Uji penurunan nilai atas properti minyak dan gas Impairment test on oil and gas properties
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
16 GOODWILL DAN ASET TAK BERWUJUD LAINNYA
4,784,608 3,851,047
3,851,047
16 GOODWILL AND OTHER INTANGIBLE ASSETS
Harga perolehan Cost
Piranti lunak
4,408,885 3,478,810
3,472,455
Software Hak atas tanah
1,913,259 1,863,328
1,863,328
Land rights Goodwill
88,061,314 88,052,049
88,058,405
Goodwill Sub total
94,383,458 93,394,186
93,394,188
Sub total Akumulasi amortisasi dan penurunan nilai
Accumulated amortization and impairment Piranti lunak
1,121,545 48,357,371
1,121,545
Software Hak atas tanah
474,278 418,568
418,567
Land rights Goodwill
88,003,027 40,767,200
88,003,029
Goodwill Sub total
89,598,850 89,543,139
89,543,141
Sub total Total
4,784,608 3,851,047
3,851,047
Total Perubahan dalam akun goodwill dan aset tak berwujud lainnya untuk tahun yang
berakhir pada tanggal 30 September 2016 dan 31 Desember 2015 adalah sebagai berikut:
The changes in the goodwill and other intangible assets account for the year ended September 30, 2016 and December 31, 2015 are as follows:
Goodwill merupakan saldo yang timbul karena akuisisi kepemilikan atas SIPBV, SIPL, dan SPLLC sebagai akibat dari pengukuran nilai wajar aset dan liabilitas
milik SIPBV, SIPL, dan SPLLC pada tanggal akuisisi Catatan 4. Goodwill represents balance arising from acquisition of ownership in SIPBV, SIPL and
SPLLC, as result of fair value measurement to assets and liabilities owned by SIPBV, SIPL and SPLLC at acquisition date Note 4.
Pengujian penurunan
nilai goodwill
dilakukan bersama
dengan pengujian
penurunan nilai properti minyak dan gas karena berasal dari unit penghasil kas yang sama, yaitu Blok Pangkah. Lihat Catatan 15c untuk metode dan asumsi yang
digunakan dalam pengujian penurunan nilai. Impairment test on goodwill were performed together with impairment test on oil and
gas properties, since they come from the same cash generating unit, Pangkah Block. See Note 15c for method and assumptions used in the impairment test.
57
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
17 UTANG USAHA
130,929,947 116,996,612
116,996,612
17 TRADE PAYABLES
Pihak berelasi PT Pertamina EP
24,021,457 28,258,571
24,249,386
PT Pertamina EP PT Pertamina Hulu Energi
6,190,981 3,563,731
3,775,166
PT Pertamina Hulu Energi PT Pertamina Gas
2,326,315 1,088,908
2,044,937
PT Pertamina Gas
Pihak ketiga Santos Madura Offshore
5,747,629 4,922,831
4,922,831
Santos Madura Offshore Kangean Energy Indonesia Ltd.
1,760,693 1,760,695
1,760,695
Kangean Energy Indonesia Ltd. Lapindo Brantas, Inc.
704,983 561,872
561,872
Lapindo Brantas, Inc. ConocoPhilips Grissik Ltd.
67,401,829 72,715,103
72,715,103
ConocoPhilips Grissik Ltd. PT Medco EP Indonesia
13,412 -
-
PT Medco EP Indonesia PT Gresik Migas
- 129,608
129,608
PT Gresik Migas PT Nugas Trans Energy
- 838,699
838,699
PT Nugas Trans Energy PT Sadikun Niagamas Raya
3,040,666 306,003
306,003
PT Sadikun Niagamas Raya PT Wali Nusa Energi
3,449,487 267,062
267,062
PT Wali Nusa Energi PT Bayu Buana Gemilang
2,995,473 113,481
113,481
PT Bayu Buana Gemilang PT Taruko Energy
1,924,319 1,823,930
1,823,930
PT Taruko Energy PT Inti Daya Latu Prima
1,197,602 1,168,148
1,168,148
PT Inti Daya Latu Prima Premier Oil Natuna Sea B.V.
5,013,316 165,684
165,684
Premier Oil Natuna Sea B.V. Sembcorp Gas Pte. Ltd
1,207,823 673,014
673,014
Sembcorp Gas Pte. Ltd Gas Supply PTE. Ltd
812,958 452,990
452,990
Gas Supply PTE. Ltd Petrogas
1,929 -
PT T Energy PT Zebra Energy
PT Zebra Energy
82,547 USD
dan
- Rp
82,547 USD
- Rp
pada tahun 2016 dan in 2016 and
73,110 USD
dan
213,190,570 Rp
73,110 USD
213,190,570 Rp
pada tahun 2015
- 88,564
88,564
in 2015 PT Granary Global Energy
PT Granary Global Energy
16,608 USD
dan
- Rp
16,608 USD
- Rp
pada tahun 2016 dan in 2016 and
60,002 USD
dan
150,443,860 Rp
60,002 USD
150,443,860 Rp
pada tahun 2015
1,116,576 70,908
70,908
in 2015 PT Indogas Dwi Kriyaguna
2,002,499 868,531
868,531
PT Indogas Dwi Kriyaguna Total
130,929,947 119,838,334
116,996,612
Total
18 PINJAMAN BANK JANGKA PENDEK
50,000,000 -
18 SHORT-TERM BANK LOANS
Bank DBS Indonesia Bank DBS Indonesia
pada tahun 2016
50,000,000 -
in 2016 Total
50,000,000 -
Total
Bank DBS Indonesia Bank DBS Indonesia
Trade payables are non-interest bearing and are normally settled within 10 to 30 days since invoice were received.
Jumlah tersebut merupakan saldo pinjaman jangka pendek yang terdiri dari:
Berdasarkan perjanjian No. 103PFP-DBSIVI1-22016 tanggal 14 Juni 2016, PT Bank DBS Indonesia menyetujui untuk memberikan pinjaman jangka pendek
kepada SEI senilai USD50.000.000 untuk mendukung modal kerja. Jangka waktu fasilitas kredit adalah 12 bulan sejak tanggal 14 Juni 2014 sampai dengan 13 Mei
2017 dan dikenakan tingkat suku bunga LIBOR tiga bulan ditambah margin sebesar 1,6 per tahun.
Based on the Loan Agreement No. 103PFP-DBSIVI1-22016 dated June 14, 2016, PT Bank DBS Indonesia agreed to provide short-term loan to SEI amounting to
USD50,000,000 to support general corporate purposes. The term of the credit facility is valid for 12 months since April 14, 2014 until May 13, 2017 and subject to three months
LIBOR interest rate plus margin of 1.6 per annum.
Related parties Third parties
Utang usaha tidak dikenakan bunga dan umumnya dibayar antara 10 sampai 30 hari sejak tanggal invoice diterima.
