 28:3157-3173

  Casey B., Peter Rogers, Upmanu Lall. Deman Management of Ground Water with

Masoon Forecasting. Agricultural System , www.elsevier.com/locate/agsy.

Chang L.C, Shoemaker C A, Liu PLF, 1992. Optrimal time-varying pumping rates for

  Monitoring : Measures of Effectiveness. Water Resources Research 19 (5): 22-41.

  Bear J. dan A. Verrujit. 1987. Modeling Groundwater Flow and Pollution, Kluwer Academic Publishers, Hingham Massachusetts. Bear J. Milovan S B, Randall R.R, 1992. Gound Water Issue Fundamental of Ground-

Water Modeling, Environtmental Protection Agency (EPA) , Ada, Oklahoma.

Burt, OR. 1967. Temporal allocation of groundwater, Water Resour, Res. 3: 45-56 Casey, D., P. N. Nemetz dan D. H. Uyeno. 1983. Sampling Frequency For Water

  Babel MS, Gupta AD, Domingo NDS. 2006. Land Subsidence: A Consequence of Groundwater Over-Exploitation in Bangkok, Thailand. International Review for Environmental Strategies Vol. 6 No. 2.

  .

  

  Remediation Under Uncertainty . Water Resour. Res. 26: 875-885

  of Hydrology, journal homepage

   Strategi for Groundwater Management Indeveloping Countries , Journal

  Astorga, 2006. A.

  Gadjah Mada University Press. Yogyakarta.

  Lingkungan Hidup (Serial Online) ingkungan -hidup-no-32-tahun-2009 Asdak, C. 2004. Hidrologi dan Pengelolaan Daerah Aliran Sungai. Cetakan ketiga.

  Anonim. 2002. Rangkuman Sidang Ketiga untuk Konferensi Tingkat Tinggi Pembangunan Berkelanjutan (Serial Online 0205161- 74151doc. Anonim. 2009. Undang-Undang No 32 Tahun 2009 tentang Perlindungan dan Pengelolaan

  Andricevic, R., dan Cvetkovic, V., 1996. Evaluation of risk from contaminants migrating by groundwater. Water Resoururces Research 32, 11–622.

  California Aqueduct Simulation . Journal of Water Resources Planning and Management. v.115, no.2 Dagan G. Models of groundwater flowin statistically homogeneous porous formations.Water Resour. Res. 1979;15(4):47–63. Das Amlan dan Datta, 2001.Application of Optimisation in Grounwater Quantity and Quality 105-106, 293-295. bithin@iitk.qc.in. Das Amlan dan Datta, 2001. Application of Optimisation Techniques in Groundwater

  Management .,.293-295 & 303-306.

   Datta B, 2004. Collection of Groundwater and Pollutants, div, Am Soc.Civ. Eng. 122: 180-188.

  Datta B, dan Harikrishna.V., 2004. Optimization Aplications in Water Resources System

  Engineering , div, Am Soc.Civ. Eng. 122: 57-62

  Deksissa T, Meirlaen J, Ashton. P.T., and Vanrolleghiem, P.A. : 2004, Simplifying dynamic River quality modeling: A case study inorganik nitrogen dynamics in

  the Crocodile river (SouthAfrica), Water, Air and Soil Pollution , 155, 303-320

  Demetriou,C. dan Punthakey,J.F,1998. Evaluation Sustanaible Groundwater Management Options Using the MIKE SHE Intergrated Hydrogeological Modelling Packege, Center for Resources Departement of Land an Water Conservation Australia, Elseivier Environtmental Modelling and Software.

  Deninger RA, 1970. Systems analisys of water supply systems, Water Resour, Bull 6: 573-579

  Edirisinghe, N., dan W. Ziemba. 1996. Implementing bounds-based approximations in convex-concave two stage stochastic programming. Math. Programming 78(2) 314-340.

Edirisinghe, N. 1999. Bounds-based approximations in multistage stochastic

programming. Ann. Oper. Res. 85 103-127.

  Fauendorfer, K. 1996. Barycantric sceanario trees in convex multistage stochastic programming. Math. Programming B 75, 277-293. Fauendorfer, K., dan P. Kall. 1988. A solution method for SLP recourse problems with arbitrary multivariate distributions-the independent case. Problems Control

  Inform. Theory 17, 177-205.

  Flores E Z, dan Gutjar, A.L,Gelhar L W, 1975ª Stochastic Model of the Operation of A stream-Aquifer System .Water Resour. Res. 14:30-38. Ford, A. 1999. Modeling of Environment : An Introduction to System Dynamics Models of Environmental System . Island Press, California.

