Sistem Pendukung Keputusan Pemilihan Kontraktor Proyek Pada Lelang Dinas Cipta Karya Kabupaten Indramayu Menggunakan Metode AHP (analytic Hierarchy Process)
Giana
Department of Informatics, Faculty of Engineering and Computer Science University Computer Indonesia
Jl. Dipati Ukur No. 112-116 Bandung
E-mail : giana.gie@gmail.com
ABSTRACT
Dinas Cipta Karya in local government areas of Indramayu district has the authority to perform duties under Regulation (Perda) No. 1 of 2001 and the Regional Regulation No. 7 of 2001. One of the tasks undertaken Dinas Cipta Karya is building the infrastructure and public facilities and infrastructure of governance in local government areas of Indramayu district. Contractor selection process conducted DGCK Office takes a long time. Besides presenting information on the procurement of goods / services are still done conventionally, so that the missing information about the procurement of goods and services led to the participation of the contractors (participants partners) in the auction held by the Office of public works has become less and less proportionally, so it is necessary a decision support system.
In the development process of decision support system for selecting the contractor on the auction Dinas Cipta Karya using data analysis techniques with methods of software development in a waterfall. For the system data stream method use structure method that is using DFD (Data Flow Diagram) in depicting functional model and ERD (Entity Relationship Diagram) to depict the standard data.Untuk model assessment criteria using AHP (Analytic Hierarchy Process) and MAUT (Multi Attribute Utility Theory) with pre-qualification and past- qualification.
The results of this study inform the auction data, data ainwijiing, and bidders who pass the prequalification stage and post-stage. The test system consists of alpha testing where this test using black box testing method that focuses on functional requirements and software beta test is test of field by giving questionnaires to the users in the Technical Section of Survey and Planning Office Building Notices of Work with a question referring to the final destination. After alpha and beta testing, can be deduced that the functionality of the system is to produce the output as expected and the user can use it with ease.
Keywords: Contractors, Auctions, Decision Support Systems, DFD, ERD, waterfall method, AHP, MAUT.
1. INTRODUCTION
Identify the problem of how to build and implement the Decision Support System for Selection of Contractor for the Project on Auction Dinas Cipta Karya Kabupaten Indramayu
Purpose and Objectives
The purpose of this research is to Build Decision Support System for Selection of
Contractor for the Project on Auction Dinas
Cipta Karya Kabupaten Indramayu.
The purpose of this study include :
1. Analyze, design, implement and test
the contractor selection decision
support system at the Department of public works has Indramayu district, which features a rapid assessment of contractors and accurately by using the method of AHP and MAUT, and
(2)
2. The use of electronic data storage media that systematically
3. Provide alternative information for
selecting the contractor's decision is in accordance with the fast, as well as provide information and interaction on auction at Dinas Cipta Karya.
2. MODEL ANALYSIS, DESIGN AND IMPLEMENTATION
In the development process of decision support system for selecting the contractor on the auction Dinas Cipta Karya using data
analysis techniques with methods of
software development in a waterfall. For the system data stream method use structure method that is using Data Flow Diagrams (DFD) in depicting functional model and Entity Relationship Diagram (ERD) to illustrate data model.
2.1 General Description of System
The identification of this system are as follows users (Adminnistrator, Staff Admin, Leadership, and Partners) to log into the system, then the Administrator is available on page five of them cultivate process master data, see information on auction data, mengolaha standard assessment criteria, see the information list black, account. On master data will be no partner data processing, user data, pre-qualification criteria, criteria for post-, sub. On process of data there are four auction auction auction
process that information, ainwijiing
information, prequalification information, information on post-, and the Standard Assessment Calculation menu using AHP (Analytic Hierarchy Process), there are three such processes, the assessment criteria for
prequalification, post-assessment and
assessment criteria post-subcriteria. On this page the admin staff there are five processes, including information on master data, data
processing auction, participants
pre-qualification and post-assessment, info blacklist, account, on valuation calculation method used by participants include MAUT (Multi Attribute Utility Theory). On this page there are five process management
prequalification information,
post-information, auction reports, reports
ainwijiing, pre-qualification statements,
reports pascakualiifikasi, pre-qualification approval, post-approval
2.2 Analysis System
1. Calculation AHP
The calculation of the pre-qualification
criteria and assessment standards
pacakualifikasi using AHP (Analytic
Hierarchy Process), for example case below:
Problem of selecting the contractor
conducted by the Office of Office of Cipta Karya Cipta Karya get into trouble choosing one of three contractors that meets the requirements. Public works has decided to create a hierarchy that can be seen figure 1
SIUJK
Pemenang Lelang
KPK
BPP APP SK
Kontraktor A Kontraktor B Kontraktor C
Figure 1 Structure of AHP Hierarchy Proof of Tax Payment (CPP), Certificate of Skills (SK), Contract Work Experience (KPK), Deed of Establishment and Changes (APP), SIUJK
After preparation of the hierarchy is complete then the next step is to make comparisons between the elements by taking into account the influence of elements on the levels above comparison is done by a scale of 1 to 9. Can be seen in table 1
Table 1 Matrix comparison
Krit siujk bpp app sk kpk
siujk 1 2 3 1 1
bpp 0.5 1 2 2 3
app 0.33 0.5 1 1 1
sk 1 0.5 1 1 1
kpk 1 0.33 1 1 1
(3)
divided by the number on the relevant column. This process will produce a matrix that has been normal
Table 2 Matrix comparison level 2
Krit siujk bpp app sk kpk ∑
siujk 0.26 0.46 0.38 0.17 0.14 1.41
bpp 0.13 0.23 0.25 0.33 0.43 1.37
app 0.09 0.12 0.13 0.17 0.14 0.64
sk 0.26 0.12 0.13 0.17 0.14 0.81
kpk 0.26 0.08 0.13 0.17 0.14 0.77
TPV = ∑ row / n
Table 3 TPV Value Kriteria TPV
siujk 0.18
bpp 0.17
app 0.08
sk 0.10
kpk 0.10
The average value of each line indicates that the level of importance factor for each criterion is: 18%, 17%, 8%, 10%, and 10%. After completion of level 2 matrix is filled and calculated the weight of its priorities, the next step to make comparisons between the matrix element level 3 with respect to its association with the level. This process has the same steps as the process described previously.
Consistency Calculation AHP Tabel 4 Normalisasi Matrik
Krit siujk bpp app sk kpk ∑
siujk 0.18 0.34 0.24 0.10 0.10 0.96
bpp 0.09 0.17 0.16 0.20 0.29 0.91
app 0.06 0.09 0.08 0.10 0.10 0.42
sk 0.18 0.09 0.08 0.10 0.10 0.54
kpk 0.18 0.06 0.08 0.10 0.10 0.51
Further on the value of each vector multiplication result is divided by the value of each cell in the priority vectors in order to obtain the results as follows:
5.37 5.43 5.39 10 . 0 10 . 0 08 . 0 52 . 0 54 . 0 42 . 0
λmaks value can be searched with the
following calculation:
λmaks =
n n 3 2 1 = 5 37 . 5 43 . 5 39 . 5 31 . 5 43 . 5 = 5 93 . 26 = 5.33
Value of Consistency Index (CI) can be found by calculation as follows:
CI= 1 n n maks = 1 5 5 33 . 5
= 0.08
Based on the Random Index (RI) for the number of element 5 is 1:12 then the value of consistency ratio (CI) is :
CR =
IR CI = 12 . 1 08 . 0
= 0.07
A value of 0.07 states that the ratio of the consistency of the results of comparative studies above have a constellation of 7%. This value causes the valuation is acceptable as it has been suggested by Saaty
2. Calculation MAUT
Calculation of the total weight of the criteria to obtain a global priority globally is a global priority with a combination of AHP and MAUT methods can be done by
following these steps:
The first step determines an alternative to determine the value of Xij can be seen in table 5
Table 5 Classification Rating
No Kriteria Classification
Rating (Xij)
1 siujk
a. Match 80
b. Not Suitable 0
2 bpp
a. Match 80
b. Not Suitable 0
3 App
(4)
5 kpk
a. Match 80
b. Not Suitable 0
The second step provides an alternative value is shown in table 5 with the weight of the criteria shown in Table 3 by multiplying the value of each alternative and sum weighting criteria and the process can be seen in table 6
Tabel 6 V value calculation
Kriteria
Penilaian
Nilai Xij
Bobot
(wj) Jumlah
siujk Match 80 0.18 11.2
bpp Not Suitable 0 0.17 0
app Match 80 0.08 11.2
sk Match 80 0.10 11.2
kpk Cocok 80 0.10 11.2
Vi = ∑ (xij * wij) 67.2
Tabel 7 Calculation of Final Score
Krit siujk bpp app sk kpk PG
Ket
0.18 0.17 0.08 0.10 0.10
K A 80 80 80 80 0 67.2 TR
K B 80 80 80 80 0 67.2 TR
K C 80 80 80 80 80 80.5 R
Keterangan : Krit = Criteria K = Contraktor PG = Global Priority TR = Not Recommended R = Recommended
administrator
Kontraktor
Pimpinan panitia
Staff admin panitia 1.0 Login
3.0 Pengolahan Data Master
5.0 Lelang pengguna Kriteria pascakualifikasi Kriteria prakualifikasi
Nilai prakualifikasi
Nilai Pascakualifikasi Join lelang prakualifkasi Join lelang pascakualifikasi Login admini s trator val id Login Sta ff Admin V alid Login pimpin an p anit ia l elang Data login
Info id_pengguna, password invalid
Info id_pengguna, password invalid Data kriteria prakulifikasi Info data kriteria
prakualifikasi Data kriteria pascakuailifikasi Info data kriteria pascakualifikasi
Rekanan
Data kriteria prakulifikasi Data bobot kriteria prakualifikasi Data kriteria pascakuailifikasi Data pengguna Data rekanan Data biodata proyek Info kriteria prakulifikasi Info kriteria pascakuailifikasi Info pengguna Info rekanan Info biodata proyek Info daftar hitam Info ainwijiing Daftar hitam Info dat a rek anan Data rekanan Info rekanan Login staff admin valid Login peserta valid
Data Lelang proyek Data Join lelang prakualfikai Data nilai kriteria prakualfikas Data Ainwijiing Data join lelang pascakualifikasi Data nilai kriteria pascakualfikasi Info lelang proyek Info join lelang prakualfikai Info nilai kriteria prakualfikasi Info ainwijiing Info Rekaanan Info nilai pascakuualifikasi Info join lelang pascakualifikasi
6.0 Pengolahan Laporan Data rekanan Data joi n le lang prak ual fik as
i Info join lelang prakualifikasi Info kriteria
prakualifikasi Info kriteria pascakualifikasi
Info rekanan Data nilai lel ang prak uali fik as i
Info nilai lelang prakualifikasi
Data nilai lelang prakualifikasi Info nilai lelang pascakualifikasi Data join lelang pascakualfikasi Info join lelang pascakualifikasi Data pen gguna In fo Login Dat a lo gin Info id _ peng guna , pas s word inv alid In fo da fta r hi ta m Dat a jo in l elang prak uali fik as i Dat a jo in l elang pasc ak ual ifik asi In fo join lel ang prak ualif ik a s i In fo join lelan g pa s cak u alif ik asi 2.0 Registrasi penyedia jasa Data rekanan Info rekanan Ainwijiing Info ainwijiing Data ainwijiing
info Join lelang prakualfikai info nilai kriteria prakualfikasi Info Ainwijiing Info nilai pascakuualifikasi info join lelang pascakualifikasi
Info rekanan Data rekanan
Info rekanan Data pengguna yang dirubah Info pengguna yang dirubah
subkriteria pascakualifikasi
Data subkriteria Info Data subkriteria
Info nilai lelang prakualifikasi
D at a n ilai lela ng p rak ualifi k asi Lelang Proyek Data lelang proyek
Info daftar hitam Info lelang proyek
Info join lelang prakualifikasi
Info join lel ang pas c akualif ik as i
Data join lelang prakualifikasi Data join lelang pascakualifikasi Persetujuan Prakualifikasi Persetujuan Pascakualifikasi Info join lelang prakualifikasi Info join lelang pascakualifikasi Info Prakualifikasi Info Pascakualifikasi
Log
in re
kan
an
Info lelang proyek
Inf o p enggu na Data Pengg una Data Rekanan In fo Login Data rekanan Inf o pe nggun a Biodata Proyek Dat a Pro yek Info Proy ek Data Proyek Info Proyek 4.0 Penilaian AHP
Info nilai kriteria prakualifikasi Info nilai kriteria pascakualifikasiData nilai kriteria
pascakualifikasi Data nil ai s ubk rite ria pas ca k ua lifi k asi Inf o ni lai s ubk rit eria pas c akuali fik as i Dat a ni lai k rit eria pra k ua lifi k asi
Data nilai kriteria prakualifikasi Data nilai kriteria pascakualifikasi Info nilai kriteria prakualifikasi Info nilai kriteria pascakualifikasi Data nilai subkriteria pascakualifikasi Info nilai subkriteria pascakualifikasi
Data login useronline Info us eronl ine D ata D aft ar h ita m
Figure 2 DFD Level 0
2.4 Menu Structure Design
MENU UTAMA
DATA MASTER DATA LELANG STANDAR NILAI
HOME LOGIN Daftar Rekanan Pengguna Kriteria Prakualifikasi Kriteria PAscakualifikasi Subkriteria Pascakualifikasi Info Ainwijiing Info Lelang Proyek
Info Pascakualifkasi Info Prakualifiaksi Penilaian Pascakualifiakasi Penilaain Prakualifikasi DAFTAR HITAM Logout Ganti Password MY ACCOUNT
(5)
Figure 4 Interface
2.6 Implementation
Implementation phase is done after doing the analysis stage of design in the system. In the implementation process of making applications require identification of this word is the author of hardware equipment (hardware) and software (software) in completing this research.
