SELISIH NILAI WAJAR EFEK DIFFERENCES IN FAIR VALUE OF SECURITIES

31. PERIKATAN Lanjutan 31. COMMITMENTS Continued c. c. 2 2 3 3 Based on the Cooperation Agreement No. 2172 H2.F4.DRTK.KONTRAK.BCA2011, dated August 10, 2011, the University entered into agreements with PT. Bank Central Asia Tbk. Cooperation Agreement of the Use of Operating Rooms in Environmental of Faculty of Technic Universitas Indonesia PT. Bank Central Asia Tbk. must pay the cost of providing the room as well as the cost of using the indoor facilities have been installed. Cost of providing the room is Rp. 375.000.000,- for a period of 5 years paid no later than October 1, 2011. Cost of room facilities such as electricity use is in accordance with the calculation kwh meter per month and payable at the end of the quarter from the date of operation of the business of PT. Bank Central Asia Tbk. Jangka waktu perjanjian kerjasama ini adalah selama 5 tahun, terhitung sejak tanggal 12 September 2011 sampai dengan 11 September 2016. Dalam perjanjian kerjasama tersebut, Universitas, melalui fakultas teknik, akan memberikan hak penggunaan kepada PT. Bank Central Asia Tbk. atas ruangan yang terletak di area lobby lantai dasar Gedung Engineering Center Fakultas Teknik dengan luas sebesar + 70 m2 berikut fasilitas yang melekat di dalamnya, sebagai lokasi kegiatan usaha penyediaan produk dan pelayanan jasa perbankan. In the agreement, the University, through the Faculty of Technic, will give the right to the use of PT. Bank Central Asia Tbk. above room located on the ground floor lobby area of Building Engineering Center, Faculty of Technic, with an area of 70 m2 including facilities inherent in it, as a business location providing banking products and services. Berdasarkan Perjanjian Kerjasama No. 2172 H2.F4.DRTK.KONTRAK.BCA2011, tanggal 10 Agustus 2011, Universitas melakukan perjanjian dengan PT. Bank Central Asia Tbk. Based on the Agreement No. 44MCC WRIIUI2007 and No. UID0207R, dated November 30, 2007, as amended by Addendum Agreement No. 001 44MCC WRII2007 and No. 001 UID0207R, dated March 1, 2009, Addendum Agreement No. 038MCCWRIIUI2011, and Addendum Agreement No. 86MCC WRIIUI2013 and No. UID02331R, dated January 31, 2013, the University entered into an agreement with PT. Bank Negara Indonesia Persero Tbk. PT. Bank Central Asia Tbk. harus membayar biaya penyediaan ruangan serta biaya penggunaan fasilitas ruangan yang telah terpasang. Biaya penyediaan ruangan adalah sebesar Rp. 375.000.000,- untuk jangka waktu selama 5 tahun yang dibayarkan paling lambat tanggal 1 Oktober 2011. Biaya penggunaan fasilitas ruangan berupa listrik adalah sesuai dengan perhitungan kwh meter per bulan dan dibayarkan pada akhir triwulan terhitung dari tanggal beroperasinya usaha PT. Bank Central Asia Tbk. Term of this agreement is for 5 years, starting from September 12, 2011 to September 11, 2016. Berdasarkan Perjanjian No. 44PKSWRII UI2007 dan No. UID0207R, tanggal 30 November 2007, sebagaimana telah mengalami perubahan melalui Addendum Perjanjian No. 001 44PKSWRII2007 dan No. 001 UID0207R, tanggal 1 Maret 2009, Addendum Perjanjian No. 038PKSWRII UI2011, dan Addendum Perjanjian No. 86PKSWRIIUI2013 dan No. UID02331R, tanggal 31 Januari 2013, Universitas melakukan perjanjian dengan PT. Bank Negara Indonesia Persero Tbk. Perjanjian Kerjasama Penggunaan Ruangan Usaha di Lingkungan Fakultas Teknik Universitas Indonesia Perjanjian Sewa Menyewa Ruangan Gedung Lease Agreement on Building Room Perjanjian Kerjasama Sewa Lahan dan Bangunan Lanjutan Cooperation Agreement on Lease of Land and Building Continued 42 31. PERIKATAN Lanjutan 31. COMMITMENTS Continued c. c. 3 3 i i ii ii iii iii iv iv Berdasarkan surat PT. Bank Negara Indonesia Persero Tbk No. UID02263, tanggal 13 Februari 2014 dan surat Universitas No. 010H2.R3LOG.02.02 2014, tanggal 18 Februari 2014, Universitas dan PT. Bank Negara Indonesia Persero Tbk. menyepakati untuk perpanjangan masa sewa 1 Maret 2014 sampai dengan 28 Februari 2015, dengan harga sewa sebesar Rp. 363.825.000,-. Rp. 346.500.000,- including taxes for a period of 1 year from the date of March 1, 2013 until February 28, 2014. Rp. 300.000.000,- per tahun, termasuk pajak untuk jangka waktu 2 tahun pertama dari tanggal 1 Maret 2007 sampai dengan 28 Februari 2009, dibayar di muka sebesar Rp. 600.000.000,-; Rp. 300.000.000,- per year, including taxes for the first period of 2 years from the date of March 1, 2007 until February 28, 2009, prepaid Rp. 600.000.000,-; Rp. 330.000.000,- per tahun, termasuk pajak untuk jangka waktu 2 tahun pertama dari tanggal 1 Maret 2009 sampai dengan 28 Februari 2011, dibayar di muka sebesar Rp. 660.000.000,-; Dalam perjanjian kerjasama tersebut, Universitas menyewakan ruangan kepada PT. Bank Negara Indonesia Persero Tbk. dengan harga sewa dan syarat-syarat pembayaran sebagai berikut: In the cooperation agreement, the University rents a bulding room to the PT. Bank Negara Indonesia Persero Tbk., with the rental price and payment terms as follows: Perjanjian Kerjasama Sewa Lahan dan Bangunan Lanjutan Cooperation Agreement on Lease of Land and Building Continued Perjanjian Sewa Menyewa Ruangan Gedung Lanjutan Lease Agreement on Building Room Continued Jangka waktu perjanjian ini adalah selama 8 tahun, terhitung sejak tanggal 1 Maret 2007 sampai dengan 28 Februari 2015. Term of this agreement is for 8 years, starting from March 1, 2007 to February 28, 2015. Rp. 330.000.000,- per year, including taxes for the first period of 2 years from the date of March 1, 2009 until February 28, 2011, prepaid Rp. 660.000.000,-; Rp. 330.000.000,- per tahun, termasuk pajak untuk jangka waktu 2 tahun pertama dari tanggal 1 Maret 2011 sampai dengan 28 Februari 2013, dibayar di muka sebesar Rp. 660.000.000,-; Rp. 346.500.000,- termasuk pajak untuk jangka waktu 1 tahun dari tanggal 1 Maret 2013 sampai dengan 28 Februari 2014. Based on the letter of PT. Bank Negara Indonesia Persero Tbk. No. UID02263, dated February 13, 2014 and letter of University No. 010H2.R3LOG.02.022014, dated February 18th 2014, the University and PT. Bank Negara Indonesia Persero Tbk. agree to the extension of the rental period March 1, 2014 until February 28, 2015, the rental price of Rp. 363.825.000,-. Rp. 330.000.000,- per year, including taxes for the first period of 2 years from the date of March 1, 2011 until February 28, 2013, prepaid Rp. 660.000.000,-; 43 31. PERIKATAN Lanjutan 31. COMMITMENTS

