Cooling Yard A-101 Mixing Point M-102 Gas Turbine JJ-201 Steam Boiler E-201 Steam Turbine JJ-202 Gudang Penyimpanan FePO

H 2 O 7.137,8942 3.721.043,2095 - 7.401.502,9396 N 2 - 22.986.992,0204 - 13.713.556,8035 CO 2 - 1.551.678,4385 - 1.231.122,8678 Jumlah 332.962,9448 29.628.401,6133 666.2154,0641 23.299.210,4939 Sub Total 29.961.364,5581 29.961.364,5581 Total 29.961.364,5581 29.961.364,5581

4.5 Electric Furnace B-103

Tabel 4.5 Neraca Panas Electric Furnace B-103 Komponen Masuk kJjam Keluar kJjam H 15 H 16 H 17 H 18 SiO 2 4.007.033,8625 - - 383.393,0281 C 2.510.690,8311 - - 356.468,8006 FePO 4 56.396,8703 - - 214.863,0053 Na 2 O 88.032,5002 - - 328.883,9479 SiC - - - 6.298.498,8766 O 2 - 12.105,1121 - - N 2 - 57.577,1166 37.057.546,7412 - CO 2 - 11.774.571,9283 - Jumlah 6.662.154,0641 69.682,2287 48.832.118,6695 7.582.107,6585 Sub Total 6.731.836,2929 56.414.226,3280 ∆Hr 4.692.961,5647 - Q 44.989.428,4704 - Total 56.414.226,3280 56.414.226,3280

4.6 Cooling Yard A-101

Tabel 4.6 Neraca Panas pada Cooling Yard A-101 UNIVERSITAS SUMATERA UTARA Komponen Q in kJjam Q out kJjam Umpan 7.582.107,6585 - Produk - 96.114,6300 Udara - 7.485.993,0285 Total 7.582.107,6585 7.582.107,6585

4.7 Mixing Point M-102

Tabel 4.7 Neraca Panas Mixing Point M-102 Komponen Masuk kJjam Keluar kJjam H 22 H 23 H 24 O 2 953.027,8831 1.667.505,3763 H 2 O 7.427.193,9471 8.128.105,6669 N 2 13.713.556,8035 37.057.546,7412 52.175.099,9145 CO 2 1.231.122,8678 11.774.571,9283 10.186.309,2133 Jumlah 23.324.901,5015 48.832.118,6695 72.157.020,1709 Sub Total 72.157.020,1709 72.157.020,1709 ∆Hr - Q - Total 72157020.1709 72.157.020,1709

4.8 Gas Turbine JJ-201

Tabel 4.8 Neraca Panas Gas Turbine JJ-201 Komponen Masuk kJjam Keluar kJjam H 24 H 25 O 2 1.667.505,3763 911.312,2941 H 2 O 8.128.105,6669 7.203.565,6160 UNIVERSITAS SUMATERA UTARA N 2 52.175.099,9145 21.514.581,4122 CO 2 10.186.309,2133 5.381.293,3871 Jumlah 72.157.020,1709 35.010.752,7095 W 17.317.828,1748 ∆Hr - - Q - 19.828.439,2866 Total 72.157.020,1709 72.157.020,1709

4.9 Steam Boiler E-201

Tabel 4.9 Neraca Panas Steam Boiler E-201 Komponen Masuk kJjam Keluar kJjam H 25 H 26 H 28 H 27 O 2 1.667.505,3763 - - 111.138,3809 CO 2 10.186.309,2133 - - 589.563,7085 N 2 52.175.099,9145 - - 2.019.369,1017 H 2 O 8.128.105,6669 2.983.999,0374 28.258.095,2870 7.016.585,2688 Jumlah 35.010.752,7095 2.983.999,0374 28.258.095,2870 9.736.656,4599 Sub Total 37.994.751,7469 37.994.751,7469 ∆Hr - - Q - - Total 37.994.751,7469 37.994.751,7469

4.10 Steam Turbine JJ-202

Tabel 4.10 Neraca Panas Steam Turbine JJ-202 Komponen Masuk kJjam Keluar kJjam H 28 H 29 H 2 O 28258095.2870 22774138.5000 UNIVERSITAS SUMATERA UTARA Jumlah 28258095.2870 22774138.5000 Sub Total 28258095.2870 22774138.5000 W - 11146112.8575 ∆Hr - - Q 5662156.0705 - Total 33920251.3575 33920251.3575 LAMPIRAN C SPESIFIKASI PERALATAN

5.1 Gudang Penyimpanan FePO

4 TT-101 Fungsi : Menyimpan bahan-bahan FePO 4 sebelum diproses selama 30 hari. Jenis : Gedung berbentuk balok dengan atap berbentuk limas. Bahan Kontruksi : Bangunan Beton Kondisi : Tekanan : 1 atm Suhu : 30 C Kapasitas : 21,4983 m 3 Ukuran : Panjang = 4 m Lebar = 4 m Tinggi = 5 m

5.2 Gudang Penyimpanan Pasir Silika SiO