1. Processor Dual Core 2.20GHZ
2. RAM 1 GB
3. VGA 256 MB
4. Monitor 15 “with resolution 1024 x 768 Specification of software (software) used to make the application identification of this word is:
1. Operating System Windows XP
Profesional
2. MySQL as database
3. PhpMyadmin as interface
4. Macromedia Dreamweaver 8 code
dan design interface
5. Mozilla Firefox,Operah, Google
Chrome for web browser
3. RESULTS
Results of identification of this research can be seen in the tables below:
1. Do you agree that the auction system is
built easily learned and used?
A. Strongly Agree D. Less Agree
B. Agree E. Disagree
C. Simply Agree
No Keterangan Responden %
1 Strongly Agree 0 0
2. Do you agree this auction system can
help you in the process of information flow auction?
A. Strongly Agree D. Less Agree
B. Agree E. Disagree
C. Simply Agree
No Keterangan Responden %
1 Strongly Agree 7 80
2 Agree 2 20
3 Simply Agree 1 10
4 Less Agree 0 0
5 Disagree 0 0
3. Do you agree to the auction conducted on
a system built with computer?
A. Strongly Agree D. Less Agree
B. Agree E. Disagree
C. Simply Agree
No Keterangan Responden %
1 Strongly Agree 0 0
2 Agree 6 60
3 Simply Agree 4 40
4 Less Agree 0 0
5 Disagree 0 0
4. Do you agree the process of submission
of tender documents on this system using electronic media (the Internet) ?
( jaringan internet ) ?
A. Strongly Agree D. Less Agree
B. Agree E. Disagree
C. Simply Agree
No Keterangan Responden %
1 Strongly Agree 0 0
2 Agree 6 60
3 Simply Agree 4 40
4 Less Agree 0 0
5 Disagree 0 0
5. Do you agree that this system will be
more easier for you in conducting the auction?
A. Strongly Agree D. Less Agree
B. Agree E. Disagree
C. Simply Agree
No Keterangan Responden %
1 Strongly Agree 0 0
2 Agree 6 60
(6)
6. Does your partner agree on a system
pendaftaraan process is done
electronically (online)?
A. Strongly Agree D. Less Agree
B. Agree E. Disagree
C. Simply Agree
No Keterangan Responden %
1 Sangat Seuju 0 0
2 Setuju 6 60
3 Cukup Setuju 4 40
4 Kurang Sertuju 0 0
5 Tidak Setuju 0 0
7. CONCLUSIONS AND SUGGESTIONS 7.1Conclusion
Based on the results of discussions during the research, it can be concluded that have been analyzed, designed, implemented and tested against the contractor selection decision support system project on auction Dinas Cipta Karya kabupaten Indramayu, including:
1. Contractor selection decision support
system on the auction Dinas Cipta Karya kabupaten Indramayu contractor to perform the assessment process quickly and accurately by using the method of AHP and MAUT.
2. Contractor selection decision support
system on the auction Dinas Cipta Karya
kabupaten Indramayu has been
computerized and can be accessed through the Internet network.
3. The use of storage media auction data
requirements on the contractor selection decision support system on the auction Dinas Cipta Karya kabupaten Indramayu
can be done electronically and
systematically.
4. Contractor selection decision support
system on the auction Dinas Cipta Karya kabupaten Indramayu to provide alternative information on contractor
selection decisions quickly and
accurately, and can provide information and interaction on auction on Dinas Cipta Karya kabupaten Indramayu
suggestions are expected to be a decision support system development contractor selection at auction Dinas Cipta Karya Kabupaten Indaramayu
1. Adding data security facilities, such
as Public Key Infrastructure
registration facility (KPI).
2. Adding a news update function work
3. Add a client software for contractors.
4. Integrating employment data that will
be auctioned with other agencies in the District Indramayu.
8. REFERENCES
1. Abdul, Kadir. (1998),Konsep dan
tuntunan praktis Basis data, Andi, Yogyakarta.
2. Jogianto HM., MBA., Akt., Ph.D.,
(2005), Analisisdan Desain Sistem
Informasi, Andi, Yogyakarta.
3. Kusrini,M.Kom,(2007), Konsep
dan Aplikasi Sistem Pendukung Keoutusan, Andi, Yogyakarta.
4. Prasetyo, Didik, Dwi. (2003),
Administrasi Database Server MySQL, Elex Media Komputindo, Jakarta.
5. Teguh Wahyono, (2004), Sistem
Informasi: Konsep Dasar, Analisis Desain dan Implementasi, Graha Ilmu, Yogyakarta.
6. www.ebisnis.wordpress.com/materi
/e-procurement/,Electronic
Procurement ( Jum’at 25
(7)
ANALYTIC HIERARCHY PROCESS
Giana
Jurusan Teknik Informatika Fakultas Teknik dan Ilmu Komputer Universitas Komputer Indonesia Jl. Dipati Ukur No. 112-116 Bandung
E-mail : giana.gie@gmail.com
ABSTRAK
Dinas Cipta Karya di wilayah pemerintah daerah Kabupaten Indramayu memiliki kewenangan untuk menjalankan tugas berdasarkan Peraturan Daerah (PERDA) nomor 1 tahun 2001 dan PERDA nomor 7 tahun 2001. Salah satu tugas yang dilakukan Dinas Cipta Karya adalah membangun infrastruktur dan fasilitas umum serta infrastuktur pemerintahan di wilayah pemerintah daerah Kabupaten Indramayu. Proses pemilihan kontraktor yang dilakukan Dinas Cipta Karya membutuhkan waktu yang lama. Selain itu penyajian informasi mengenai pengadaaan barang / jasa masih dilakukan secara konvensional, sehingga informasi yang kurang mengenai pengadaan barang dan jasa menyebabkan keikutsertaan para kontraktor(peserta rekanan) dalam mengikuti lelang yang diadakan oleh Dinas Cipta Karya menjadi sedikit serta kurang proporsional, maka dari itu diperlukan suatu sistem pendukung keputusan.
Pada proses pembangunan sistem pendukung keputusan untuk pemilihan kontraktor pada lelang Dinas Cipta Karya menggunakan teknik analisis data dengan metode pembangunan perangkat
lunak secara waterfall. Untuk metode aliran data sistem menggunakan metode terstruktur yaitu
menggunakan DFD (Data Flow Diagram) dalam menggambarkan model fungsional dan ERD
(Entity Relationship Diagram) untuk menggambarkan model data.Untuk standar penilaian kriteria
menggunakan metode AHP(Analytic Hierarchy Process) dan MAUT (Multi Attribute Utility
Theory) dengan tahapan prakualifikasi dan pascakualifikasi.
Hasil dari penelitian ini menginformasikan data pelelangan, data ainwijiing, dan peserta lelang yang lolos pada tahap prakualifikasi dan tahap pascakualifikasi. Pengujian sistem terdiri dari
pengujian alpha dimana pengujian ini menggunakan metode pengujian black box yang berfokus
pada persyaratan fungsional perangkat lunak dan pengujian beta yaitu pengujian lapangan dengan
memberikan kuesioner terhadap pengguna di Seksi Survey dan Perencanaan Teknis Bangunan
Dinas Cipta Karya dengan pertanyaan yang mengacu pada tujuan akhir. Setelah dilakukan pengujian alpha dan beta, dapat ditarik kesimpulan bahwa secara fungsionalitas sistem sudah dapat
menghasilkan output sesuai yang diharapkan dan user dapat meggunakannya dengan mudah.
Kata Kunci : Kontraktor, Lelang, Sistem Pendukung Keputusan, DFD, ERD, waterfall, AHP,
MAUT.
1. PENDAHULUAN
Identifikasi masalah bagaimana
membangun dan mengimplementasikan
Sistem Pendukung Keputusan Pemilihan Kontraktor Proyek pada Lelang Dinas Cipta Karya Kabupaten Indramayu
Maksud dan Tujuan
Maksud dari penelitian ini adalah
Membangun Sistem Pendukung Keputusan Pemilihan Kontraktor Proyek pada Lelang Dinas Cipta Karya Kabupaten Indramayu. Tujuan dari penelitian ini antara lain:
1. Menganalisis, merancang,
mengimplementasikan serta menguji
(8)
yang cepat dan akurat dengan
menggunakan Metode AHP dan
MAUT, serta pengaksesan kegiatan
lelang yang dilakukan secara
komputerisasi dengan terhubung
melalui jaringan internet.
