Uraian Kegiatan
Uraian Kebutuhan Koefisien
Satuan Harga
Total
Kayu Meranti Bekisting
0.7 m
3
2,070,000.00 1,449,000.00 Paku Usuk
4 Kg
17,100.00 68,400.00
Multiplex 120 x 240 x 9 mm
3.5 lembar
105,000.00 367,500.00
C. Kebutuhan Pekerja
Mandor 0.009
hari 60,000.00
540.00 Kepala Tukang Besi
0.006 hari
55,000.00 330.00
Tukang Besi 0.02
hari 50,000.00
1,000.00 Tukang Batu
0.02 hari
50,000.00 1,000.00
Tukang Kayu 0.02
hari 50,000.00
1,000.00 Tenaga Kasar
0.18 hari
30,000.00 5,400.00
Harga satuan kolom beton bertulang Total
3,737,165.00
Pekerjaan Sloof Beton
Bertulang m
3
A. Kebutuhan Alat
- -
- -
-
B. Kebutuhan Material
Semen portland 40kg
8.4 Zak
52,900.00 444,360.00
Pasir Beton 0.54
m
3
180,000.00 97,200.00
Batu Pecah Mesin 12 cm
0.81 m
3
310,500.00 251,505.00
Besi Beton Polos 210
Kg 8,500.00 1,785,000.00
Kawat Beton 3
Kg 23,000.00
69,000.00 Kayu Meranti
Bekisting 0.27
m
3
2,070,000.00 558,900.00
Paku Usuk 2
Kg 17,100.00
34,200.00 Minyak Bekisting
0.6 Ltr
4,800.00 2,880.00
C. Kebutuhan Pekerja
Mandor 0.283
hari 60,000.00
16,980.00 Kepala Tukang Besi
0.323 hari
55,000.00 17,765.00
Tukang Besi 0.275
hari 50,000.00
13,750.00 Tukang Batu
0.275 hari
50,000.00 13,750.00
Tukang Kayu 1.56
hari 50,000.00
78,000.00 Pembantu Tukang
5.65 hari
40,000.00 226,000.00
Harga satuan pekerjaan sloof beton bertulang 200kg besi + bekisting
Total 3,609,290.00
STIKOM SURABAYA
Uraian Kegiatan
Uraian Kebutuhan Koefisien
Satuan Harga
Total
Genteng Karang
Pilang m
2
A. Kebutuhan Alat
- -
- -
-
B. Kebutuhan Material
Genteng Karang Pilang
25 Buah
6,400.00 160,000.00
C. Kebutuhan Pekerja
Mandor 0.008
hari 60,000.00
480.00 Kepala Tukang
Kayu 0.008
hari 55,000.00
440.00 Tukang Kayu
0.15 hari
50,000.00 7,500.00
Harga satuan genteng karang pilang Total
72,420.00
Talang Datar m
A. Kebutuhan Alat
- -
- -
-
B. Kebutuhan Material
Seng Plat BJLS 1
m 31,000.00
31,000.00 Paku
0.02 Kg
14,500.00 290.00
Papan Kayu Borneo Super
0.01 m
3
3,300,000.00 33,000.00
Meni Besi 0.25
Kg 14,500.00
3,625.00
C. Kebutuhan Pekerja
Mandor 0.009
hari 60,000.00
540.00 Kepala Tukang
Kayu 0.032
hari 55,000.00
1,760.00 Tukang Kayu
0.4 hari
50,000.00 20,000.00
Pembantu Tukang 0.15
hari 40,000.00
6,000.00
Harga satuan talang datar Total
96,215.00
Listplank Kayu
Kamper 330 cm
m
2
A. Kebutuhan Alat
- -
- -
-
STIKOM SURABAYA
Uraian Kegiatan
Uraian Kebutuhan Koefisien
Satuan Harga
Total B. Kebutuhan
Material Kayu Kamper
papan 220 0.011
m
3
8,000,000.00 88,000.00
Paku Reng Paku Reng
0.05 Kg
17,900.00 895.00
C. Kebutuhan Pekerja