Jarak terminal site dengan rute kendaraan dalam km

27

b. Jarak terminal site dengan rute kendaraan dalam km

TERMINAL SITE R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 R12 SPA Sunter 6.9 6.4 6.7 6.6 6.5 6.6 5.6 5.4 5.1 5.3 3.3 5 SPA Cilincing 14.2 15 14.7 14.6 14.4 15.3 14.4 14.5 14.2 14.7 13.9 13.9 TPA Bantar Gebang 21.7 22.8 22.2 22.3 22.4 22.4 22.5 22.8 23.1 22.8 22.2 21.7 ITF Duri Kosambi 11.1 8.9 9.1 9.2 9.3 9 10.3 10.2 10.1 9.7 10.8 10.8 TPST Bojong 30.5 31.4 30.5 30.6 30.7 30.5 30.6 31 31.3 31.7 31.1 30.8 TERMINAL SITE R13 R14 R15 R16 R17 R18 R19 R20 R21 R22 R23 R24 SPA Sunter 6.1 6.7 5.8 5.8 6.4 4.2 3.6 3.3 3.3 3.6 3.6 4.7 SPA Cilincing 13.6 13.9 13.6 13.6 13.3 13.6 13.3 12.5 13.1 13.1 13.9 13.1 TPA Bantar Gebang 21.1 20.6 20.8 21.4 20 23.3 23.1 22.2 22.8 22.5 23.1 21.7 ITF Duri Kosambi 11.9 11.7 11.7 10.1 11.9 11.1 11.4 11.9 11.7 11.9 10.6 11.7 TPST Bojong 29.4 29.2 29.4 30 28.6 32.2 31.9 31.9 32.5 31.7 32.2 30.8 TERMINAL SITE R25 R26 R27 R28 R29 R30 R31 R32 R33 R34 R35 R36 SPA Sunter 4.7 4.2 4.7 4.2 4.2 5.3 5.6 6.7 6.7 5.8 5.6 5.6 SPA Cilincing 13.1 13.1 12.8 13.1 13.3 12.8 12.8 13.6 13.3 13.7 13.1 12.6 TPA Bantar Gebang 21.7 21.9 21.1 22.2 22.2 20.1 20.6 20.6 20 21.1 20 20 ITF Duri Kosambi 11.7 11.9 12.2 11.7 11.1 11.9 12.5 11.7 12.2 11.2 11.8 11.9 TPST Bojong 30.8 31 30.6 30.8 31.4 30 30 29.2 28.6 29.7 29.4 28.6 TERMINAL SITE R37 R38 R39 R40 R41 R42 R43 R44 R45 R46 R47 R48 SPA Sunter 6.1 5.8 6 5.7 5.3 5.8 5.6 6.1 6.2 5.9 4.3 4.2 SPA Cilincing 12.8 12.6 12.9 12.8 13.2 13.2 13.5 11.8 11.9 13.6 12.2 11.7 TPA Bantar Gebang 19.7 20 20.2 20.3 21.1 20.8 21.1 18.9 18.9 19.7 20.8 21.1 ITF Duri Kosambi 12.8 12.5 12.1 11.9 11.5 11.8 11.5 13.5 13.6 12.9 12.6 12.8 TPST Bojong 28.3 28.6 28.3 29.4 29.7 29.4 29.7 28.1 28.1 29.9 30 30 28 TERMINAL SITE R49 R50 R51 R52 R53 R54 R55 R56 R57 R58 R59 R60 SPA Sunter 3.7 6.8 6.4 7.2 7.1 7.1 7.1 7.6 8.1 7.9 7.6 8.6 SPA Cilincing 12.5 14.9 14.7 15.3 14.7 14.7 14.7 15.6 15.7 15 15.3 15.6 TPA Bantar Gebang 21.5 21.7 21.7 21.9 20.8 21.1 21.1 21.4 20.3 20.4 20.8 20.1 ITF Duri Kosambi 9 10.1 10.1 9.9 10.7 10.1 10.1 10 10 10.6 10.3 10.4 TPST Bojong 30.8 30 30 30 29.2 30.1 30.1 29.6 28.9 28.6 29.3 28.1 TERMINAL SITE R61 R62 R63 R64 R65 R66 R67 R68 R69 R70 R71 R72 SPA Sunter 9 8.9 9.3 9 9.6 7.9 8.3 9.4 9.4 3.7 3.7 3.7 SPA Cilincing 15.8 15.7 16.7 16.5 16.9 16 16.2 16.8 16.4 13.6 13.9 1.8 TPA Bantar Gebang 20.4 20.6 21.8 21.4 21.7 21.8 21.7 21.2 20.3 22.8 23.3 20.7 ITF Duri Kosambi 10.4 10.4 9.2 9.6 9 9.3 9.6 9.4 10.1 10.7 10.7 12.6 TPST Bojong 28.1 28.2 