2. Penggunaan media penyimpanan data
secara elektronik yang tersistematis.
3. Memberikan informasi alternatif
keputusan untuk pemilihan kontraktor yang sesuai dengan cepat, serta memberikan informasi dan interaksi mengenai lelang di Dinas Cipta Karya.
2. MODEL ANALISA, DESAIN, DAN IMPLEMENTASI
Pada proses pembangunan sistem
pendukung keputusan untuk pemilihan kontraktor pada lelang Dinas Cipta Karya menggunakan teknik analisis data dengan metode pembangunan perangkat lunak
secara waterfall. Untuk metode aliran data
sistem menggunakan metode terstruktur
yaitu menggunakan Data Flow Diagram
(DFD) dalam menggambarkan model
fungsional dan Entity Relationship Diagram
(ERD) untuk menggambarkan model data
2.1 Deskripsi Umum Sistem
Proses pengidentifikasian pada sistem ini
adalah sebagai berikut
pengguna(Adminnistrator, Staff Admin,
Pimpinan, dan Rekanan) melakukan login
kedalam sistem, lalu pada halaman
Administrator tersedia lima proses
diantaranya mengolah data master, melihat informasi data lelang, mengolaha standar penilaian kriteria, melihat informasi daftar
hitam, account. Pada data master akan ada
proses pengolahan data rekanan, data pengguna, kriteria prakualifikasi, kriteria pascakualifikasi, subkriteria. Pada proses data lelang lelang terdapat empat proses yaitu informasi lelang, informasi ainwijiing,
informasi prakualifikasi, informasi
pascakualifikasi,, lalu pada menu
Perhitungan Standar Penilaian yang
menggunakan metode AHP (Analytic
Hierarchy Process) terdapat tiga proses
halaman staff admin terdapat lima proses,
diantaranya informasi data master,
pengolahan data lelang, penilaian peserta prakualifikasi dan pascakualifikasi, info
daftar hitam, account, pada penilaian peserta
metode perhitungan yang digunakan antara
lain MAUT (Multi Attribute Utility Theory).
Pada halaman pimpinan terdapat lima
proses diantaranya informasi daftar master,
laporan data rekanan, laporan proyek,
informasi lelang, informasi ainwijiing,
informasi prakualifikasi, informasi
pascakualifikasi, laporan lelang, laporan
ainwijiing, laporan prakualifikasi, laporan
pascakualiifikasi, approval prakualifikasi,
approval pascakualifikasi.
2.2 Analisis Sistem
1. Perhitungan AHP
Pada perhitungan standar penilaian kriteria
prakualifikasi dan pacakualifikasi
menggunakan metode AHP (Analytic
Hierarchy Process), sebagai contoh kasus dibawah ini :
Masalah pemilihan kontraktor dilakukan oleh Dinas Cipta Karya Dinas Cipta Karya menemui kesukaran memilih satu dari tiga kontraktor yang memnuhi syarat. Cipta Karya memutuskan membuat suatu hirarki yang dapat dilihat gambar 1
SIUJK
Pemenang Lelang
KPK
BPP APP SK
Kontraktor A Kontraktor B Kontraktor C
Gambar 1 Struktur Hirarki AHP Bukti Pembayaran Pajak (BPP), Sertifikat Keterampilan(SK), Kontrak Pengalaman
Kerja (KPK), Akte Pendirian dan
Perubahannya (APP), SIUJK
Setelah penyusunan hirarki selesai maka langkah selanjutnya adalah melakukan perbandingan antara elemen-elemen dengan memperhatikan pengaruh elemen pada level
(9)
Krit siujk bpp app sk kpk
siujk 1 2 3 1 1
bpp 0.5 1 2 2 3
app 0.33 0.5 1 1 1
sk 1 0.5 1 1 1
kpk 1 0.33 1 1 1
∑ 3.83 4.33 8 6 7
Nilai pada tabel 1 dapat disintesiskan dengan jalan menjumlahkan angka-angka yang terdapat pada setiap kolom, setelah itu angka dalam setiap sel dibagi dengan jumlah pada kolom yang bersangkutan. Proses ini akan menghasilkan matriks yang telah normal
Tabel 2 Matrik perbandingan level 2
Krit siujk bpp app sk kpk ∑
siujk 0.26 0.46 0.38 0.17 0.14 1.41
bpp 0.13 0.23 0.25 0.33 0.43 1.37
app 0.09 0.12 0.13 0.17 0.14 0.64
sk 0.26 0.12 0.13 0.17 0.14 0.81
kpk 0.26 0.08 0.13 0.17 0.14 0.77
TPV = ∑ baris / n
Tabel 3 Nilai TPV Kriteria TPV
siujk 0.18
bpp 0.17
app 0.08
sk 0.10
kpk 0.10
Nilai rata-rata dari setiap baris menunjukan bahwa tingkat kepentingan faktor untuk masing-masing kriteria adalah : 18%, 17%, 8% 10%, dan 10%. Setelah matriks level 2 selesai diisi dan dihitung bobot prioritasnya,
langkah selanjutnya membuat matriks
perbandingan antar elemen level 3 dengan memperhatilan keterkaitanya dengan level . proses ini memiliki langkah sama seperti proses yang telah dijelaskan sebelumnya. Perhitungan Konsistensi AHP
siujk 0.18 0.34 0.24 0.10 0.10 0.96
bpp 0.09 0.17 0.16 0.20 0.29 0.91
app 0.06 0.09 0.08 0.10 0.10 0.42
sk 0.18 0.09 0.08 0.10 0.10 0.54
kpk 0.18 0.06 0.08 0.10 0.10 0.51
Selanjutnya nilai masing-masing pada vector hasil perkalian tersebut dibagi dengan nilai masing-masing sel pada vektor prioritas sehingga diperoleh hasil sebagai berikut :
5.37 5.43 5.39 5.31 5.43 10 . 0 10 . 0 08 . 0 17 . 0 0.18 52 . 0 54 . 0 42 . 0 91 . 0 96 . 0
Nilai λmaks dapat dicari dengan
perhitungan sebagai berikut :
λmaks =
n n 3 2 1 = 5 37 . 5 43 . 5 39 . 5 31 . 5 43 . 5 = 5 93 . 26 = 5.33
Nilai Consistency Index (CI) dapat dicari dengan perhitungan sebagai berikut :
CI= 1 n n maks = 1 5 5 33 . 5
= 0.08
Berdasarkan Random Index (RI) untuk jumlah elemen 5 adalah 1.12 maka nilai consistency Ratio (CI) adalah
CR =
IR CI = 12 . 1 08 . 0
= 0.07
Nilai 0.07 menyatakan bahwa rasio
konsistensi dari hasil penelitian
perbandingan diatas mempunyai rasi sebesar 7%. Nilai ini menyebabkan penilaian tersebut dapat diterima seperti yang telah dikemukankan oleh Saaty
2. Perhitungan MAUT
Perhitungan total bobot kriteria untuk
memperoleh prioritas global global
(10)
Langkah pertama menentukan alternative untuk menentukan nilai Xij dapat dilihat pada table
Tabel 5 Klasifikasi Nilai
No Kriteria Klasifikasi
Nilai(Xij)
1 siujk
a. Cocok 80
b. Tidak Cocok 0
2 bpp
a. Cocok 80
b. Tidak Cocok 0
3 App
a. Cocok 80
b. Tidak Cocok 0
4 Sk
a. Cocok 80
b. Tidak Cocok 0
5 kpk
a. Cocok 80
b. Tidak Cocok 0
Langkah kedua memberikan nilai
alternative yang ditunjukan pada tabel 5 dengan bobot kriteria yang ditunjukan pada tabel 3 dengan mengkalikan nilai masing-masing alternatif dan bobot kriteri dan menjumlahkannya prosesnya dapat dilihat pada tabel 6
Tabel 6 Perhitungan Nilai v
Kriteria
Penilaian Nilai
Xij
Bobot
(wj) Jumlah
siujk Cocok 80 0.18 11.2
bpp Tidak
Cocok
0 0.17 0
app Cocok 80 0.08 11.2
sk Cocok 80 0.10 11.2
kpk Cocok 80 0.10 11.2
Vi = ∑ (xij * wij) 67.2
Tabel 7 Perhitungan Nilai Akhir
Krit siujk bpp app sk kpk PG
Ket
0.18 0.17 0.08 0.10 0.10
K A 80 80 80 80 0 67.2 TR
K B 80 80 80 80 0 67.2 TR
K C 80 80 80 80 80 80.5 R
PG = Prioritas Global
TR = Tidak Direkomendasikan R = Rekomendasikan
2.3 DFD(Data Flow Diagram)
administrator
Kontraktor
Pimpinan panitia
Staff admin panitia 1.0 Login
3.0 Pengolahan Data Master
5.0 Lelang pengguna Kriteria pascakualifikasi Kriteria prakualifikasi
Nilai prakualifikasi
Nilai Pascakualifikasi Join lelang prakualifkasi Join lelang pascakualifikasi Login admini s trator val id Login Sta ff Admin V alid Login pimpin an p anit ia l elang Data login
Info id_pengguna, password invalid
Info id_pengguna, password invalid Data kriteria prakulifikasi Info data kriteria
prakualifikasi Data kriteria pascakuailifikasi Info data kriteria pascakualifikasi
Rekanan
Data kriteria prakulifikasi Data bobot kriteria prakualifikasi Data kriteria pascakuailifikasi Data pengguna Data rekanan Data biodata proyek Info kriteria prakulifikasi Info kriteria pascakuailifikasi Info pengguna Info rekanan Info biodata proyek Info daftar hitam Info ainwijiing Daftar hitam Info dat a rek anan Data login Info user, password invalid
Data rekanan Info rekanan Login staff admin valid Login peserta valid
Data Lelang proyek Data Join lelang prakualfikai Data nilai kriteria prakualfikas Data Ainwijiing Data join lelang pascakualifikasi Data nilai kriteria pascakualfikasi Info lelang proyek Info join lelang prakualfikai Info nilai kriteria prakualfikasi Info ainwijiing Info Rekaanan Info nilai pascakuualifikasi Info join lelang pascakualifikasi
6.0 Pengolahan Laporan Data rekanan Data joi n le lang prak ual fik as
i Info join lelang prakualifikasi Info kriteria
prakualifikasi Info kriteria pascakualifikasi
Info rekanan Data nilai lel ang prak uali fik as i
Info nilai lelang prakualifikasi
Data nilai lelang prakualifikasi Info nilai lelang pascakualifikasi Data join lelang pascakualfikasi Info join lelang pascakualifikasi Data pen gguna In fo Login Dat a lo gin Info id _pengg una , pas sword inv alid In fo da fta r hi ta m Dat a jo in l elang prak uali fik as i Dat a jo in l elang pasc a k ual ifik asi In fo join lel ang prak ualif ik a si In fo j oin lelan g pa sc ak u alif ik asi 2.0 Registrasi penyedia jasa Data rekanan Info rekanan Ainwijiing Info ainwijiing Data ainwijiing
info Join lelang prakualfikai info nilai kriteria prakualfikasi Info Ainwijiing Info nilai pascakuualifikasi info join lelang pascakualifikasi
Info rekanan Data rekanan
Info rekanan Data pengguna yang dirubah Info pengguna yang dirubah
subkriteria pascakualifikasi
Data subkriteria Info Data subkriteria
Info nilai lelang prakualifikasi
D at a n ilai lela ng p rak ua lifi kasi Lelang Proyek Data lelang proyek
Info daftar hitam Info lelang proyek
Info join lelang prakualifikasi
Info join lel ang pas c akualif ik as i
Data join lelang prakualifikasi Data join lelang pascakualifikasi Persetujuan Prakualifikasi Persetujuan Pascakualifikasi Info join lelang prakualifikasi Info join lelang pascakualifikasi Info Prakualifikasi Info Pascakualifikasi Log in re k an an
Info lelang proyek Data login Info rekanan Inf o p enggu na Data Pengg una Info Rekanan Data Rekanan In fo Login Data rekanan Inf o pe nggun a Biodata Proyek Dat a Pro y ek Info Proy ek Data Proyek Info Proyek 4.0 Penilaian AHP
Info nilai kriteria prakualifikasi Info nilai kriteria pascakualifikasiData nilai kriteria
pascakualifikasi Data nil ai s ubk rite ria pas ca kua lifi kasi Inf o nil ai s ubk rit eria pas cakuali fik as i Dat a ni lai k rit eria pra kua lifi kasi
Data nilai kriteria prakualifikasi Data nilai kriteria pascakualifikasi Info nilai kriteria prakualifikasi Info nilai kriteria pascakualifikasi Data nilai subkriteria pascakualifikasi Info nilai subkriteria pascakualifikasi
Data login useronline Info us eronl ine D ata D aft ar h ita m
Gambar 2 DFD Level 0
2.4 Perancangan Struktur Menu
MENU UTAMA
DATA MASTER DATA LELANG STANDAR NILAI
HOME LOGIN Daftar Rekanan Pengguna Kriteria Prakualifikasi Kriteria PAscakualifikasi Subkriteria Pascakualifikasi Info Ainwijiing Info Lelang Proyek
Info Pascakualifkasi Info Prakualifiaksi Penilaian Pascakualifiakasi Penilaain Prakualifikasi DAFTAR HITAM Logout Ganti Password MY ACCOUNT
(11)
Gambar 4 Antar Muka
2.6 Implementasi
Tahap implementasi dilakukan setelah
melakukan tahap analisis perancangan pada sistem.
