COAL RESERVE ESTIMATE Mt 5.5 Mt
5.5 Metallurgical Factors
The coal is sold unwashed so no metallurgical factors have been applied.5.6 Cost and Revenue Factors
Bayan provided a “data sheet” of unit costs relevant to GBP Block 1. MMC checked these for reasonableness and also used an in-house NPV based economic model to show that the project and reserves are “economic”. These unit rates were then used to calculate the cost to deliver coal to a ship fob vessel. This allowed a break even strip ratio to be calculated and was also used to calibrate the optimiser software. The following points summarise the assumed cost and revenue factors used for the estimate: ‰ all costs are in US dollars. ‰ a benchmark coal price of US65 per tonne for coal of a 6300 kcalkg gar moisture was used for the estimates. An additional 10 per tonne increment was added as a “semi soft” premium due to the high quality of this coal relative to other coals. A sulphur penalty of US0.10 per 0.1 over 1 was applied. ‰ Royalties of 13.5 of revenue less marketing, barging and shipping costs have been allowed. ‰ A fuel price of 68 cents per litre was used for mining costs. ‰ A coal haulage cost of 12 cents per tonne kilometre. ‰ Allowances were made for crushing, stockpiling, barge loading and ship loading which totalled approximately 9 per tonne. ‰ Administration and marketing costs were 1.50 per tonne. ‰ Coal mining was a variable rate depending on depth. ‰ Waste mining was variable depending on depth and distance of haul.5.7 Marketing and Product Specifications
A detailed market study had not been done. The current demand for high energy thermal and semi-soft coking coal is high and MMC see no problems in selling this coal.5.8 Other Relevant Factors
There are a number of planning issues which may impact on the stated mining reserves. These include: ‰ contract mining rates ‰ future exploration drilling and updates to the geological model, and ‰ ongoing mine planning including different mining equipment and more detailed planning of the start up period and the box cut design. All of these issues impact on the pit shells and mining quantities. Consequently, when the next JORC statement is prepared it is likely to have a different pit shells and quantities.5.9 Classification
At this stage a detailed Life of Mine plan has not been completed and the majority of reported Coal Resources are of Indicated category. Hence, all of the Coal Reserves are classified as “Probable”. A-26Parts
» PT. Bayan Resources Tbk - Prospectus
» 40.3 PT. Bayan Resources Tbk - Prospectus
» 53.1 PT. Bayan Resources Tbk - Prospectus
» 52.9 PT. Bayan Resources Tbk - Prospectus
» 57.9 PT. Bayan Resources Tbk - Prospectus
» 6.5 PT. Bayan Resources Tbk - Prospectus
» 6.6 PT. Bayan Resources Tbk - Prospectus
» 7.0 PT. Bayan Resources Tbk - Prospectus
» 9.0 PT. Bayan Resources Tbk - Prospectus
» 9.7 PT. Bayan Resources Tbk - Prospectus
» 18.4 PT. Bayan Resources Tbk - Prospectus
» 20.8 PT. Bayan Resources Tbk - Prospectus
» 24.8 PT. Bayan Resources Tbk - Prospectus
» 27.8 PT. Bayan Resources Tbk - Prospectus
» 26.8 PT. Bayan Resources Tbk - Prospectus
» 29.8 PT. Bayan Resources Tbk - Prospectus
» 11.3 PT. Bayan Resources Tbk - Prospectus
» 8.5 PT. Bayan Resources Tbk - Prospectus
» 9.9 PT. Bayan Resources Tbk - Prospectus
» 4.4 6.8 PT. Bayan Resources Tbk - Prospectus
» 1.6 PT. Bayan Resources Tbk - Prospectus
» 20.9 PT. Bayan Resources Tbk - Prospectus
» 22.7 PT. Bayan Resources Tbk - Prospectus
» 38.8 PT. Bayan Resources Tbk - Prospectus
» 34.0 PT. Bayan Resources Tbk - Prospectus
» 55.3 PT. Bayan Resources Tbk - Prospectus
» 63.0 PT. Bayan Resources Tbk - Prospectus
» 76.3 PT. Bayan Resources Tbk - Prospectus
» 19.0 PT. Bayan Resources Tbk - Prospectus
» 18.7 PT. Bayan Resources Tbk - Prospectus
» 11.0 PT. Bayan Resources Tbk - Prospectus
» 10.0 PT. Bayan Resources Tbk - Prospectus
» 89.6 PT. Bayan Resources Tbk - Prospectus
» 107.5 PT. Bayan Resources Tbk - Prospectus
