commit to user
Sambungan Dari Tabel 5.1
NO STA
JARAK LUAS m
2
VOLUME m
3
m GALIAN
TIMBUNAN GALIAN
TIMBUNAN
77 2+600
2,235 0,962
50 135,305
31,348 78
2+650 3,178
0,292 50
193,213 7,293
79 2+700
4,551 50
204,850 80
2+750 3,643
50 274,483
81 2+800
7,336 50
276,528 2,420
82 2+850
3,725 0,097
50 200,115
7,088 83
2+900 4,280
0,187 50
165,808 9,850
84 2+950
2,353 0,207
50 174,403
5,183 85
3+000 4,624
50 289,538
86 3+050
6,958 50
264,210 2,150
87 3+100
3,610 0,086
Total Volume Galian = 22.898,976 m
3
Total Volume Timbunan = 7.729,186 m
3
5.2.2 Penghitungan Volume Pekerjaan Drainase
1. Galian Saluran
Gambar 5.4 Sket Volume Galian Saluran
1,5 m
0,5 m 1 m
commit to user
1 2
5 ,
5 ,
1 Luas
2
1 m
Volume galian saluran
2
Drainase Panjang
Luas Volume
3
066 ,
116 .
6 2
3.058,033 1
m
2. Pasangan Batu Dengan Mortar
I II
I
0.2 m 0.2 m
1.5 m
0.3 m
1.5 m 0.2 m
0.8 m
Gambar 5.5 Sket Volume Pasangan Batu
2 2
, 2
, 8
, 2
I uas
L
= 0,32 m
2
2 ,
2 3
, 5
,
II uas
L
= 0,08 m
2
08 ,
32 ,
total uas
L
= 0,4 m
2
drainase Panjang
luastotal Volume
2
= 2 x 0,4 x 3.058,033
= 2.446,426 m
3 0,5 m
commit to user
3. Plesteran Kepala Drainase
Gambar 5.6 Detail Plesteran pada Drainase
Luas = p. plesteran × p. jalan × 2
= 0,20 + 0,1 + 0,05 × 3.058,033 × 2 = 2.140,623 m
2
4. Siaran
h’ =
2 2
30 80
= 85,440 cm = 0,854 m Luas
= Luas daerah siaran × p.jalan × 2 = [2 x 0,854-0,1+0,3]× 3.058,033 × 2
= 11.057,847 m
2 10 cm
5 cm
Pasangan batu 20 cm
Plesteran
10 cm 10 cm
30 cm 30 cm
h = 80 cm h’
commit to user
5.2.3 Penghitungan Volume Pekerjaan Dinding Penahan
Gambar 5.7 Sket Volume Pasangan Batu pada Dinding Penahan
1. Galian Pondasi a. Ruas Kiri
Sta 1+750 sd 1+800 Sta 1+750
H Sta 1+750 = 0,313 m
H5+0,3 = 0,363 m
H6+0,3 = 0,352 m
Luas galian pondasi = 0,363 x 0,352 = 0,128 m
2
Sta 1+800 H Sta 1+800
= 0,381 m H5+0,3
= 0,376 m H6+0,3
= 0,364 m Luas galian pondasi = 0,376 x 0,364 = 0,137 m
2
Volume 1+750 sd 1+800 =
50 2
0,137 0,128
= 6,625 m³
H
H5+0,3 25 cm
H6+0,3
commit to user
b. Ruas Kanan Sta 1+750 sd 1+800
Sta 1+750 H Sta 1+750
= 1,258 m H5+0,3
= 0,552 m H6+0,3
= 0,51 m Luas galian pondasi = 0,51 x 0,552 = 0,281 m
2
Sta 1+800 H Sta 1+800
= 1,256 m H5+0,3
= 0,551 m H6+0,3
= 0,509 m Luas galian pondasi = 0,551 x 0,509 = 0,281 m
2
Volume Sta 1+750 sd 1+800 =
50 2
0,281 0,281
= 14,05 m
3
Perhitungan selanjutnya dapat dilihat pada tabel 5.2 di bawah ini :
162
Tabel 5.2 Hasil Perhitungan Galian Pondasi pada Dinding Penahan
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
1 0+250
30,85 3,902
2 0+280,85
0,452 0,390
0,375 0,147
1,109 0,522
0,485 0,253
19,15 1,403
3,719 3
0+300 0,371
0,374 0,362
0,135 50
6,324 4
0+350 0,234
0,347 0,339
0,118 50
6,627 5
0+400 0,459
0,392 0,377
0,148 50
7,713 6
0+450 0,553
0,411 0,392
0,161 29,331
4,145 7
0+479,331 0,266
0,353 0,344
0,122 28,333
3,440 8