Dalam pelaksanaan proses pembuatan
aplikasi pengidentifikasian kata ini penulis memerlukan peralatan perangkat keras (hardware) dan perangkat lunak (software) dalam menyelesaikan penelitian ini.
1. Processor Dual Core 2.20GHZ
2. RAM 1 GB
3. VGA 256 MB
4. Monitor 15 “dengan resolusi 1024 x 768
Spesifikasi perangkat lunak (software) yang
digunakan untuk membuat aplikasi
pengidentifikasian kata ini adalah :
1. Sistem Operasi Windows XP
Profesional
2. MySQL sebagai database
3. PhpMyadmin sebagai interface
4. Macromedia Dreamweaver 8 kode
dan perancangan tampilan
5. Mozilla Firefox,Operah, Google
Chrome untuk web browser
3. HASIL
Hasil dari pengidentifikasian dari penelitian ini dapat dilihat pada table-tabel dibawah ini:
1. Apakah anda setuju sistem pelelangan
yang dibangun mudah dipelajari dan digunakan?
A. Sangat Setuju D. Kurang Setuju
No Keterangan Responden %
1 Sangat Seuju 0 0
2 Setuju 8 80
3 Cukup Setuju 2 20
4 Kurang Sertuju 0 0
5 Tidak Setuju 0 0
2. Apakah anda setuju sistem pelelangan
ini dapat membantu anda dalam proses arus informasi pelelangan?
A. Sangat Setuju D. Kurang Setuju
B. Setuju E. Tidak Setuju
C. Cukup Setuju
No Keterangan Responden %
1 Sangat Seuju 7 80
2 Setuju 2 20
3 Cukup Setuju 1 10
4 Kurang Sertuju 0 0
5 Tidak Setuju 0 0
3. Apakah anda setuju proses pelelangan
pada sistem yang dibangun dilakukan secara komputerisasi?
A. Sangat Setuju D. Kurang Setuju
B. Setuju E. Tidak Setuju
C. Cukup Setuju
No Keterangan Responden %
1 Sangat Seuju 0 0
2 Setuju 6 60
3 Cukup Setuju 4 40
4 Kurang Sertuju 0 0
5 Tidak Setuju 0 0
4. Apakah anda setuju proses penyerahan
dokumen lelang pada sistem ini menggunakan media elektronik
( jaringan internet ) ?
A. Sangat Setuju D. Kurang Setuju
B. Setuju E. Tidak Setuju
C. Cukup Setuju
No Keterangan Responden %
1 Sangat Seuju 0 0
2 Setuju 6 60
3 Cukup Setuju 4 40
4 Kurang Sertuju 0 0
(12)
A. Sangat Setuju D. Kurang Setuju
B. Setuju E. Tidak Setuju
C. Cukup Setuju
No Keterangan Responden %
1 Sangat Seuju 0 0
2 Setuju 6 60
3 Cukup Setuju 4 40
4 Kurang Sertuju 0 0
5 Tidak Setuju 0 0
6. Apakah anda setuju proses pendaftaraan
rekanan pada sistem ini dilakukan secara
elektronik (online)?
A. Sangat Setuju D. Kurang Setuju
B. Setuju E. Tidak Setuju
C. Cukup Setuju
No Keterangan Responden %
1 Sangat Seuju 0 0
2 Setuju 6 60
3 Cukup Setuju 4 40
4 Kurang Sertuju 0 0
5 Tidak Setuju 0 0
7. KESIMPULAN DAN SARAN 7.1Kesimpulan
Berdasarkan hasil pembahasan selama
melakukan penilitian, dapat diambil
kesimpulan bahwa telah dianalisis,
dirancang, diimplementasi serta dilakukan
pengujian terhadap sistem pendukung
keputusan pemilihana kontraktor proyek pada lelang Dinas Cipta Karya Kabupaten Indramayu , diantaranya :
1. Sistem pendukung keputusan pemilihan
kontraktor pada lelang Dinas Cipta Karya Kabupaten Indramayu dapat melakukan proses penilaian kontraktor secara cepat dan akurat dengan menggunakan Metode AHP dan MAUT.
2. Sistem pendukung keputusan pemilihan
kontraktor pada lelang Dinas Cipta
Karya kabupaten Indramayu sudah
terkomputerisasi dan dapat diakses
melalui jaringan internet.
3. Penggunaan media penyimpaman
kebutuhan data lelang pada sistem
pendukung keputusan pemilihan
4. Sistem pendukung keputusan pemilihan
kontraktor pada lelang Dinas Cipta Karya Kabupaten Indramayu dapat memberikan informasi alternatif keputusan pemilihan kontraktor dengan cepat dan akurat, serta
dapat memberikan informasi dan
interaksi mengenai lelang di Dinas Cipta Karya Kabupaten Indramayu
7.2Saran
Berdasarkan kesimpulan di atas, maka saran yang diharapkan yaitu dilakukan suatu pengembangan sistem pendukung keputusan pemilihan kontraktor pada lelang Dinas Cipta Karya Kabupaten Indaramayu
1. Menambahkan fasilitas pendukung
keamanan data, seperti fasilitas
pendaftaraan Infrastruktur Kunci
Publik (IKP).
2. Menambahkan fungsi pembaharuan
berita pekerjaan.
3. Menambahkan fasilitas software
client untuk kontraktor.
4. Mengintegrasikan data pekerjaan
yang akan dilelang dengan instansi yang lain di Kabupaten Indramayu.
8 DAFTAR PUSTAKA
1. Abdul, Kadir. (1998),Konsep dan
tuntunan praktis Basis data, Andi, Yogyakarta.
2. Jogianto HM., MBA., Akt., Ph.D.,
(2005), Analisisdan Desain Sistem
Informasi, Andi, Yogyakarta.
3. Kusrini,M.Kom,(2007), Konsep
dan Aplikasi Sistem Pendukung Keoutusan, Andi, Yogyakarta.
4. Prasetyo, Didik, Dwi. (2003),
Administrasi Database Server MySQL, Elex Media Komputindo, Jakarta.
5. Teguh Wahyono, (2004), Sistem
Informasi: Konsep Dasar, Analisis Desain dan Implementasi, Graha Ilmu, Yogyakarta.
6. www.ebisnis.wordpress.com/materi
/e-procurement/,Electronic
Procurement ( Jum’at 25
(13)
ON AUCTION DINAS CIPTA KARYA KABUPATEN INDRAMAYU USING METHOD AHP (Analytic Hierarchy Process)
BY GIANA 10106137
Dinas Cipta Karya in local government areas of Indramayu district has the authority to perform duties under Regulation (Perda) No. 1 of 2001 and the Regional Regulation No. 7 of 2001. One of the tasks undertaken Dinas Cipta Karya is building the infrastructure and public facilities and infrastructure of governance in local government areas of Indramayu district. Contractor selection process conducted DGCK Office takes a long time. Besides presenting information on the procurement of goods / services are still done conventionally, so that the missing information about the procurement of goods and services led to the participation of the contractors (participants partners) in the auction held by the Office of public works has become less and less proportionally, so it is necessary a decision support system.
.In the development process of decision support system for selecting the contractor on the auction Dinas Cipta Karya using data analysis techniques with methods of software development in a waterfall. For the system data stream method use structure method that is using DFD (Data Flow Diagram) in depicting functional model and ERD (Entity Relationship Diagram) to depict the standard data.Untuk model assessment criteria using AHP (Analytic Hierarchy Process) and MAUT (Multi Attribute Utility Theory) with pre-qualification and past- qualification.
The results of this study inform the auction data, data ainwijiing, and bidders who pass the prequalification stage and post-stage. The test system consists of alpha testing where this test using black box testing method that focuses on functional requirements and software beta test is test of field by giving questionnaires to the users in the Technical Section of Survey and Planning Office Building Notices of Work with a question referring to the final destination. After alpha and beta testing, can be deduced that the functionality of the system is to produce the output as expected and the user can use it with ease.
.
Keywords: Contractors, Auctions, Decision Support Systems, DFD, ERD, waterfall method, AHP, MAUT.