29.4 29 28.9 29.8 29.4 28.7 28.1 32.1 32.5 30 TERMINAL SITE R73 R74 R75 R76 R77 R78 R79 R80 R81 R82 R83 R84 SPA Sunter 3.6 3.8 3.5 1.2 3.1 5.1 3.7 3.5 3.5 5.3 4 4.2 SPA Cilincing 11.4 11.6 11.5 11.7 11.2 11.7 11.1 10.6 10.4 11 11.1 10 TPA Bantar Gebang 20.6 20.3 20.8 21.4 21.1 20.8 20.3 20.3 20.3 20.3 20 19.7 ITF Duri Kosambi 13.2 13.5 13.3 11.4 13.5 12.9 13.3 13.7 14 13.6 13.5 14.2 TPST Bojong 30.1 30.6 30.6 31 30.6 30.1 30.3 30 30 30 29.7 28.1 TERMINAL SITE R85 R86 R87 R88 R89 R90 R91 R92 R93 R94 R95 R96 SPA Sunter 3.6 3.6 4.7 4.9 5.1 4.6 4.2 5.3 5.7 5.3 5.8 7.9 SPA Cilincing 10.4 10.3 10.1 9.4 9.9 9.9 9.4 9.2 10.1 10 9.6 10.8 TPA Bantar Gebang 20 19.7 18.7 18.5 18.5 18.7 19 18.1 18.1 18.2 17.9 18.2 ITF Duri Kosambi 13.9 13.6 14.3 14.9 14.6 14.4 14.7 15.3 14.6 14.4 15 15 TPST Bojong 29.7 29.4 28.5 28.5 28.3 28.5 28.9 28.2 27.6 28.1 27.5 28.2 29 TERMINAL SITE R97 R98 R99 R100 R101 R102 R103 R104 R105 R106 R107 R108 SPA Sunter 6 5.8 5.6 6.4 6 6.2 6.4 6.4 6.8 7.1 6.7 6.5 SPA Cilincing 9.2 9.4 8.9 9.2 9.6 9.4 9.9 10.1 10.4 10.3 10.1 11 TPA Bantar Gebang 17.4 17.6 17.6 17.1 17.6 17.2 17.2 17.8 17.5 16.9 17.2 17.8 ITF Duri Kosambi 15.6 15.4 15.4 15.7 15.1 15.4 15.8 14.7 15.1 15.4 15.3 14.4 TPST Bojong 27.4 27.5 27.8 25.4 27.4 27.1 26.9 27.2 26.9 26.8 27.1 27.2 TERMINAL SITE R109 R110 R111 R112 R113 R114 R115 R116 R117 R118 R119 R120 SPA Sunter 7.1 6.4 6.5 5.8 5.8 6.2 6 5.4 5.4 3.6 5.4 5.4 SPA Cilincing 11.5 11.5 11.4 10.7 11 10.8 10.1 10.7 10.3 10.6 12.6 12.5 TPA Bantar Gebang 18.1 18.3 18.2 18.5 18.5 18.3 18.2 18.7 18.6 18.9 20.4 20 ITF Duri Kosambi 14 13.7 14.2 14.4 14.3 14.3 14.4 14 14.4 14.3 11.9 12.4 TPST Bojong 27.1 27.5 27.5 28.1 27.9 27.8 27.6 28.2 28.2 28.5 29.4 28.9 TERMINAL SITE R121 R122 SPA Sunter 5.8 5.7 SPA Cilincing 12.8 12.9 TPA Bantar Gebang 20 20.4 ITF Duri Kosambi 12.5 11.8 TPST Bojong 28.9 29.1 30 Lampiran 5 Penyelesaian masalah simulasi pengangkutan sampah di Jakarta Pusat dengan menggunakan LINGO 8.0 a. Tahap 1 Solusi yang dihasilkan pada tahap 1 tidak ditampilkan semuanya pada lampiran ini disebabkan karena ukurannya yang terlalu banyak. MODEL : TITLE Phase 1 : PENGEMBANGAN MODEL OPTIMASI RUTE PENGAMBILAN SAMPAH DI JAKARTA PUSAT; SETS : RUTE_PENGANGKUTAN: VOL_SAMPAH; DEPOT : KAPASITAS_DEPOT; KENDARAAN: DAYA_ANGKUT, BIAYA_ANGKUT, BIAYA_PERJALANAN; JARAK1DEPOT,RUTE_PENGANGKUTAN: JARAK_DEPOT_KE_RUTE; VAR_KEPUTUSANKENDARAAN,DEPOT,RUTE_PENGANGKUTAN: DELTA, LOAD; ENDSETS FUNGSI OBJEKTIF; MIN = SUM VAR_KEPUTUSANI,J,K: DELTAI,J,KJARAK_DEPOT_KE_RUTEJ,KBIAYA_PERJALANANI + SUM