0+500 0,263
0,353 0,344
0,121 7,664
0,465 9
0+507,664 10
1+450 41,56
11 1+491,560
0,331 0,366
0,355 0,130
8,44 1,083
Bersambung
1 6
2
Sambungan tabel 5.2
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
12 1+500
0,305 0,361
0,351 0,127
6,12 0,788
13 1+506,120
0,337 0,367
0,356 0,131
25 3,138
14 1+531,123
0,255 0,351
0,343 0,120
18,877 2,211
15 1+550
0,206 0,341
0,334 0,114
6,123 0,713
16 1+556,123
0,245 0,349
0,341 0,119
25 2,980
17 1+581,123
0,249 0,350
0,342 0,119
18,877 2,273
18 1+600
0,264 0,353
0,344 0,121
50 7,159
19 1+650
0,580 0,416
0,397 0,165
50 3,192
10,947 20
1+700 1,215
0,543 0,503
0,273 50
13,850 21
1+750 0,313
0,363 0,352
0,128 1,258
0,552 0,510
0,281 50
6,625 14,047
Bersambung
1 6
3
Sambungan tabel 5.2
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
22 1+800
0,381 0,376
0,364 0,137
1,256 0,551
0,509 0,281
50 8,357
14,500 23
1+850 0,789
0,458 0,432
0,198 1,35
0,570 0,525
0,299 50
7,781 11,383
24 1+900
0,203 0,341
0,334 0,114
0,519 0,404
0,387 0,156
50 2,843
3,902 25
2+000 26
2+050 50
3,034 27
2+100 0,264
0,353 0,344
0,121 50
3,034 28
2+150 29
2+350 24,125
1,582 30
2+374,125 0,339
0,368 0,357
0,131 25
3,760 31
2+399,125 0,611
0,422 0,402
0,170 0,875
0,149
Bersambung
1 6
4
Sambungan tabel 5.2
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
32 2+400
0,62 0,424
0,403 0,171
24,125 4,430
33 2+424,125
0,781 0,456
0,430 0,196
25,875 5,453
34 2+450
0,954 0,491
0,459 0,225
50 6,893
12,919 35
2+500 1,23
0,546 0,505
0,276 1,311
0,562 0,519
0,292 50
11,496 7,288
36 2+550
0,705 0,441
0,418 0,184
50 8,280
37 2+600
0,456 0,391
0,376 0,147
50 3,677
38 2+650
Volume galian pondasi kiri = 60,534 m
3
Volume galian pondasi kanan = 166,959 m
3
Volume Total galian pondasi = 60,534 + 166,959
= 227,493 m
3
1 6
5
commit to user
166
2. Pasangan Batu untuk Dinding Penahan
a. Ruas Kiri Sta 1+750 sd 1+800
Sta 1+750 Lebar atas
= 0,250 m H Sta 1+750
= 0,313 m H5+0,3
= 0,363 m H6+0,3
= 0,352 m Luas pasangan batu
=
352 ,
363 ,
313 ,
2 352
, 25
,
= 0,222 m
2
Sta 1+800 Lebar atas
= 0,250 m H Sta 1+850
= 0,381 m H5+0,3
= 0,376 m H6+0,3
= 0,364 m Luas pasangan batu
=
0,364 x
0,376 381
, 2
364 ,
25 ,
= 0,254 m
2
Volume pasangan batu =
50 2
254 ,
222 ,
= 11,899 m³
commit to user
b. Ruas Kanan Sta 1+750 sd 1+800
Sta 1+750 Lebar atas
= 0,25 m H Sta 1+750
= 1,258 m H5+0,3
= 0,552 m H6+0,3
= 0,51 m Luas pasangan batu
=
0,552 x
0,51 258
, 1
2 51
, 25
,
= 0,759 m
2
Sta 1+800 Lebar atas
= 0,250 m H Sta 1+800
= 1,256 m H5+0,3
= 0,551 m H6+0,3
= 0,509 m Luas galian pondasi = 0,551 x 0,509 = 0,281 m
2
Luas pasangan batu =
0,509 x
0,551 256
, 1
2 509
, 25
,
= 0,758 m
2
Volume pasangan batu =
50 2
758 ,
0,759
= 37,925 m³ Untuk hasil penghitungan selanjutnya bisa dilihat pada tabel 5.3
168
Tabel 5.3 Hasil Perhitungan Pasangan Batu untuk Dinding Penahan