This amount represents short-term bank loans is consist of:
58
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
19 UTANG LAIN-LAIN
97,198,654 84,667,261
84,667,261
19 OTHER PAYABLES
Pihak berelasi Related parties
Utang kepada PT Transportasi Gas Indonesia
1,469,330 3,270,539
1,776,587
Payables to PT Transportasi Gas Indonesia
Pihak ketiga Liabilitas kepada kontraktor dan pemasok
Liabilities to contractors and suppliers
40,299,048 USD
,
- JPY
dan
40,299,048 USD
- JPY
and
419,473,241,795 Rp
pada tahun 2016 dan
419,473,241,795 Rp
in 2016 and
35,891,532 USD
dan
- JPY
dan
35,891,532 USD
- JPY
and
378,965,566,599 Rp
pada tahun 2015
72,571,186 63,362,759
63,362,759 378,965,566,599
Rp
in 2015 PT Riau Andalan Pulp and Paper
1,901,604 1,910,300
1,910,300
PT Riau Andalan Pulp and Paper Jaminan gas
Gas guarantee deposits
16,912,959 USD
dan
2,406,796,060 Rp
16,912,959 USD
2,406,796,060 Rp
pada tahun 2016 dan in 2016 and
10,891,388 USD
10,893,084 USD
dan
59,545,749,220 Rp
10,893,084 USD
59,545,749,220 Rp
pada tahun 2015
17,098,126 15,209,557
15,209,557
in 2015 Pembelian barang dan jasa
Purchase of goods and services
- USD
dan
9,138,874,139 Rp
- USD
9,138,874,139 Rp
pada tahun 2016 dan in 2016 and
36,279 USD
4,796 USD
dan
7,171,281,477 Rp
4,796 USD
7,171,281,477 Rp
pada tahun 2015
703,098 524,642
524,642
in 2015 Lain-lain
Others
44,912,120,731 Rp
pada tahun 2016 dan
44,912,120,731 Rp
in 2016 and
25,981,722,708 Rp
pada tahun 2015
3,455,310.10 1,896,418
1,883,416 25,981,722,708
Rp
in 2015 Total
97,198,654 86,174,216
84,667,261
Total
20 LIABILITAS IMBALAN KERJA JANGKA PENDEK 20
SHORT-TERM EMPLOYEES BENEFITS LIABILITIES DAN LIABILITAS YANG MASIH HARUS DIBAYAR
246,131,198 322,567,676
322,567,676
AND ACCRUED LIABILITIES Liabilitas imbalan kerja jangka pendek
Short-term employee’s benefits liabilities
Gaji dan bonus karyawan Employees salaries and bonus
376,980,060,219 Rp
pada tahun 2016 dan
376,980,060,219 Rp
in 2016 and
481,978,600,813 Rp
pada tahun 2015
29,002,929 39,291,056
34,938,644 481,978,600,813
Rp
in 2015 Imbalan kerja
Employees benefits
158,910,577,086 Rp
pada tahun 2016 dan
158,910,577,086 Rp
in 2016 and
245,075,867,765 Rp
pada tahun 2015
12,225,771 17,765,558
245,075,867,765 Rp
in 2015 Sub total
41,228,700 39,291,056
52,704,202
Sub total
Liabilitas yang masih harus dibayar Accrued liabilities
Liabilitas kepada kontraktor dan pemasok Liabilities to contractors and suppliers
3,361,261 USD
dan
- JPY
dan
3,361,261 USD
- JPY
and
475,732,112,930 Rp
pada tahun 2016 dan
475,732,112,930 Rp
in 2016 and
13,503,132 USD
dan
- JPY
13,503,132 USD
- JPY
1,412,122,103,032 Rp
pada tahun 2015
39,961,670 111,318,218
115,867,910 1,412,122,103,032
Rp
in 2015 Bunga
Interests
29,828,692 USD
dan
14,864,207 JPY
29,828,692 USD
14,864,207 JPY
- Rp
pada tahun 2016 dan in 2015
- USD
12,725,149 USD
dan
159,134,412 JPY
12,725,149 USD
159,134,412 JPY
pada tahun 2015
29,975,916 14,046,213
14,046,213
in 2015 Liabilitas atas aktivitas minyak dan gas
134,410,303 139,334,987
139,334,987
Liabilities for oil and gas activities Iuran BPH Migas
BPH Migas levy
- Rp
pada tahun 2016 dan
- Rp
in 2016 and
8,064,371,209 Rp
pada tahun 2015
- 584,587
584,587 8,064,371,209
Rp
in 2015 Lain-lain
Others
7,208,825,401 Rp
pada tahun 2016 dan
7,208,825,401 Rp
in 2016 and
410,798,376 Rp
pada tahun 2015
554,609 24,472
29,777 410,798,376
Rp
in 2015 Sub total
204,902,498 269,858,168
269,863,474
Sub total Total
246,131,198 309,149,223
322,567,676
Total Utang lain-lain pembelian barang dan jasa terkait utang kepada pemasok terkait
dengan pembelian barang dan jasa. Other payables purchase of goods and services related to payables to suppliers for
purchase of goods and services. Utang lancar Iainnya kepada PT Riau Andalan Pulp and Paper RAPP terkait
dengan Perjanjian Jual Beli Gas. Berdasarkan perjanjian ini, RAPP bersedia menyediakan fasilitas-fasilitas seperti jaringan pipa gas, metering station dan
fasilitas Iainnya yang kemudian akan dikompensasi dengan pemakaian gas RAPP. Other payables to PT Riau Andalan Pulp and Paper RAPP is related to Gas Sales
and Purchase Agreement GSPA. Based on this agreement, RAPP agreed to build facilities such as gas pipeline, metering station and other facilities and those will be
compensated by RAPP’s usage of gas.
Jumlah tersebut merupakan saldo liabilitas imbalan kerja jangka pendek dan liabilitas yang masih harus dibayar
terdiri dari: This amount represents short-term employee’s
benefits liabilities and accrued liabilities is consist of: Utang cash call merupakan utang kepada operator yang berkaitan dengan
kegiatan operasional di blok Ujung Pangkah, Fasken, Bangkanai Barat, Muriah, dan Ketapang.
Cash call payables represent payables to operator related with operational activities in Ujung Pangkah, Fasken, Bangkanai Barat, Muriah, and Ketapang blocks.
Jumlah tersebut merupakan saldo utang lain-lain yang terdiri dari:
This amount represents other payables balance is consist of:
Third parties
10,891,388 USD
36,279 USD
Utang jaminan gas merupakan uang jaminan gas yang diterima oleh Perusahaan dari pelanggan dalam rangka transaksi penjualan gas.
Gas guarantee deposits payable represents gas deposits received by the Company from the customers in relation to the gas sales transactions.
Liabilitas kepada kontraktor dan pemasok merupakan liabilitas sehubungan dengan pembangunan gedung PMO Wilayah 2 dan PMO Wilayah 3 beserta
liabilitas kepada kontraktor terkait aktivitas minyak dan gas. Liabilities to contractors and suppliers represents mainly liabilities related to the
construction of building for PMO Area 2 and PMO Area 3 and liabilities to contractors related to the oil and gas activities.
59
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
20 LIABILITAS IMBALAN KERJA JANGKA PENDEK 20
SHORT-TERM EMPLOYEES BENEFITS LIABILITIES DAN LIABILITAS YANG MASIH HARUS DIBAYAR lanjutan
AND ACCRUED LIABILITIES continued Liabilitas imbalan kerja jangka pendek
Short-term employee’s benefits liabilities
a. Gaji dan bonus karyawan
a. Employees salaries an bonus
Liabilitas yang masih harus dibayar Accrued liabilities
a. Liabilitas atas aktivitas minyak dan gas
a. Liabilities for oil and gas activities b.
Liabilitas kepada kontraktor dan pemasok b. Liabilities to contractors and suppliers
c. Bunga
c. Interests
21 UTANG PAJAK
14,224,597 21,467,084
21,467,084
21 TAXES PAYABLE
Pajak penghasilan Income taxes
Pasal 21 Article 21
7,265,995,963 Rp
pada tahun 2016 dan
7,265,995,963 Rp
in 2016 and
11,398,674,356 Rp
pada tahun 2015
559,009 826,290
826,291 11,398,674,356
Rp
in 2015 Pasal 22
Article 22
19,018,839,195 Rp
pada tahun 2016 dan
19,018,839,195 Rp
in 2016 and
28,951,431,171 Rp
pada tahun 2015
1,463,213 2,098,678
2,098,690 28,951,431,171
Rp
in 2015 Pasal 23
Article 23
37,560,705,155 Rp
pada tahun 2016 dan
37,560,705,155 Rp
in 2016 and
55,455,475,929 Rp
pada tahun 2015
2,889,730 4,019,969
4,019,969 55,455,475,929
Rp
in 2015 Pasal 25
951,160 10,245,898
10,245,898
Article 25 Pasal 29
Article 29
436,522 USD
436,522 USD
82,340,664,779 Rp
pada tahun 2016 dan
82,340,664,779 Rp
in 2016 and
- USD
- USD
9,922,954,761 Rp
pada tahun 2015
6,771,393 719,315
719,315 9,922,954,761
Rp
in 2015 Pajak pertambahan nilai
Value-Added Tax
20,668,033,144 Rp
pada tahun 2016 dan
20,668,033,144 Rp
in 2016 and
49,067,715,212 Rp
pada tahun 2015
1,590,092 3,556,932
3,556,921 49,067,715,212
Rp
in 2015 Total
14,224,597 21,467,083
21,467,084
Total
22 PINJAMAN JANGKA PANJANG
1,366,490,270 1,253,416,592
1,253,416,592
22 LONG-TERM LOANS
18,750,000 37,500,000
37,500,000 USD
dan
42,164,627,000 JPY
USD 42,164,627,000
JPY
pada tahun 2016 dan
3,807,172 USD
in 2016 and
3,807,172 USD
USD
dan
43,755,745,000 JPY
USD 43,755,745,000
JPY
pada tahun 2015
417,623,794 363,240,878
363,240,879
in 2015
19,002,694 21,378,031
21,378,031 43,815,759
47,477,873 47,477,874
1,035,000,000 -
917,500,000 10,871,912
917,500,000 12,058,644
1,523,320,336 1,387,096,782
1,375,038,140
Total Dikurangi: bagian pinjaman jangka panjang
156,830,066 121,621,548
121,621,548
Less current portion of long-term loans
1,366,490,270 1,265,475,235
1,253,416,592
Long-term portion - Net PT
Bank Negara
Indonesia Persero
Tbk No.
058KPIPK2007 PT Bank Negara Indonesia Persero Tbk No.
058KPIPK2007 Japan
Bank for
International Cooperation
SLA- 1156DP32003 dan SLA-879DP31996
Japan Bank for International Cooperation SLA- 1156DP32003 dan SLA-879DP31996
European Investment Bank dan SLA-1139DP32000 European Investment Bank SLA-1139DP32000
International Bank
for Reconstruction
and Development
SLA-1201DP32006 dan
SLA- 1166DP32004
International Bank
for Reconstruction
and Development
SLA-1201DP32006 dan
SLA- 1166DP32004
Pihak ketiga Third parties
Pinjaman Sindikasi Syndication Loan
Biaya transaksi yang belum diamortisasi Unamortized cost of transction
Total Pinjaman Jangka Panjang - Neto
Pihak berelasi Related parties
Bonus karyawan pada tanggal 30 September 2016 dan 31 Desember 2015 merupakan akrual bonus untuk karyawan masing-masing sebesar
Rp 348.791.524.765 dan Rp425.810.513.310 untuk Perusahaan dan masing-
masing sebesar Rp 28.188.535.454 dan Rp55.423.150.670 untuk Entitas Anak.