(14)
i
PROYEK PADA LELANG DINAS CIPTA KARYA KABUPATEN INDRAMAYU MENGGUNAKANAN METODE
ANALYTIC HIERARCHY PROCESS
Oleh GIANA 10106137
Dinas Cipta Karya di wilayah pemerintah daerah Kabupaten Indramayu memiliki kewenangan untuk menjalankan tugas berdasarkan Peraturan Daerah (PERDA) nomor 1 tahun 2001 dan PERDA nomor 7 tahun 2001. Salah satu tugas yang dilakukan Dinas Cipta Karya adalah membangun infrastruktur dan fasilitas umum serta infrastuktur pemerintahan di wilayah pemerintah daerah Kabupaten Indramayu. Proses pemilihan kontraktor yang dilakukan Dinas Cipta Karya membutuhkan waktu yang lama. Selain itu penyajian informasi mengenai pengadaaan barang / jasa masih dilakukan secara konvensional, sehingga informasi yang kurang mengenai pengadaan barang dan jasa menyebabkan keikutsertaan para kontraktor(peserta rekanan) dalam mengikuti lelang yang diadakan oleh Dinas Cipta Karya menjadi sedikit serta kurang proporsional, maka dari itu diperlukan suatu sistem pendukung keputusan.
Pada proses pembangunan sistem pendukung keputusan untuk pemilihan kontraktor pada lelang Dinas Cipta Karya menggunakan teknik analisis data dengan metode pembangunan perangkat lunak secara waterfall. Untuk metode aliran data sistem menggunakan metode terstruktur yaitu menggunakan Data Flow Diagram (DFD) dalam menggambarkan model fungsional dan Entity Relationship Diagram (ERD) untuk menggambarkan model data.Untuk standar penilaian kriteria menggunakan metode AHP(Analytic Hierarchy Process) dan MAUT (Multi Attribute Utility Theory) dengan tahapan prakualifikasi dan pascakualifikasi.
Hasil dari penelitian ini menginformasikan data pelelangan, data ainwijiing, dan peserta lelang yang lolos pada tahap prakualifikasi dan tahap pascakualifikasi. Pengujian sistem terdiri dari pengujian Alpha dimana pengujian ini menggunakan metode pengujian Black box yang berfokus pada persyaratan fungsional perangkat lunak dan pengujian beta yaitu pengujian lapangan dengan memberikan kuesioner terhadap pengguna di Seksi Survey dan Perencanaan Teknis Bangunan Dinas Cipta Karya dengan pertanyaan yang mengacu pada tujuan akhir. Setelah dilakukan pengujian alpha dan beta, dapat ditarik kesimpulan bahwa secara fungsionalitas sistem sudah dapat menghasilkan output sesuai yang diharapkan dan user dapat meggunakannya dengan mudah.
Kata Kunci : Kontraktor, Lelang, Sistem Pendukung Keputusan, DFD, ERD,
(15)
10
2.1 Tinjauan Perusahaan 2.1.1Sejarah Perusahaan
Pada tahap awal bidang Cipta Karya di Kabupaten Indramayu masih merupakan bagian dari Direktorat Cipta Karya Departemen PU. Pada tahun 1996, Pemerintah Kabupaten Indramayu menetapkan kebijakan berupa penataan bidang keciptakaryaan menjadi :
1. Dinas Bangunan ( Perda No 16 Tahun 1996),
2. Dinas Perumahan dan Penyehatan Lingkungan (Perda No 18 Tahiun 1996) dan Dinas Tata Ruang ( Perda No 3 Tahun 2996 )
Dalam rangka efisiensi, pada tahun 2001 melalui Perda No. 1 tahun 2001 dibentuk Dinas PU Cipta Karya yang didalamnya tercakup tiga dinas yaitu :
1. Dinas Bangunan,
2. Dinas Perumahan dan Penyehatan Lingkungan Permukiman dan 3. Dinas Kebersihan dan Pertamanan.
Kewenangan keciptakaryaan yang ada pada Dinas Tata Ruang diwadahi oleh Sub Dinas Tata Ruang pada Dinas Pertanahan. Dalam rangka peningkatan kinerja Lembaga Perangkat Daerah agar lebih berdaya guna dan berhasil guna sesuai dengan Perda No. 19 Tahun 2002, Dinas Cipta Karya dipecah menjadi :
1. Dinas PU Cipta Karya dan
(16)
Pada tahun 2008, seiring dengan diberlakukannya PP No. 41 tahun 2007 tentang Organisasi Perangkat Daerah, melalui Perda No. 8 tahun 2008, dibentuklah Dinas Cipta Karya yang mewadahi bidang Tata Bangunan, Bidang Perumahan dan Penyehatan Lingkungan, Bidang Pengendalian Bangunan dan Bidang Tata Ruang.
2.1.2Visi dan Misi 1. Visi
“ Terwujudnya Dinas Cipta Karya Yang Mampu Mendorong Terciptanya Permukiman dan Penataan Ruang Yang Berwawasan Lingkungan “.
2. Misi
1. Meningkatkan Kinerja Penyelenggara Pembangunan di Bidang
Keciptakaryaan.
2. Meningkatkan Ketersediaan dan Kualitas Prasarana dan Sarana Permukiman Yang Berwawasan Lingkungan
3. Meningkatkan Penyelenggaraan Pembangunan di Bidang Keciptakaryaan yang Berbasis Pemberdayaan, Kemitraan dan Kemandiriran.
(17)
2.1.3Stuktur Organisasi
KEPALA DINAS
SEKRETARIS KLOMPOK JABATAN
FUNGSIONAL
KASUB BAGIAN PERENCANAAN DAN
EVALUASI KASUB BAGAIN UMUM
DAN KEPEGAWAIAN
KASUB BAGIAN KEUANGAN
UPTD
KEPALA BIDANG PERUMAHAN DAN PENYEHATAN LINGKUNGAN
KEPALA BIDANG TATA RUANG
KEPALA SEKSI PERUMAHAN
KEPALA SEKSI AIR BERSIH
KEPALA SEKSI PENYEHATAN LINGKUNGAN
KEPALA SEKSI PENYUSUNAN TATA
RUANG
KEPALA SEKSI PEMANFAATAN RUANG
KEPALA SEKSI PENGENDALIAN PEMANFAATAN RUANG KEPALA BIDANG
DAN TATA BANGUNAN
KEPALA BIDANG PENGENDALIAN BANGUNAN
KEPALA SEKSI DAN INFORMASI BANGUNAN
KEPALA SEKSI SURVEY DAN PERENCANAAN
TEKNIS BANGUNAN KEPALA SEKSI
PENAKSIRAN BANGUNAN
KEPALA SEKSI PENGAWASAN TEKNIS BANGUNAN
KEPALA SEKSI PEMANFAATAN BANGUNAN KEPALA SEKSI PEMELIHARAAN BANGUNAN
Bagian Struktur Organisai Dinas Cipta Karya Kabupaten Indramayu
Gambar 2. 1 Struktur Organisasi Dinas Cipta Karya Kabupaten Indramayu
2.1.4Tugas Pokok dan Fungsi
Seksi Survey dan Perencanaan Teknis Bangunan dipimpin oleh seorang Kepala Seksi, yang mempunyai tugas pokok mempersiapkan bahan pelaksanaan kegiatan survey dan perencanaan teknis bangunan. Untuk menyelenggarakan tugas pokok dimaksud, Kepala Seksi Survey dan Perencanaan Teknis Bangunan Mempunyai fungsi sebagai berikut:
1. Penyiapan bahan pelaksanaan kegiatan survey dan perencanaan teknis bangunan.
(18)
2. Penyiapan bahan perencanaan teknis bangunan gedung milik pemerintah, BUMD, dan bangunan pelayanan umum lain.
3. Penyiapan bahan dan pelaksanaan advis perencanaan teknis bangunan bagi Instansi Pemerintah, Lembaga Masyarakat yang memerlukan standard teknis bangunan.
4. Pelaksanaan operasional kegiatan survey dan perencanaan teknis bangunan.
5. Pelaksanaan operasional panyiapan bahan penyusunan perencanaan teknis survey dan perencanaan teknis bangunan.
6. Pelaksanaan operasional pengelolaan survey bangunan. 7. Pelaksanaan operasional pengawasan survey teknis bangunan.
8. Pelaksanaan operasional koordinasi pengelolaan survey dan perencanaan teknis bangunan dengan SKPD terkait.
9. Pelaksanaan tugas kedinasan lain sesuai dengan bidang tugas dan fungsinya.
2.2 Landasan Teori 2.2.1Pengertian Sistem
Sistem merupakan istilah dari bahasa Yunani “system” yang artinya adalah
himpunan bagian atau unsure yang saling berhubungan secara teratur untuk mencapai tujuan bersama.[3]
Deskripsi mengenai pengertian sistem menurut beberapa ahli :
1. Sistem adalah prosedur logis dan radional untuk merancang suatu rangkaian komponen yang berhubungan satu dengan yang lainya dengan
(19)
maksud untuk berfungsi sebagai suatu kesatuan dalam usaha mencapai suatu tujuan yang telah ditentukan [L. James Havery].
2. Sistem adalah sebuah structural konseptual yang tersusun dari fungsi-fungsi yang saling berhubungan yang bekerja sebagai suatu kesatuan organic untuk menapai suatu hasil yang diinginkan secara efektif dan efesien [John Mc Manama].
3. Sistem adalah seperangkat bagian-bagian yang terkordinasi untuk melaksanakan suatu tujuan [C.W. Churchman].
4. Sistem adalah suatu seri atau rangkaian bagian-bagian yang saling berhubungan dan bergantung sedemikian rupa sehingga interaksi dan saling pengaruh dari sutu bagian akan mempengaruhi keseluruhan
[Edgar F Huse dan James L. Bowdict].
1. .Karakter Sistem
Suatu sistem mempunyai karekteristik atau sifat-sifat tertentu yaitu mempunyai komponen-komponen (components), batas sistem (boundary), lingkungan luar sistem (environments), penghubung (interfacae), masukan(input), keluaran (output), pengolhan(process), dan sasaran (objectives) atau tujuan (goal).
2. Klasifikasi Sistem
Sistem dapat diklasifikasikan dari beberapa sudut pandang, diantaranya sebagai berikut:
1. Sistem diklasifikasikan sebagai sistem abstrak (abstract system) dan sistem fisik (physical system). Sistem abstak adalah sistem yang berupa pemikiran
(20)
atau ide-ide yang tidak tampak secara fisik. Sistem fisik merupakan sistem yang ada secara fisik.
2. Sistem diklasifikasikan sebagai sistem alamaiah (natural system) dan sistem buatan manusia (human made system). Sistem alamiah adalah sistem yang terjadi melalui proses alam, tiak dibuat manusia. Sistem buatan manusia yang melibatkan interkasi antara manusia dengan mesin disebut human-machine system atau ada yang menyebut dengan man-machine-system. 3. Sistem diklasifikasikan sebagai sistem tertentu (deterministic system) dan
sistem tak tentu (probabilistic system). Sistem tertentu beroperasi dengan tingkah laku yang sudah diprediksi. Interkasi diantara bagian-bagiannya dapat dideteksi dengan pasti, sehingga keluaran dari sistem dapat diramalkan. Sistem tak tentu adlah sistem yang kondisi masa depannya tidak dapat diprediksi karena mengandung probabilitas.
