commit to user 48
Tugas akhir 48
Perencanaan Struktur Gedung Lembaga Pendidikan dan Keterampilan 2 lantai
Bab 3 Perencanaan Atap
Yosep Denica K I8508078
=
2 .
xtz su
a y
+
=
5 ,
1 2
26 ,
2 76
, x
+
= 2,265 m
2
· Luas plafond b’ y.a’
=½. ya. b’z =½. 0,76.0,76 =0,2888 m
2
3.5.3. Perhitungan Pembebanan Setengah Kuda-kuda
Data-data pembebanan : Berat gording
= 11 kgm sumber : tabel baja dengan profil lip channels 150 x 75 x 20 x 4,5
Jarak antar kuda-kuda = 4,00 m sumber : gambar perencanaan Berat penutup atap
= 50 kgm
2
Genteng; sumber : PPIUG 1989 Beban hujan
= 40- 0, 8α kgm
2
= 40 – 0,8.30 = 16 kgm
2
Berat profil kuda-kuda = 6,76 kgm
2
commit to user 49
Tugas akhir 49
Perencanaan Struktur Gedung Lembaga Pendidikan dan Keterampilan 2 lantai
Bab 3 Perencanaan Atap
Yosep Denica K I8508078
1 2
3 4
5 6
7 8
9 1 0
1 2 1 3
1 4 1 5
P 1 P 2
P 3 P 4
P 5
P 6 P 7
P 8 P 9
1 1
Gambar 3.10 . Pembebanan Setengah Kuda-kuda akibat beban mati
Perhitungan Beban a.
Beban Mati
1 Beban P
1
a Beban gording = 66 kg
b Beban atap = 616 kg
c Beban kuda-kuda =21,77 kg
d Beban plat sambung = 6,53kg e Beban bracing
= 2,177 kg f. Beban plafon
= 191,992 kg
2 Beban P
2
a Beban gording = 49,5 kg
b Beban atap = 453,255 kg
c. Beban kuda-kuda =40,844 kg
d. Beban plat sambung = 12,25 kg e. Beban bracing
= 4,0844 kg
commit to user 50
Tugas akhir 50
Perencanaan Struktur Gedung Lembaga Pendidikan dan Keterampilan 2 lantai
Bab 3 Perencanaan Atap
Yosep Denica K I8508078
3 Beban P
3
a Beban gording = 33 kg
b Beban atap = 302,505 kg
c. Beban kuda-kuda =50,4152 kg
d Beban plat sambung = 15,125 kg e Beban bracing
= 5,04152 kg
4 Beban P
4
a Beban atap = 151,755 kg
b. Beban kuda-kuda = 61,064 kg
c. Beban bracing = 6,1064 kg
d. Beban plat sambung = 18,319 kg e Beban gording
= 16,5 kg
5 Beban P
5
a. Beban kuda-kuda =34,98 kg
b Beban bracing = 3,498 kg
c Beban atap = 16,5kg
d Beban plat sambung = 10,49 kg
6 Beban P
6
a. Beban kuda-kuda =28,084 kg
b Beban bracing = 2,8084 kg
c Beban plafon = 121,635 kg
d Beban plat sambung = 7,83 kg
7 Beban P
7
a. Beban kuda-kuda =43,54 kg
b Beban bracing = 4,354 kg
c Beban plafon = 81,27 kg
d Beban plat sambung = 13,06 kg
commit to user 51
Tugas akhir 51
Perencanaan Struktur Gedung Lembaga Pendidikan dan Keterampilan 2 lantai
Bab 3 Perencanaan Atap
Yosep Denica K I8508078
8 Beban P
8
a. Beban kuda-kuda =53,179 kg b Beban bracing
= 5,3179 kg c Beban plafon
= 40,77 kg d Beban plat sambung = 15,95 kg
9 Beban P
9
a. Beban kuda-kuda =53,8526 kg
b Beban bracing = 5,38526 kg
c Beban plafon = 5,1984 kg
d Beban plat sambung = 16,16 kg
Tabel 3.8. Rekapitulasi Pembebanan Setengah Kuda-kuda
Beban Beban
Atap kg
Beban gordin
g kg
Beban Bracing kg
Beban Plat Penyambung
kg Beban
Plafon kg
Jumlah Beban
kg Input
SAP 2000
kg P1
533,1 66
2,177 6,53
191,992 799,799
800 P2
337,875 49,5
4,0844 12,25
- 403,7094
404 P3
225,75 33
5,04152 15,125
- 27,89
28 P4
13,25 16,5
6,1064 18,319
- 48,07
49 P5
14,4 -
3,498 10,49
- 28,39
29 P6
- -
2,8084 7,83
121,635 132,273
133 P7
- -
4,354 13,06
81,27 98,68
99 P8
- -
5,3179 15,95
40,77 62,04
63 P9
- -
5,38526 16,16
5,1984 26,7
27
a. Beban Hidup