Final Engineering Designs, Engineer s Estimates and bidding documents have been completed for all projects proposed for WP-1, WP-2, WP-3.
A brief status of the nineteen 19 sub-projects relative to the procurement of Civil works contracts
and implementation can be found in Implementation Status table on Page 1-1 of this Report. While progress of road safety audit are shown in Appendix B.
4.2 Procurements
Procurement shall be conducted under the Bank s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding ICB based on the Bank letter Ref. WINRIP136 will
apply to the packages with the construction estimated cost of more than US 25 Million to comply with the new Bank s threshold for ICB. According to the GOI regulation, a prequalification shall be applied for
the packages with the construction estimated cost more than IDR 10 Billion. Review from previous procurement process, the World Bank in the Aide Memoire requested to GOI, for next 4 ICB subprojects
qualification still used Pre-Qualification and for remaining sub-project must be process with Post Qualification. As well as for all NCB the World Bank also requested to follow Post Qualification in
procurement process.
As of this reporting month December 2016, a more detailed current updates are fully indicated in Sub-Chapter 1.4 Procurement of Civil Works Contract Under Category 1 on Page 1-5 of this Report .
Under Category 3 of Loan Agreement the three 3 consultancy packages capacity building for disaster risk reduction, environmental management and road safety has been cancelled. As a result of the
cancellation of the three 3 Technical Assistance, the Technical Assistance for Development of Slope Stabilization, Design and Management has been included as replacement, but to be part of the Loan
Category-2 ;
Procurement update of the new consultancy package can be found in Sub-Chapter 1.5 Procurement of Consultancy Package Under Category 2 on Page 1-5 of this Report.
The WINRIP updated Procurement Plan and Progress are shown in Appendix F.
4.3 Civil Works Implementation
As of end of this reporting month December 2016, five 5 of contract packages were previously completed and currently under defects liability period for twenty four 24 months effective on the
day the TOCs were issued and thirteen 13 packages are currently under construction.
Details of each contract package are shown in Table 4.1.
Western I ndonesia National Roads I mprovement Project 4 - 2
Table 4.1
Program Contract
Package Contractor
Name of Road Province
Contract Signed
Commence ment of
Work Original
Time Extension
Revised Contract
Amount Contract
Time Completion
Date Contract Amount
Contract Time
Completion Date
AWP-1 1
PT. Jaya Konstruksi Manggala Pratama Tbk
Biha - Krui Lampung
Nov 25, 2013
Jan 8, 2014 134,909,211,000
640 CD Oct 9, 2015
93 CD 140,255,020,000
733 CD Jan 20, 2016
2 PT.Jaya Konstruksi Manggala
Pratama Tbk Padang Sawah
Sp. Empat including Air Gadang
West Sumatera
Dec 6, 2013 Jan 6, 2014
197,936,699,000 730 CD
Jan 5, 2016 105 CD
249,348,931,000 835 CD
Apr 14, 2016
3 PT. Jaya Konstruksi
Manggala Pratama Tbk Manggopoh
Padang Sawah West
Sumatera Dec 6, 2013
Jan 6, 2014 143,688,963,000
730 CD Jan 5, 2016
75 CD 183,940,872,000
805 CD Mar 17,
2016 4
PT. Waskita Karya and PT. Mulya Turangga JO
Ipuh - Bantal Bengkulu
Nov 14, 2013
Jan 13, 2014 186,936,750,000
730 CD Jan 12, 2016
90 CD 194,902,179,000
820 CD May 31,
2016
AWP-2 5
PT. Nusa Konstruksi Enjiniring Tbk.
Sp. Rampa - Poriaha
North Sumatera
March 17, 2015
June 18, 2015
107,321,260,310 540 CD
Dec 8, 2016 -
107,321,260,310 764 CD
Jul 20, 2016 6
PT. Waskita Karya Persero Tbk.
Ps. Pedati - Kerkap Bengkulu
Feb 27, 2015
Mar 11, 2015
86,517,470,000 450 CD
Jun 2, 2016 240 CD
118,444,156,000 690 CD
Jan 28, 2017 7
PT. Adhi Karya Indrapura Tapan
West Sumatera
Nov 26, 2015
Dec 10, 2015
129,699,900,000 630 CD
Aug 30, 2017
- -
- 8
PT. PPPT. Statika Mitra Sarana J.O
Bts. Kota Pariaman - Manggopoh
West Sumatera
Jan 28, 2016 Mar 23,
2016 355,500,000,000
720 CD Mar 12,
2018 - 71 CD
649 CD Dec 31,
2017 11
PT. Hutama KaryaPT. Daya Mulya J.O.
Bantal Mukomuko
Bengkulu Dec 18,
2014 Feb 23,
2015 228,899,717,000
720 CD Feb 11,
2017 -
262,611,303,000 -
- 12
PT. Lancar JayaPT. Cahaya T.A. J.O
Kambang Indrapura
West Sumatera
Jan 28, 2016 May 23,
2016 358,650,400,000
720 CD May 12,
2018 -116 CD
604 CD Jan 16, 2018
13 PT. Waskita Karya Persero
Tbk. Sp. Rukis
TJ. Kemuning
Bengkulu Dec 18,
2014 July 22,
2015 292,700,000,000
720 CD July 10,
2017 -
- -
AWP-3 14
PT. Yasa Patria PerkasaConbloc, JO
Painan Kambang West
Sumatera Jun 1, 2016
Aug 3, 2016 214,327,429,680
630CD Apr 12,
2018 -114 CD
- 516 CD
Dec 31, 2017
15 PT. Pembangunan
Perumahan Persero Sibolga Bts.
Tapsel North
Sumatera July 13,
2015 Nov 20,
2015 260,100,000,000
810 CD Feb 6, 2018
- 37 CD 773 CD
Dec 31, 2017
16 KSO PT Yasa PP-Multi
Structure Ipuh - seblat
Bengkulu Oct 28, 2016
Nov 8, 2016 211,374,500,000
630CD July 30,
2018 -
- -
- 17
PT. Jaya Konstruksi Manggala Pratama Tbk
Sp. Gunung Kemala Pugung Tampak
Lampung Nov 17,
2014 Sept 4, 2015
199,551,000,000 720 CD
Aug 23, 2017
- -
- 19
PT. Roda Tekindo Purajaya Bintunan - Lais
Bengkulu Feb 27,
2015 Mar 11,
2015 33,689,452,000
300 CD Jan 4, 2016
125CD 44,419,760.000
425CD June 30,
2016 20
PT. Nindya Karya Lubuk Alung
Sicincin West
Sumatera Jun 1, 2016
Sept 1, 2016 113,818,300,000
540CD Feb 22,
2018 - 54 CD
- 486 CD
Dec 31, 2017
21 PT. Multi Structure
Lubuk Alung Kuraitaji
West Sumatera
Jun 1, 2016 Sept 1, 2016
126,301,900,000 540CD
Feb 22, 2018
- 54 CD -
486 CD Dec 31,
2017