4. Sistem diklasifikasikan sebagai sistem tertutup (closed system) dan sistem terbuka (open system). Sistem tertutup merupakan sistem yang tidak berhubungan dan tidak berpengaruh dengan lingkugan luarnya. Sistem ini bekerja secara otomatis tanpa adanya turut campur tangan dari pihak diluarnya. Secara teoritis sistem ini ada, tetapi kenyataanya tidak ada sistem yang benar-benar tertutup, yang ada hanyalah relatively closed system. Sistem terbuka adalah sistem yang berhubungan dan terpengaruh dengan lingkungan luarnya. Sistem ini menerima masukan dan menghasilkan keluaran untuk lingkungan luar sistem atau subsistem yang lainnya.
(21)
2.2.2Pengertian Sistem Informasi
Deskripsi mengenai pengertian sistem Informasi menurut beberapa ahli [3]: 1. Sistem informasi adalah kombinasi antar prosedur kerja, informasi, orang,
dan teknologi informasi yang diorganisasikan untuk mencapai tujuan dalam sebuah organisasi. [Alter(1992)].
2. Sistem informasi adalah kumpulan perangkat keras dan perangkat lunak yang dirancang untuk mentransformasikan data ke dalam bentuk informasi yang berguna. [Bodnar dan Hopwood(1993)].
3. Sistem informasi adalah suatu sistem buatan manusia yang secara umum terdiri atas sekumpulan komponen berbasis komputer dan manual yang dibuat untuk menghimpun, menyimpan, dan mengelola data serta menyediakan informasi keluaran kepada para pemakai. [Gelinas, Oram, dan Wiggins (1990)].
4. Sistem informasi adalah sebuah rangkaian prosedur formal dimana data
dikelompokkan, diproses menjadi informasi, dan didistribusikan kepada pemakai. [Hall(2001)]
5. Sebuah sistem informasi mengumpulkan, memproses, menyimpan,
menganalisis, dan menyebarkan informasi untuk tujuan yang spesifik. [Turban, McLean, dan Wetherbe (1999)].
6. Sistem informasi adalah kerangka kerja yang mengkoordinasikan sumberdaya (manusia, komputer) untuk mengubah masukan menjadi (informasi), guna mencapai sasaran perusahaan. [Wilkinson (1992)].
(22)
2.2.3Konsep Dasar Informasi
Sumber dari informasi adalah data. Data adalah kenyataan yang menggambarkan suatu kejadian-kejadian dan kesatuan nyata. Kejadian-kejadian adalah sesuatu yang terjadi pada saat tertentu. Informasi dapat didefinisikan sebagai :
“Data yang diolah menjadi bentuk yang lebih berguna dan lebih berarti bagi yang menerimanya”.[4]
1. Siklus Informasi
Data merupakan bentuk yang masih mentah yang belum dapat berceritera banyak, sehingga perlu diolah lebih lanjut. Data diolah melalui suatu model untuk dihasilkan informasi.
Data yang diolah melalui suatu modelmenjadi suatu informasi, penerima kemudian menerima informasi tersebut, membuat sutu keputusan dan melakukan tindakan yang berarti menghasilkna sutu tindakana yang lain yanag akan membuat sejumlah data kembali. Data tersebut akan ditangkap sebagai input, diproses kembali lewat suatiu model membentuk suatu siklus seperti ditunjukan pada Gambar 2.2
Masukan (Input)
Data
Hasil
Proses
Keluaran (Output)
Penerima
Keputusan Dasar
Data
(23)
2. Teknologi Informasi
Informasi teknologi adalah sebuah terminology kontemporer yang mendeskripsikan kombinasi antarateknologi computer (hardware dan software) dengan teknologi komunikasi (data, gambar, dan jaringan suara).
Peranan Teknologi Informasi :
1. Teknologi informasi menggantikanperan manusia. Dalam hal ini, teknologi informasi melakukan otomasi terhadap suatu tugas atau proses. 2. Teknologi memperkuat peran manusia, yakni dengan menyajikan
informasi terhadap suatu tugas atau proses.
3. Teknologi informasi berpertan dalam restruksisasi terhadap peran manusia. Dalam hal ini, teknologi berperan dalam melakukan perubahan-perubahanterhadap sekumpulan tugas atau proses
3. Kualitas Informasi
Kualitas dari suatu informasi tergantung dari tiga hal, yaitu informasi harus akurat(accurate), tepat waktunya (timeliness) dan relevan(relevance).
1. Akurat, berartti informasi harus bebas dari kesalahan-kesalahan dan tidak bias atau menyesatkan. Akurat juga berarti informasi harus jelas mencerminka maksudnya.
2. Tepat pada waktunya, berarti informasi yang dating padapenerimatiak boleh terlambat. Informasi yang sudah using tidak akan mempunyai nilai lagi. Bila pengambilan keputusan terlambat, maka dapat berakibat fatal untuk organisasi.
(24)
3. Relevan, berarrti informasi tersebut mempunyai manfaat untuk pemakainya, dengan cara mengurangi ketidakpastian, menaikan kemampuan untuk memprediksi atau menegaskan ekspetasi semula. 4. Nilai Informasi
Nilai dari informasi (Value of Information) dimasukan dari 2 hal yaitu manfaat dan biaya mendapatkannya. Suatu informasidikatakan bernilai manfaaatnya lebih efektif dibandingkan dengan biaya mendapatkannya. Akan tetapi perlu diperhatikan bahwa informasi informasi yang digunakan didalam suatu sistem informasi umumnya digunkan untuk beberap kegunaan. Sebagian informasi tidak dapat ditaksir keuntungannya dengan suatu nilai tetapi dapat ditaksir nilai kefektifannya
2.2.4Konsep Dasar Sistem Informasi
Informasi merupakan hala yang sangat penting didalam
mengambilkeputusan. Informasi tersbut didapatkan dari sitem
informasi(information system) atau disebut juga dengan processing systems atau
information processing systems ayau information generating systems. Sistem informasi adalah :
“Suatu sistem didalam suatu organisasi yang mempertemukan kebutuhan pengolahan transaksi harian, mendukung operasi, bersifat manejerial dan kegiatan strategi dari suatu organisasi dan menyediakan pihak luar tertentu dengan laporan-laporan yang diperlukan.”[3]
(25)
2.2.5Sistem Pendukung Keputusan
Sistem pendukung keputusan merupakan suatu sistem interaktif yang mendukung keputusan dalam proses pengambilan keputusan melalui alternative-alternatif yang diperoleh dari hasil penegolahan data, informasi dan rancangan model.
Pengambilan keputusan merupakan proses pemilihan alternative tindakan untuk mencapai tujuan atau sasaran tertentu. Pengambilan keputusan dilakukan dengan pendekatan sistematis terhadap permasalahan melalui proses pengumpulan data menjadi informasi seta ditambah dengan faktor-faktor yang perlu dipertimbangkan dalam pengambilan keputusan.
1. Pengertian Sistem Pendukung Keputusan
Sistem pendukung keputusan merupakan penggabungan sumber-sumber kecerdasaan individu dengan kemampuan komponen untuk memperbaiki kualitas keputusan. Sistem Pendukung keputusan juga merupakan sistem informasi berbasis komputer untuk manjemen pengambilan keputusan yang menangani masalah-masalah semi struktur[3].
Dengan pengertian diatas dapat dijeskan bahwa sistem pendukung keputusan bukan merupakan alat pengambilan keputusan, melainkan merupakan sistem yang membantu pengambilan keputusan dengan melengkapi mereka dengan informasi dari data yang telah diolah dengan relevan dan diperlukan untuk membuat keputusan tentang suatu masalah dengan lebih cepat dan akurat. Sehingga sistem ini tidak dimaksudkan untuk menggantikan pengambilan keputusan dalam proses pembuatan keputusan. Dalam proses pengambilan
(26)
keputusan terdapat model pengambilan keputusan yang diajukan Simon(1960) yang terdiri atas 4 fase, yaitu :Penelusuran (Intelegence)
Tahap ini merupakan proses penelusuran dan pendeteksian dari lingkup problematika serta pengenalan masalah.
a. Perancangan (Design)
Tahap ini merupakan menemukan, mengembangkan dan menganalisis alternative yang bisa dilakukan.
b. Pemilihan (Choice)
Dilakukan proses pemilihan diantara berbagai alternative tinakan yang mungkin dijalankan.
c. Implementasi (Implementation)
Tahap ini sebenarnya adalah dari 3 tahap yang merupakan pelaksanaan dari keputusan yang diambil.
2. Karektiristik Sistem Pendukung Keputusan
Dari pengertian sistem pendukung keputusan maka dapat ditentukan karekteristik antara lain[7] :
a. Mendukung proses pengambilan keputusan, menitik beratkan pada
management by perception
b. Adanya interface manusia/ mesin dimana manusia(user) tetap memegan control dalam proses pengambilan keputusan
c. Mendukung pengambilan keputusan untuk membahas masalah terstruktur, semi terstruktur dan tak struktur.
(27)
d. Memiliki kapasitas dialog untuk memperoleh informasi sesuai dengan kebutuhan.
e. Memiliki subsistem-subsistem yang terintegrasi sedemikian rupa sehingga dapat berfungsi sebagai kesatuan item.
f. Membutuhkan struktur data komprehensif yang dapat melayani kebutuhab seluruh tingkat manajemen.
3. Komponen Sistem Pendukung Keputusan
Sistem Pendukung Keputusan terdiri atas tiga komponen utama atau subsistem yaitu :
a. Subsistem data (database)
Subsistem data merupakan komponen Sistem Pendukung Keputusan penyedia data bagi sistem. Data ini disimpan dalam database yang diorganisasikan oleh DBMS.
b. Subsistem model(model base).
Salah satu keunggulan Sistem Pendukung Keputusan adalah kemampuan untuk mengintegrasikan akses data dan model-model keputusan. Hal ini dapat dilakukan dengan menambahkan model-model keputusan ke dalam sistem informasi yang menggunakan database sebagai mekanisme integrasi dan komunikasi-komunikasi diantara model-model.
c. Subsistem dialog (user system interface)
Subsistem dialog merupakan bagian dari Sistem Pendukung Keputusan yang dibangun untuk memenuhi kebutuhan representasi dan mekanisme control selama proses analisa dalam Sistem Pendukung Keputusan ditentukan dari
(28)
kemampuan berinteraksi antara sistem yang terpasang dengan user. Pemakai terminal dan sistem perangkat lunak merupakan komponen-komponen yang terlibat dalam subsistem dialog yang mewujudkan kom,unikasi antara user dengan sistem tersebut. Komponen dialog menampilkan keluaran sistemtersebut. Komponen menampilakn keluaran sistem bagi pemakai dan menerima masukan dari pemakai ke dalam Sistem Pendukung Keputusan.
