Bab 3 Perencanaan Atap
3.9. Perencanaan Kuda-kuda Utama B KKB
3.9.1. Perhitungan Panjang Batang Kuda-kuda Utama B
Gambar 3.32. Panjang batang kuda-kuda B
Perhitungan panjang batang selanjutnya disajikan dalam tabel dibawah ini :
Tabel 3.32.
Perhitungan Panjang Batang Pada Kuda-kuda Utama B No batang
Panjang batang m 1-2
0,938 2-4
1,083 5-6
1,443 7-8
1,083 9-10
0,938 11-14
1,083 15-16
1,443 17-20
1,083 21
0,541 22-27
1,083 28
1,301 29
1,083 30
1,301 31-36
1,083 37
0,541
commit to user
143 143
Tugas akhir Perencanaan Struktur Gedung Swalayan 2 Lantai
Bab 3 Perencanaan Atap
3.9.2 Perhitungan Luasan Kuda-Kuda Utama B
Gambar 3.33. Luasan Atap Kuda-kuda Utama B
Panjang aj = 4,400 m
Panjang ab = 1,947 m
Panjang bi = 3,531 m
Panjang bc = 2,170 m
Panjang ch = 2,594 m
Panjang cd = 1, 804 m
Panjang dg = 2,125 m
Panjang de = 0,722 m
Panjang ef = 1,500 m
Luas abij
= aj + bi xab2 = 4,40+ 3,531x1,9472
= 7,72 m
2
Luas bcih = bi + ch xbc2
= 3,531+ 2,594x2,1702 = 6,66 m
2
Luas cdgh = ch + dg xcd2
= 2,594+ 2,125x1,8042 = 4,26 m
2
Luas defg = dg+ ef xde2
= 2,125+ 1,50x0,7222 = 1,31 m
2
commit to user
144 144
Tugas akhir Perencanaan Struktur Gedung Swalayan 2 Lantai
Bab 3 Perencanaan Atap
Gambar 3.34. Luasan Plafon Kuda-kuda Utama B
Panjang aj = 4,400 m
Panjang ab = 1,738 m
Panjang bi = 3,531 m
Panjang bc = 1,875 m
Panjang ch = 2,594 m
Panjang cd = 1,563 m
Panjang dg = 2,125 m
Panjang de = 0,625 m
Panjang ef = 1,500 m
Luas abij = aj + bi xab2
= 4,40+ 3,531x1,7382 = 6,89 m
2
Luas bcih = bi + ch xbc2
= 3,531+ 2,594x1,8752 = 5,75 m
2
Luas cdgh = ch + dg xcd2
= 2,594+ 2,125x1,5632 = 3,69 m
2
Luas defg = dg+ ef xde2
= 2,125+ 1,50x0,6252 = 1,14 m
2
commit to user
145
3.9.3 Perhitungan Pembebanan Kuda-kuda Utama B
Data-data pembebanan : Berat gording
= 11 kgm Jarak antar kuda-kuda utama = 5,00 m
Berat penutup atap = 50 kgm
2
Berat profil = 15
kgm
Gambar 3.35. Pembebanan Kuda - Kuda utama B akibat beban mati
Perhitungan Beban a.
