5.1 Typical Potongan Melintang
Gambar 5.1 Potongan Melintang Jalan
5.2 Analisa Penghitungan Volume Pekerjaan
5.2.1 Penghitungan Volume Pekerjaan Tanah
1. Pembersihan Semak dan Pengupasan Tanah. Luas
= p. Rumija x p. Jalan = 10 m x 3.058,033 m
= 30.580,033 m² 2. Persiapan Badan Jalan m² .
Luas = Lebar lapis pondasi bawah x Panjang jalan
= 8,59 m x 3.058,033 m . = 26.268,503 m²
commit to user
3. Galian Tanah Biasa m³ Contoh penghitungan : STA 0+750
Gambar 5.2 Tipical Cross Section STA 0+750
H1 = 78,352 – 76,841 = 1,511
H2 = 78,28 – 76,841 = 1,439
H3 = 78,222– 76,921 = 1,301
H4 = 78,123 – 76,991 = 1,132
H5 = 78,02 – 76,921 = 1,099
H6 = 77,962 – 76,841 = 1,121
H7 = 77,89 – 76,841 = 1,049
¤ Perhitungan Luas
2
58 ,
1 2
1 1
m H
alas Luas
2
688 ,
4 5
, 2
2 2
1 2
m H
H Luas
2
74 ,
2 2
2 3
2 3
m H
H Luas
2
258 ,
4 5
, 3
2 4
3 4
m H
H Luas
STA 0+800
78,123 78,410
77,835
- 4 - 2
- 2 - 4
Bahu Jalan
200 cm 2 x 350 cm
Lebar Perkerasan
Bahu Jalan
200 cm 150 cm
Drainase
150 cm
Drainase 50 cm
50 cm 2 :
1 76,991
78,368 78,352
78,28 78,222
78,02 77,962
77,89 77,876
76,921 76,841
76,841 76,921
76,841 76,841
2 1
10 3
4 5
6 7
8 9
0,768 alas
0,518 alas
STA 1+750
commit to user
2
904 ,
3 5
, 3
2 5
4 5
m H
H Luas
2
22 ,
2 2
2 6
5 6
m H
H Luas
2
713 ,
2 5
, 2
2 7
6 7
m H
H Luas
2
272 ,
7 2
1 8
m H
alas Luas
2
m 24,375
Galian
Total
L
¤ Perhitungan Volume
Luas Total Galian Sta 0+750 = 24,375 m
2
Luas Total Galian Sta 0+800 = 21,949 m
2
Volume galian pada Sta 0+750 sampai Sta 0+800 adalah Volume galian =
50 2
800 750
sta galian
luas sta
galian luas
=
50 2
949 ,
21 375
, 24
= 1.158,1 m
3
commit to user
4. Timbunan Tanah Biasa m³ Contoh penghitungan : STA 1+850
Gambar 5.3 Tipical Cross Section STA 1+850
H1 = 76,551 – 75,743 = 0,808
H2 = 76,631 – 75,65 = 0,981
H3 = 76,701- 75,488 = 1,213
H4 = 76,631 – 75,326 = 1,305
H5 = 76,551 – 75,233 = 1,318
¤
Perhitungan Luas
2
31 ,
1 2
1 1
m H
alas Luas
2
485 ,
1 2
78 ,
78 ,
2 2
2 1
2 m
H H
Luas
2
84 ,
3 5
, 3
2 3
2 3
m H
H Luas
2
407 ,
4 5
, 3
2 4
3 4
m H
H Luas
STA 1+900
75,488 75,951
75,024 76,701
- 4 - 2
- 2 - 4
Bahu Jalan
200 cm 2 x 350 cm
Lebar Perkerasan
Bahu Jalan
200 cm 150 cm
Drainase
150 cm
Drainase 50 cm
50 cm 2 :
1 Dinding
Penahan Dinding
Penahan
76,631 76,551
76,631 76,551
75,326 75,233
75,65 75,743
1 2
3 4
5 6
0,688 alas
0,402 alas
STA 1+850
commit to user
2
319 ,
2 2
78 ,
78 ,
2 2
5 4
5 m
H H
Luas
2
453 ,
5 2
1 6
m H
alas Luas
2
12,814m Timbunan
Ltotal
¤ Perhitungan Volume
Luas Total Timbunan Sta 1+850 = 12,814 m
2
Luas Total Timbunan Sta 1+900 = 1,507 m
2
Volume timbunan pada Sta 1+850 sampai Sta 1+900 adalah Volume Timbunan =
50 2
900 1
850 1
sta timbunan
luas sta
timbunan luas
=
50 2
507 ,
1 814
, 12
= 350,025 m
3
Untuk hasil penghitungan selanjutnya disajikan dalam Tabel 5.1
commit to user
Tabel. 5.1 Hasil Penghitungan Volume Galian dan Timbunan
NO STA
JARAK LUAS m
2
VOLUME m
3
m GALIAN
TIMBUNAN GALIAN
TIMBUNAN
1 0+000
4,628 0,394
50 165,700
15,890 2
0+050 2,000
0,242 50
126,165 14,430
3 0+100
3,047 0,335
50 185,508
10,580 4
0+150 4,374
0,088 45,851
227,951 2,013
5 0+195,851
5,569 4,149
18,532 0,543
6 0+200
55,549 24,148
711,311 7
0+224,184 3,364
0,262 25,816
133,567 3,378
8 0+250
7,306 2,517
17,983 56,352
9 0+252,517
6,984 28,333
127,515 634,333
10 0+280,85
2,017 44,777
198,481 586,462
4519,134 11
0+300 3,892