Employees’ bonus as of September 30, 2016 and December 31, 2015 represent bonus accrual for employees amounting to Rp 348.791.524.765 and Rp425,810,513,310,
respectively for the Company and Rp 28.188.535.454 and Rp55,423,150,670, respectively, for the Subsidiaries.
Liabilitas atas aktivitas minyak dan gas merupakan liabilitas yang berkaitan dengan aktivitas eksplorasi dan produksi minyak dan gas
Liabilities for oil and gas activities represent liabilities relating to oil and gas exploration and production activities.
Liabilitas kepada kontraktor dan pemasok merupakan liabilitas dimana tagihan atas liabilitas tersebut belum diterima Grup.
Liabilities to contractors and suppliers represent liabilities for which the related invoices for such amount have not been received by the Group.
Pada tanggal 30 September 2016 dan 31 Desember 2015, biaya bunga yang masih harus dibayar terdiri dari biaya bunga pinjaman sebesar USD
4.222.791 dan USD5.205.588. Bunga obligasi sebesar USD25.753.125 dan USD8.840.625.
As of September 30, 2016 and December 31, 2015, accrued interest consists of interest from loan amounting to USD 4.222.791 and USD5,205,588, respectively.
Interest from bonds amounting USD25.753.125 and USD8,840,625.
Jumlah tersebut merupakan saldo utang pajak yang terdiri dari :
This amount represents taxes payable is consist of:
Jumlah tersebut
merupakan saldo
pinjaman jangka
panjang, dengan rincian sebagai berikut: This amount represents long-term loans is consist of:
60
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
22 PINJAMAN JANGKA PANJANG Lanjutan 22
LONG-TERM LOANS Continued
European Investment Bank EIB SLA-1139DP32000. European Investment Bank EIB SLA-1139DP32000.
Japan Bank for International Cooperation JBIC SLA-879DP31996. Japan Bank for International Cooperation JBIC SLA-879DP31996.
Japan Bank for International Cooperation JBIC SLA-1156DP32003. Japan Bank for International Cooperation JBIC SLA-1156DP32003.
Selama periode yang berakhir pada tanggal 31 Desember 2015, Perusahaan telah membayar angsuran sebesar USD3.807.172. Pada bulan Mei 2015,
Perusahaan telah melunasi pinjaman ini. During the period ended December 31, 2015, the Company has already paid
installments amounting to USD3,807,172. In May 2015, the Company has fully repaid this loan.
Pada tanggal 27 Maret 2003, JBIC menyetujui untuk memberikan pinjaman kepada Pemerintah Republik Indonesia Pemerintah berdasarkan Perjanjian
Pinjaman No.
IP-511 dengan
jumlah keseluruhan
setara dengan
JPY49.088.000.000 untuk
membantu Pemerintah
dalam membiayai
pembangunan jaringan pipa transmisi gas dari Sumatera Selatan sampai Jawa Barat dan jaringan pipa distribusi di Jawa Barat. Pada tanggal 28 Mei 2003,
Perusahaan dan Pemerintah mengadakan Perjanjian Penerusan Pinjaman No. SLA-1156DP32003, dimana Pemerintah meneruskan pinjaman dari JBIC ini
dengan jumlah tidak melebihi JPY49.088.000.000 kepada Perusahaan. On March 27, 2003, JBIC agreed to provide a loan to the Government of the Republic
of Indonesia the Government based on Loan Agreement No. IP-511 for a total aggregate amount equivalent to JPY49,088,000,000 to assist the Government in
financing the development of a gas transmission pipeline from South Sumatera to West Java and a distribution pipeline in West Java. On May 28, 2003, the Company
and the Government entered into a Subsidiary Loan Agreement No. SLA- 1156DP32003, which provides for the Government’s relending of the JBIC loan
proceeds not exceeding JPY49,088,000,000 to the Company.
Pinjaman ini dikenakan tingkat bunga atas pinjaman JBIC kepada Pemerintah ditambah 0,50 untuk jasa bunga bagian Pemerintah termasuk beban bank
sebesar 0,15 per tahun, yang harus dibayar pada tanggal 20 April dan 20 Oktober sebelum seluruh pinjaman ditarik dan pada tanggal 20 Maret dan 20
September setelahnya. Tingkat bunga tahunan pinjaman JBIC berkisar antara 0,75 sampai 0,95 untuk periode yang berakhir pada tanggal 30 September
2016 dan 31 Desember 2015. This loan is subject to the interest rate of the JBIC loan to the Government plus a
Government fee of 0.50 including a 0.15 banking fee per annum, payable on April 20 and October 20 prior to the withdrawal of all facilities amount and on March 20 and
September 20 afterwards. The JBIC’s annual interest rate of the loan is ranging from 0.75 to 0.95 for period ended September 30, 2016 and December 31, 2015.
Jumlah pokok pinjaman harus dibayar dalam 60 kali angsuran tengah tahunan pada tanggal 20 Maret dan 20 September setiap tahun, dengan angsuran
pertama akan jatuh tempo pada tanggal 20 Maret 2013 dan pembayaran terakhir akan jatuh tempo pada 20 Maret 2043.
The principal amount of the loan is repayable in 60 equal semi-annual installments every March 20 and September 20 of each year, with the first installment due on March
20, 2013 and the last payment due on March 20, 2043. Pada tanggal 9 Juli 2013, Pemerintah melalui Direktorat Jenderal Manajemen
Pinjaman menerima Notice of Completion of Disbursement dari Japan International Cooperation Agency mengenai jumlah kumulatif penarikan dan
sisa fasilitas pinjaman yang tidak dipergunakan sampai dengan batas waktu penarikan
pinjaman tanggal
4 Juli
2013 masing-masing
sebesar JPY48.538.362.136 dan JPY 549.637.864 dari total keseluruhan fasilitas
pinjaman dari JBIC sebesar JPY49.088.000.000. On July 9, 2013, the Government through the Directorate General of Debt
Management received a Notice of Completion of Disbursement from the Japan International Cooperation Agency related to the cumulative amount of the withdrawal
and the rest of the loan facility which was not used until the date of completion of disbursement
as of
July 4,
2013 amounted
to JPY48,538,362,136
and JPY549,637,864,
respectively of
the total
loan from
JBIC amounting
to JPY49,088,000.000.
Selama periode yang berakhir pada tanggal 30 September 2016, Perusahaan telah membayar angsuran sebesar JPY1,591,118,000
During the period ended September 30, 2016, the Company has already paid installments amounting to JPY1,591,118,000
Pada tanggal 12 Maret 1996, Perusahaan dan Pemerintah mengadakan Perjanjian Penerusan Pinjaman No. SLA-879DP31996, dimana Pemerintah
meneruskan hasil pinjaman dari JBIC sebesar USD195.000.000 kepada
Perusahaan yang akan melaksanakan Proyek. Pinjaman ini dikenakan tingkat bunga atas pinjaman JBIC kepada Pemerintah ditambah 0,50 untuk jasa
bunga bagian Pemerintah termasuk beban bank sebesar 0,15 per tahun, yang harus dibayar pada tanggal 15 Mei dan 15 November setiap tahun.
Tingkat bunga tahunan pinjaman JBIC adalah sebesar 0,67. On March 12, 1996, the Company and the Government entered into the related
Subsidiary Loan
Agreement No.
SLA-879DP31996, which
provides for
the Government’s relending of the JBIC loan proceeds of USD195,000,000 to the
Company, which shall undertake the project. The loan is subject to the interest rate of the JBIC loan to the Government plus a Government fee of 0.50 including a 0.15
banking fee per year, payable on May 15 and November 15 of each year. The JBIC’s annual interest rate of the loan is 0.67.
Pada tanggal 15 September 2000, Perusahaan dan Pemerintah mengadakan Perjanjian Penerusan Pinjaman No. SLA-1139DP32000, dimana Pemerintah
meneruskan pinjaman
dari EIB
dengan jumlah
tidak melebihi
EUROS70.000.000 kepada Perusahaan sebagai bagian dari pembiayaan Proyek Distribusi dan Transmisi Gas Tahap II.
On September 15, 2000, the Company and the Government entered into a Subsidiary Loan Agreement No. SLA-1139DP32000, which provides for the Government’s
relending of the EIB loan proceeds not exceeding EUROS70,000,000 to the Company as part of the financing of the Gas Transmission and Distribution Project Phase II.
Pinjaman ini dikenakan tingkat bunga sebesar pinjaman EIB kepada Pemerintah ditambah 0,50 untuk jasa bunga bagian Pemerintah termasuk
beban bank sebesar 0,15 per tahun, yang harus dibayar pada tanggal 15 Juni dan 15 Desember setiap tahun.
The loan is subject to the interest rate of the EIB loan to the Government plus a Government fee of 0.50 including 0.15 banking fee per annum, payable on June
15 and December 15 of each year. Tingkat bunga pinjaman EIB adalah berkisar antara 4,95 sampai dengan
5,30 per tahun untuk periode yang berakhir pada tanggal 30 September 2016 dan 31 Desember 2015. Jumlah pokok pinjaman harus dibayar dalam 32 kali
angsuran tengah tahunan pada tanggal 15 Juni dan 15 Desember setiap tahun, dengan angsuran pertama yang jatuh tempo pada tanggal 15 Desember 2004
dan pembayaran terakhir akan jatuh tempo pada 15 Juni 2020. The EIB’s annual interest rates of the loan ranged from 4.95 to 5.30 for period
ended September 30, 2016 and December 31, 2015. The principal amount of the loan is repayable in 32 equal semi-annual installments on June 15 and December 15 of
each year, with the first installment due on December 15, 2004 and the last payment due on June 15, 2020.
