H
2
O 7.137,8942
3.721.043,2095 -
7.401.502,9396 N
2
- 22.986.992,0204
- 13.713.556,8035
CO
2
- 1.551.678,4385
- 1.231.122,8678
Jumlah 332.962,9448 29.628.401,6133
666.2154,0641 23.299.210,4939
Sub Total 29.961.364,5581
29.961.364,5581
Total 29.961.364,5581
29.961.364,5581
4.5 Electric Furnace B-103
Tabel 4.5 Neraca Panas Electric Furnace B-103
Komponen Masuk kJjam
Keluar kJjam H
15
H
16
H
17
H
18
SiO
2
4.007.033,8625 -
- 383.393,0281
C 2.510.690,8311
- -
356.468,8006 FePO
4
56.396,8703 -
- 214.863,0053
Na
2
O 88.032,5002
- -
328.883,9479 SiC
- -
- 6.298.498,8766
O
2
- 12.105,1121
- -
N
2
- 57.577,1166
37.057.546,7412 -
CO
2
- 11.774.571,9283
-
Jumlah 6.662.154,0641 69.682,2287
48.832.118,6695 7.582.107,6585
Sub Total 6.731.836,2929
56.414.226,3280 ∆Hr
4.692.961,5647 -
Q 44.989.428,4704
- Total
56.414.226,3280 56.414.226,3280
4.6 Cooling Yard A-101
Tabel 4.6 Neraca Panas pada Cooling Yard A-101
UNIVERSITAS SUMATERA UTARA
Komponen Q
in
kJjam Q
out
kJjam
Umpan 7.582.107,6585
- Produk
- 96.114,6300
Udara -
7.485.993,0285 Total
7.582.107,6585 7.582.107,6585
4.7 Mixing Point M-102
Tabel 4.7 Neraca Panas Mixing Point M-102 Komponen
Masuk kJjam Keluar kJjam
H
22
H
23
H
24
O
2
953.027,8831 1.667.505,3763
H
2
O 7.427.193,9471
8.128.105,6669 N
2
13.713.556,8035 37.057.546,7412
52.175.099,9145 CO
2
1.231.122,8678 11.774.571,9283
10.186.309,2133 Jumlah
23.324.901,5015 48.832.118,6695
72.157.020,1709 Sub Total
72.157.020,1709 72.157.020,1709
∆Hr -
Q -
Total 72157020.1709
72.157.020,1709
4.8 Gas Turbine JJ-201
Tabel 4.8 Neraca Panas Gas Turbine JJ-201
Komponen Masuk kJjam
Keluar kJjam H
24
H
25
O
2
1.667.505,3763 911.312,2941
H
2
O 8.128.105,6669
7.203.565,6160
UNIVERSITAS SUMATERA UTARA
N
2
52.175.099,9145 21.514.581,4122
CO
2
10.186.309,2133 5.381.293,3871
Jumlah 72.157.020,1709
35.010.752,7095 W
17.317.828,1748 ∆Hr
- -
Q -
19.828.439,2866
Total 72.157.020,1709
72.157.020,1709
4.9 Steam Boiler E-201
Tabel 4.9 Neraca Panas Steam Boiler E-201
Komponen Masuk kJjam
Keluar kJjam H
25
H
26
H
28
H
27
O
2
1.667.505,3763 -
- 111.138,3809
CO
2
10.186.309,2133 -
- 589.563,7085
N
2
52.175.099,9145 -
- 2.019.369,1017
H
2
O 8.128.105,6669 2.983.999,0374 28.258.095,2870 7.016.585,2688
Jumlah 35.010.752,7095 2.983.999,0374 28.258.095,2870 9.736.656,4599
Sub Total 37.994.751,7469
37.994.751,7469 ∆Hr
- -
Q -
- Total
37.994.751,7469 37.994.751,7469
4.10 Steam Turbine JJ-202
Tabel 4.10 Neraca Panas Steam Turbine JJ-202
Komponen Masuk kJjam
Keluar kJjam H
28
H
29
H
2
O 28258095.2870
22774138.5000
UNIVERSITAS SUMATERA UTARA
Jumlah 28258095.2870
22774138.5000 Sub Total
28258095.2870 22774138.5000
W -
11146112.8575 ∆Hr
- -
Q 5662156.0705
- Total
33920251.3575 33920251.3575
LAMPIRAN C SPESIFIKASI PERALATAN
5.1 Gudang Penyimpanan FePO
4
TT-101
Fungsi :
Menyimpan bahan-bahan FePO
4
sebelum diproses selama 30 hari.
Jenis :
Gedung berbentuk balok dengan atap berbentuk limas.
Bahan Kontruksi :
Bangunan Beton Kondisi
: Tekanan
: 1 atm Suhu
: 30 C
Kapasitas :
21,4983 m
3
Ukuran : Panjang
= 4 m Lebar
= 4 m Tinggi
= 5 m
5.2 Gudang Penyimpanan Pasir Silika SiO