85
C. World Bank Group’s Effe ti eness and Results ontinued
Building Existing Country Systems N
DK Mean
SD
5. To what extent does the WBG help to buildstrengthen existing country systems
in Afghanistan? 1-To no degree at all, 10-To a very significant degree 313
86 6.50
2.70
To what extent do you agree with the following statements about the World Bank Group in Afghanistan? 1-Strongly disagree, 10-Strongly agree
N DK
Mean SD
6. The Wo ld Ba k G oup’s fi a ial i st u e ts eet the eeds of Afgha ista
322 63
7.00 2.84
7. The
Wo ld Ba k G oup eets Afgha ista ’s eeds fo k o ledge se i es 262
70 6.97
2.87
Measuring and Correcting Work N
DK Mean
SD
8. To what extent do you believe the World Bank Group measures and corrects its
work in real time in Afghanistan? 1-To no degree at all, 10-To a very significant degree
280 123
6.57 2.88
D. The Afghanistan Reconstruction Trust Fund ARTF
Familiarity with ARTF N
DK Mean
SD
1. How familiar are you with the work of the ARTF in Afghanistan?
1- Not familiar at all, 10-Very familiar 288
104 5.83
3.29
To what extent do you agreedisagree with the following statements? 1-Strongly disagree, 10-Strongly agree
Degree N
DK Mean
SD
2. The ARTF priorities are aligned with the key development priorities in
Afghanistan. 258
107 5.96
3.02 3.
The ARTF distributes resources fairly and equally throughout the country. 268
81 4.34
3.01 4.
The ARTF distributes resources in a way that effectively supports the key development priorities in Afghanistan.
269 80
4.91 3.01
5. The ARTF’s effo ts a e leading to sustainable results on the ground.
273 72
6.35 3.11
6. The ARTF collaborates well with the Afghanistan Government.
245 106
5.59 3.05
7. The World Bank Group collaborates well with other ARTF donors.
206 129
6.41 2.98
8. There should be more oversight of how ARTF resources are spent.
244 98
5.94 3.42
9. There should be more public information available about the work of the
ARTF. 283
67 6.87
3.49 10.
The ARTF is flexible and responds to changing conditions in Afghanistan. 237
103 5.39
3.27
E.
The World Bank Group’s Kno ledge Work and A ti ities
. Ho f e ue tl do ou o sult Wo ld Ba k G oup’s k o ledge o k a d activities in the work you do?
Percentage of Respondents N=392
Weekly 4.8
Monthly 7.4
A few times a year 8.4
Rarely 45.2
Never 34.2
86
E. The World Bank Group’s Kno ledge Work and A ti ities continued