Dokumen yang terkait

Analisis Pengaruh Pengangguran, Kemiskinan dan Fasilitas Kesehatan terhadap Kualitas Sumber Daya Manusia di Kabupaten Jember Tahun 2004-2013

21 388 5

PENGALAMAN KELUARGA DALAM MERAWAT ANGGOTA KELUARGA DENGAN GANGGUAN JIWA (SKIZOFRENIA) Di Wilayah Puskesmas Kedung Kandang Malang Tahun 2015

28 256 11

Analisis Pertumbuhan Antar Sektor di Wilayah Kabupaten Magetan dan Sekitarnya Tahun 1996-2005

3 59 17

DAMPAK INVESTASI ASET TEKNOLOGI INFORMASI TERHADAP INOVASI DENGAN LINGKUNGAN INDUSTRI SEBAGAI VARIABEL PEMODERASI (Studi Empiris pada perusahaan Manufaktur yang Terdaftar di Bursa Efek Indonesia (BEI) Tahun 2006-2012)

12 142 22

Hubungan antara Kondisi Psikologis dengan Hasil Belajar Bahasa Indonesia Kelas IX Kelompok Belajar Paket B Rukun Sentosa Kabupaten Lamongan Tahun Pelajaran 2012-2013

12 269 5

Peningkatan keterampilan menyimak melalui penerapan metode bercerita pada siswa kelas II SDN Pamulang Permai Tangerang Selatan Tahun Pelajaran 2013/2014

20 223 100

Pengaruh kualitas aktiva produktif dan non performing financing terhadap return on asset perbankan syariah (Studi Pada 3 Bank Umum Syariah Tahun 2011 – 2014)

6 101 0

Kajian administrasi, farmasetik dan klinis resep pasien rawat jalan di Rumkital Dr. Mintohardjo pada bulan Januari 2015

19 169 0

Peranan Hubungan Masyarakat (Humas) Mpr Ri Dalam Mensosialisasikan Empat Pilar Bangsa Tahun 2014

4 126 93

Perancangan Sistem Informasi Akuntansi Laporan Keuangan Arus Kas Pada PT. Tiki Jalur Nugraha Ekakurir Cabang Bandung Dengan Menggunakan Software Microsoft Visual Basic 6.0 Dan SQL Server 2000 Berbasis Client Server

32 174 203