VAR_KEPUTUSANI,J,K: LOADI,J,KBIAYA_ANGKUTI ; SEMUA SAMPAH DI SETIAP RUTE PENGANGKUTAN HARUS DIANGKUT; FOR RUTE_PENGANGKUTANK: SUM KENDARAANI: SUM DEPOTJ:LOADI,J,K = VOL_SAMPAHK; Jumlah sampah yang diangkut oleh setiap kendaraan tidak boleh melebihi kapasitas kendaraan dimana setiap kendaraan hanya bisa melakukan 2 ritasi; FOR VAR_KEPUTUSANI,J,K: LOADI,J,K = 2DAYA_ANGKUTI; Jika deltaijk = 0 maka tidak ada sampah yang diangkut oleh kendaraan ke-i; FOR VAR_KEPUTUSANI,J,K: LOADI,J,K = DELTAI,J,KVOL_SAMPAHK; Jika delta ijk=1 maka load ijk harus 0 dan banyak sampah yang diangkut harus sebanyak jumlah yang ditetapkan, yaitu 3 m 3 ; FOR VAR_KEPUTUSANI,J,K: 3DELTAI,J,K - LOADI,J,K = 0; Load ijk harus = 0; FOR VAR_KEPUTUSANI,J,K: LOADI,J,K = 0; UNTUK SETIAP RUTE PENGANGKUTAN, MINIMAL ADA SATU KENDARAAN YANG BERTUGAS MENGANGKUT SAMPAH; FOR RUTE_PENGANGKUTANK: SUM KENDARAANI: SUM DEPOTJ:DELTAI,J,K = 1; Setiap kendaraan hanya boleh bertugas di satu rute pengangkutan saja; FOR KENDARAANI: SUM DEPOTJ: SUM RUTE_PENGANGKUTANK:DELTAI,J,K= 1; 31 JUMLAH KENDARAAN YANG DITEMPATKAN DI DEPOT TIDAK BOLEH MELEBIHI KAPASITAS YANG TERSEDIA; FOR DEPOTJ: SUM KENDARAANI: SUM RUTE_PENGANGKUTANK:DELTAI,J,K= KAPASITAS_DEPOTJ; DELTA ADALAH VARIABEL BINER; FOR VAR_KEPUTUSAN: BIN DELTA; Data yang dipakai disimpan di dalam program excel yang dapat diimpor dari G:\Prototipe Program\Data Kebersihan1.XLS; DATA : RUTE_PENGANGKUTAN, DEPOT, KENDARAAN, VOL_SAMPAH, KAPASITAS_DEPOT, DAYA_ANGKUT, BIAYA_ANGKUT, JARAK_DEPOT_KE_RUTE, BIAYA_PERJALANAN = OLE G:\Prototipe Program\Data Kebersihan1.XLS; ENDDATA Global optimal solution found at iteration: 1996898 Objective value: 8775295. Model Title: Phase 1 : PENGEMBANGAN MODEL OPTIMASI RUTE PENGAMBILAN SAMPAH Variable Value Reduced Cost VOL_SAMPAH R1 30.00000 0.000000 VOL_SAMPAH R2 50.00000 0.000000 VOL_SAMPAH R3 24.00000 0.000000 VOL_SAMPAH R4 20.00000 0.000000 VOL_SAMPAH R5 30.00000 0.000000 VOL_SAMPAH R6 24.00000 0.000000 VOL_SAMPAH R7 50.00000 0.000000 VOL_SAMPAH R8 20.00000 0.000000 VOL_SAMPAH R9 20.00000 0.000000 VOL_SAMPAH R10 30.00000 0.000000 VOL_SAMPAH R11 28.00000 0.000000 VOL_SAMPAH R12 24.00000 0.000000 VOL_SAMPAH R13 20.50000 0.000000 VOL_SAMPAH R14 18.00000 0.000000 VOL_SAMPAH R15 20.00000 0.000000 KAPASITAS_DEPOT D1 5.000000 0.000000 KAPASITAS_DEPOT D2 7.000000 0.000000 KAPASITAS_DEPOT D3 10.00000 0.000000 DAYA_ANGKUT TB1 18.00000 0.000000 DAYA_ANGKUT TB2 18.00000 0.000000 DAYA_ANGKUT TB3 18.00000 0.000000 DAYA_ANGKUT TB4 18.00000 0.000000 DAYA_ANGKUT TB5 18.00000 0.000000 DAYA_ANGKUT