  Freeze, R. Allan dan Chery, John A., 1979. Groundwater. Prentice-Hall, Inc,.Englewood Cliffs, New Jersey. P. 14

  Gu, R. and Dong, M.: 1998, Water quality modelling in the watershed-based approach for wasteload allocations, Wat. Sci. Tech. 38(10), 165–172.

  Model for Water Resources Management Under Uncertainty . Civil Engineering

  Propinsi Sumatera Utara, 15-30 Huang, G.H.; dan Loucks, D.P. (2000). A InexactTtwo-stage Stochastic Programming

   Hillman, P. 1986. Pemboran Air Tanah Serta Dampak yang di timbulkan di Kota Medan,

  Hardjasoemantri, K. 2000. Hukum Tata Lingkungan.Edisi ketujuh Cetakan kelima belas. Gadjah Mada University Press.

  Civ. Eng. 115: 259-277.

  Hantush M M S, dan Marino M A, 1989.Chance-Constrained Model for Management of a Stream-Aquifer System . J. Water Resour. Plannning Manager. Div, Am Soc.

  Henriksen, Rasmussen, Bradt, Bulow van, 2006. Public Participation Modelling Using Bayesian Network in Management of Groundwater Contamination. www.elsevier.com/locate/advwaters

  Girsang, R dan Siddik, M, 1992, Potensi Pertambangan dan Energi Kota Medan, Kanwil Departemen Pertambangan dan Energi Propinsi Sumatera Utara. Goldenberg, L. C., dan M. Magaritz and S. Mandel. 1983. Experimental investigation o

  Guang, Li, dan Liao, Fa-Ni, 2004. Stochastic Modelling of Complex Nonstationary Groundwater Systems.

  water resources. World Bank

  (Editor). Efficiency in Irrigation, the conjunctive use of surface and ground

  Management Models . Water Resources Research. v.19, n.2, pp.305-319 Gorelick, S.M.(1988). A Review of Groundwater Management Models. in O’Mara, G.T.

  Gorelick, S.M. (1980). A Model fo Managing Sources of Groundwater Pollution, Water Resour Res. 18 (4) , pp.773-781. Gorelick dan Remson., (1982a). A Review of Distributed Parameter Groundwater

  Inirreversible Changes of Hydraulic Conductivity on the Seawater-Freshwater

Interface in Coastal Aquifers . Water Resources Research 19 (1) : 225-242.

  and Environmental Systems. v.17, p.95-118 Huang, Li, Nie, 2005. An Interval-Parameter Multi-stage Stochastic Programing Model for Water Resources Management Under Uncertainty . www. elsevier. com/locate/advwalters.110-111

  Jacob Bear, Milovan S.,Beijin, and Randali R., Ross., 1992. Ground Water Issue, Fudamentals of Ground-Water Modelling , EPA. Oklahoma. James Mc. Phee, William W, Yeh G, Asce Hon.M. 2004. Multiobjective Optimazion for

  Sustainable Groundwater Management in Semiarid Regions ., Jornal of waters resources planning and menegement@asce.

  Javandel I., dan Tsang, 1986. Groundwater Tansport Handbook of Mathematical

  Models AGU Wate Resources Momograph 10, Ameican Geopohysical Union, Washington, D.C..

  Jianbing Li, Gordon, Huang,H, Zeng, Imran, Huang Yuefei. 2006. An Intergrated Fuzzy-

  stochastic Modelling Approach for Assessment of Groundwater Contamination ,

  (Kantor Menteri Negara Lingkungan Hidup, 1997. Agenda 21 Indonesia, Strategi Nasional untuk Pembangunan Berkelanjutan, Kantor Menteri Negara Lingkungan Hidup, Jakarta)

  Kaunas, JR, dan Haimes YY, 1985. Risk management on goundwater contamination in a multi objective framework, Water Resour.Res. 21:1721-1730 Kataoka,. Y. 2006.Towards Sustainable Groundwater Management in Asian Cities-

  Lessons from Osaka International Revie Strategies , vol 6. No. 2. Institute for Global Environmental Strategies, Hayama, Kanagawa, Japan., 269-270.

  Kendall, B.E et al.1999. Why do populations cycle A Synthesis of Statistical and

  MechanisticModeling Approaches The Ecological Society of America.Vol

  80 No 6 Kodoatie, R.J. 1996. Pengantar Hidrogeologi, Penerbit Andi Jogyakarta, hal 246-248 Kodoatie, .J. dan Basuki, M. 2004. Kajian Undang-Undang Sumber Daya Air. Penerbit ANDI.Yogyakarta.