Selama periode yang berakhir pada tanggal 30 September 2016, Perusahaan telah membayar angsuran sebesar USD2.375.337.
During the period ended September 30, 2016, the Company has already paid installments amounting to USD2,375,337.
Didalam perjanjian pinjaman, Perusahaan diharuskan memelihara batasan keuangan setiap tahun, yaitu rasio utang terhadap ekuitas debt to equity ratio
sebesar 2:1. Under the loan agreement, the Company undertakes among other things, that it shall
maintain certain financial covenants each year such as debt to equity ratio of at least 2:1.
Berdasarkan Perjanjian Pinjaman tanggal 23 Oktober 1995, JBIC menyetujui untuk memberikan pinjaman kepada Pemerintah Republik Indonesia dengan
jumlah keseluruhan
setara dengan
USD195.000.000 untuk
membantu Pemerintah dalam membiayai Proyek Transmisi dan Distribusi Gas di
Sumatera Tengah dan Pulau Batam. Based on the Loan Agreement dated October 23, 1995, JBIC agreed to lend to the
Government of the Republic of Indonesia an aggregate amount equivalent to USD195,000,000 to assist the Government in financing the Gas Transmission and
Distribution Project in Central Sumatera and Batam Island.
61
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
22 PINJAMAN JANGKA PANJANG Lanjutan 22
LONG-TERM LOANS Continued
a a
b b
c c
PT Bank Negara Indonesia Persero Tbk BNI No. 058KPIPK2007 PT Bank Negara Indonesia Persero Tbk BNI No. 058KPIPK2007
Pokok pinjaman, yang dari semula USD80.000.000 menjadi USD69.381.312 terhitung mulai tanggal 21 Desember 2011;
The principal amount, from USD80,000,000 to become USD69,381,312, starting on December 21, 2011;
Tingkat bunga, yang dari semula LIBOR Base Rate + LIBOR Total Spread + 1 menjadi tingkat bunga IBRD + 1;
The interest rate, from LIBOR Base Rate + LIBOR Total Spread + 1 to become IBRD interest rate + 1;
Tanggal terakhir penarikan pinjaman closing date yang dari semula pada tanggal 31 Maret 2011 menjadi 31 Maret 2014.
The date of the last drawdown closing date, from March 31, 2011 to March 31, 2014. Perusahaan wajib membayar kepada Pemerintah biaya komitmen sebesar
0,75 per tahun atas jumlah pinjaman penerusan yang belum ditarik. Jumlah pokok pinjaman harus dibayar dalam 30 tiga puluh kali angsuran tengah
tahunan pada tanggal 15 Februari dan 15 Agustus setiap tahun, dengan angsuran pertama yang jatuh tempo pada tanggal 15 Agustus 2011 dan
pembayaran terakhir akan jatuh tempo pada tanggal 15 Februari 2026. The Company must pay 0.75 to the Government commitment fee per annum on the
total subsidiary loan that is not yet drawn. The principal amount of the loan is repayable in 30 equal semi-annual installments every February 15 and August 15 of
each year, with the first installment due on August 15, 2011 and the last payment due on February 15, 2026.
Pada tanggal 14 November 2013, Perusahaan mendapatkan Surat No. 5- 786PU2013
dari Direktorat
Jenderal Pengelolaan
Utang, Kementrian
Keuangan Republik
Indonesia, mengenai
persetujuan pembatalan
sisa pinjaman IBRD SLA 1201 sebesar USD7.616.230 terhitung mulai pada tanggal
1 Februari 2013. On November 14, 2013, the Company obtained Letter No.5-786PU2013 from
Directorate General of Debt Management, Ministry of Finance of the Republic of Indonesia, regarding the approval for the cancellation of the remaining IBRD SLA 1201
loan amounting to USD7,616,230 starting on February 1, 2013. Selama periode yang berakhir pada tanggal 30 September 2016, Perusahaan
telah membayar angsuran sebesar USD3,662,115 During the period ended September 30, 2016, the Company has already paid
installments amounting to USD3,662,115
Berdasarkan perjanjian pinjaman No. 058KPIPK2007 tanggal 17 September 2007, BNI menyetujui untuk memberikan pinjaman kepada Perusahaan dengan
jumlah keseluruhan
setara dengan
USD150.000.000 untuk
keperluan pembiayaan penyelesaian proyek Jaringan Pipa Transmisi Gas Bumi Sumatera
Selatan – Jawa Barat Proyek SSWJ dan Jaringan Pipa Distribusi Gas Jawa Barat.
Based on the Loan Agreement No. 058KPI PK2007 dated September 17, 2007, BNI agreed to provide loan to the Company at an aggregate amount equivalent to
USD150,000,000 to
finance the
South Sumatera-West
Java Pipeline
Gas Transmission Project SSWJ Project and West Java Pipeline Distribution.
Pada tanggal 30 Desember 2011, Perusahaan mendapatkan surat dari Kementrian Keuangan Republik Indonesia No. S-12051MK.52011, mengenai
perubahan terhadap Perjanjian Penerusan Pinjaman No. SLA-1201DP32006, tanggal 3 April 2006, antara Pemerintah dengan Perusahaan, yang mengatur
perubahan sebagai berikut: On December 30, 2011, the Company obtained a letter from Ministry of Finance of the
Republic of Indonesia No. S-12051MK.52011, regarding the changes of a Subsidiary Loan Agreement No. SLA-1201DP32006, dated April 3, 2006, between the
Government with the Company, with the changes as follows: Berdasarkan Perjanjian Pinjaman No. 4712-IND tanggal 1 Oktober 2003, IBRD
setuju untuk memberikan pinjaman kepada Pemerintah Republik Indonesia Pemerintah sebesar USD141.000.000 untuk pembiayaan proyek yang akan
dilaksanakan oleh Perusahaan dan PT Perusahaan Listrik Negara Persero PLN. Pemerintah Indonesia akan meneruskan pinjaman tersebut kepada
Perusahaan dan PLN melalui perjanjian penerusan pinjaman. Proyek yang akan dilaksanakan oleh Perusahaan berhubungan dengan persiapan kebijakan
rasionalisasi harga gas, restrukturisasi Perusahaan, persiapan penawaran umum perdana atas aktivitas distribusi dan persiapan mitra strategis pada
aktivitas transmisi gas Perusahaan. Based on the Loan Agreement No. 4712-IND dated October 1, 2003, the International
Bank for Reconstruction and Development agreed to lend to the Government of the Republic of Indonesia Government the amount of USD141,000,000 to finance a
project to be carried out by the Company and PT Perusahaan Listrik Negara Persero PLN. The Government will relend the loan proceeds to the Company and PLN
through two-step loan. The project to be carried out by the Company relates to preparation of a rationalized gas pricing policy, corporate restructuring of the Company,
preparation for an initial public offering for the Company’s distribution activities and preparation for the involvement of a strategic partner in the Company’s gas
transmission operations.
Pada tanggal 13 Mei 2004, Perusahaan dan Pemerintah mengadakan Perjanjian Penerusan Pinjaman No. SLA-1166DP32004, dimana Pemerintah
meneruskan sebagian hasil pinjaman dari IBRD sebesar USD2.487.672
kepada Perusahaan yang akan melaksanakan Proyek. Pinjaman ini dikenakan tingkat bunga atas pinjaman IBRD kepada Pemerintah ditambah 0,50 untuk
jasa bunga bagian Pemerintah termasuk beban bank sebesar 0,15 per tahun, yang harus dibayar pada tanggal 15 Juni dan 15 Desember setiap
tahun. On May 13, 2004, the Company and the Government entered into the related
Subsidiary Loan Agreement No. SLA-1166DP32004, which provides for the Government’s relending of a portion of the IBRD loan proceeds of USD2,487,672 to
the Company, which shall undertake the project. The loan is subject to the interest rate of the IBRD loan to the Government plus a Government fee of 0.50 including a
0.15 banking fee per annum, payable on June 15 and December 15 of each year.
Selama periode yang berakhir pada tanggal 31 Desember 2015, Perusahaan telah membayar angsuran sebesar USD58.270. Pada bulan Juni 2015,
Perusahaan telah melunasi pinjaman ini. During the period ended December 31, 2015, the Company has already paid
installments amounting to USD58,270. In June 2015, the Company has fully repaid this loan.
International Bank
for Reconstruction and
Development IBRD SLA-
1201DP32006. International Bank for Reconstruction and Development IBRD SLA-1201DP32006.
Berdasarkan Perjanjian Pinjaman No. 7755-ID Ex 4810-IND tanggal 7 Februari 2006, IBRD menyetujui memberikan fasilitas pinjaman kepada
Pemerintah dengan jumlah keseluruhan setara dengan USD80.000.000 untuk membantu Pemerintah dalam membiayai Proyek Pengembangan Pasar Gas
Domestik “Proyek”. Based on the Loan Agreement No. 7755-ID Ex 4810-IND dated February 7, 2006,
IBRD agreed to provide lending facility to the Government an aggregate amount equivalent to USD80,000,000 to assist the Government in financing the Domestic Gas
Market Development Project “the Project”.