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas
m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
1 0+250
30,85 10,187
2 0+280,85
0,452 0,390
0,375 0,288
1,109 0,522
0,485 0,660
19,15 2,756
8,707 3
0+300 0,371
0,374 0,362
0,249 50
10,884 4
0+350 0,234
0,347 0,339
0,186 50
11,944 5
0+400 0,459
0,392 0,377
0,291 50
15,747 6
0+450 0,553
0,411 0,392
0,339 29,331
7,908 7
0+479,331 0,266
0,353 0,344
0,201 28,333
5,666 8
0+500 0,263
0,353 0,344
0,199 7,664
0,764 9
0+507,664 10
1+450 41,56
4,784 11
1+491,560 0,331
0,366 0,355
0,230 8,44
1,893
Bersambung
1 6
8
Sambungan Tabel 5.3
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas
m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
12 1+500
0,305 0,361
0,351 0,218
6,12 1,381
13 1+506,120
0,337 0,367
0,356 0,233
25 5,359
14 1+531,123
0,255 0,351
0,343 0,196
18,877 3,492
15 1+550
0,206 0,341
0,334 0,174
6,123 1,119
16 1+556,123
0,245 0,349
0,341 0,191
25 4,805
17 1+581,123
0,249 0,350
0,342 0,193
18,877 3,708
18 1+600
0,264 0,353
0,344 0,200
50 13,808
19 1+650
0,580 0,416
0,397 0,353
50 27,064
20 1+700
1,215 0,543
0,503 0,730
50 37,224
21 1+750
0,313 0,363
0,352 0,222
1,258 0,552
0,510 0,759
50 11,889
37,925 22
1+800 0,381
0,376 0,364
0,254 1,256
0,551 0,509
0,758 50
18,000 39,500
Bersambung
1 6
9
Sambungan Tabel 5.3
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
23 1+850
0,789 0,458
0,432 0,466
1,35 0,570
0,525 0,822
50 15,984
28,590 24
1+900 0,203
0,341 0,334
0,173 0,519
0,404 0,387
0,321 50
4,324 8,031
25 2+000
26 2+050
50 4,994
27 2+100
0,264 0,353
0,344 0,200
50 4,994
28 2+150
29 2+350
24,125 2,822
30 2+374,125
0,339 0,368
0,357 0,234
25 7,534
31 2+399,125
0,611 0,422
0,402 0,369
0,875 0,325
32 2+400
0,62 0,424
0,403 0,374
24,125 10,077
33 2+424,125
0,781 0,456
0,430 0,462
25,875 13,265
34 2+450
0,954 0,491
0,459 0,563
50 18,501
33,968
Bersambung
1 7
Sambungan Tabel 5.3
NO STA
JARAK KIRI
KANAN m
h h5+0,3
h6+0,3 Luas
m
2
Volume m
3
h h5+0,3
h6+0,3 Luas m
2
Volume m
3
35 2+500
1,23 0,546
0,505 0,740
1,311 0,562
0,519 0,795
50 28,987
19,881 36
2+550 0,705
0,441 0,418
0,419 50
17,731 37
2+600 0,456
0,391 0,376
0,290 50
7,245 38
2+650
Volume pasangan batu pada dinding penahan kiri = 125,418 m
3
Volume pasangan batu pada dinding penahan kanan = 388,342 m
3
Volume Total pasangan batu pada dinding penahan = 125,418 + 388,342
= 513,76 m
3
1 7
1
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
25 cm 3 0 cm
1 0 cm H - 0,3
3. Plesteran
Gambar 5.8 Detail Plesteran pada Dinding Penahan
Ruas kiri Luas = 0,1+0,3+0,25 × p.dinding penahan kiri
= 0,1+0,3+0,25 × 19,15+50+50+50+50+50+50+50+50 = 0,65 × 419,15
= 272,448 m
2
Ruas kanan Luas = 0,1+0,3+0,25 × p.dinding penahan kanan
= 0,1+0,3+0,25 × 30,85+19,15+50+50+50+29,331+28,333+7,664+41,56+8,44+6,12+25+18,8
