Current Implementation Situation Civil Works

Western I ndonesia National Roads I mprovement Project 1 - 3 Actual Implementation Timeline of WINRIP Length Cti on Km Peri od J N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Core Team Consultant CTC 40 mth IMPLEMENTATION Time extension for sevices Design Supervision Cslt DSC 42 mth IMPLEMENTATION Time extension for sevices TA for Dev.of Sl ope Sta bi l i za ti on, Desi gn M a na gement 1 Krui - Biha 25,00 21 mth 8 Jan14 2 Padang Sawah - Sp.Empat 40,90 24 mth 6 Jan14 3 M anggopoh - Padang Sawah 32,00 24 mth 6 Jan14 4 Ipuh - Bantal 42,40 24 mth 10 Jan14 5 SIMPANG RAMPA - PORIAHA 11,10 18 mth 18 Jun15 20 Jul17 11 BANTAL - MUKOMUKO 50,10 24 mth 23 Feb15 11 Feb17 13 SP RUKIS - TJ KEMUNING 56,30 24 mth 11 Feb17 17 Sp.Gn.KEMALA - Pg. TAMPAK 36,80 24 mth 04 Sep15 23 Agt17 6 PS. PEDATI - KERKAP 25,00 15 mth 11 Mar15 19 LAIS - BINTUNAN 11,60 10 mth 11 Mar15 CONSTRUCTION 300+125+53 days 30 Jun 16 15 SIBOLGA - BATAS TAPSEL 36,00 27 mth 20 Nov15 7 INDRAPURA - TAPAN 19,50 21 mth 10 Dec15 30 Agt17 8 BTS.Kt PARIAMAN-MANGGOPOH 46,80 24 mth PROC 23 Mar16 10 SIMPANG EMPAT - SP.AIR BALAM 61,70 24 mth 12 KAMBANG - INDRAPURA 55,20 24 mth 14 PAINAN KAMBANG 31,50 21 mth PROC 13 Aug16 16 SEBLAT IPUH 34,50 21 mth 8 Nov16 CONSTRUCTION 20 LUBUK ALUNG SICINCIN 14,60 18 mth 1 Sep16 21 LUBUK ALUNG KURAITAJI 16,80 18 mth 1 Sep16 Original target : 715,60 km ENVIRONMENT SOCIAL SAFEGUARD 1st Revised target : 640,00 km Prequalification Detail Eng Design LARAP Study Road Safety Owners Estimate Appraisal Public Consultation Procurement Sign Contr Bid Document LARAP Implementation Preparation for Commencement of Work Standard Biding Document 28 Jan17 30-Des-17 30-Des-17 PROC PROC to be canceled CONSTRUCTION 720 - 71 days Rev-DED RS Rev-DED RS Rev-DED RS 31-Des-17 30-Des-17 PROCUREMENT IMPLEMENTATION 31-Des-17 31-Des-17 31-Des-17 CONSTRUCTION 450 + 240 days 31-Des-17 CONSTRUCTION 540 - 53 days 31-Des-17 CONSTRUCTION 540 - 53 days CONSTRUCTION 630 - 114 days 6-Nov-12 19-Jun-13 PROC PROC DED Rev-DED RS ICB ICB NCB NCB DED PROC CONSTRUCTION 720 days ICB ICB ICB ICB PROC CONSTRUCTION 810 - 37 days DED CONSTRUCTION 630 days 23-Mei-16 CONSTRUCTION 720 - 132 days NCB NCB NCB Review DED RS Review DED RS SBD OE + BD RSA REVISED DED OE BD DED RSA REVISED DED OE BD SBD OE + BD DED RSA REVISED DED OE BD DED ICB RSA REVISED DED OE BD Review DED RS SBD OE + BD PQ RS Proc COW SBD DED OE BD DED NCB NCB DED Pack PACKAGE NAME 2012 2013 2014 2015 2016 2017 2018 ICB ICB ICB ICB ICB CONSTRUCTION 640 + 93 days 14-Apr-16 PROC 17-Mar-16 CONSTRUCTION 540 + 224 days CONSTRUCTION 730 + 105 days CONSTRUCTION 730 + 75 days CONSTRUCTION 730 + 90 days 31-Mei-16 Review DED RS PQ Review DED RS PQ PQ Review DED RS Review DED RS PROC CONSTRUCTION 720 days CONSTRUCTION 720 days 22-Jul-15 PQ PROC Western I ndonesia National Roads I mprovement Project 1 - 4

