River Information’s Monitoring Site Stakeholders Information The Cases of Environmental Problems

83

4.8.3.11 River Information’s

Information’s on rivers consist of the river-name, river-class, sub basin and basin which are related to each other. Figure 42 shows the information of rivers located in Upper Citarum River Basin. Figure 42 . Information of River

4.8.3.12 Monitoring Site

Monitoring sites are located at the river as point of reference in measurement or taking of water sampling. The position of the monitoring site should be exact, therefore geographical positions Latitude, Longitude and also Altitude are needed as presented in Figure 43 . Figure 43 . The Information of Monitoring Site 84 Figure 43 shows that each monitoring site has a special code referring to the methodology, and also a detailed information of location, for instance: CTR-8.1.1 located in Cikapundung-Dayeuhkolot, Dayeuhkolot Village, Dayeuhkolot Sub District, Bandung Regency Latitude: 6 o 59’3” S, Longitude: 107 o 37’47” W, Altitude: 690 m above sea level. The detailed information of monitoring site including the edited form as presented in Figure 44. Figure 44 . Edited Form of Monitoring Site

4.8.3.13 Stakeholders Information

Stakeholders’ information is needed to develop the networking in case of response-reaction for special cases as contact person or personal in charge. Stakeholders consist of several components of the community, e.g. government, publics or private, NGO, industry, etc Figure 45. Figure 45 . The Stakeholders Information 85 This information will be useful if a special case of environmental problem occurred. Collaboration, coordination and networking can be improved intensively based on stakeholder information’s.

4.8.3.14 The Cases of Environmental Problems

The cases of environmental problems can be recorded by the systems. The form consists of some information’s such as date of case, title, industry name and descriptions. The other information’s are the date of solving, coordinator name, treatmentsolving, recommendation, and information of stakeholders. Figure 46 . Information on Cases Management

4.8.3.15 Superkasih Level of Compliance