77+6,123+25+18,877+50+50+50+50+50+50+50+50+50+50+50+24,125+25 +0,875+24,125+25,875+50+50
= 0,65 × 1.065,325 = 1.0478,825 m
2
Luas total = 272,448 + 1.0478,825 = 1.320,273 m
2
172
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
H’ 30 cm
55 H
5. Siaran Contoh hitungan siaran pada sta 1+750 s.d 1+800
Gambar 5.9 Sket Luas Siaran Talud
Ruas kiri Sta 1+750 sd 1+800
Sta 1+750 H
= 0,313 m H’
= 0,313 × tan 55 – 0,3
= 0,147 m Sta 1+800
H =0,381 m
H’ = 0,381 × tan 55
– 0,3 = 0,244 m
Luas =
50 2
244 ,
0,147
= 9,775 m
2
Ruas kanan
Sta 1+750 sd 1+800 Sta 1+750
H = 1,258 m
H’ = 1,258 × tan 55
– 0,3 = 1,497 m
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user Sta 1+800
H = 1,256 m
H’ = 1,256 × tan 55
– 0,3 = 1,494 m Luas
= 50
2 494
, 1
497 ,
1
= 74,775 m
2
Penghitungan selanjutnya dapat dilihat pada tabel 5.4
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
Tabel 5.4 Perhitungan Luas Siaran pada Dinding Penahan
NO STA
JARAK KIRI
KANAN m
h h
h-0,3 Luas m
2
h h
h-0,3 Luas m
2
1 0+250
30,85 5,330
19,803 2
0+280,85 0,452
0,646 0,346
1,109 1,584
1,284 19,15
3,308 14,493
3 0+300
0,371 0,530
0,230 50
6,601 4
0+350 0,234
0,334 0,034
50 9,743
5 0+400
0,459 0,656
0,356 50
21,132 6
0+450 0,553
0,790 0,490
29,331 8,354
7 0+479,331
0,266 0,380
0,080 28,333
2,203 8
0+500 0,263
0,376 0,076
7,664 0,290
9 0+507,664
10 1+450
41,56 3,589
11 1+491,560
0,331 0,473
0,173 8,44
1,301 12
1+500 0,305
0,436 0,136
6,12 0,970
13 1+506,120
0,337 0,481
0,181 25
3,068 14
1+531,123 0,255
0,364 0,064
18,877 0,551
15 1+550
0,206 0,294
-0,006 6,123
0,135 16
1+556,123 0,245
0,350 0,050
25 1,319
17 1+581,123
0,249 0,356
0,056 18,877
1,252 18
1+600 0,264
0,377 0,077
50 15,134
19 1+650
0,580 0,828
0,528 50
49,088
Bersambung
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user Sambungan tabel 5.4
NO STA
JARAK KIRI
KANAN m
h h
h-0,3 Luas
m
2
h h
h-0,3 Luas m
2
20 1+700
1,215 1,735
1,435 50
3,675 73,295
21 1+750
0,313 0,447
0,147 1,258
1,797 1,497
50 9,775
74,775 22
1+800 0,381
0,544 0,244
1,256 1,794
1,494 50
26,773 78,044
23 1+850
0,789 1,127
0,827 1,35
1,928 1,628
50 20,418
51,730 24
1+900 0,203
0,290 0,010
0,519 0,741
0,441 50
-0,252 11,030
25 2+000
26 2+050
50 1,926
27 2+100
0,264 0,377
0,077 50
1,926 28
2+150 29
2+350 24,125
2,221 30
2+374,125 0,339
0,484 0,184
25 9,459
31 2+399,125
0,611 0,873
0,573 0,875
0,507 32
2+400 0,62
0,885 0,585
24,125 16,898
33 2+424,125
0,781 1,115
0,815 25,875
24,295 34
2+450 0,954
1,362 1,062
50 36,416
65,869 35
2+500 1,23
1,757 1,457
1,311 1,872
1,572 50
54,087 39,308
36 2+550
0,705 1,007
0,707 50
26,452 37
2+600 0,456
0,651 0,351
50 8,781
38 2+650
Luas Kiri = 194,766 m
2
Luas Kanan = 610,291 m
2
Luas Total = 194,766+ 610,291
perpustakaan.uns.ac.id digilib.uns.ac.id
commit to user
= 805,057 m
2
5.2.4 Penghitungan Volume Pekerjaan Perkerasan