1.2 Disbursement

Loan Allocation and Percent Disbursement To Date REF 1.25 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 Month Co m p le te Actual Expenditure USD 101.18 mil 40.47 WINRIP ACTUAL PROGRESS UP TO DECEMBER 2016 AND FORECAST UP TO JUNE 2018 ACTUAL Dec 2016 Original Forecast Forecast Expenditure Rev USD 65.00 mil 26.00 Forecast Dec 2016 Deviation = + 14.47 The total disbursement summary from the loan by The World Bank to the end of December 2016 was USD 101,180,236.97 equivalent to approximately 40.47 of the loan funds. The following table summarizes the individual disbursements as calculated by CTC but retaining the total disbursement from Client Connection at the end of December 2016. Appendix A shows the Overall Loan Progress Status. Category Description Loan Restructuring Amount US Disbursement This Period Previous Disbursement Totals Disbursed to End Dec 2016 in US Disbursed 1 Part 1 Betterment and Capacity Expansion of National Roads. 220,400,000.00 19,454,368.91 74,935,762.23 94,390,131.14 42.83 2 Part 2 Implementation Support 17,000,000.00 6,790,105.83 6,790,105.83 39.94 3 Part 3 Road Sector Institutional Development 4 Part 4 Contingency for Disaster Risk Response Unallocated 12,600,000.00 Original Loan Amount 250,000,000.00 19,454,368.91 81,725,868.06 101,180,236.97 40.47 Breakdown of amount disbursed during the period December 2016 are for Statement of Work Accomplished for the following civil works contract packages : • Package No.02 : Final Escalation USD 642,987.66 • Package No.03 : IPC Nos. 27 USD 244,238.04 • Package No.03 : Retention Money USD 435,608.29 • Package No.03 : Final Escalation USD 532,904.76 • Package No.04 : IPC Nos. 09 Final USD 1,522,607.14 • Package No.04 : Retention Money USD 510,635.25 • Package No.05 : MC Nos. 14 - 19 USD 717,141.15 • Package No.06 : IPC Nos. 07 USD 930,102.62 • Package No.06 : IPC Nos. 08 USD 761,205.17 Western I ndonesia National Roads I mprovement Project 1 - 5 • Package No.07 : IPC Nos. 03 USD 1,042,076.76 • Package No.08 : IPC Nos. 05 USD 1,557,425.73 • Package No.08 : IPC Nos. 06 USD 1,761,294.63 • Package No.11 : IPC Nos. 12 USD 1,110,691.66 • Package No.12 : IPC Nos. 02 USD 334,740.74 • Package No.13 : IPC Nos. 05 USD 784,383.52 • Package No.14 : MC Nos. 04 USD 1,995,758.47 • Package No.15 : IPC Nos. 03 USD 207,955.44 • Package No.15 : IPC Nos. 04 USD 1,831,616.64 • Package No.16 : Down Payment USD 996,825.62 • Package No.17 : IPC Nos. 14 USD 413,278.16 • Package No.17 : IPC Nos. 15 USD 290,193.12 • Package No.19 : IPC Nos. 06 Final USD 152,464.55 • Package No.19 : Retention Money USD 115,324.65 • Package No.20 : MC Nos. 01 - 03 USD 562,909.14 The Ending balance for Special Account as of the end of December 2016 USD 1,012,712.68 Include Follow up on BPK audit findings for FY 2014 USD 11,765.00.

1.3 World Bank Implementation Review Mission and Site Visit

Not performed for this month.

1.4 Procurement of Civil Works Contract Under Category 1 of the Loan Agreement

As of end this reporting month, nineteen 19 contract packages are already procured and are either completed, eighteen 18 under construction and the remaining one 1 package is proposed to be cancelled Package No. 10 Sp. Empat Sp. Air Balam is proposed to be cancelled, because the road is still relatively in the good condition and widening is not needed immediately. 1.5 Procurement of Consultancy Package Under Category 2 of the Revised Loan Agreement Reallocation. Technical Assistance for Development of Slope Stabilization, Design and Management The Technical Assistance for Disaster Risk Reduction was canceled based on the results of meeting between DGH and the WB on October 12, 2015. It was decided to cancel the Technical Assistance and replaced by a Technical Assistance for Development of Slope Stabilization, Design and Management under Loan Category- 2. As mentioned in previous Monthly Report, eight 8 interested consultants met the deadline for submission of Expression of Interest . After POKJA s evaluation, five 6 consulting firms made the shortlist, three 4 international and two 2 local companies. The revised proposed shortlisted consultants from POKJA and the revised Request For Proposal RFP have already been submitted to World Bank for request of No Objection Letter NOL. The World Bank had issued No Objection Letter for RFP and Shortlisted Consultant respectively on September 23, 2016 and October 27, 2016. RFP had sent by POKJA to all shortlisted consultants on November 2, 2016. Pre- Western I ndonesia National Roads I mprovement Project 1 - 6 Proposal Conference was held on November 22, 2016 and all shortlisted consultants attended the event. The submission and opening the technical proposals was held on December 5, 2016. Three 3 consultants submitted the proposals, one 1 consultant was late for submitting their proposal and other one 1 consultant did not submit the proposal. POKJA evaluated the technical proposal first, while the financial proposal keep closed in envelope and will be opened after NOL for Techanical Evaluation Report TER issued by the World Bank. Evaluation of technical proposal was finalized by POKJA on December 23, 2016 with issuance the Technical Evaluation Report TER. CTC reviewed the TER and submitted the founding issues and recommendation related the TER to PMU WINRIP on December 29, 2016.