TB6 18.00000 0.000000 DAYA_ANGKUT TK1 8.000000 0.000000 DAYA_ANGKUT TK2 8.000000 0.000000 DAYA_ANGKUT TK3 8.000000 0.000000 DAYA_ANGKUT TK4 8.000000 0.000000 DAYA_ANGKUT CB1 20.00000 0.000000 DAYA_ANGKUT CB2 20.00000 0.000000 DAYA_ANGKUT CK1 10.00000 0.000000 DAYA_ANGKUT CK2 10.00000 0.000000 DAYA_ANGKUT AB1 10.00000 0.000000 DAYA_ANGKUT AB2 10.00000 0.000000 DAYA_ANGKUT AB3 10.00000 0.000000 DAYA_ANGKUT AB4 10.00000 0.000000 32 DAYA_ANGKUT AK1 6.000000 0.000000 DAYA_ANGKUT AK2 6.000000 0.000000 DAYA_ANGKUT AK3 6.000000 0.000000 DAYA_ANGKUT AK4 6.000000 0.000000 BIAYA_ANGKUT TB1 16148.04 0.000000 BIAYA_ANGKUT TB2 16148.04 0.000000 BIAYA_ANGKUT TB3 16148.04 0.000000 BIAYA_ANGKUT TB4 16148.04 0.000000 BIAYA_ANGKUT TB5 16148.04 0.000000 BIAYA_ANGKUT TB6 16148.04 0.000000 BIAYA_ANGKUT TK1 19245.82 0.000000 BIAYA_ANGKUT TK2 19245.82 0.000000 BIAYA_ANGKUT TK3 19245.82 0.000000 BIAYA_ANGKUT TK4 19245.82 0.000000 BIAYA_ANGKUT CB1 21991.76 0.000000 BIAYA_ANGKUT CB2 21991.76 0.000000 BIAYA_ANGKUT CK1 25038.37 0.000000 BIAYA_ANGKUT CK2 25038.37 0.000000 BIAYA_ANGKUT AB1 16675.23 0.000000 BIAYA_ANGKUT AB2 16675.23 0.000000 BIAYA_ANGKUT AB3 16675.23 0.000000 BIAYA_ANGKUT AB4 16675.23 0.000000 BIAYA_ANGKUT AK1 18614.39 0.000000 BIAYA_ANGKUT AK2 18614.39 0.000000 BIAYA_ANGKUT AK3 18614.39 0.000000 BIAYA_ANGKUT AK4 18614.39 0.000000 BIAYA_PERJALANAN TB1 10819.78 0.000000 BIAYA_PERJALANAN TB2 10819.78 0.000000 BIAYA_PERJALANAN TB3 10819.78 0.000000 BIAYA_PERJALANAN TB4 10819.78 0.000000 BIAYA_PERJALANAN TB5 10819.78 0.000000 BIAYA_PERJALANAN TB6 10819.78 0.000000 BIAYA_PERJALANAN TK1 6859.520 0.000000 BIAYA_PERJALANAN TK2 6859.520 0.000000 BIAYA_PERJALANAN TK3 6859.520 0.000000 BIAYA_PERJALANAN TK4 6859.520 0.000000 BIAYA_PERJALANAN CB1 10332.16 0.000000 BIAYA_PERJALANAN CB2 10332.16 0.000000 BIAYA_PERJALANAN CK1 8800.020 0.000000 BIAYA_PERJALANAN CK2 8800.020 0.000000 BIAYA_PERJALANAN AB1 9825.600 0.000000 BIAYA_PERJALANAN AB2 9825.600 0.000000 BIAYA_PERJALANAN AB3 9825.600 0.000000 BIAYA_PERJALANAN AB4 9825.600 0.000000 BIAYA_PERJALANAN AK1 7080.420 0.000000 BIAYA_PERJALANAN AK2 7080.420 0.000000 BIAYA_PERJALANAN AK3 7080.420 0.000000 BIAYA_PERJALANAN AK4 7080.420 0.000000 JARAK_DEPOT_KE_RUTE D1, R1 8.900000 0.000000 JARAK_DEPOT_KE_RUTE D1, R2 9.700000 0.000000 JARAK_DEPOT_KE_RUTE D1, R3 9.200000 0.000000 JARAK_DEPOT_KE_RUTE D1, R4 9.300000 0.000000 JARAK_DEPOT_KE_RUTE D1, R5 9.100000 0.000000 JARAK_DEPOT_KE_RUTE D1, R6 9.100000 0.000000 JARAK_DEPOT_KE_RUTE D1, R7 8.600000 0.000000 JARAK_DEPOT_KE_RUTE