Management Information Systems Quality Assurance Current Situation Action Required

Monthly Progress Report April 2013 Western I ndonesia National Roads I mprovement Project 40 • The provision of properly equipped laboratories with properly trained operators for each package. Package supervision comes under the responsibilities of the immediate supervision teams and the relevant DSC but the Quality Assurance Engineer from CTC, when mobilized, will periodically monitor their performance. Monthly Progress Report April 2013 Western I ndonesia National Roads I mprovement Project 41 7 ISSUES and RECOMMENDATIONS

7.1 Current Situation

The main issue during April 2013 is the procurement of four 4 packages under AWP-1. The AERs have been approved by the Bank. The tender will be started soon after announcement of the pre-qualification result. The existing road conditions of the four packages under AWP-1, which are predicted being deteriorated rapidly by the traffic during almost a year, shall be anticipated. Another issue is establishment of the Design and Supervision Consultant DSC. The DEDs for AWP-2 and AWP-3 packages, including the 7 packages under CTC review at the current time, shall be completed soonest and the procurement can be started immediately.

7.2 Action Required

Since it was concluded that the delay on the procurement is caused by limited performance of the Procurement Teams Pokja, a workshop discussing procurement procedures under the World Bank Procurement Guidelines was delivered on 24 – 25 April 2013 at Tanjung Pandan in Bangka Belitung Province which were attended by all Pokjas. Afterwards, the Pokjas will have more capability on tender process including preparation of the bid evaluation report and the tender process will be implemented smoothly without delays. The project managers PPKs are suggested and required to update the DEDs of the AWP-1 packages following actual condition of the existing roads. The estimated construction cost should be considered to not significantly increase. Otherwise, the prequalification shall be cancelled since the experience criteria for the Applicants were set based on previous estimated construction cost. It is required to expedite the DSC contract signing process following up the Bank’s approval for negotiation results and draft contract on 19 April 2013. Western Indonesia National Roads Improvement Project Appendix A Overall Loan Progress Exchange Rate : 1 equal to IDR 9,750 30 April 2013 Estimated Contractors or Total Est. Budget Starting Completion Consultants Man-Month WB + GOI Remarks Date Date Name Excl. the PIP Original Revised Physical Man-Month Physical Man-Month Physical Man-Month Supp. Staff USD, Excl.VAT Excl. VAT Excl. VAT MM MM MM 1 Betterment and Capacity 314,900,000.00 Expansion of National Roads 1.A AWP-1 ICB DGH 81,630,000.00 Procurement process prequalification. 1.B AWP-2 and AWP-3 ICB NCB DGH 227,100,000.00 Detailed Engineering Design preparation. 1.C Contingency - DGH 6,170,000.00 2 Implementation Support 6,000,000.00 2.A Core Team Consultants CTC QCBS DGH 6-Nov-12 15-Feb-16 PT. Perentjana Djaja 556 5,000,000.00 1,276,700.00 16.192 90.03 11.695

65.03 -4.496

-25.00 Ongoing Joint Venture with Rp21,415,400,000.00 Yongma Engineering Co.Ltd. Or US equivalent total : PT. Epadascon Permata 3,473,151.28 2.B Design Superv. Consultants QCBS DGH Recruitment process. 2.C Incremental Operating Cost Varies PMU 1,000,000.00 Including Technical Audits 3 Road Sector Institutional 1,000,000.00 Development 3.A Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Disaster Risks Reduction 3.B Capacity Building for NCB DGH 350,000.00 Preparation of TOR. Environmental Management 3.C Capacity Building for NCB DGH 300,000.00 Preparation of TOR. Road Safety 4 Contingency for Disaster DGH - Risk Response 5 Unallocated DGH 18,100,000.00 Total 340,000,000.00 3,473,151.28 16.192 90.02580645 11.695

65.03 -4.496

-25.00 Appendix - A OVERALL PROGRESS STATUS Description WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WINRIP IBRD LOAN No. 8043-ID Proc. Method Category Planned Actual Balance PROGRESS Respon- sibility Contract ValueBudget Total WB + GOI CTC 30-Nov-12 31-Dec-12 31-Jan-13 28-Feb-13 31-Mar-13 30-Apr-13 31-May-13 30-Jun-13 31-Jul-13 31-Aug-13 30-Sep-13 31-Oct-13 30-Nov-13 Team Leader 25-Mar-13 0.25 1.25 2.25 3.25 4.25 5.25 6.25 7.25 8.25 Senior Highway 1-Feb-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Senior Proc Senior Road Sft 1-May-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Ass. TL 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Highway Eng 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Qualty Ass. Eng 1-Jul-13 1.00 2.00 2.82 3.82 4.82 Financial 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Enviro 17-Dec-12 0.45 1.45 2.45 3.45 4.45 5.45 6.45 7.45 8.45 9.27 10.27 11.27 Socio 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.15 11.15 12.15 Proc. Speclt-1 Proc. Speclt-2 19-Nov-12 0.33 1.33 2.33 3.33 4.35 5.35 6.35 7.35 8.35 9.35 10.35 11.35 12.35 MIS 1-May-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 Comm.Devlp. 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Prof 1.65

7.10 14.10

22.10 30.37

39.37 50.36

61.36 73.36

85.36 96.29

108.29 120.29 Ass. Highway Ass. Financial 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.33 11.33 12.33 Ass. EnvSocio 19-Nov-12 0.33 1.33 2.33 3.33 4.33 5.33 6.33 7.33 8.33 9.33 10.33 11.33 12.33 Ass. MIS 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Ass. Comm. Dev 1-Feb-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 Ass. Proc-1 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Ass. Proc-2 3-Jan-13 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 Total Sub Prof 0.66

2.66 7.66

13.66 19.66

25.66 31.66

37.66 43.66

49.66 55.66

61.66 67.66

Grand Total 2.31

9.76 21.76

35.76 50.03

65.03 82.02

99.02 117.02

135.02 151.95 169.95 187.95 Mobilized Total Manmonth Up To