Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

Lampiran 1

Tabel Produksi Pengiriman dan Biaya Pengadaan CPO (Crude Palm Oil) PT. Bakrie Sumatera Plantation Tbk 2013
2013
Bulan

Produksi
(kg)
3.665.976
2.441.271
2.308.126
3.572.280
3.932.497
4.086.113
4.159.974
4.911.691
3.949.379
4.676.651
4.205.581
4.261.917


Penyaluran
(kg)
jan
3.277.270
feb
2.738.298
mar
2.053.640
apr
3.718.379
mei
3.660.508
jun
3.883.957
jul
4.371.377
agst
4.896.220
sep
4.103.092

okt
4.413.340
nov
4.454.603
des
3.825.111
jumlah
46.171.456
45.395.795
Sumber : PT.Bakrie Sumatera Plantation Tbk

Stok
(kg)
388.706
91.679
346.165
200.066
472.055
674.211
462.808

495.670
341.957
605.268
339.248
717.212
5.135.045

Pengadaan Produksi
(Rp)
5.924.155.125
8.374.747.101
8.971.748.071
13.306.868.053
15.599.035.862
19.492.138.948
17.271.879.264
18.765.882.733
15.769.249.900
18.844.615.578
17.123.476.805

21.583.771.750
181.027.569.190

35

Lampiran 2

Tabel Produksi Pengiriman dan Biaya Pengadaan CPO (Crude Palm Oil) PT. Bakrie Sumatera Plantation Tbk 2014
2014
Bulan
jan
feb
mar
apr
mei
jun
jul
agst
sep
okt

nov
des
jumlah

Produksi
(kg)
5.097.800
2.947.266
3.785.179
4.217.214
3.893.900
4.130.310
5.385.508
4.904.279
5.048.076
4.794.621
5.173.030
5.244.122
54.583.495


Penyaluran
(kg)
4.610.181
2.907.990
3.821.710
4.317.490
3.641.726
4.197.570
5.091.540
4.857.001
5.571.832
4.794.621
5.011.058
5.413.094
54.235.813

Stok
(kg)
449.809
489.085

452.554
318.730
370.904
303.144
434.972
491.730
168.972
3.479.900

Pengadaan Produksi
(Rp)
20.858.042.545
15.342.877.927
17.398.434.655
19.505.972.301
17.413.734.276
16.857.199.870
23.080.479.919
16.613.851.320
19.758.759.192

19.433.087.350
23.220.685.484
23.641.736.126
233.124.860.965

Sumber: PT. Bakrie Sumatera Plantation Tbk

36

Lampiran 3
. Uji Kenormalan Data Penyaluran CPO periode 2013



No



S(Zi)


|



|

1

3277270

-505712.917

255745554083.51 -0.67

0.2486 0.2514 0.250

0.001

2


2738298

-1044684.917

1091366575110.84 -1.38

0.4162 0.0838 0.167

0.083

3

2053640

-1729342.917

2990626923425.17 -2.28

0.4487 0.0513 0.083


0.032

4

3718379

-64603.917

4173666048.67 -0.09

0.0359 0.4641 0.417

0.047

5

3660508

-122474.917

15000105212.51 -0.16

0.0636 0.4362 0.333

0.103

6

3883957

100974.083

10195765505.01

0.13

0.0517 0.5517 0.583

0.032

7

4371377

588394.083

346207597301.67

0.78

0.2823 0.7823 0.750

0.032

8

4896220

1113237.083

1239296803708.51

1.47

0.4292 0.9292 1.000

0.071

9

4103092

320109.083

102469825232.51

0.42

0.1628 0.6628 0.667

0.004

10

4413340

630357.083

397350052508.51

0.83

0.2967 0.7967 0.833

0.037

11

4454603

671620.083

451073536336.67

0.89

0.3133 0.8133 0.917

0.103

12

3825111

42128.083

1774775405.34

0.06

0.0239 0.5239 0.500

0.024

Σ

45395795

mean

6905281179878.92

3782982.92

37

Lampiran 4
Uji Kenormalan Data Penyaluran (CPO) periode 2014


No
1
2
3
4
5
6
7
8
9
10
11
12
Σ
mean

S(Zi)



||



|

4610181

90529.917

8195665811.67

0.12

0.0478

0.5478

0.500

0.047

2907990

-1611661.083

2597451447531.17

-2.16

0.4846

0.0154

0.083

0.067

3821710

-697941.083

487121755804.51

-0.94

0.3264

0.1736

0.250

0.076

4317490

-202161.083

40869103614.51

-0.27

0.1064

0.3936

0.416

0.023

3641726

-877925.083

770752451945.84

-1.18

0.381

0.119

0.166

0.047

4197570

-322081.083

103736224241.17

-0.43

0.1664

0.3336

0.333

0.000

5091540

571888.917

327056933006.17

0.77

0.2794

0.7794

0.833

0.053

4857001

337349.917

113804966275.01

0.45

0.1736

0.6736

0.666

0.006

5571832

1052180.917

1107084681397.51

1.41

0.4207

0.9207

1.000

0.079

4794621

274969.917

75608455071.67

0.37

0.1443

0.6443

0.583

0.061

5011058

491406.917

241480757747.84

0.66

0.2454

0.7454

0.750

0.004

5413094
54235813

893442.917

798240245341.84
6671402687788.92

1.20

0.3849

0.8849

0.916

0.031

4519651.08

38

Lampiran 5.
Jadwal Penelitian
NO

KEGIATAN

1

Studi pustaka

2

Penyusunan proposal

3

Seminar proposal

4

Perbaikan proposal

5

Pengumpulan dan pengolahan data

6

Penyusunan skripsi

7

Seminar hasil

8

Perbaikan skripsi

9

Penyusunan intisari skripsi untuk dimasukkan
ke jurnal

10

Tahap akhir penyusunan skripsi (Sidang)

JANUARI FEBRUARI

BULAN
MARET APRIL

MEI

JUNI

JULI

39

Dokumen yang terkait

Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

5 70 53

Pengendalian Produksi Crude Palm Oil dengan Menggunakan Metode Economic Production Quantity (EPQ) (Studi Kasus: PT. Perkebunan Nusantara III Medan)

5 30 63

PENGENDALIAN PERSEDIAAN PRODUKSI CRUDE PALM OIL (CPO) MENGGUNAKAN MODEL ECONOMIC PRODUCTION QUANTITY (EPQ) PADA PKS PT. PERKEBUNAN SUMATERA UTARA.

6 34 21

Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

0 0 12

Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

0 0 2

Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

1 1 7

Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

0 0 10

Analisis Pengendalian Tingkat Produksi Optimal Crude Palm Oil (CPO) Dengan Metode EPQ (Economic Production Quantity) (Studi Kasus: PT. Bakrie Sumatera Plantation Tbk)

0 0 1

Pengendalian Produksi Crude Palm Oil dengan Menggunakan Metode Economic Production Quantity (EPQ) (Studi Kasus: PT. Perkebunan Nusantara III Medan)

0 0 12

Pengendalian Produksi Crude Palm Oil dengan Menggunakan Metode Economic Production Quantity (EPQ) (Studi Kasus: PT. Perkebunan Nusantara III Medan)

0 0 2