Detailed Design Preparation WINRIP DOC MPR CTC MPR No.4 2013 04 2013 04 10 00225.

Monthly Progress Report April 2013 Western I ndonesia National Roads I mprovement Project 15 • Package No. 1 Krui – Biha : 13 Applicants applied. • Package No. 2 Pd. Sawah – Sp. Empat : 13 Applicants applied. • Package No. 3 Manggopoh – Pd. Sawah : 18 Applicants applied. • Package No. 4 Ipuh – Bantal : 12 Applicants applied. All three 3 Procurement Teams or Pokja evaluated all qualification documents submitted by those Applicants. Submission of the Application Evaluation Report AER to the Bank was on 9 May 2012 for two packages Package No.1 and No.4 and on 20 June 2012 for other two packages Package No.2 and No.3. The Bank still reviews the AERs and requested the Pokja to submit supporting documents. The latest request from the Bank was sent to DGH on 15 March 2013 for board of director and board of commissioner information of the Government’s Entity participated in the prequalification. Finally, the Bank approved the AERs with issuance letter Ref. No. WINRIP120 dated 22 April 2013. The results of prequalification are summarized as the table below. No Singles JO Legal Name Participate and Result of the PQ Package No.1 Package No.2 Package No.3 Package No.4 1 PT. AdhiKarya Persero, Tbk. Passed NA NA Passed 2 PT. AdhiKarya - PT. AngkasapuriKonsursindo, JO. NA Passed Passed NA 3 PT. BangunCiptaKonstruksi - PT. AmartaKarya Persero, JO. Passed NA NA NA 4 PT. BrantasAbipraya Persero Passed NA Passed NA 5 PT. Citra GadingAsritama NA NA NA Passed 6 PT. ConblocInfratecno Passed NA Passed NA 7 PT. Duta Graha Indah, Tbk. Passed Passed Passed NA 8 PT. HutamaKarya Persero NA Passed Passed NA 9 PT. HutamaKarya Persero - PT. SuciKarya Bad inusa, JO. Passed NA NA Passed 10 PT. Jaya Konstruksi MP, Tbk. Passed Passed Passed Failed 11 Kuk Dong Eng. Corp. - PT. Duta Graha Indah, Tbk., JO. NA NA NA Passed 12 PT. Multi Structure Passed Passed Passed Passed 13 PT. NindyaKarya Persero NA Failed Passed Failed 14 PT. NindyaKarya Persero - PT. RindangTigasatuPratama, JO. Passed NA NA NA 15 Pan Asia Corp. - PT. AnugerahKarya Agra Sentosa, JO. Passed NA Passed Failed 16 PT. PP Persero, Tbk. NA Passed Passed NA 17 PT. PP Persero Tbk - PT. Tri Citra Perdana JO. Passed NA NA Passed 18 PT. WaskitaKarya Persero NA Passed Passed NA 19 PT. WaskitaKarya Persero - PT. AngkasaPuriKonsursindo, JO. Passed NA NA NA 20 PT. WaskitaKarya Persero - PT. DayaMuliaTurangga, JO. NA NA NA Passed 21 PT. WijayaKarya – PT. LubukMinturunKaryaPersada, JO. NA Passed Passed Passed 22 PT. Yasa Patria Perkasa NA NA Passed NA 23 PT. AngkasaTeknik Raya NA Failed Failed NA 24 PT. BangunCipta - Barettamuda KSO. NA NA Failed NA 25 PT. BumiRejo Failed NA NA Failed 26 PT. CiptaKarya Prima Mandiri NA Failed Failed NA 27 PT. SumberBatu NA Failed NA NA 28 Synohidro Co. Ltd. NA Failed Failed NA 29 PT. TelagaMegabuana - PT. Mawatindo Road Construction, JO NA NA Failed NA Number Of Applicants submitted the document 13 13 18 12 Number Of Qualified Applicant 12 8 13 8 Number Of Applicant failed to fulfill the qualification requirement 1 5 5 4 Note : NA = Not Applied for Prequalification . DGH has also completed the draft of consolidated multiple contract ICB Standard Bidding Document for four 4 packages under AWP-1. The draft had been submitted to the Bank on 8 March 2012. The Bank’s comments had been issued on 12 March 2012. The draft of consolidated SBD was revised by DGH accommodating the Bank’s