Pada tanggal 3 April 2006, Perusahaan dan Pemerintah mengadakan Perjanjian Penerusan Pinjaman No. SLA-1201DP32006, dimana Pemerintah
meneruskan hasil pinjaman dari IBRD sebesar USD80.000.000 kepada Perusahaan yang akan melaksanakan Proyek. Pinjaman ini semula dikenakan
tingkat bunga atas pinjaman IBRD kepada Pemerintah ditambah 1 untuk jasa bunga bagian Pemerintah termasuk beban bank sebesar 0,15 per tahun,
yang harus dibayar pada tanggal 15 Februari dan 15 Agustus setiap tahun.. Tingkat bunga pinjaman IBRD masing-masing berkisar antara 1,81 sampai
dengan 5,48 untuk periode yang berakhir pada tanggal 30 September 2016 dan 31 Desember 2015.
On April 3, 2006, the Company and the Government entered into the related Subsidiary Loan Agreement No. SLA-1201DP32006, which provides for the
Government’s relending of the IBRD loan proceeds of USD80,000,000 to the Company, which shall undertake the Project. The loan was initially subject to the
interest rate of the IBRD loan to the Government plus a Government fee of 1 including 0.15 banking fee per annum, payable on February 15 and August 15 of
each year. The IBRD annual interest rate is ranging from 1.81 to 5.48 for period ended September 30, 2016 and December 31, 2015, respectively.
International Bank
for Reconstruction and
Development IBRD SLA-
1166DP32004. International Bank for Reconstruction and Development IBRD SLA-1166DP32004.
62
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
22 PINJAMAN JANGKA PANJANG Lanjutan 22
LONG-TERM LOANS Continued
Pinjaman Sindikasi Syndication Loan
PGN PGN
- Australia and New-Zealand Banking Group Limited
- Australia and New-Zealand Banking Group Limited -
The Bank of Tokyo-Mitsubishi UFJ, Ltd. - The Bank of Tokyo-Mitsubishi UFJ, Ltd.
- Citigroup Global Markets Singapore PTE. Ltd.
- Citigroup Global Markets Singapore PTE. Ltd. -
The Hongkong and Shanghai Banking Corporation Limited - The Hongkong and Shanghai Banking Corporation Limited
- Sumitomo Mitsui Banking Corporation
- Sumitomo Mitsui Banking Corporation
a a
b b
SEI SEI
- PT BNP Paribas
- PT BNP Paribas -
The Hongkong and Shanghai Banking Corporation Limited, Singapore branch - The Hongkong and Shanghai Banking Corporation Limited, Singapore branch
- Mizuho Bank
- Mizuho Bank -
PT BNP Paribas Indonesia - PT BNP Paribas Indonesia
- PT Bank Mizuho Indonesia
- PT Bank Mizuho Indonesia -
PT HSBC Securities Indonesia - PT HSBC Securities Indonesia
- PT Bank Sumitomo Mitsui Indonesia
- PT Bank Sumitomo Mitsui Indonesia -
Sumitomo Mitsui banking Corporation - Sumitomo Mitsui banking Corporation
a a
b b
c c
- -
- -
Its Interest Coverage Ratio for each Relevant Period shall be at least 4.0:1; and Untuk setiap Periode relevan terjadi sebelum tanggal jatuh dua 2 tahun
setelah Tanggal Efektif 4,5: 1; dan for each Relevant Period to occur before the date falling two 2 years after the
Effective Date 4.5:1; and Untuk setiap Periode relevan sesudahnya 3,5: 1
for each Relevant Period thereafter 3.5:1. Pada tanggal 30 September 2016, Grup telah memenuhi semua rasio
keuangan yang dipersyaratkan dalam perjanjian pinjaman. As of September 30, 2016, the Group has complied with all financial ratios required to
be maintained under the loan agreements. Rasio Hutang terhadap EBITDA tidak melebihi;
the ratio of its Debt to EBITDA shall not exceed: Sampai dengan tanggal 31 Desember 2015, Perusahaan telah menarik seluruh
nilai fasilitas pinjaman tersebut. Pinjaman ini memiliki jangka waktu 5 tahun dengan masa tenggang selama 1 tahun. Pinjaman ini dikenakan tingkat bunga
sebesar LIBOR plus 2,25 all in cost untuk porsi onshore dan LIBOR plus 2 all in cost untuk porsi offshore.
Up to December 31, 2015, the Company has fully drawdown the loan facility. This loan has a term of 5 years with a grace period of 1 year. The loan bears interest at LIBOR
plus 2.25 all in cost for the Onshore portion and LIBOR plus 2 all in cost for the Offshore portion.
Selama periode yang berakhir pada tanggal 30 September 2016, Perusahaan telah membayar angsuran sebesar USD29,500,000 untuk porsi onshore dan
USD3,000,000 untuk porsi offshore During the period ended September 30, 2016, the Company has already paid
installments amounting to USD29,500,000 for the onshore portion and USD3,000,000 for the ofshore portion.
Selama pinjaman masih terutang, Perusahaan diwajibkan memenuhi rasio keuangan sebagai berikut:
As long as the loan is still outstanding, the Company is required to meet the financial ratios, as follows:
Rasio utang terhadap ekuitas adalah 70:30; Debt to equity ratio was 70:30;
Debt service coverage ratio setiap saat minimal 1,3:1 Debt service coverage ratio minimum 1,3:1
Pada tanggal 2 Desember 2015, SEI memperoleh fasilitas pinjaman sindikasi sebesar USD600.000.000 dengn jumlah porsi Onshore
adalah sebesar USD300.000.000 dan porsi Offshore sebesar USD300.000.000. Bank yang
bertindak sebagai Agent adalah Sumitomo Mitsui Banking Corporation,
Singapore Branch dan di arrange oleh: On December 2, 2015, SEI obtained a syndicated loan
facility amounting USD600.000.000 with Onshore portion USD300.000.000 and Offshore portion of
USD300.000.000. Bank acting as Mandated Lead Arrangers is Sumitomo Mitsui Banking Corporation, Singapore Branch and bookrunners are:
Pada tanggal 8 April 2016, 1 Juni 2016 dan Juli 2016, SEI telah mencairkan fasilitas
pinjaman sindikasi
dengan jumlah
sebesar masing
- masing
USD50.000.000. Sampai tanggal 30 September 2016, fasilitas yang belum digunakan sebesar USD150.000.000. Pinjaman ini memiliki jangka waktu 5 tahun
dengan masa tenggang selama 1 tahun. Pinjaman ini dikenakan tingkat bunga sebesar LIBOR plus 1,85 all in cost untuk porsi onshore dan LIBOR plus
1,60 all in cost untuk porsi offshore. Selama pinjaman masih terutang, Perusahaan diwajibkan memenuhi rasio keuangan:
On April 8, 2016, June 1 and July, 2016 SEI has drewdown syndicate loan facility amounting to USD50,000,000 in each date. Until September 30, 2016, the facility has
not been used for USD150,000,000. This loan has a term of 5 years with a grace period of 1 year. The loan bears interest at LIBOR plus 1.85 all in cost for the
onshore portion and LIBOR plus 1.60 all in cost for the offshore portion. As long as the loan is still outstanding, the Company is required to meet the financial ratios:
Rasio utang terhadap ekuitas adalah 65:35; The ratio of its Gross Debt to equity shall not exceed 65:35;
Rasio interest coverage untuk masing-masing periode relevan paling sedikit 4,0:1; dan
Pada tanggal 28 Agustus 2014, Perusahaan memperoleh fasilitas pinjaman sindikasi sebesar USD650.000.000 dengn jumlah porsi Onshore adalah
sebesar USD590.000.000 dan porsi Offshore sebesar USD60.000.000. Bank yang bertindak sebagai Mandated Lead Arrangers and Bookrunners adalah:
On August 28, 2014, the Company obtained a syndicated loan facility amounting USD650.000.000 with Onshore portion USD590.000.000 and Offshore portion of
USD60.000.000. Bank acting as Mandated Lead Arrangers and bookrunners are: Berdasarkan perjanjian pinjaman ini, jangka waktu fasilitas kredit adalah
selama sepuluh tahun sejak tanggal 17 September 2007 sampai tanggal 16 September 2017, termasuk tenggang waktu dua tahun. Pinjaman ini akan
dibayar dalam 16 kali angsuran tengah tahunan dimulai dari 16 Maret 2010. Pinjaman ini dikenakan tingkat bunga sebesar SIBOR tiga bulan ditambah
1,75 per tahun, yang harus dibayar paling lambat pada tanggal 25 setiap bulannya.
Based on this loan agreement, the term of the credit facility is valid for ten years since September 17, 2007 until September 16, 2017, including two years grace period. The
loan is payable in 16 semi-annual installments starting from March 16, 2010. This loan is subject to the three months SIBOR interest rate plus 1.75 per annum, payable not
more than the 25th every month.
Selama periode yang berakhir pada tanggal 30 September 2016, Perusahaan telah membayar angsuran sebesar USD18,750,000.
During the period ended September 30, 2016, the Company has already paid installments amounting to USD18,750,000.
