INVESTASI DALAM SAHAM INVESTMENT IN SHARE OF STOCK
PT ELNUSA Tbk DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran
537 Schedule
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN
30 JUNI 2014 TIDAK DIAUDIT DAN 31 DESEMBER 2013 DIAUDIT
Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain
NOTES TO THE CONSOLIDATED INTERIM FINANCIAL STATEMENTS
30 JUNE 2014 UNAUDITED AND 31 DECEMBER 2013 AUDITED
Expressed in millions of Rupiah, unless otherwise stated
12. INVESTASI DALAM SAHAM lanjutan 12. INVESTMENT IN SHARE OF STOCK continued
b. Investasi pada entitas asosiasi dan
pengendalian bersama entitas lanjutan b. Investments in associates and jointly controlled
entities continued Bagian Grup atas entitas asosiasi dan entitas
pengendalian bersama adalah sebagai berikut: The Group’s share on its associates and jointly
controlled entities are as follows:
Aset Liabilitas
Pendapatan LabaRugi
TahunYear Assets
Liabilities Revenue ProfitLoss
2014 PT Elnusa CGGVeritas Seismic
82,670 111,453
- 2,382
2013 PT Elnusa CGGVeritas Seismic
136,660 131,732
168 11
PT Patra Telekomunikasi Indonesia ”Patrakom”
PT Patra Telekomunikasi Indonesia ”Patrakom” Pada tanggal 24 September 2013,
Perusahaan menjual seluruh investasi di Patrakom dengan harga jual Rp45,6 miliar.
On 24 September 2013, the Company sold all its investment in Patrakom with selling price totalling
Rp45.6 billion.
13. ASET TETAP 13. FIXED ASSETS
Aset tetap terdiri dari: Fixed assets consist of:
2014 Saldo
Awal Saldo
Akhir Beginning Penambahan
Pengurangan Reklasifikasi Ending
balance Additions
Deductions Reclassifications
balance Biaya
Perolehan Cost
Kepemilikan Langsung
Direct Ownership Tanah
198,628 -
- -
198,628 Land Bangunan,
prasarana Buildings,
improvements 3 dan
instalasi 314,941
1,175 62
- 316,054 and
installations Mesin dan peralatan
1,270,234 1,973
953 24,510
1,295,764 Machinery and equipment
Perabotan dan Office furniture, fixtures
perlengkapan kantor
43,478 506
86 165
43,733 and equipment
Alat transportasi
40,404 10,382
- 2,778
48,008 Transportation equipment
Konstruksi baja
1,036,505 468
- 10,605
1,026,368 Steel constructions
Sub-jumlah 2,904,190
14,504 1,101
10,962 2,928,555
Sub-total Aset dalam Penyelesaian
Construction in Progress Mesin dan peralatan
42,236 127,519
- 45,172
124,583 Machinery and equipment
Jumlah harga perolehan 2,946,426
142,023 1,101
34,210 3,053,138 Total
cost
Akumulasi Penyusutan
Accumulated Depreciation
Bangunan, prasarana
Buildings, improvements dan
instalasi 212,610
8,445 62
- 220,993 and
installations Mesin dan peralatan
1,086,973 41,833
953 2,162
1,125,691 Machinery and equipment
Perabotan dan Office furniture, fixtures
perlengkapan kantor
43,004 287
86 66
43,139 and equipment
Alat transportasi
32,254 4,715
- 2,778
34,191 Transportation equipment Konstruksi
baja 518,572
53,952 17,160
555,364 Steel constructions
Jumlah akumulasi
Total accumulated
penyusutan 1,893,413
109,232 1,101
22,166 1,979,378 depreciations Provisi
penurunan nilai
4,065 4,065
Provision for impairment
Nilai buku bersih 1,048,948
1,069,695 Net book value
PT ELNUSA Tbk DAN ENTITAS ANAKAND SUBSIDIARIES Lampiran
538 Schedule
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN
30 JUNI 2014 TIDAK DIAUDIT DAN 31 DESEMBER 2013 DIAUDIT
Disajikan dalam jutaan Rupiah, kecuali dinyatakan lain
NOTES TO THE CONSOLIDATED INTERIM FINANCIAL STATEMENTS
30 JUNE 2014 UNAUDITED AND 31 DECEMBER 2013 AUDITED
Expressed in millions of Rupiah, unless otherwise stated
13. ASET TETAP lanjutan 13. FIXED ASSETS continued
2013 Saldo
Awal Saldo
Akhir Beginning Penambahan
Pengurangan Reklasifikasi Ending
balance Additions
Deductions Reclassifications
balance Biaya
Perolehan Cost
Kepemilikan Langsung
Direct Ownership Tanah
205,507 -
1,024 5,855
198,628 Land Bangunan,
prasarana Buildings,
improvements dan
instalasi 319,609
7,341 545
11,464 314,941 and
installations Mesin dan peralatan
1,289,017 26,487
19,756 25,514
1,270,234 Machinery and equipment
Perabotan dan
Office furniture, fixtures perlengkapan
kantor 42,006
1,749 277
- 43,478 and
equipment Alat
transportasi 49,266
7,667 -
16,529 40,404 Transportation
equipment Konstruksi
baja 1,042,501
530 -
6,526 1,036,505 Steel
constructions Sub-jumlah
2,947,906 43,774
21,602 65,888
2,904,190 Sub-total
Aset dalam Penyelesaian Construction in Progress
Mesin dan peralatan 18,031
83,237 -
59,032 42,236
Machinery and equipment Jumlah
harga perolehan
2,965,937 127,011
21,602 124,920
2,946,426 Total cost
Akumulasi Penyusutan
Accumulated Depreciation
Bangunan, prasarana
Buildings, improvements dan
instalasi 197,250
19,925 545
4,020 212,610 and
installations Mesin dan peralatan
999,134 136,080
15,833 32,408
1,086,973 Machinery and equipment
Perabotan dan Office furniture, fixtures
perlengkapan kantor
41,513 1,768
277 -
43,004 and equipment
Alat transportasi
33,672 7,819
- 9,237
32,254 Transportation equipment Konstruksi
baja 433,068
100,228 -
14,724 518,572 Steel
constructions Jumlah
akumulasi Total
accumulated penyusutan
1,704,637 265,820
16,655 60,389 1,893,413 depreciations
Provisi penurunan
nilai 4,065
4,065 Provision for impairment
Nilai buku bersih 1,257,235
1,048,948 Net book value
Pada tanggal 31 Desember 2013, termasuk didalam reklasifikasi adalah transfer aset tetap ke
aset lain-lain, aset dimiliki untuk dijual dan sewa pembiayaan dengan nilai buku masing-masing
sebesar Rp15.948, Rp34.584 dan Rp13.999. On 31 December 2013 including in reclassification
are transfer from fixed assets to other assets, asset held for sale and finance lease with total net book
value amounting to Rp15,948, Rp34,584 and Rp13,999, respectively.
Beban penyusutan aset tetap dialokasikan sebagai berikut:
Fixed assets depreciation was charged as follows:
2014 2013
Beban pokok pendapatan 106,550
133,425 Cost of revenue
Beban umum dan General and administrative
administrasi 2,682
3,226 expenses 109,232
136,651