  Lee, J.G.; Lacewell, R.D.(1990). Farm Program Impacts on an Exhaustible Ground water Supply: An analysis of the Texas Southern High Plains. Water Resource Research. v.26, n.3, p.361-368.

  Lefkoff I. J. Goelick SM, 1996. Design dan cost analysis of apid aquifer estoration systems using flow simuation and quadratic programming , Ground Water24: 777-790.

  Li.JB.,Huang.G.H., Zeng, Maqsood, Huang Yuefei., 2006.An Intergrated Fuzzy-

  

Stochastic Modeling Approach for Risk Assessment of Groundwater

Contamination. Journal of Environtmental Management

  www.eisevier.com/locate/jnvnan Li, Y.P., Huang, G.H., 2006. An Inexact Two-stage Mixed Integer Linear Programming

  Method for Solid Waste Management in The City of Regina . Journal of Environmental Management 81, 188–209.

  Li, Y.P., Huang, G.H., Nie, S.L., Nie, X.H., Maqsood, I., 2006a. An interval-Parameter

  Two-stage Stochastic Integer Programming Model for Environmental Systems Planning Under Uncertainty. Engineering Optimization 38 (4), 461–483.

  Li, Y.P., Huang, G.H., Nie, S.L., 2006b. An Interval-parameter Multistage Stochastic Programming Model for Water resources Management Under Uncertainty.

  Advances in Water Resources 29, 776–789. Li.Y.P.,Huang.G.H.Nie, S.L.,Liu.L., 2007.Inexat Multistage Stochastic Integer

  Programing for Water Resources Management under Uncertainty . Journal of

  Environmental Management www.eisevier.com/locate/jnvnan Lund, J.R. (1995). Derived Estimation of Willingness to Pay to Avoid Probabilistic

  Shortage . Water Resources Research. v.31, n.5, p.1367-1372

  Maddock T 1972a. Algebraic technological function from a simulation model. Water Resour , Res. 8: 129-134. Maddock T 1972b. Agroundwater planning model : A basis fo data collection network

  Presented at the Int Symp, on. Uncertaintes in Hydrologic and Water Resources System.

  Mawengkang, H. 2006. Modeling Decision Problem under Uncertainty, Proceedings IMTGT Int. Conference, Medan. Mawengkang, H. 2008. Algoritme Pembentukan SkenarioProgram Stokastik Tak Linier Tahap Ganda, Proceedings IMTGT Int. Conference, Medan.

  Marino, M.A.(2001). Conjunctive Management of surfacve and groundwater. IN:

  Schuman , A.H (Editor). Regional Management of Water Resources. IAHS

  publication n.268, International Association of Hydrological Sciences, Wallingford,

  Mende, et al., 2007.Strategy for Grounwater Management in Developing Countries :

  A Case Study in Northern Costa Rica , Journal of Hydrology, www.elsevier.com/locate/jhydrol.

  Meijerink. 1970. Photo Interpretation in Hydrology. A Geomorphologycal Approach.

  ITC, Delf. Molz. F J, dan Bell I. C, 1977. Head gradient contol in aquifes used fo fluid storage, Water Resour , Res. 13:795-798. Morgan D R, Eheart, J W, Valocchi A J, 1993. Aquifer Remediation Design Under

  Uncertainty Using a New Chance Constrained Programming Technique. Water Resour. Res . 29:551-561.

  Grounwater Menagement Problems , pp. 770-772. European Journal of

  tanah

  ……., 2008. Peraturan Pemerintah Repblik Indnesia Nomor 43 tahun 2008 tentang Air

  dan Pengendalian Pencemaran Air

  ……, 2001 Peraturan Pemerintah Republik Indonesia Nomor 86, tentang Pengelolaan

  form JBPTBPP/2007-02-14 18:47:20. Oleh Priana Sudjono, Departemen of Environmental Engineering, ITB. Purnama, S. 2002. Hasil Aman Eksploitasi Air Tanah di Kota Semarang, Propinsi Jawa Tengah.Majalah Geografi Indonesia 16 (2) : 77-85.

  Representation, Object Oriented Programming Groundwater Conservation

  Priana Sudjono. 2007 Journal of System Interrelationship Model, Knowledge

  Operation Research.www.elservier.com/locate/ejor Polo, J. F dan J. R. Ramis. 1983. Simulation of Salt Water-fresh Water interface Motion Water Resources Research 19 (1) : 911-931.