D1, R8 8.800000 0.000000 JARAK_DEPOT_KE_RUTE D1, R9 9.000000 0.000000 JARAK_DEPOT_KE_RUTE D1, R10 8.300000 0.000000 JARAK_DEPOT_KE_RUTE D1, R11 9.200000 0.000000 JARAK_DEPOT_KE_RUTE D1, R12 8.600000 0.000000 JARAK_DEPOT_KE_RUTE D1, R13 7.800000 0.000000 JARAK_DEPOT_KE_RUTE D1, R14 7.200000 0.000000 JARAK_DEPOT_KE_RUTE D1, R15 7.800000 0.000000 JARAK_DEPOT_KE_RUTE D2, R1 5.500000 0.000000 JARAK_DEPOT_KE_RUTE D2, R2 6.100000 0.000000 33 JARAK_DEPOT_KE_RUTE D2, R3 6.100000 0.000000 JARAK_DEPOT_KE_RUTE D2, R4 5.900000 0.000000 JARAK_DEPOT_KE_RUTE D2, R5 6.000000 0.000000 JARAK_DEPOT_KE_RUTE D2, R6 6.300000 0.000000 JARAK_DEPOT_KE_RUTE D2, R7 6.100000 0.000000 JARAK_DEPOT_KE_RUTE D2, R8 5.800000 0.000000 JARAK_DEPOT_KE_RUTE D2, R9 5.400000 0.000000 JARAK_DEPOT_KE_RUTE D2, R10 5.600000 0.000000 JARAK_DEPOT_KE_RUTE D2, R11 4.200000 0.000000 JARAK_DEPOT_KE_RUTE D2, R12 4.200000 0.000000 JARAK_DEPOT_KE_RUTE D2, R13 5.300000 0.000000 JARAK_DEPOT_KE_RUTE D2, R14 5.800000 0.000000 JARAK_DEPOT_KE_RUTE D2, R15 5.600000 0.000000 JARAK_DEPOT_KE_RUTE D3, R1 14.40000 0.000000 JARAK_DEPOT_KE_RUTE D3, R2 14.70000 0.000000 JARAK_DEPOT_KE_RUTE D3, R3 15.00000 0.000000 JARAK_DEPOT_KE_RUTE D3, R4 14.80000 0.000000 JARAK_DEPOT_KE_RUTE D3, R5 14.90000 0.000000 JARAK_DEPOT_KE_RUTE D3, R6 15.10000 0.000000 JARAK_DEPOT_KE_RUTE D3, R7 14.70000 0.000000 JARAK_DEPOT_KE_RUTE D3, R8 14.80000 0.000000 JARAK_DEPOT_KE_RUTE D3, R9 14.30000 0.000000 JARAK_DEPOT_KE_RUTE D3, R10 15.00000 0.000000 JARAK_DEPOT_KE_RUTE D3, R11 13.30000 0.000000 JARAK_DEPOT_KE_RUTE D3, R12 13.60000 0.000000 JARAK_DEPOT_KE_RUTE D3, R13 13.90000 0.000000 JARAK_DEPOT_KE_RUTE D3, R14 14.20000 0.000000 JARAK_DEPOT_KE_RUTE D3, R15 13.90000 0.000000 DELTA TB1, D1, R1 0.000000 96296.04 DELTA TB1, D1, R2 0.000000 -49937.13 DELTA TB1, D1, R3 0.000000 40349.58 DELTA TB1, D1, R4 0.000000 90080.15 DELTA TB1, D1, R5 0.000000 98460.00 DELTA TB1, D1, R6 0.000000 24113.28 DELTA TB1, D1, R7 1.000000 93050.11 DELTA TB1, D1, R8 0.000000 84670.26 DELTA TB1, D1, R9 0.000000 86834.22 DELTA TB1, D1, R10 0.000000 89804.17 DELTA TB1, D1, R11 0.000000 99541.98 DELTA TB1, D1, R12 0.000000 33857.71 DELTA TB1, D1, R13 0.000000 -35401.98 DELTA TB1, D1, R14 0.000000 -27284.54 DELTA TB1, D1, R15 0.000000 73850.48 DELTA TB1, D2, R1 0.000000 59508.79 DELTA TB1, D2, R2 0.000000 -88888.34 DELTA TB1, D2, R3 0.000000 6808.258 DELTA TB1, D2, R4 0.000000 53292.90 DELTA TB1, D2, R5 0.000000 64918.68 DELTA TB1, D2, R6 0.000000 -6182.106 DELTA TB1, D2, R7 0.000000 -88888.34 DELTA TB1, D2, R8 