Perjanjian pinjaman ini mencakup pembatasan-pembatasan antara lain tidak diperkenankan
menjaminkan aset
Perusahaan kepada
kreditur lain,
mengadakan merger, mengubah status hukum, memberikan pinjaman kepada pihak lain, melakukan investasi dengan jumlah lebih besar daripada 15 dari
ekuitas neto, menerima pinjaman dan mengambil lease tanpa persetujuan tertulis dari BNI.
The loan agreement includes negative covenants, relating to, among others, create any liens on any property to other debtors, conducting merger, change the legal status,
provide the loan to other parties, conducting the investment more than 15 from net shareholder equity, obtain the loan and lease without obtaining the BNI’s written
approval.
63
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
22 PINJAMAN JANGKA PANJANG Lanjutan 22
LONG-TERM LOANS Continued
Unused facilites
23
1,334,930,609 1,333,756,692
1,333,756,692
23
The amount is consist of: Senior Unsecured Fixed Rate Notes
Senior Unsecured Fixed Rate Notes Penerbitan tahun 2014
1,350,000,000 1,350,000,000
1,350,000,000
Issued in 2014 Jumlah
1,350,000,000 1,350,000,000
1,350,000,000
Total Diskonto
13,000,500 13,000,500
13,000,500
Discount Biaya penerbitan
5,647,211 5,647,210
5,647,211
Issuance cost Amortisasi diskonto dan biaya penerbitan
3,578,319 903,224
2,404,403
Jumlah Utang Obligasi - Bersih
1,334,930,609 1,332,255,514
1,333,756,692
Total Bonds Payable - Net Bagian yang jatuh tempo dalam satu tahun
- -
-
Current portion Bagian jangka panjang
1,334,930,609 1,332,255,514
1,333,756,692
Total Non-current portion
Amortization of discount and issuance cost
Pada tanggal 12 Mei 2014, Perusahaan menerbitkan USD1.350.000.000 Senior Unsecured Fixed Rate Notes , yang akan jatuh tempo pada tanggal 16 Mei 2024,
dengan harga penerbitan sebesar 99,037. Wali amanat atas obligasi ini adalah The Bank of New York Mellon. Obligasi ini dikenakan bunga sebesar 5,125 per
tahun yang terhutang setengah tahunan in arrear setiap tanggal 16 Mei dan 16 November, dimulai pada tanggal 16 November 2014. Obligasi ini dicatatkan pada
Bursa Efek Singapura, tidak dapat dibatalkan dan dijamin tanpa syarat oleh Perusahaan. Dana bersih yang diperoleh sebesar USD1.335.334.469, diterima
pada tanggal 16 Mei 2014 dan dipergunakan untuk penambahan modal kerja dan keperluan umum lainnya. Berdasarkan Moody’s Investors Services, Standard
Poor SP dan Fitch Rating, peringkat dari obligasi tersebut masing-masing adalah Baa3, BB+ dan BBB-.
On May 12, 2014, the Company issued USD1,350,000,000 Senior Unsecured Fixed Rate Notes, which will be due on May 16, 2024, with issue price of 99.037. The
trustee of these bonds is The Bank of New York Mellon. These bonds bear interest rate of 5.125 per annum payable semi annualy in arrears on May 16 and November 16,
starting November 16, 2014. These bonds, which were listed at the Singapore Exchange Securities Trading Limited, are irrevocably and unconditionally guaranteed
by the Company. The net proceeds, which amounted to USD1,335,334,469 were received by the Company on May 16, 2014 and were used for addtional working capital
and other general corporate purposes. Based on Moody’s Investors Services, Standard Poor SP and Fitch Rating, the bonds are rated at Baa3, BB+ and BBB-,
respectively.
Sehubungan dengan
obligasi ini,
Perusahaan dibatasi
dalam melakukan
konsolidasi, penggabungan usaha, mengalihkan, menyewakan, atau menjual semua atau sebagian besar asetnya.
In relation to these bonds, the Company is restricted in conducting consolidate, merger, transfer, lease or disposal of all or substantially all of it assets.
Perusahaan tidak diharuskan melakukan pembentukan dana sinking fund untuk pelunasan utang obligasi ini.
The Company is not required to make sinking fund payment with respect to these bonds.
Fasilitas yang belum digunakan Pada tanggal 29 Agustus 2016, Perusahaan memperpanjang jangka waktu
perjanjian fasilitas Non Cash Loan yang terdiri dari Standby Letter of Credit SBLC, Bank Garansi, SKBDN dan LC Impor yang diperoleh dari PT Bank
Mandiri Persero Tbk dengan maksimum nilai plafon sebesar USD300.000.000. Perusahaan juga wajib memelihara rasio kemampuan membayar utang minimum
130 dan rasio utang terhadap modal maksimum sebesar 300. Fasilitas ini akan jatuh tempo pada 26 Agustus 2017. Pada tanggal 30 September 2016,
fasilitas yang belum digunakan sebesar USD188.725.565. On August 29, 2016, the Company ammended the Non Cash Loan facility agreement
which consist of Standby Letter of Credit SBLC, Guarantee Bank, SKBDN and LC Import, obtained from PT Bank Mandiri Persero Tbk with a maximum limit of
USD300,000,000. The Company shall also maintain debt service ratio at minimum of 130 and debt to equity ratio at maximum of 300. The facility will mature on August
26, 2017. As of September 30, 2016, the facility which has not been used amounted to USD188,725,565.
Pada tanggal 30 Januari 2015, Perusahaan memperpanjang fasilitas Non Cash Loan NCL yang diperoleh dari PT Bank Negara Indonesia Persero Tbk yang
terdiri dari Standby Letter of Credit SBLC, Bank Guarantee, Letter of Credit LC dan SKBDN, dengan maksimum nilai plafon sebesar USD140.000.000.
Fasilitas ini akan jatuh tempo pada 18 Desember 2016. Di samping itu Perusahaan juga wajib memelihara current ratio tidak kurang dari 1 kali, debt to
equity ratio maksimal 3 kali dan EBITDA terhadap interest tidak kurang dari 200. Pada tanggal 30 September 2016, fasilitas yang belum digunakan sebesar
USD112.599.410. On January 30, 2015, the Company has extended the Non Cash Loan NCL facility
from PT Bank Negara Indonesia Persero Tbk which consists of Standby Letter of Credit SBLC, Bank Guarantee, Letter of Credit LC and SKBDN with a maximum
limit of USD140,000,000. The facility will mature on December 18, 2016. Furthermore, the Company shall also maintain current ratio not less than 1 time, debt to equity ratio
at a maximum 3 times and EBITDA to interest not less than 200. As of September 30, 2016, the facility that has not been used amounted to USD112,599,410.
Pada tanggal 7 April 2016, Perusahaan mengubah Corporate Facility Agreement dengan PT Bank ANZ Indonesia Bank ANZ. Bank ANZ akan menyediakan
fasilitas korporasi dengan maksimum nilai plafon baru sebesar USD182.000.000 dari nilai plafon lama sebesar USD300.000.000. Fasilitas ini akan jatuh tempo
pada tanggal 28 Februari 2017. Fasilitas ini diberikan dengan ketentuan penggunaan keseluruhan dari semua jenis bank garansi jaminan pembayaran,
jaminan pembayaran uang muka, jaminan penawaran, jaminan pelaksanaan dan jaminan pemeliharaan setiap saat tidak akan melebihi USD100.000.000 dan
penggunaan keseluruhan fasilitas pembiayaan modal kerja jangka pendek setiap saat tidak melebihi USD82.000.000. Pada tanggal 30 September 2016, fasilitas
bank garansi yang belum digunakan sebesar USD48.647.134 dan untuk fasilitas pembiayaan modal kerja jangka pendek belum dipergunakan sama sekali.
On April 7, 2016, the Company amended Corporate Facility Agreement with PT Bank ANZ Indonesia Bank ANZ. Bank ANZ will provide Corporate Facility with a new
maximum limit
of USD182,000,000
from the
previous maximum
limit of
USD300,000,000. The facility will expire on February 28, 2017. This facility is given with total utilization of all type of bank guarantee payment guarantee, advance
payment bond, bid bond, performance bond and retention bond at any time shall not exceed USD100,000,000 and total utilization of uncommitted a short-term working
capital facility at any time shall not exceed USD82,000,000. As of September 30, 2016, a payment guarantee facility that has not been used amounted to USD48,647,134 and
for uncommitted short-term working capital facility has not been used at all.
Pada tanggal 6 Juni 2016, Perusahaan dengan BRI menandatangani adendum perjanjian kredit dengan perubahan penambahan nilai plafon atas fasilitas
Standby Letter of Credit SBLCFasilitas Bank Garansi merupakan sub limit fasilitas SBLCPenangguhan Jaminan Impor PJI menjadi USD400.000.000.
Fasilitas ini akan jatuh tempo pada tanggal 5 April 2017. Pada tanggal 30 September 2016, fasilitas yang belum digunakan sebesar USD167.206.700.
On June 6, 2016, the Company and BRI signed amendment of credit agreement with changes in additional amount of maximum limit of Standby Letter of Credit
SBLCBank Guarantee Facility a sub limit of SBLC Facilitythe guarantees of the suspension of import PJI to become USD400,000,000. This facility will mature on
April 5, 2017. As of September 30, 2016, the unused facility amounted to USD167,206,700.