  Papadopoulou et al (2006), Flexible Time Optimization Methodology for The Solution of

  Morris, B. L., Lawrence, A. R., and Stuart, M. E., 1994, The Impact of Urbanisation on

  Programming Stud. 6, 111-124.

  Olsen, P. 1976. Discretizations of multistage stochastic programming. Math.

  Nurgiyantoro, B, Gunawan dan Marzuki. 2004. Statistik Terapan. Untuk Penelitian Ilmu- ilmu Sosial. Gadjah Mada University Press.Cetakan ketiga (revisi).

  Composite Porous Media . Journal of Environmental Management homepage:

  Ni dan Li,., 2006. Modeling Grounwater Velocity Uncertainly in Nonstationary

  Hidup , Sosial Ekonomi, Manajemen. UMP Press, Jakarta

  Muhammadi, E., Aminullah dan B. Soesilo. 2001. Analisis Sistem Dinamis : Lingkungan

  Groundwater Quality , Technical Report WC/94/56, British Geological Survey, Nottingham.

  Randolph J, 2004, Environtmental Land Use Planning and Management, Island Press, p 36-52.

  Rachmat Fajar Lubis, Air Sebagai Parameter Kendali dalam Tata Ruang, Graduate School of Science and Technology, Chiba University, Japan, 2006

  Ranjithan S, Eheart J W, Garrett Jr J H, 1993. Neural Network-based Screening for

  Groundwater Reclamation Under Uncertainty . Water Resour. Res.29: 563-574

  Remson dan Gorelick., (1980). Sensitivitas Analyisis of Optimal Groundwater

  Contaminat Capture curves: spatial variability and robust solutions. In proceedings , NWWA Conferences Solving Groundwater Problems with Models

  (Dumblin, OH: Natipnal Water Association) pp 133-146. RI (Republik Indonesia). 2008. Undang-Undang Republik Indonesia Nomor 7 Tahun 2004 Tentang Sumber Daya Air, Pemerintah Republik Indonesia, Jakarta.

  RI (Republik Indonesia). 2009. Undang-Undang Nomor 32 Tahun 2009 Tentang

  

Pelindungan dan Pengelolaan LIngkungan Hidup , Pemerintah Republik

  RI (Republik Indonesia). 2008. Peraturan Pemerintah Nomor 43 Tahun 2008 Tentang Air Tanah , Pemerintah Republik Indonesia, Jakarta.

  Peraturan Menteri Kesehatan Republik Indonesia No. 492/MENKES/PER/IV/2010)

  tentang persyaratan kualitas air minum RI (Republik Indonesia). 2008. Keputusan Presiden Nomor 26 Tahun 2011 Tentang

Penetapan Cekungan Air Tanah , Pemerintah Republik Indonesia, Jakarta.

  

Rockafellar, R.T., and R.J-B. Wets. 1991. Scenarios and Policy Aggregation in

. Math.Oper.Res. 16, 119-147 Optimization under Uncertainty Rockafellar, R. T. 1999. Duality and optimality in multistage stochastic programming.

  Ann. Oper. Res. 85, 1-19.

  Saad O.M, B.M.A. Hassan and I.M. Hizam, 2011. Optumizing the Underground Water

  Confined Steady flow using a Fuzzy Approach , Affiican Journal of Mathematics and Computer Sciense Research, vol 4 (11). pp. 350-356.

  Sarah P.Hollinshead, Lund Jay R., 2002. Optimization of Environtmental Water

  Purchases with Uncertainty , In press, Water Resources Research. Columbia

  University School of Law, Departemen of Civil and Environmental Engineering, University of California, Davia

  Shu-Guang Li, Hua-Sheng Liao, Chucn Fa-Ni. Stochastik Modeling of Complex non

  sttionary Groundwater System

  Siregar, Doli D. 2004. Manajemen Aset Strategi Penataan Konsep Pembangunan

  Berkelanjutan Secara Nasional Dalam Konteks Kepala Daerah Sebagai CEO’s

pada Era Globalisasi & Otonomi Daerah . Gramedia Pustaka Utama. Jakarta

  Soedijono, B. 1995. Model Matematika. Program Pascasarjana UGM, Yogyakarta.

  Soemarto, C.D., 1999, Hidrologi Teknik Edisi 2, Erlangga, Jakarta.

  

S oerjani, M, Ahmad, dan Munir, R. 1987. Lingkungan Sumber Daya Alam dan

Kependudukan dalam Pembangunan . Penerbit Universitas Indonesia. UI Press.

  Jakarta

  Sugandhy, dan Aca, Rustam Hakim, 2007, Prinsip Dasar Kebijakan Pembangunan Berkelanjutan Berwawasan Lingkungan , Cet. I, Bumi Aksara, Jakarta.