0.000000 52210.92 DELTA TB1, D2, R9 0.000000 47883.01 DELTA TB1, D2, R10 0.000000 60590.77 DELTA TB1, D2, R11 0.000000 45443.08 DELTA TB1, D2, R12 0.000000 -13749.32 DELTA TB1, D2, R13 0.000000 -62451.43 DELTA TB1, D2, R14 0.000000 -42432.24 DELTA TB1, D2, R15 0.000000 50046.97 DELTA TB1, D3, R1 0.000000 155804.8 DELTA TB1, D3, R2 0.000000 4161.766 DELTA TB1, D3, R3 0.000000 103104.3 DELTA TB1, D3, R4 0.000000 149588.9 DELTA TB1, D3, R5 0.000000 161214.7 DELTA TB1, D3, R6 0.000000 89031.96 DELTA TB1, D3, R7 0.000000 4161.766 34 DELTA TB1, D3, R8 0.000000 149588.9 DELTA TB1, D3, R9 0.000000 144179.1 DELTA TB1, D3, R10 0.000000 162296.7 DELTA TB1, D3, R11 0.000000 143903.1 DELTA TB1, D3, R12 0.000000 87956.61 DELTA TB1, D3, R13 0.000000 30598.68 DELTA TB1, D3, R14 0.000000 48453.92 DELTA TB1, D3, R15 0.000000 139851.1 DELTA TB2, D1, R1 0.000000 96296.04 DELTA TB2, D1, R2 0.000000 -49937.13 DELTA TB2, D1, R3 0.000000 40349.58 DELTA TB2, D1, R4 0.000000 90080.15 DELTA TB2, D1, R5 0.000000 98460.00 DELTA TB2, D1, R6 0.000000 24113.28 DELTA TB2, D1, R7 0.000000 -61838.89 DELTA TB2, D1, R8 0.000000 84670.26 DELTA TB2, D1, R9 0.000000 86834.22 DELTA TB2, D1, R10 0.000000 89804.17 DELTA TB2, D1, R11 0.000000 99541.98 DELTA TB2, D1, R12 0.000000 33857.71 DELTA TB2, D1, R13 0.000000 -35401.98 DELTA TB2, D1, R14 0.000000 -27284.54 DELTA TB2, D1, R15 0.000000 73850.48 DELTA TB2, D2, R1 0.000000 59508.79 DELTA TB2, D2, R2 1.000000 66000.66 DELTA TB2, D2, R3 0.000000 6808.258 DELTA TB2, D2, R4 0.000000 53292.90 DELTA TB2, D2, R5 0.000000 64918.68 DELTA TB2, D2, R6 0.000000 -6182.106 DELTA TB2, D2, R7 0.000000 -88888.34 DELTA TB2, D2, R8 0.000000 52210.92 DELTA TB2, D2, R9 0.000000 47883.01 DELTA TB2, D2, R10 0.000000 60590.77 DELTA TB2, D2, R11 0.000000 45443.08 DELTA TB2, D2, R12 0.000000 -13749.32 DELTA TB2, D2, R13 0.000000 -62451.43 DELTA TB2, D2, R14 0.000000 -42432.24 DELTA TB2, D2, R15 0.000000 50046.97 DELTA TB2, D3, R1 0.000000 155804.8 DELTA TB2, D3, R2 0.000000 4161.766 DELTA TB2, D3, R3 0.000000 103104.3 DELTA TB2, D3, R4 0.000000 149588.9 DELTA TB2, D3, R5 0.000000 161214.7 DELTA TB2, D3, R6 0.000000 89031.96 DELTA TB2, D3, R7 0.000000 4161.766 DELTA TB2, D3, R8 0.000000 149588.9 DELTA TB2, D3, R9 0.000000 144179.1 DELTA TB2, D3, R10 0.000000 162296.7 DELTA TB2, D3, R11 0.000000 143903.1 DELTA TB2, D3, R12 0.000000 87956.61 DELTA TB2, D3, R13 0.000000 30598.68 DELTA TB2, D3, R14 0.000000 48453.92 DELTA TB2, D3, R15 0.000000 139851.1 DELTA TB3, D1, R1 0.000000 96296.04 DELTA TB3, D1, R2 0.000000 -49937.13 DELTA TB3, D1, R3 0.000000 40349.58 DELTA TB3, D1, R4 0.000000 90080.15 DELTA TB3, D1, R5 0.000000 98460.00 DELTA TB3, D1, R6 0.000000 24113.28 DELTA TB3, D1, R7 0.000000 -61838.89 DELTA TB3, D1, R8 0.000000 84670.26 DELTA TB3, D1, R9 0.000000 86834.22 DELTA TB3, D1, R10 0.000000 89804.17 DELTA TB3, D1, R11 0.000000 99541.98 DELTA TB3, D1, R12 0.000000 33857.71 35 LOAD AK3, D3, R2 0.000000 0.000000 LOAD AK3, D3, R3 12.00000 0.000000 LOAD AK3, D3, R4 0.000000 0.000000 LOAD AK3, D3, R5 0.000000 0.000000 LOAD AK3, D3, R6 0.000000 0.000000 LOAD AK3, D3, R7 0.000000 0.000000 LOAD AK3, D3, R8 0.000000 0.000000 LOAD AK3, D3, R9 0.000000 0.000000 LOAD AK3, D3, R10 0.000000 2466.350 LOAD AK3, D3, R11 0.000000 0.000000 LOAD AK3, D3, R12 0.000000 0.000000 LOAD AK3, D3, R13 0.000000 0.000000 LOAD AK3, D3, R14 0.000000 0.000000 LOAD AK3, D3, R15 0.000000 0.000000 LOAD AK4, D1, R1 0.000000 0.000000 LOAD AK4, D1, R2 0.000000 0.000000 LOAD AK4, D1, R3 0.000000 0.000000 LOAD AK4, D1, R4 0.000000 0.000000 LOAD AK4, D1, R5 0.000000 0.000000 LOAD AK4, D1, R6 0.000000 0.000000 LOAD AK4, D1, R7 0.000000 0.000000 LOAD AK4, D1, R8 0.000000 0.000000 LOAD AK4, D1, R9 0.000000 0.000000 LOAD AK4, D1, R10 0.000000 2466.350 LOAD AK4, D1, R11 0.000000 0.000000 LOAD AK4, D1, R12 0.000000 0.000000 LOAD AK4, D1, R13 0.000000 0.000000 LOAD AK4, D1, R14 0.000000 0.000000 LOAD AK4, D1, R15 0.000000 0.000000 LOAD AK4, D2, R1 0.000000 0.000000 LOAD AK4, D2, R2 0.000000 0.000000 LOAD AK4, D2, R3 0.000000 0.000000 LOAD AK4, D2, R4 0.000000 0.000000 LOAD AK4, D2, R5 0.000000 0.000000 LOAD AK4, D2, R6 0.000000 0.000000 LOAD AK4, D2, R7 0.000000 0.000000 LOAD AK4, D2, R8 0.000000 0.000000 LOAD AK4, D2, R9 0.000000 1939.160 LOAD AK4, D2, R10 0.000000 0.000000 LOAD AK4, D2, R11 0.000000 2466.350 LOAD AK4, D2, R12 0.000000 0.000000 LOAD AK4, D2, R13 0.000000 0.000000 LOAD AK4, D2, R14 0.000000 0.000000 LOAD AK4, D2, R15 0.000000 0.000000 LOAD AK4, D3, R1 0.000000 0.000000 LOAD AK4, D3, R2 0.000000 0.000000 LOAD AK4, D3, R3 0.000000 0.000000 LOAD AK4, D3, R4 0.000000 0.000000 LOAD AK4, D3, R5 0.000000 0.000000 LOAD AK4, D3, R6 0.000000 0.000000 LOAD AK4, D3, R7 0.000000 0.000000 LOAD AK4, D3, R8 0.000000 0.000000 LOAD AK4, D3, R9 0.000000 0.000000 LOAD AK4, D3, R10 0.000000 0.000000 LOAD AK4, D3, R11 0.000000 0.000000 LOAD AK4, D3, R12 12.00000 0.000000 LOAD AK4, D3, R13 0.000000 0.000000 LOAD AK4, D3, R14 0.000000 0.000000 LOAD AK4, D3, R15 0.000000 0.000000 Row Slack or Surplus Dual Price 1 8775295. -1.000000 2 0.000000 -16148.04 