UTANG OBLIGASI BONDS PAYABLES
Akun ini terdiri dari:
64
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
24 MODAL SAHAM
344,018,831 344,018,831
344,018,831
24 CAPITAL STOCK
Dolar Amerika Serikat US Dollar
1. Pemerintah Republik Indonesia 1. The Government of the Republic of Indonesia
Saham Seri A Dwiwarna 1 saham
0.00
Series A Dwiwarna 1 Share Saham Seri B 13.809.038.755 saham
195,968,391 56.96
Series B 13,809,038,755 Shares 2. Masyarakat umum dan karyawan
2. Public and Employees Saham Seri B 10.432.298.940 saham
148,048,446 43.03
Series B 10,432,298,940 Shares 3. Manajemen
3. Management Hendi Kusnadi Direksi Saham seri B 140.500 saham
1,994 0.00
Hendi Kusnadi Director Series B 140,500 shares
344,018,831 100
Issued and fully paid
Nilai harga perolehan pembelian kembali saham adalah sebesar USD251.054. The acquisition cost of the treasury stock amounted to USD251,054.
The selling of the treasury stock Seri B 1,850,000 Shares in March 2016
25 PENCADANGAN SALDO LABA DAN PEMBAGIAN LABA 25
1 1
a a
b c
b 2
2
1 1
a a
b b
2 2
Berdasarkan Risalah Rapat Umum Pemegang Saham Tahunan yang diadakan pada tanggal 6 April 2015 yang diaktakan dengan Akta Notaris No. 22 dari Notaris
Fathiah Helmi S.H., tanggal 6 April 2015, para pemegang saham menyetujui keputusan-keputusan, sebagai berikut:
Based on the Minutes of the Company’s Annual General Shareholders’ Meeting held on April 6, 2015 which were notarized with Notarial Deed No. 22 of Notary Fathiah
Helmi, S.H., dated April 6, 2015, the shareholders ratified the following decisions, as follows:
Pembagian dividen tunai sebesar Rp3.510.872.093.109 atau Rp144,84 per saham kepada pemegang saham;
Distribution of cash dividends of Rp3,510,872,093,109 or Rp144.84 per share to shareholders;
Sisanya akan dicatat sebagai cadangan. The remaining amount will be appropriated as reserve.
Kepada Direksi diberikan wewenang untuk mengatur lebih lanjut tata cara pembagian dividen tersebut dan mengumumkannya dengan memperhatikan
peraturan dan perundangan yang berlaku. To give authority to the Board of Directors to prepare and publish the cash dividends
distribution procedures with consideration of the prevailing laws and regulations. Menetapkan penggunaan laba tahun berjalan yang dapat diatribusikan kepada
pemilik Entitas Induk Perusahaan untuk tahun buku 2014 berjumlah sebesar USD722.754.065 diperuntukkan sebagai berikut:
Approved the use of profit for the year that are attributable to Owner of the Parent Entity for the financial year of 2014 in the amount of USD722,754,065 to be utilized as
follows: Modal saham diperoleh kembali Saham Seri B 1.850.000 saham dijual kembali
selama bulan Maret 2016 Saham
Seri A
Dwiwarna merupakan
saham yang
memberikan kepada
pemegangnya hak-hak untuk mencalonkan direksi dan komisaris, menghadiri dan menyetujui pengangkatan dan pemberhentian komisaris dan direksi, perubahan
anggaran dasar
termasuk perubahan
modal, pembubaran
dan likuidasi,
penggabungan, peleburan dan pengambilalihan Perusahaan. Series A Dwiwarna share represents share which provides the holder rights to propose
directors and commissioners, attend and approve the appointment and dismissal of commissioners and directors, change in Articles of Association including changes in
capital, closure and liquidation, merger and acquisition of the Company.
Pada tanggal 8 sampai dengan 28 Maret 2016, Perusahaan melakukan penjualan 1.850.000 lembar modal saham diperoleh kembali yang dimiliki oleh Perusahaan.
On March 8 to 28, 2016, the Company sold totaling to 1.850.000 shares of its treasury stock.
Perusahaan telah mencatatkan sebanyak 24.241.508.196 lembar saham pada Bursa Efek Indonesia untuk 30 September 2016.
The Company has listed its shares at the Indonesia Stock Exchange totaling to 24,241,508,196 shares as of September 30, 2016.
APPROPRIATIONS OF RETAINED EARNINGS AND DISTRIBUTIONS OF INCOME
Berdasarkan Risalah Rapat Umum Pemegang Saham Tahunan yang diadakan pada tanggal 8 April 2016 yang diaktakan dengan Akta Notaris No. 22 dari Notaris
Fathiah Helmi S.H., tanggal 6 April 2016, para pemegang saham menyetujui keputusan-keputusan, sebagai berikut:
Based on the Minutes of the Company’s Annual General Shareholders’ Meeting held on April 8, 2016 which were notarized with Notarial Deed No. 22 of Notary Fathiah
Helmi, S.H., dated April 6, 2016, the shareholders ratified the following decisions, as follows:
Menetapkan penggunaan laba tahun berjalan yang dapat diatribusikan kepada pemilik Entitas Induk Perusahaan untuk tahun buku 2015 berjumlah sebesar
USD401.199.880 diperuntukkan sebagai berikut: Approved the use of profit for the year that are attributable to Owner of the Parent
Entity for the financial year of 2014 in the amount of USD 401.199.880 to be utilized as follows:
Pembagian dividen tunai sebesar Rp 2.213.734.528.459 atau Rp 91,32 per saham kepada pemegang saham;
Distribution of cash dividends of Rp 2.213.734.528.459 or Rp 91,32 per share to shareholders;
Sebesar Rp80.562.941.903 atau setara 1,5 dari laba bersih tahun buku yang berakhir pada tanggal 31 Desember 2015 yang sumber dananya dari beban
Perseroan untuk dipergunakan sebagai dana Program Bina Lingkungan ditambah sisa saldo dana PKBL dari rangkaian tahun sebelumnya.
Rp80.562.941.903 or equivalent amounted to 1.5 of the profit for the year that are attributable to Owner of the Parent Entity for the financial year of 2015 in which the
funds as expense of the Company to be used as a Community Development Program funds with addition of the remaining balance of funds PKBL from the previous years.
Sisanya akan dicatat sebagai cadangan. The remaining amount will be appropriated as reserve.
Kepada Direksi diberikan wewenang untuk mengatur lebih lanjut tata cara pembagian dividen tersebut dan mengumumkannya dengan memperhatikan
peraturan dan perundangan yang berlaku. To give authority to the Board of Directors to prepare and publish the cash dividends
distribution procedures with consideration of the prevailing laws and regulations. Susunan pemilikan saham Perusahaan pada tanggal 30
September 2016 berdasarkan catatan yang dibuat oleh PT Datindo Entrycom, Biro Administrasi Efek adalah sebagai
berikut: The details of the shareholders based on the report
prepared by PT Datindo Entrycom, a Securities Administration Agency, as of September 30, 2016, are
as follows:
Ditempatkan dan disetor penuh
65
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
30 September 2015 September 30, 2015
Tidak Diaudit Unaudited
26 PENDAPATAN NETO 26
NET REVENUES
Distribusi gas
1,926,492,529
Gas distribution Transmisi gas
10,927,047
Gas transmission Penjualan minyak dan gas neto
194,327,641
Net oil and gas sales Sewa fiber optik
6,487,035
Fibre optic rental Pendapatan keuangan dari sewa pembiayaan
-
Finance income from finance lease lain-lain
-
Others Total
2,138,234,252
Total Gas distribution consists of natural gas revenue to:
Industri
1,886,808,196
Industrial Komersial
35,200,378
Commercial
1,383,518
Fuel gas filling stations SPBG Rumah Tangga
3,100,437
Households Total
1,926,492,529
Total
27 BEBAN POKOK PENDAPATAN 27
COST OF REVENUES
Akun ini terdiri dari: This account consists of:
907,925,490
Pihak berelasi Catatan 37
295,049,212
Related parties Note 37 Sub total
1,202,974,702
Sub total
72,593,951 84,249,931
Sub total
156,843,882
Sub total
63,409,354 12,118,156
75,527,510
Total
1,435,346,094
Total
1,490,904,302
Pembelian neto dari pemasok yang melebihi 10 dari jumlah pendapatan neto konsolidasi adalah pembelian dari Pertamina, entitas berelasi dengan Pemerintah,
dan ConocoPhillips masing-masing sebesar USD 294.689.760 atau 13,67 dan USD 636.587.414 atau 29.53 dari total pendapatan neto konsolidasian untuk
periode yang berakhir 30 September 2016 dan pembelian dari Pertamina dan ConocoPhillips masing masing sebesar USD295.049.212 atau 13,8 dan USD
648.970.842 atau 30,35 dari jumlah pendapatan neto konsolidasian untuk periode yang berakhir 30 September 2015.
Net purchases from suppliers involving purchases in excess of 10 of the total consolidated net revenues are for purchases from Pertamina, a Government-related
entity, and ConocoPhillips amounting to USD 294.689.760 or 13.67 and USD 636.587.414 atau 29.53 of total consolidated net revenues for the period ended
September 30, 2016, respectively, and purchases from Pertamina and ConocoPhillips amounting to USD295.049.212 or 13,8 and USD 648.970.842 or 30,35 of total
consolidated net revenues for the period ended September 30, 2015, respectively.