  Subramanya, K. (1984). Engineering Hydrology. Tata McGraw Hill Publishing Company Limited. New Delhi

  Sukardi, 1984. Air Tanah dan Keterdapatan, Pengembangan, dan Pengelolaannya, Bandung Suripin, 2002. Pelestarian Sumbedaya Tanah dan Air, Yogyakarta, Andi Offset, hal. 142.

  Taylor, 1994. A First Course In Stochastic Processes, Academic Press. Inc., Tiedeman G, Gorelick S M 1993 Analysis of Uncertainty in Optimal Groundwater

  Conyaminant Capture Design . Wate rosour. 29: 2139-2153

Tyson, J. M., dan Guarino, C. F., Best, H. J. and Tanaka, K.: 1993, Management and

institutional aspects , Wat. Sci. Tech. 27(12), 159–172.

  Todd, D.K. 1995. Groundwater Hydrology. second edition.Singapore: John Wiley & Sons. Tung YK. 1986, Goundwate management by chance –constrained model. J. Water

  Resour Planning Manage, Div., Am. Civ. Eng. 112: 1-19 United Nations Division for Sustainable Development. Documents: Sustainable

  Development Issues Retrieved: 2007-05-12

  Usmar, dkk., 2006. Tinjauan Hidrologi Laporan Tugas Akhir Pemanfaatan Air Tanah Untuk Memenuhi Air Irigasi Di Kabupaten Kudus Jawa Tengah

  Va der Heijde,P.K.M. et al 1985. Groundwater Management The Use of Nummerical

  nd Models.

  2 edition, AGU Water Resources Monograph No. 5, Washington, D.C. Wagner B J, Gorelick.S M, 1987. Optimal Groundwater Quality Management Under Parameter Uncertainty, Water Resour, Res 23: 1162-1174. Wagner J M, , 1988. Stochastic Programming with Recourse Applied to Groundwater Quality Management. Massachusetts Institute of Technology. Res. 25:2210-2225. Wagner J M, Gorelick S M, 1992. Reliable Aquifer Remediation in the Presence of Spatially Variable Hydroulich Conductivity : From data to design. Water resour.

  Res . 25:2210-2225. Wagner, J.M., Shamir, U., Nemati, H.R., 1992. Groundwater quality management under uncertainty: stochastic programming approache sand the value of information.

  Water Resources Research 28, 1233–1246. West Java EPA. 2006. Analysis final report Groundwater management, Bandung (unpublished).

  Winardi. 1999. Pengantar Tentang Teori Sistem dan Analisis Sistem. Mandar Maju, Bandung. Whiffen G J, Shoemaker C A 1993 nonlinear weighted feedback control of groundwater remediation under uncertainty. Water resour. Res. 29:3277-3298 Willis R, 1976a. Optimal groundwater quality management: Well injection of waste water, water resour, Res. 12: 47-53. Willis R, 1976b. Optimal groundwater resource management using the response equation method, in Finite elements in water resources. Willis R, 1979. A planing model for the management of groundwater quality Water resour. Res . 15:1305-1312. Willis R, Liu P, 1984. Optimitation for groundwater planning, J. Water Resour, Planning . 110: 333-347.

  Manage, Div, Am, Soc, Civ, Eng Willis R, Newman BA, 1977. Management model for groundwater development, J. Water Resour. Planning Manage, Div, Am, Soc, Civ, Eng . 103: 159-171

  Wright, S. E. 1994. Primal-dual aggregation and disaggregation for stochastic linear programs. Math. Oper. Res. 19, 893-908.

  Yeh, W. W. G. (1986). “Review of parameter-identification procedures in groundwater hydrology The inverse problem.” Water Resour. Res.,22(2), 95–108. Zulkarnaini,dan Priana Sudjono, 2006. System Interrelationship Model As Basis For

  Computer Programming On Groundwater Conservation In Semarang 1) email : zulkarnaini_80@yahoo.com, memteq@bdg.centrin.net.id Zbigniew N , Hans F. Ravn. 2000. A review of mathematical models in economic environmental problems. System Research Institute, Polish Academy of sciences, Newelska 6 E-mail:naborski@ibspan.waw.pl. Zhang YK, Zhang D. Forum: The state of stochastic hydrology. Stoch Environ Res Risk Assess 2004;18(4):265. Zhang,X.H, Zang H.W,Chen.B,Guo.H.C,Chen,G.O, Zhao,B.A. 2007. An Inexact- stochastic Dual Water Supply Programming Model. Article in press.