2.3 Tender Proyek 2.3.1Tender
Berdasarkan Penjelasan Pasal 22 UU No 5/1999, tender adalah tawaran mengajukan harga untuk memborong suatu pekerjaan, untuk mengadakan barang-barang atau menyediakan jasa. Pengertian tender tersebut mencakup tawaran mengajukan harga untuk [6]:
1. Memborong atau melaksanakan suatu pekerjaan. 2. Mengadakan barang dan atau jasa.
3. Membeli suatu barang dan atau jasa. 4. Menjual suatu barang dan atau jasa.
2.3.2 Proyek
Proyek merupakan suatu rangkaian kegiatan yang berlangsung dalam jangka waktu terbatas, dengan alokasi sumber daya tertentu dan dimaksudkan untuk menghasilkan produk yang Kriteria mutunya telah digariskan dengan jelas. Proyek dapat diartikan pula sebagai sederetan aktifitas yang diarahkan pada suatu hasil dimana jangka waktu penyelesaiannya ditentukan. ada terdapat beberapa alasan tertentu yang menyebabkan bahwa tidak seluruh proyek pengadaan barang
(29)
atau jasa di instansi pemerintah dapat dilakukan melalui proses tender terbuka, antara lain: setiap pekerjaan yang dianggap perlu di- rahasiakan karena menyangkut pertahanan dan keamanan negara. Terhadap proyek pekerjaan seperti ini dapat dilakukan mekanisme “Penunjukan Langsung” (Keputusan Presiden Nomor 8 Tahun 2003). Adapun ciri pokok proyek:
1. Bertujuan menghasilkan lingkup (scope) tertentu berupa produk akhir atau hasil akhir.
2. Dalam proses mewujudkan lingkup di atas, ditentukan jumlah biaya, jadwal, serta kriteria mutu.
3. Bersifat sementara, dalam arti umurnya dibatasi oleh selesainya tugas. Titik awal dan akhir ditentukan dengan jelas.
4. Nonrutin, tidak berulang-ulang. Macam dan intensitas kegiatan berubah sepanjang proyek berlangsung.
Tahap yang dilakukan dalam proyek yaitu : 1. Perencanaan (Planning)
Dalam tahapan ini garis-garis besar rencana proyek mencakup:
recruitment konsultan perencana untuk menterjemahkan kebutuhan pemilik. Pembuatan tim of reference (TOR), survey, studi kelayakan
(Feasibility Studies), pemilihan design, program yang digunakan, budget yang ada serta alat - alat yang di butuhkan .
(30)
2. Pengadaan / Pelelangan (Tender)
Tahapan ini dilaksanakan apabila telah di adakannya perencanaan yang matang oleh konsultan perencanaan terhadap proyek-proyek yang akan dikerjakan.
3. Pelaksanaan (Construction)
Pada tahan ini merupakan tahap pelaksanaan pertimbangan konstruksi fisik yang telah di rancang. Pada tahap ini setelah kontrak di tanda tangani, SPK di keluarkan maka pekerjaan pelaksanaan dilakukan.
4. Pengawasan dan Pengendalian (Controlling)
Pengendalian pelaksanaan proyek untuk memastikan proyek yang telah ditetapkan sudah sesuai dengan yang direncanakan
5. Evaluasi
Satu tahapan yang menanyakan tindakan proyek berjalan pada yang benar. Evaluasi terhadap pelaksanaan proyek.
2.4Basis Data
2.4.1 Pengertian Basis Data
Basis data terdiri atas dua kata yaitu basis dan data. Basis kurang lebih dapt diartikan sebagai markas atau gudang, tempat bersarang/berkumpul. Sedangkan data adalah representasi fakta dunia nyata yang mewakili suatu objek seperti manusia (pegawai,peserta,pembeli,pelanggan), barang, hewan, peristiwa konsep, keadaan dan sebagainya, yang direkam dalam bentuk angka, huruf, symbol, teks, gambar, bunyi, atau kombinasinya.
(31)
Basis data(database) sendiri dapat didefiniskan sebagai berikut :
Basis data (database) merupakan kumpulan dari data yang saling berhubungan satu dengan yang lainnya, tersimpan pada perangkat keras komputer dan digunakan perangkat lunak untuk memanipulasinya.[1]
Prinsip utama pada basis data adalah pengaturan data/arsip dan tujuan utamanaya adalah kecepatan dan kemudahan dalam pengambilan kembali data/arsip yang menggunakan media penyimpanan elektronis seperti disk (disket atau harddisk). Basis data dikeloloa/ditangani melalui perantara alat/mesin pintar elektronis yang ita kenal sebagaikomputer.
Basis data bukan hanya sekedar penyimpanan data secara elektronis dengan bantuan komputer. Artinya, tidak semua bentuk penyimpanan data secara elektronis bisa disebut basis data. Yang sangat ditonjolkan dalm basis data adalah pengaturan/penilaian/pengelompokan/pengorganisasian data yang akan kita simpan sesuai fungsi/jenisnya. Penilaian/pengelompoka/pengorganisasian ini dapat berbentuk sejumlah file/table terpisah atau dalam bentuk pendefniasn kolom-kolom/ field-field data dalam setiap file/table.
Operasi-operasi dasar yang dapat dilakukan berkenaan dengan basis data dapat meliputi pembuatan basis data baru (create database), penghapusan basis data (drop database), pembuatan file/table dari suatu basis data(create table), penghapusan file/table dari suatu basis data(drop table), pengisian/penambahan data baru di sebuah basis data(insert), pengambilan data dari sebuah file/table
(32)
(retrieve/search), pengubahan data dari sebuah file/table(update), dan penghapusan data dari sebuah file/table (delete).
2.4.2 Sistem Pengolahan Basis Data (Database Management System/DBMS)
Pengoloahan basis data secara fisik tidak dilakukan oleh pemakai secara langsung, tetapi ditangani oleh sebuah perangkat lunak (sistem) yang khusus/spesifik. Perangkat klunak ini (disebut DBMS) yang akan menentukan bagaimana data diorganisasi, disimpan, dan diambil kembali. DBMS juga menerapkam mekanisme pengamanan data, pemakain data secara bersama pemaksaan keakuratan/konsistensi data dan sebagainya.
Perangkat lunak yang termasuk DBMS seperti dBase III+, dBase IV, FoxBase, RBase, MS-Acces dan Borland-Paradok (untuk kelas sederhana) atau Borlan-Interbase, MS-SQLServer, CA-Open Ingres, Oracle, Informix dan Sybase(untuk kelas komplex/berat).
2.4.3 Bahasa Basis Data
Basis Data (Database) dapat dibayangkan sebagai sebuah lemari arsip yang ditempatkan secara berurutan untuk memudahkan dalam pengambilan kembali data tersebut. Basis Data menunjukkan suatu kumpulan data yang dipakai dalam suatu lingkungan perusahaan atau instansi-instansi. Penerapan basis data dalam sistem informasi disebut sistem basis data (database system).
2.4.1 Permodelan Data
1. ERD (Entity Relationship Diagram)
Entity Relationship Diagram atau biasa dikenal dengan diagram E-R secara grafis menggambarkan isi sebuah database. Diagram ini memiliki dua
(33)
komponen utama yaitu entity dan relasi. Untuk melambangkan fungsi diatas maka digunakan simbol-simbol yang bisa dilihat pada daftar simbol.
Diagram hubungan entitas atau yang lebih dikenal dengan sebutan E-R diagram, adalah notasi grafik dari sebuah model data atau sebuah model jaringan yang menjelaskan tentang data yang tersimpan (storage data) dalam sistem secara abstrak. Diagram hubungan entitas tidak menyatakan bagaimana memanfaatkan data, membuat data, mengubah data dan menghapus data.
Terdapat tiga macam kardinalitas relasi, yaitu : 1. Relasi satu-ke-satu (one-to-one )
2. Relasi satu-ke-banyak (one-to many) atau banyak-ke-satu (many-to-one)
3. Relasi banyak-ke-banyak (many-to-many) 2. Kamus Data
Salah satu komponen kunci dalam sistem manajemen database adalah file
khusus yang disebut kamus data (data dictionary). Kamus data didefinisikan sebagai berikut :
“Katalog fakta tentang data dan kebutuhan-kebutuhan informasi dari suatu sistem informasi”. [1]
Dengan menggunakan kamus data, analisis sistem dapat mendefinisikan data yang mengalir berisi informasi tentang struktur database. Untuk setiap elemen data yang disimpan dalam database seperti nomor pokok pegawai, diuraikan secara lengkap mulai dari nama, tempat penyimpanan, program komputer yang berhubungan dan lain-lain.
(34)
2.5Alat Permodelan Sistem
Alat-alat permodelan sistem informasi sangat dibutuhkan dalam proses analisis dan perancangan sistem. Alat-alat permodelan sistem informasi terdiri dari :
2.5.1 Bagan Alir Dokumen (Document Flowmap)
Bagan alir dokumen(document flowmap) atau disebut juga bagan alir formulir (form flowmap) atau paperwork flowmap merupakan bagan alir yang menunjukan arus dari laporan dan formulir termasuk tembusan-tembusanya. Daftar simbol flowmap dapat dilhihat pada Tabel 2.1 :
Tabel 2. 1 Daftar simbol flowmap
No. Simbol Ketengan
1
Proses Komputerisasi :
Menunjukkan proses yang dilkukan oleh komputer
2
Proses Manual :
Merupakan proses yang dikerjakan secara manual
3 Keputusan :
Menujukkan pengambilan keputasan
4
Dokumen :
Menunjukan dokumen sebagai masukan / keluaran baik secara manual ataupun
komputer
5
Multi Dokumen:
Menunjukan banyak dokumen tercetak sebagai masukan atau keluaran baik secara
manual atau komputerisasi
6
Input manual :
Menunjukkan operasi input manual melalui
(35)
7 Data
8
Magnetik Disk :
Menunjukan media penyimpanan data dalam bentuk harddisk
9 Merge :
Penggabungan data
2.5.2 Diagram Konteks
Merupakan diagram tingkat atas (level tertinggi dari DFD) yang menggambarkan seluruh input ke sistem atau output dari sistem. Diagram konteks akan memberi gambaran tentang keseluruhan sistem. Sistem dibatasi oleh
boundary (dapat digambarkan dengan garis putus). Dalam diagram konteks hanya ada satu proses. Tidak boleh ada store dalam diagram konteks. Entitas eksternal
adalah entitas yang terletak di luar sistem yang mengirim data atau menerima data dari sistem tersebut.
Diagram konteks didefinisikan sebagai berikut :
“Diagram yang terdiri dari suatu proses dan menggambarkan ruang lingkup suatu sistem“.
2.5.3 Diagram Aliran Data (Data Flow Diagram)
DFD merupakan alat yang digunakan pada metodologi pengembangan sistem yang terstruktur (structured Analysis and design). DFD merupakan alat yang cukup populer sekarang ini, karena dapat menggambarkan arus data di dalam sistem denagn terstruktur dan jelas. Lebih lanjut DFD juga merupakan dokumentasi dari sistem yang baik.
(36)
Model analisis harus dapat mencapai tiga sasaran utama, yaitu menggambarkan apa yang dibutuhkan oleh pelanggan, membangun dasar bagi pembuatan desain perangkat lunak dibangun. Diagram aliran data merupakan model dari sistem untuk menggambarkan pembagian sistem ke modul yang lebih kecil. Salah satu keuntungan menggunakan diagram aliran data adalah memudahkan pemakai atau user yang kurang menguasai bidang komputer untuk mengerti sistem yang akan dikerjakan. Elemen dasar dari data flow diagram adalah :
a. Entitas Luar ( External Entity )
Suatu yang berada diluar sistem, tetapi ia memberikan data kedalam sistem atau meberiakan data dari sistem, disimbolkan dengan suatu kotak notasi. External Entity tidak termasuk bagian dari sistem. Bila sistem informasi dirancang untuk suatu bagian lain yang masih terkait menjadi external entity.
