PRARANCANGAN PABRIK PARAXYLENE DARI PROSES SELEKTIVITAS DISPROPORSIONASI TOLUENE
DENGAN KAPASITAS 300.000 TONTAHUN
BAB III SPESIFIKASI PERALATAN PROSES
3.1. Tangki Penyimpanan Bahan Baku Toluene T-01
Fungsi : Menyimpan
~
ol
C
6
H
5
CH
3
dalam bentuk cair sebagai bahan baku
Jumlah : 10 buah
Tipe : Tangki silinder tegak dengan dasar datar flat
bottom dan conical head roof Bahan konstruksi
: Carbon steel SA 283 grade C Kapasitas
: 70789,776 m
3
Kondisi operasi
Suhu : 30˚C
Tekanan : 1 atm
Kondisi penyimpanan : cair Waktu penyimpanan
: 1 bulan Dimensi
: Diameter
= 90 ft = 27,432 m
Tebal
ll =
Course 1 = 2 in = 0,0508 m
Course 2 = 1,875 in = 0,0476 m
Course 3 = 1.75 in = 0,0445 m
Course 4 = 1,625 in = 0,0413 m
commit to user
48
PRARANCANGAN PABRIK PARAXYLENE DARI PROSES SELEKTIVITAS DISPROPORSIONASI TOLUENE
DENGAN KAPASITAS 300.000 TONTAHUN
Course 5 = 1.5 in = 0,0381 m
Course 6 = 1,375 in = 0,0349 m
Course 7 = 1,125 in = 0.0286 m
Course 8 = 1,125 in = 0.0286 m
3.2. Tangki Penyimpanan Produk Benzene T-02
Fungsi : Menyimpan Benzene C
6
H
6
Jumlah : 2 buah
Tipe : Tangki silinder tegak dengan dasar datar flat
bottom dan conical head roof Bahan konstruksi
: Carbon steel SA 283 grade C Kapasitas
: 26326,88 m
3
Dimensi :
Diameter = 160 ft
= 48.7686 m Tebal
ll =
Course 1 = 2,75 in = 0,0699 m Course 2 = 2,5 in = 0,0635 m
Course 3 = 2,5 in = 0,0635 m Course 4 = 2,25 in = 0,0572 m
Course 5 =1.875 in = 0,0476 m
Kondisi operasi
Suhu : 30˚C
Tekanan : 1 atm
commit to user
49
PRARANCANGAN PABRIK PARAXYLENE DARI PROSES SELEKTIVITAS DISPROPORSIONASI TOLUENE
DENGAN KAPASITAS 300.000 TONTAHUN
Kondisi penyimpanan : cair Waktu penyimpanan
: 1 bulan
3.3. Tangki Penyimpanan Produk Paraxylene T-03
Fungsi : Menyimpan Produk
yl
p-C
8
H
10
Jumlah : 5 buah
Tipe : Tangki silinder tegak dengan dasar datar flat
bottom dan conical head roof Bahan konstruksi
: Carbon steel SA 283 grade C Kapasitas
: 25326,18 m
3
Kondisi operasi
Suhu : 30˚C
Tekanan : 1 atm
Kondisi penyimpanan : cair Waktu penyimpanan
: 1 bulan Dimensi
: Diameter
= 90 ft = 27,4323 m
Tebal
ll =
Course 1 = 3 in = 0,0762 m Course 2 = 2,75 in = 0,0699 m
Course 3 = 2,5 in = 0,0635 m Course 4 = 2,5 in = 0,0635 m
Course 5 = 2,25 in = 0,0572 m
commit to user
50
PRARANCANGAN PABRIK PARAXYLENE DARI PROSES SELEKTIVITAS DISPROPORSIONASI TOLUENE
DENGAN KAPASITAS 300.000 TONTAHUN
3.4. Reaktor