0,760 50
220,465 31,985
12 0+350
4,926 0,519
50 186,403
36,263 13
0+400 2,530
0,931 50
191,025 48,773
14 0+450
5,111 1,020
24,331 126,020
24,413 15
0+479,331 5,248
0,987 28,333
224,482 13,984
16 0+500
5,364 0,523
7,664 61,167
2,004 17
0+507,664 10,598
28,333 207,413
2,954 18
0+535,997 4,043
0,209 28,333
240,731 2,954
19 0+550
8,603 14,33
154,432 0,000
Bersambung
commit to user
Sambungan Dari Tabel 5.1
NO STA
JARAK LUAS m
2
VOLUME m
3
m GALIAN
TIMBUNAN GALIAN
TIMBUNAN
20 0+564,33
12,950 35,67
617,813 21
0+600 21,690
50 1156,090
22 0+650
24,553 50
1241,198 23
0+700 25,095
50 1236,738
24 0+750
24,375 50
1158,110 25
0+800 21,949
50 978,113
26 0+850
17,175 50
542,813 27
0+900 4,537
50 216,985
28 0+950
4,142 50
321,705 29
1+000 8,726
50 677,430
30 1+050
18,371 50
671,055 31
1+100 8,471
50 330,118
32 1+150
4,734 50
204,725 33
1+200 3,456
50 381,290
34 1+250
11,796 50
589,805 35
1+300 11,796
50 715,318
36 1+350
16,817 50
580,568 37
1+400 6,406
11,56 69,382
38 1+416,56
5,598 25
127,545
Bersambung
commit to user
Sambungan Dari Tabel 5.1
NO STA
JARAK LUAS m
2
VOLUME m
3
m GALIAN
TIMBUNAN GALIAN
TIMBUNAN
39 1+441,56
4,606 8,44
40,043 0,851
40 1+450
4,883 0,202
16,56 76,138
4,548 41
1+466,56 4,312
0,348 25
116,276 8,690
42 1+491,560
4,990 0,348
8,44 38,780
4,085 43
1+500 4,200
0,621 6,12
24,926 3,972
44 1+506,120
3,946 0,678
25 95,881
15,049 45
1+531,123 3,725
0,526 18,877
71,304 9,119
46 1+550
3,830 0,440
6,123 22,427
2,914 47
1+556,123 3,496
0,512 25
80,766 12,900
48 1+581,123
2,966 0,520
18,877 54,234
10,134 49
1+600 2,780
0,554 50
113,338 54,635
50 1+650
1,753 1,632
50 91,795
123,320 51
1+700 1,919
3,301 50
100,895 185,748
52 1+750
2,117 4,129
50 105,603
211,428 53
1+800 2,107
4,328 50
104,290 428,555
54 1+850
2,065 12,814
50 102,538
350,025 55
1+900 2,037
1,507 50
110,120 37,663
56 1+950
2,368 50
303,558 57
2+000 9,774
50 389,133
14,120
Bersambung
commit to user
Sambungan Dari Tabel 5.1
NO STA
JARAK LUAS m
2
VOLUME m
3
m GALIAN
TIMBUNAN GALIAN
TIMBUNAN
58 2+050
5,791 0,565
50 302,138
24,138 59
2+100 6,295
0,401 50
469,593 10,018
60 2+150
12,489 2,148
26,569 0,000
61 2+152,148
12,249 25
268,210 0,000
62 2+177,148
9,208 22,852
189,356 0,000
63 2+200
7,365 2,148
15,491 0,000
64 2+202,148
7,059 25
155,505 65
2+227,148 5,382
22,852 104,470
0,000 66
2+250 3,761
50 259,048
0,000 67
3+300 6,601
49,125 323,854
0,000 68
2+349,125 6,584
0,875 5,090
0,000 69
2+350 5,050
24,125 116,159
8,081 70
2+374,125 4,580
0,670 25
111,355 22,945
71 2+399,125
4,328 1,166
0,875 3,791
1,021 72
2+400 4,338
1,167 24,125
119,707 22,554
73 2+424,125
5,586 0,703
25,875 122,153
31,569 74
2+450 3,856
1,738 50
146,588 285,358
75 2+500
2,008 9,677
50 102,050
285,158 76
2+550 2,075
1,730 50
107,728 67,293
Bersambung
commit to user
Sambungan Dari Tabel 5.1
NO STA
JARAK LUAS m
2
VOLUME m
3
m GALIAN
TIMBUNAN GALIAN
TIMBUNAN
77 2+600
2,235 0,962
50 135,305
31,348 78
2+650 3,178
0,292 50
193,213 7,293
79 2+700
4,551 50
204,850 80
2+750 3,643
50 274,483
81 2+800
7,336 50
276,528 2,420
82 2+850
3,725 0,097
50 200,115
7,088 83
2+900 4,280
0,187 50
165,808 9,850
84 2+950
2,353 0,207
50 174,403
5,183 85
3+000 4,624
50 289,538
86 3+050
6,958 50
264,210 2,150
87 3+100
3,610 0,086
Total Volume Galian = 22.898,976 m
3
Total Volume Timbunan = 7.729,186 m
3
5.2.2 Penghitungan Volume Pekerjaan Drainase