» 63.6 PT. Bayan Resources Tbk - Prospectus
» 65.4 PT. Bayan Resources Tbk - Prospectus
» GENERAL continued IP continued
» GENERAL continued BE continued
» GENERAL continued TSA continued
» GENERAL continued GBP continued
» Principles of consolidation PT. Bayan Resources Tbk - Prospectus
» Transactions with related parties
» Receivables PT. Bayan Resources Tbk - Prospectus
» Inventories PT. Bayan Resources Tbk - Prospectus
» Prepaid expenses PT. Bayan Resources Tbk - Prospectus
» Fixed assets under finance leases
» Impairment of long lived assets
» Revenue and expense recognition
» Stripping costs PT. Bayan Resources Tbk - Prospectus
» Environmental expenses Accounting for derivative financial instruments and hedging activities
» Provision for decommissioning, demobilisation and restoration
» Segment reporting PT. Bayan Resources Tbk - Prospectus
» Sharing of production PT. Bayan Resources Tbk - Prospectus
» Dividends PT. Bayan Resources Tbk - Prospectus
» Taxes payable PT. Bayan Resources Tbk - Prospectus
» Income tax expense PT. Bayan Resources Tbk - Prospectus
» Administration PT. Bayan Resources Tbk - Prospectus
» Coal Swap Transactions PT. Bayan Resources Tbk - Prospectus
» Interest rate swap transactions
» Difference in value from transactions for subscription of additional shares in subsidiary
» Cooperation agreement Coal handling services contracts
» Reclamation guarantees Rental commitments
» Agency fees PT. Bayan Resources Tbk - Prospectus
» Litigation PT. Bayan Resources Tbk - Prospectus
» Agreement for construction of reclaiming conveyors 9 and 13
» Forestry fee PT. Bayan Resources Tbk - Prospectus
» Coal sales and purchase agreements
» Construction of coal stockpiles and coal loading jetty
» Bank facilities PT. Bayan Resources Tbk - Prospectus
» Agreement for construction of infrastructure
» Machinery purchase contract PT. Bayan Resources Tbk - Prospectus
» Lease agreement PT. Bayan Resources Tbk - Prospectus
» Maintenance agreement PT. Bayan Resources Tbk - Prospectus
» Introduction PT. Bayan Resources Tbk - Prospectus
» Approach PT. Bayan Resources Tbk - Prospectus
» Previous Coal Resource and Reserve Statements
» General Background PT. Bayan Resources Tbk - Prospectus
» Location and Titles PT. Bayan Resources Tbk - Prospectus
» Mining Operations PT. Bayan Resources Tbk - Prospectus
» Infrastructure of Site Facilities
» Marketing PT. Bayan Resources Tbk - Prospectus
» Geology Overview PT. Bayan Resources Tbk - Prospectus
» Coal Quality PT. Bayan Resources Tbk - Prospectus
» 6.7 PT. Bayan Resources Tbk - Prospectus
» 7,650 PT. Bayan Resources Tbk - Prospectus
» 7,660 PT. Bayan Resources Tbk - Prospectus
» Geological Database and Modelling
» Data Validation PT. Bayan Resources Tbk - Prospectus
» Mt 3.9 Mt Geological Confidence And Resource Categories
» COAL RESERVE ESTIMATE Mt 5.5 Mt
» Coal Resource Estimate PT. Bayan Resources Tbk - Prospectus
» Study Status PT. Bayan Resources Tbk - Prospectus
» Cut-off Parameters and Pit Limits
» Mining Factors PT. Bayan Resources Tbk - Prospectus
» Metallurgical Factors PT. Bayan Resources Tbk - Prospectus
» Marketing and Product Specifications
» Other Relevant Factors PT. Bayan Resources Tbk - Prospectus
» Classification PT. Bayan Resources Tbk - Prospectus
» 7,390 Mt 8.4 Summary Table of Model Data
» Coal Quality 4.3 PT. Bayan Resources Tbk - Prospectus
» 7,597 PT. Bayan Resources Tbk - Prospectus
» Geological Confidence And Resource Categories
» Mt PT. Bayan Resources Tbk - Prospectus
» Mineral Resource Estimate PT. Bayan Resources Tbk - Prospectus
» Audits and Reviews PT. Bayan Resources Tbk - Prospectus
» Discussion of Relative Accuracy and Confidence
» Results PT. Bayan Resources Tbk - Prospectus
» 1.2 PT. Bayan Resources Tbk - Prospectus
» 0.1 Summary Table of Model Data
» 5,770 PT. Bayan Resources Tbk - Prospectus
» Coal Resources PT. Bayan Resources Tbk - Prospectus
» Results 5.1 5,970 PT. Bayan Resources Tbk - Prospectus
» 1.1 Summary Table of Model Data
Show more