PROGRAM STRATEGIS PRODUKSI TAHUN 2012

PROGRAM STRATEGIS PRODUKSI TAHUN 2012

PROGRAM STRATEGIS PRODUKSI TAHUN 2012

Sasaran & Strategi Targets & Strategy Kebijakan Policy

Program Strategis Produksi Tahun 2012

Peningkatan kompetensi SDM

A. Optimalisasi SDM

Strategic Improvement of HRD

A. HRD Optimization

Competency

Program of Production in 2012

A. Implementasi PSM (Process Safety Management)

A. Implementation of PSM (Process Safety Management)

Program Strategis Produksi

Peningkatan keselamatan

Tahun 2012 semua aset perusahaan Strategic dengan mencapai zero

accident dan zero effluent

Program of

Improvement of the safety

Production in of all the company's assets 2012 to achieve zero accident and

zero effluent

B. Implementasi Safety Culture

B. Implementation of Safety Culture

C. Mengikuti Penilaian Proper

C. Following Proper Assessment

30 Laporan Tahunan 2012 Annual Report PT Pupuk Indonesia (Persero)

Profil Perusahaan Company Profile

Program-program Programs Tolak Ukur Keberhasilan Indicator of Success

Tersedia online Data Base

1. Sistem transfer knowledge (knowledge management) Knowledge (Statik/Dinamik)

1. System of transfer knowledge (knowledge management) Available online Knowledge Data Base (Static / Dynamic)

2. Standarisasi dan sertifikasi keahlian Kenaikan Jumlah Tenaga ahli

2. Standardization and certification of skills Increase in Number of experts

1. Standarisasi CSMS:

1. Standardization of CSMS:

Berdasarkan 6 Tahapan

1.1. Pembuatan Prosedur CSMS

1.1. Preparation of Procedur CSMS (Oct 2012 -

(Oct 2012 selesai)

completed)

dan item pemenuhannya

1.2. Nov-Des: Sosialisasi ke semua

1.2. Nov-Dec: Socialization to all contractors

Based on 6 Stages and

kontraktor

fulfillment items

1.3. Implementasi bertahap dan sesuai

1.3. Staged Implementation and in accordance

dengan tipe pekerjaan

type of work

Keterangan: Tahapan yang dilakukan PKC, PSP,

Note: Stages done by PKC, PSP, and PIM in 2013:

dan PIM Tahun 2013: penyelesaian prosedur CSMS the completion of the Company's internal CSMS internal Perusahaan, evaluasi, inspeksi, rapat,

procedures, evaluations, inspections, meetings,

training reward dan punishment terhadap

training reward and punishment against contractor

kontraktor.

Prosentase kesesuaian terhadap prosedur 2. Standarisasi Work Permit:

2. 2. Standardization of Work Permit:

Percentage of conformity with the

2.1. Standarisasi Pedoman Work Permit

2.1. Guidelines Standardization Work Permit

procedure

2.2. Pelaksanaan sesuai pedoman

2.2 Implementation of Guidelines

Tersedianya dan berjalannya investigasi 3. Standarisasi Incident Report

sesuai pedoman & Investigasi

3. Standardization of Incident Report &

Investigasi

Availability and implementation of

investigation based on guidelines 4. Pelaksanaan (PSM)

3.1. Pembuatan Pedoman

3.1. Guidelines Preparation

3.2. Pelaksanaan

3.2 Implementation

4. Implementation of (PSM)

Implementation of PSM based on procedur 5. Implementasi ISRS:

4.1. Pedoman PSM

4.1. Guidelines of PSM

Implementasi PSM sesuai prosedur

4.2. Eksternal Audit PSM

4.2. Eksternal Audit of PSM

5. Implementation of ISRS:

5.1. Development

5.1. Development

5.2. Implementasi ISRS

5.2. Implementasi ISRS

ISRS edition 8 level 5

5.3. Assessment ISRS

5.3. Assessment ISRS

1. Leading Indicator (KPI Individu

1. Leading Indicator (KPI Individual

Management)

Management)

1.1. Pelaksanaan Safety Management

1.1. Implementation of Safety

Walk Through: Direksi & GM - MGR

Management Walk Through:

& SI

Director & GM - MGR & SI

Peningkatan Level Safety Culture dari Level 3

1.2. Pelaporan Kondisi Tidak Aman:

1.2. Reporting Unsafe Conditions:

menjadi Level 4

- PKC & PIM - PKT, PKG & PSP

PKC & PIM - PKT, PKG & PSP

Improvement of Level Safety Culture

1.3. Rapat P2K3 (Direksi)

1.3. Meeting P2K3 (Directors)

fromLevel 3 to be Level 4

1.4. Rapat Sub P2K3 (GM)

1.4. Meeting Sub P2K3 (GM)

2. Re-Awarness K3

2. Re-Awarness K3

3. Safety Plant Audit

3. Safety Plant Audit

4. Re-Assessment Safety Culture

4. Re-Assessment Safety Culture

1. Pemenuhan Seluruh Kriteria Proper: 1. Fulfillment of All Proper Criteria:

a. Proper Biru

a. Blue Proper

b. Proper Hijau

b. Green Proper

1.1. Internal Audit

c. Proper Emas

c. Gold Proper

Laporan Tahunan 2012 Annual Report PT Pupuk Indonesia (Persero)