Gambar 2. 3 Entitas Luar
b. Arus Data ( Data Flow )
Arus data merupakan tempat mengalirnya informasi dan digambarkan dengan garis yang menghubungkan komponen dari sistem. Arus data ditunjukan dengan arah panah dan garis diberi nama atas arus data yang mengalir. Arus data ini mengalir diantara proses, data store dan menunjukan arus data dari data yang berupa masukan untuk sistem atau hasil proses sistem.
(37)
Gambar 2. 4 Gambar Arus Data
c. Proses (Process)
Proses merupakan apa yang dikerjakan oleh sistem. Proses dapat mengolah data atau aliran data masuk menjadi aliran data keluar. Proses befungsi menstransformasikan sutu atau beberapa data keluaran sesuai dengan spesifikasi yang diinginkan. Setiap proses memiliki satu atau beberapa masukan serta menghasilkan satu atau beberapa data kelurahan. Proses sering juga disebut bubble.
Gambar 2. 5 Gambar Proses
d. Simpanan Data ( Data Store)
Simpanan data merupakan tempat penyimpanaan data yang ada dalam sistem. Data store dapat disimbolkan dengan dua garis sejajar atau dua garis dengan salah satu sisi samping terbuaka. Proses dapat mengambil data dari atau memberiakn data ke simpanan data (database)
(38)
2.6 Metode yang Digunakan dalam SPK 2.6.1 Analitycal Hierarchy Process (AHP)
Pada hakekatnya AHP merupakan suatu model pengambil keputusan yang komprehensif dengan memperhitungkan hal-hal yang bersifat kualitatif dan kuantitatif. Dalam model pengambilan keputusan dengan AHP pada dasarnya berusaha menutupi semua kekurangan dari model-model sebelumnya. AHP juga memungkinkan ke struktur suatu sistem dan lingkungan kedalam komponen saling berinteraksi dan kemudian menyatukan mereka dengan mengukur dan mengatur dampak dari komponen kesalahan sistem (Saaty,2001).[3]
Peralatan utama dari model ini adalah sebuah hirarki fungsional dengan input utamanya adalah persepsi manusia. Jadi perbedaan yang mencolok model AHP dengan model lainnya terletak pada jenis inputnya. Terdapat 4 aksioma-aksioma yang terkandung dalam model AHP
1. Reciprocal Comparison artinya pengambilan keputusan harus dapat memuat perbandingan dan menyatakan preferensinya. Prefesensi tersebut harus memenuhi syarat resiprokal yaitu apabila A lebih disukai daripada B dengan skala x, maka B lebih disukai daripada A dengan skala 1/x
2. Homogenity artinya preferensi seseorang harus dapat dinyatakan dalam skala terbatas atau dengan kata lain elemen- elemennya dapat dibandingkan satu sama lainnya. Kalau aksioma ini tidak dipenuhi maka elemen- elemen yang dibandingkan tersebut tidak homogen dan harus dibentuk cluster (kelompok elemen) yang baru
(39)
3. Independence artinya preferensi dinyatakan dengan mengasumsikan bahwa kriteria tidak dipengaruhi oleh alternatif-alternatif yang ada melainkan oleh objektif keseluruhan. Ini menunjukkan bahwa pola ketergantungan dalam AHP adalah searah, maksudnya perbandingan antara elemen-elemen dalam satu tingkat dipengaruhi atau tergantung oleh elemen-elemen pada tingkat diatasnya
4. Expectation artinya untuk tujuan pengambil keputusan. Struktur hirarki diasumsikan lengkap. Apabila asumsi ini tidak dipenuhi maka pengambil keputusan tidak memakai seluruh kriteria atau objectif yang tersedia atau diperlukan sehingga keputusan yang diambil dianggap tidak lengkap
Selanjutnya Saaty (2001) menyatakan bahwa proses hirarki analitik (AHP) menyediakan kerangka yang memungkinkan untuk membuat suatu keputusan efektif atas isu kompleks dengan menyederhanakan dan mempercepat proses pendukung keputusan. Pada dasarnya AHP adalah suatu metode dalam merinci suatu situasi yang kompleks, yang terstruktur kedalam suatu komponen-komponennya. Artinya dengan menggunakan pendekatan AHP kita dapat memecahkan suatu masalah dalam pengambilan keputusan.[3]
1. Prinsip Kerja AHP
Prinsip kerja AHP adalah penyederhanaan suatu persoalan kompleks yang tidak terstruktur, stratejik, dan dinamik menjadi bagian-bagiannya, serta menata dalam suatu hierarki. Kemudian tingkat kepentingan setiap variabel diberi nilai numerik secara subjektif tentang arti penting variabel tersebut secara relatif dibandingkan dengan variabel lain. Dari berbagai pertimbangan tersebut
(40)
kemudian dilakukan sintesa untuk menetapkan variabel yang memiliki prioritas tinggi dan berperan untuk mempengaruhi hasil pada sistem tersebut (Marimin, 2004). [3]
2. Prosedur AHP
Pada dasarnya langkah-langkah dalam metode AHP meliputi : a. Menyusun hirarki dari prmasalahan yang dihadapi.
Persoalan yang akan diselesaikan, diuraikan menjadi unsur-unsurya, yaitu kriteria dan alternatif kemudian disusun menjadi struktur hierarki seperti di bawah ini :
Tujuan
Kriteria 1 Kriteria 2 Kriteria 3 Kriteria n
Kriteria 1 Kriteria 2 Kriteria 3 Kriteria n
Gambar 2. 7 Struktur Hierarki AHP
b. Penilaian kriteria dan alternatif
Kriteria dan alternatif dinilai melalui perbandingan berpasangan. Menurut Saaty (1988), untuk berbagai persoalan, skala 1 sampai 9 adalah skala terbaik dalam mengekspresikan pendapat. Nilai dan definisi pendapat kualitatif dari skala perbandingan Saaty dapat dilihat pada Tabel 2.2
(41)
Tabel 2. 2 Skala Penilaian Perbandingan Berpasangan
Intensitas
Kepentingannya Definisi
1 Kedua elemen sama pentingnya
3 Elemen yang satu sedikit lebih penting
5
Elemen yang satu esensial atau sangat penting (lebih penting) ketimbang eleman yang lainya
7 satu elemen jelas lebih penting
dari elemen yang lainya
9 Satu elemen mutlak lebih penting ketimbang elemen yang lainya
2,4,6,8 Nilai-nilai diantara dua pertimbangan yang berdekatan
Kebalikan
Jika untuk aktivitas imendapat suatu angka bila dibandingkan dengan suatu aktivitas j. maka j
mempunyai nilai kebalikanya bila dibandingkan dengan aktivitas i
Perbandingan dilakukan berdasarkan kebijakan pembuat keputusan dengan menilai tingkat kepentingan satu elemen terhadap elemen lainnya Proses perbandingan berpasangan, dimulai dari level hirarki paling atas yang ditujukan untuk memilih kriteria, misalnya K, kemudian diambil elemen yang akan dibandingkan, misal K1, K2, dan K3. Maka susunan elemen-elemen yang dibandingkan tersebut akan tampak seperti pada Tabel 2.2 :
Tabel 2. 3 Matrik Perbandingan
Kriteria 1 Kriteria 2 Kriteria 3 Kriteria 1 1
Kriteria 2 1
(42)
Untuk menentukan nilai kepentingan relatif antar elemen digunakan skala bilangan dari 1 sampai 9 seperti pada Tabel 1., Penilaian ini dilakukan oleh seorang pembuat keputusan yang ahli dalam bidang persoalan yang sedang dianalisa dan mempunyai kepentingan terhadapnya.
Apabila suatu elemen dibandingkan dengan dirinya sendiri maka diberi nilai 1. Jika elemen i dibandingkan dengan elemen j mendapatkan nilai tertentu, maka elemen j dibandingkan dengan elemen i merupakan kebalikannya.
c. Penentuan prioritas
Untuk setiap kriteria dan alternatif, perlu dilakukan perbandingan berpasangan (pairwise comparisons). Nilai-nilai perbandingan relatif kemudian diolah untuk menentukan peringkat alternatif dari seluruh alternatif.
Baik kriteria kualitatif, maupun kriteria kuantitatif, dapat dibandingkan sesuai dengan penilaian yang telah ditentukan untuk menghasilkan bobot dan proritas. Bobot atau prioritas dihitung dengan manipulasi matriks atau melalui penyelesaian persamaan matematik.
Pertimbangan-pertimbangan terhadap perbandingan berpasangan disintesis untuk memperoleh keseluruhan prioritas melalui tahapan-tahapan berikut:
1. Menjumlahkan nilai-nilai dari setiap kolom pada matriks
2. Membagi setiap nilai dari kolom yang bersangkutan untuk memperoleh normalisasi matriks
(1)
Perancangan struktur Menu Staff
MENU UTAMA
DATA MASTER DATA LELANG PENILAIN PESERTA
HOME
LOGIN
Info Proyek
Ainwijiing Lelang Proyek
Penilaian Pascakualifiakasi
Penilaain Prakualifikasi
DAFTAR HITAM
Logout Ganti Password MY ACCOUNT
Informasi Approval pascakualifikasi Informasi Approval
(2)
Perancangan struktur Menu Pimpinan
PERSETUJUAN
PESERTA MY ACCOUNT
HOME DATA MASTER DATA LELANG
Info rekanan
Info Proyek
Info Lelang
Info Ainwijiing
Approval Prakualifikasi
Approval Pascakualifikasi
DAFTAR HITAM
Ganti Password
Logout MENU UTAMA
LOGIN
Info Prakualifikasi Info Pascakualifikasi
(3)
Perancangan struktur Menu Rekanan
Sistem Pelelangan DinasCipta Karya
INFORMASI PENGUMUMAN
HOME DATA ADMINITRASI INFORMASI DAFTAR HITAM INFORMASI PEMENANG PROYEK INFORMASI RENCAN PROYEK PERSYARATAN PENGUMUMAN LELANG INFORMASI AINWIJIING PENGUMUMAN AINWIJIING PENGUMUMAN AINWIJIING HISTORY HISTORY LELANG HISTORY AINWIJIING REGISTRASI PENYEDIA JASA LOGIN
(4)
Dapat melakukan
proses penilaian kontraktor
secara cepat dan akurat
.
Sudah
terkomputerisasi
dan dapat diakses melalui
jaringan internet.
Media penyimpanan yang
digunakan sudah
menggunakan
Media Penyimpanan Elektronik dan
Tersistematis.
Dapat
memberikan
informasi
dan
interaksi
mengenai lelang
(5)
Menambahkan
fasilitas pendukung keamanan
data, seperti fasilitas pendaftaraan
Infrastruktur
Kunci Publik (IKP)
.
Menambahkan
fungsi
pembaharuan
berita
pekerjaan.
Menambahkan fasilitas
software client
untuk
kontraktor.
(6)