Beban Mati
1 Beban P1 = P7 a Beban gording
= Berat profil gording x panjang gording
= 11 x 4= 44,00 kg b Beban atap
= Luasan atap abij x Berat atap
= 7,72 x 50 = 386,00 kg c Beban kuda-kuda
= Btg 20+1+½ x Btg 21 x berat profil kuda kuda = 1,08+0,938 +½ x 0,541 x 15
= 34,37 kg d Beban plat sambung = 30 x beban kuda-kuda
= 0,3 x 34,37 = 10,31 kg
commit to user
146
e Beban bracing = 10 x beban kuda-kuda
= 0,1 x 34,37 = 3,35 kg f Beban plafon
= Luasan abij x berat plafon = 6,89 x 18 = 24,02 kg
2 Beban P2 = P6
a Beban gording =
Berat profil gording x panjang gording = 11 x 3,059 = 33,65kg
b Beban atap = Luasan atap bcih x berat atap
= 6,66 x 50 = 333,00 kg c Beban kuda-kuda
= Btg 22+2+3+½ x Btg 21+23 x berat profil kuda kuda
= 1,083x2+0,938+½ x 1.083+0,541x15 = 58,74 kg
d Beban plat sambung = 30 x beban kuda-kuda = 0,3 x 58,74 = 17,63 kg
e Beban bracing = 10 x beban kuda-kuda
= 0,1 x 58,74 = 5,88 kg 3 Beban P3=P5
a Beban gording =
Berat profil gording x panjang gording = 11 x 1,813 = 19,95 kg
b Beban atap = Luasan atap cdgh x berat atap
= 4,26 x 50 = 213,00 kg c Beban kuda-kuda
= Btg 4+17+½ x Btg 16 + 28 + 27 x berat profil kuda kuda
= 2x1,083+½ x 1,442 + 1,301 + 1,083 x 17 = 60,19 kg
d Beban plat sambung = 30 x beban kuda-kuda = 0,3 x 61,19 = 18,36 kg
commit to user
147
e Beban bracing = 10 x beban kuda-kuda
= 0,1 x 61,19 = 6,12 kg 4 Beban P4
a Beban gording =
Berat profil gording x panjang gording = 11 x 1,50 = 16,50 kg
b Beban atap = Luasan atap cdgh x berat atap
= 2 x 1,14 x 50 = 114,00 kg c Beban kuda-kuda
= Btg 4+17+½ x Btg 16 + 28 + 27 x berat profil kuda kuda
= ½ x 1,442 + 1,442 + 1,083 x 15 = 29,75 kg
d Beban plat sambung = 30 x beban kuda-kuda
= 0,3 x 29,75 = 8,93 kg e Beban bracing
= 10 x beban kuda-kuda = 0,1 x 29,75 = 2,98 kg
5 Beban P 8=P12
a Beban plafon = Luasan bcih x berat plafon
= 5,75 x 18 = 103,5 kg b Beban kuda-kuda
= Btg 36+8+9+ ½ x Btg 37+35 x berat profil kuda kuda
= 1,083x2+0,938+0,5x1,083+0,541 x 15 = 58,74 kg
c Beban plat sambung = 30 x beban kuda-kuda = 0,3 x 58,74= 17,63 kg
d Beban bracing = 10 x beban kuda-kuda
= 0,1 x 58,74 = 5,88 kg
commit to user
148
6 Beban P 9=P11
a Beban plafon = Luasan cdgh x berat plafon
= 3,69 x 18 = 66,42 kg b Beban kuda-kuda
= Btg 7+32+33+ ½ x Btg 6+31 x berat profil kuda kuda
= 1,083x3+0,5x1,083x2 x 15 = 64,98 kg
c Beban plat sambung = 30 x beban kuda-kuda = 0,3 x 64,98= 19,50 kg
d Beban bracing = 10 x beban kuda-kuda
= 0,1 x 64,98 = 6,50 kg 7 Beban P
10 a Beban plafon
= Luasan defg x berat plafon = 2x1,14x 18 = 41,04 kg
b Beban kuda-kuda = ½ x Btg 5+6+28+30+29
x berat profil kuda kuda = 0,5x5x1.083 x 15
= 40,61 kg c Beban plat sambung = 30 x beban kuda-kuda
= 0,3 x 40,61= 12,18 kg d Beban bracing
= 10 x beban kuda-kuda = 0,1 x 40,61 = 4,06 kg
e Beban reaksi = Beban reaksi 12 kuda-kuda+beban reaksi jurai
=902,66 + 957,34x2 =2817,34 kg
commit to user
149 149
Tugas akhir Perencanaan Struktur Gedung Swalayan 2 Lantai
Bab 3 Perencanaan Atap
Tabel 3.33. Rekapitulasi Beban Mati Kuda kuda Utama B
Beban Beban
Atap kg
Beban gording
kg Beban
Kuda - kuda kg
Beban Bracing
kg Beban Plat
Penyambung kg
Beban Plafon
kg
Beban Reaksi
kg Jumlah
Beban kg
Input SAP
kg P1=P7
386,00 44,00
34,37 3,35
10,31 24,02
- 502,05
503 P2=P6
333,00 33,65
58,74 5,88
17,63 -
- 438,90
439 P3=P5
117,15 19,95
60,19 6,12
18,36 -
- 221,77
222 P4
114,00 16,50
29,75 2,98
8,93 -
- 172,16
173 P8=P12
- -
58,74 5,88
17,63 103,5
- 185,75
186 P9=P11
- -
64,98 6,50
19,50 66,42
- 15740
158 P10
- -
40,61 4,06
12,18 41,04 2817,34 2915,23 2916