Grup melakukan transaksi pembelian gas dengan entitas berelasi dengan Pemerintah, dengan total masing-masing sebesar 19,65 dan 20,56 dari total
beban pokok pendapatan konsolidasian di atas untuk periode yang berakhir pada tanggal-tanggal 30 September 2016 dan 2015.
The Group enters sales transactions with the Government-related entities, totalling to 19,65 and 20,56 of its consolidated cost of revenues above for the period ended
September 30, 2016 and 2015, respectively.
204,765,489
c. LNG c. LNG
Beban LNG
110,166,217
LNG costs Beban penyusutan, deplesi dan amortisasi
12,270,224
Depreciation
122,436,441 1,163,702,372
b. Beban pengoperasian minyak dan gas bumi b. Oil and gas operation cost
Beban produksi dan lifting
73,791,560
Production and lifting costs Pendapatan lain-lain merupakan pendapatan PGASSOL atas penyediaan jasa
konstruksi dan pemeliharaan jaringan pipa kepada pelanggannya. Other revenues represents PGASSOL’s revenues of pipeline construction and
maintenance services to the customers.
Beban penyusutan, deplesi dan amortisasi
130,973,929
Depreciation, depletion and amortization Grup melakukan transaksi penjualan dengan entitas berelasi dengan Pemerintah,
dengan total masing-masing sebesar 28,46 dan 26,88 dari total pendapatan neto konsolidasian di atas untuk periode yang berakhir pada tanggal-tanggal 30
September 2016 dan 2015. The Group enters sales transactions with the Government-related entities, totalling to
28,46 dan 26,88 of its consolidated net revenues above for the period ended September 30, 2016 and 2015, respectively.
1,490,904,302 1,435,346,094
a. Distribusi gas a. Gas distribution
Pihak ketiga
869,012,612
Third parties
294,689,760 237,341
Pendapatan neto dari pelanggan yang melebihi 10 dari jumlah pendapatan neto konsolidasian adalah pendapatan dari PT PLN Persero, entitas berelasi dengan
Pemerintah, masing-masing sebesar USD 471.854.939 atau 21,89 dan USD 407.925.971 atau 19.08 dari jumlah pendapatan neto konsolidasian untuk
periode yang berakhir pada tanggal-tanggal 30 September 2016 dan 2015. Net revenues from customer in excess of 10 of the total consolidated net revenues
are revenue from PT PLN Persero, Government-related entity, which amounting to USD USD 471.854.939 or 21,89 and USD 407.925.971 or 19.08 from total
consolidated net revenues for the period ended September 30, 2016 and 2015 respectively.
29,206,715
Stasiun Pengisian Bahan Bakar Gas SPBG
1,178,927 4,064,958
1,885,530,467
Penyesuaian pendapatan merupakan koreksi faktur pelanggan melalui rekonsiliasi atas penggunaan gas antara Grup dan pelanggan.
The revenue adjustments pertain to corrections made to customers’ invoices upon reconciliation of the gas consumption between the Group and the customers.
Penjualan minyak dan gas merupakan pendapatan atas penjualan minyak dan gas Grup dari aktivitas produksi yang diperoleh dari PSC.
Net oil and gas sales represents Group’s sales of oil and gas from exploration and production activities earned under PSC.
Pendapatan keuangan dari sewa pembiayaan merupakan pendapatan KJG atas bunga sehubungan dengan sewa pembiayaan yang timbul dari perjanjian
pengangkutan gas antara KJG dengan PLN dan PC Muriah Ltd. berdasarkan GTA Kalija Tahap I.
Finance income from lease transaction represents KJG’s interest in relation to finance lease under the gas transportation agreement between KJG, PLN and PC Muriah Ltd.
under the provision of GTA Kalija Tahap I. Sewa fiber optik merupakan pendapatan PGASKOM atas penyediaan jaringan
kepada para pelanggan. Fibre optic rental represents PGASKOM’s revenues of network services to the
customers.
2,155,554,528
Pendapatan distribusi gas bumi terdiri dari distribusi gas kepada:
1,851,079,867
30 September 2016 September 30, 2016
Tidak Diaudit Unaudited
2,155,554,528 2,138,234,252
Akun ini terdiri dari: This account consists of:
1,885,530,467 5,871,770
209,449,869 6,780,046
47,685,035
66
CATATAN ATAS LAPORAN KEUANGAN INTERIM KONSOLIDASIAN NOTES TO INTERIM CONSOLIDATED FINANCIAL STATEMENTS
30 September 2016 dan untuk Periode Sembilan Bulan September 30, 2016 and for Period The Nine Months
yang Berakhir Pada Tanggal Tersebut Then Ended
Disajikan dalam Dolar Amerika Serikat AS, kecuali dinyatakan lain Expressed in US Dollar, unless otherwise stated
28
155,978,165
28
Akun ini terdiri dari: This account consists of:
Penyusutan
75,528,100
Depreciation Gaji dan kesejahteraan karyawan
15,570,931
Iuran BPH Migas
6,478,406
BPH Migas levy Perbaikan dan pemeliharaan
8,838,463
Repairs and maintenance Sewa
8,663,167
Rental Honorarium profesional
6,387,639
Professional fees Perjalanan dinas dan transportasi
1,531,510
Traveling and transportation Peralatan dan suku cadang
15,279,709
Tools and spare parts Peralatan kantor
741,898
Office supplies Bahan bakar dan bahan kimia
4,796,988
Fuel and chemicals Komunikasi
380,095
Communications Representasi dan jamuan
1,582,676
Representation and entertainment Listrik dan air
629,591
Electricity and water Pajak dan perizinan
510,192
Taxes and licenses Pendidikan dan pelatihan
51,405
Education and training Asuransi
2,017,698
Insurance Amortisasi
105,772
Amortization Jasa umum
4,646,785
General services Material umum
302,191
General material Lain-lain
1,934,949
Others Total
155,978,165
Total
29
125,173,673
29
Akun ini terdiri dari: This account consists of:
Penyusutan
12,419,981
Depreciation Gaji dan kesejahteraan karyawan
51,953,837
Salaries and employees’ benefits Perbaikan dan pemeliharaan
7,255,691
Repairs and maintenance Sewa
6,978,040
Rental Honorarium profesional
9,772,859
Professional fees Perjalanan dinas dan transportasi
2,595,383
Traveling and transportation Peralatan dan suku cadang
1,481,387
Tools and spare parts Peralatan kantor
502,693
Office supplies Bahan bakar dan bahan kimia
702,646
Fuel and chemicals Komunikasi
808,730
Communications Representasi dan jamuan
2,346,848
Representation and entertainment Listrik dan air
871,241
Electricity and water Promosi
6,348,907
Promotion Pajak dan perizinan
1,379,752
Taxes and licenses Pendidikan dan pelatihan
2,393,057
Education and training Biaya bank
938,938
Bank expenses Perayaan
609,487
Celebration Asuransi
2,806,716
Insurance Amortisasi
1,183,630
Amortization Jasa umum
2,879,171
General services Cadangan kerugian penurunan nilai
1,008,108
Allowance for impairment losses Tanggung jawab sosial dan bina lingkungan
6,853,022
Corporate Social and Environmental Responsibilty Material umum
139,127
General material Pakaian dinas
106,538
Employees uniform Lain-lain
837,884
Others Total
125,173,673
Total
30 BEBAN KEUANGAN 30
FINANCE COST
- Asian Development Bank
17,545
Asian Development Bank - - European Investment Bank
1,053,920
European Investment Bank - - Japan Bank for International Cooperation
3,980,046
Japan Bank for International Cooperation - - International Bank for Reconstruction and Development
1,947,013
International Bank for Reconstruction and Development - Obligasi
61,912,022
Bonds Pinjaman sindikasi
5,898,043
Syndication loan PT Bank Negara Indonesia Persero Tbk
748,340
PT Bank Negara Indonesia Persero Tbk Penurunan nilai wajar piutang jangka panjang
5,385,888
Impairment of long-term receivables Pembalikan dari efek diskonto atas provisi
The unwinding of the effect of discounting pembongkaran aset dan restorasi area
3,269,020
the provision of assets abandonment and area restoration Total
84,211,837
Total
4,384,845 1,999,993
90,910,877
This account consists of: Penerusan pinjaman dari Pemerintah Republik Indonesia
yang didanai oleh : Two Step Loan from the Government of the Republic
of Indonesia funded by:
- 858,493
3,938,888 1,888,791
59,598,917 17,694,138
546,812 8,633,368
4,115,761 72,151
80,240 802,270
141,976,668 90,910,877
7,997,605 9,509,629
9,187,605
84,211,837
Akun ini terdiri dari:
717,969 968,223
2,455,222 1,034,853
5,658,267 1,389,742
2,825,388 856,129
580,194 1,277,402
1,045,634 19,918,902
1,470,837 129,319,328
BEBAN ADMINISTRASI DAN UMUM
141,976,668
GENERAL AND ADMINISTRATIVE EXPENSES
11,195,974 48,169,722
13,168 403
1,302,790 277,637
8,658,848 33,458
453,515 246,351
BEBAN DISTRIBUSI DAN TRANSMISI
129,319,328
DISTRIBUTION AND TRANSMISSION EXPENSES
81,869,215 14,064,317
Salaries and employees’ benefits
8,059,680 3,221,110
2,531,559 1,510,739
891,666 93,991
183,324 4,358,855
77,865
2,551,865 349,229
583,324
67