3 0.000000 -19245.82 4 0.000000 -18614.39 36 5 0.000000 -16675.23 6 0.000000 -16148.04 7 0.000000 -19245.82 8 0.000000 -19245.82 9 0.000000 -16675.23 10 0.000000 -16675.23 11 0.000000 -16148.04 12 0.000000 -16148.04 13 0.000000 -18614.39 14 0.000000 -21991.76 15 0.000000 -21991.76 16 0.000000 -16675.23 17 36.00000 0.000000 18 36.00000 0.000000 19 36.00000 0.000000 20 36.00000 0.000000 21 36.00000 0.000000 22 36.00000 0.000000 23 0.000000 3097.780 24 36.00000 0.000000 25 36.00000 0.000000 26 36.00000 0.000000 27 36.00000 0.000000 28 36.00000 0.000000 29 36.00000 0.000000 30 36.00000 0.000000 31 36.00000 0.000000 32 36.00000 0.000000 33 36.00000 0.000000 34 36.00000 0.000000 35 36.00000 0.000000 36 36.00000 0.000000 37 36.00000 0.000000 38 36.00000 0.000000 39 36.00000 0.000000 40 36.00000 0.000000 41 36.00000 0.000000 42 36.00000 0.000000 43 36.00000 0.000000 44 36.00000 0.000000 45 36.00000 0.000000 46 36.00000 0.000000 47 36.00000 0.000000 48 36.00000 0.000000 49 36.00000 0.000000 50 36.00000 0.000000 51 36.00000 0.000000 52 36.00000 0.000000 53 36.00000 0.000000 54 36.00000 0.000000 55 36.00000 0.000000 56 36.00000 0.000000 57 36.00000 0.000000 58 36.00000 0.000000 59 36.00000 0.000000 60 36.00000 0.000000 61 36.00000 0.000000 62 36.00000 0.000000 63 36.00000 0.000000 64 36.00000 0.000000 65 36.00000 0.000000 66 36.00000 0.000000 67 36.00000 0.000000 68 36.00000 0.000000 69 36.00000 0.000000 37 3969 0.000000 0.000000 3970 0.000000 0.000000 3971 0.000000 0.000000 3972 0.000000 0.000000 3973 12.00000 0.000000 3974 0.000000 0.000000 3975 0.000000 0.000000 3976 0.000000 0.000000 3977 0.000000 0.000000 3978 1.000000 0.000000 3979 1.000000 0.000000 3980 0.000000 0.000000 3981 0.000000 0.000000 3982 1.000000 0.000000 3983 1.000000 0.000000 3984 0.000000 0.000000 3985 0.000000 0.000000 3986 0.000000 0.000000 3987 0.000000 0.000000 3988 1.000000 0.000000 3989 0.000000 0.000000 3990 0.000000 0.000000 3991 0.000000 0.000000 3992 0.000000 0.000000 3993 0.000000 0.000000 3994 0.000000 0.000000 3995 0.000000 0.000000 3996 0.000000 0.000000 3997 0.000000 0.000000 3998 0.000000 0.000000 3999 0.000000 0.000000 4000 0.000000 0.000000 4001 0.000000 0.000000 4002 0.000000 0.000000 4003 0.000000 0.000000 4004 1.000000 0.000000 4005 1.000000 0.000000 4006 0.000000 0.000000 4007 0.000000 0.000000 4008 0.000000 0.000000 4009 0.000000 0.000000 4010 0.000000 0.000000 4011 0.000000 0.000000 4012 0.000000 0.000000 4013 0.000000 0.000000 4014 0.000000 0.000000 4015 0.000000 0.000000 4016 2.000000 0.000000

b. Tahap 2