41.34 WINRIP DOC MPR CTC MPR No.48 2016 12 2016 12 30 00442

Western I ndonesia National Roads I mprovement Project 4 - 6 increasing supply of agreegate materials, especialy Abu batu and changing the main equipments in good conditions. For more details of the Contract Package, refer to ANNEX P-11 Executive Summary Report . Package No. 12 : Kambang - Indrapura From the commencement date to this month, the construction time has been elapsed of 8 months but the actual wrok progress to date is only 4.02 against 9.39. Delayed works are mosthly General, Earthwork, Granular Pavement and Structures. Furthermore asphalt pavement works are not started so far. The weight of work portion for asphalt pavement is to be more than 50 from the total of works. Therefore, the contractor has been strongly adviced that the preparatory arrangements for executing asphalt pavement works should be done as early as possible. Details of the Contract Package are shown in ANNEX P-12 Executive Summary Report . Package No. 13 : Sp. Rukis Tj. Kemuning During this month, the work progress is achieved of 9.86 per a month against 4.69 scheduled. Overall work progress to date is only 32.63 against 46.63 scheduled. Hence the slippage rate of the progress is to become -14.00 which is considerably improved from the previous month. For this month progress has been leaded by the asphalt pavement affacted by more than 90 of this month overall progress. In order to maintain the constant progress in the future, the contractor has to improve and catch-up the work progress of granular pavement to obtain the more working areas of the next works, Asphalt Pavement. Details of the work progress are shown in ANNEX P-13 Executive Summary Reports. Package No. 14: Painan - Kambang The work progress up to this month is achieved of 3.94, excepting asphalt pavement due to the fault to apply the material on site of aggregate stones, etc as the work progress which is not allowed by the contract, against 5.87 scheduled. Aggregate stone materials are stockpiled in huge amount, accordingly it is expecting that the next month progress is to be improved. ANNEX P-14 Executive Summary Report shows the complete details of the project. Package No. 15: Sibolga Bts. Tapsel During this month, the work progress per a month is achieved of 7.28 against 6.95 scheduled. Overall work progress to date is only 20.52 against 44.45 scheduled. Hence the slippage rate of the progress is to be -23.93 which is slightly less than the previous month -24.2. This month progress has been leaded by the asphalt pavement work mostly affacted by more than 97 of this month overall progress. In order to maintain the smooth progress in the future, the contractor has to improve and catch-up the