PEKERJAAN ARSITEKTUR A. LANTAI DASAR

14 Plat lantai t. 12 cm ; elv. 12.550 m3 40.20 1.4988 15 Plat tangga m3 1.83 0.0639 16 Plat bordes tangga utama m3 0.29 0.0114 7.8081 0.0000 0.0000 0.0000 C.5 LANTAI 4 ELV. +12.550 - ELV. +16.750 1 Kolom K1B d. 35 cm m3 3.23 0.2392 2 Kolom K3C d. 25 cm m3 1.65 0.1032 3 Kolom K4 20 x 40 m3 0.67 0.0445 4 Kolom KL 20 x 40 x 40 Lift m3 2.02 0.1449 5 Kolom B6 45 x 45 m3 10.13 0.5435 6 Kolom B7A 0.15 x 0.5 m3 9.75 0.7298 7 Kolom B8A 25 x 45 m3 12.15 0.7503 8 Kolom B9 20 x 40 m3 3.52 0.2713 9 Kolom B9K 20 x 40 m3 5.76 0.4624 10 Kolom B10 20 x 40 m3 4.16 0.3190 11 Kolom B10K 20 x 40 m3 0.48 0.0385 12 Plat lantai t. 12 cm ; elv. 16.750 m3 40.20 1.5049 13 Plat tangga m3 1.83 0.0641 14 Plat bordes tangga utama m3 0.29 0.0114 5.2270 0.0000 0.0000 0.0000 C.6 LANTAI LMR ELV. +16.750 - ELV. +21.250 1 Kolom K1B d. 35 cm m3 3.23 0.2397 2 Kolom K4 20 x 40 m3 0.67 0.0494 3 Kolom KL 20 x 40 x 40 Lift m3 2.02 0.1456 4 Kolom B6 45 x 45 m3 7.09 0.3829 5 Kolom B9 20 x 40 m3 3.52 0.2729 6 Kolom B9K 20 x 40 m3 5.76 0.4651 7 Kolom B10 20 x 40 m3 4.16 0.3208 8 Kolom B10K 20 x 40 m3 0.48 0.0388 9 Plat DAK t.12 cm ; elev. 21.250 m3 11.52 0.3958 2.3110 0.0000 0.0000 0.0000 C.7 LANTAI ATAP 1 Kolom KP9 Pipa baja 8 kg 10348.80 2.1757 2 Balok pipa d. 8 kg 14886.93 3.1298 3 Plat t. 14 mm kg 361.65 0.0516 4 Plat t. 8 mm kg 361.44 0.0515 5 Anchor Bolt d. 19 mm bh 64.00 0.0230 6 Cat ex. Kansai kg 25958.82 0.2196 5.65120.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN STRUKTUR 69.3437 0.0000 0.0000 0.0000

III. PEKERJAAN ARSITEKTUR A. LANTAI DASAR

A.1 PEK. DINDING 1 Dinding hebel t. 10 cm + MU 380 m2 481.14 0.4738 2 Plesteran dinding MU 100 t. 10 mm m2 962.28 0.4604 3 Acian MU 200 t. 3 mm m2 962.28 0.2349 4 Kolom praktis 10 x 10 m 52.21 0.0380 5 Balok lintel 10 x 15 m 132.39 0.1224 6 Finishing kolom MU 200 m2 177.59 0.0433 7 Railing pagar pipa hitam finishing cat m 46.00 0.0708 8 Railing tangga pipa hitam finishing cat m 10.00 0.0154 1.4590 0.0000 0.0000 0.0000 A.2PEK. LANTAI 1 Keramik 3030 DN putih m2 105.61 0.0898 2 Keramik 3030 DN putih tangga m2 21.69 0.0184 3 Stair nozing keramik 7 x 40 cm m 31.05 0.0260 0.13420.0000 0.0000 0.0000 A.3 PEK. KUSEN LENGKAP 1 SD1 unit 1.00 0.0477 2 FD1 unit 1.00 0.0260 3 ADW1 unit 1.00 0.0394 4 ADW2 unit 1.00 0.0609 5 ADW3 unit 1.00 0.0675 6 ADW4 unit 1.00 0.0578 7 BV1 unit 4.00 0.0494 8 BV2 unit 1.00 0.0103 9 BV3 unit 1.00 0.0103 10 Handrall pagar type R-5 bh 1.00 0.2752 0.6445 0.0000 0.0000 0.0000 A.4 PEK. PLAFOND 1 Plafond beton expose finishing m2 105.61 0.0258 0.0258 0.0000 0.0000 0.0000 A.5 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 962.28 0.2163 2 Cat plafond beton expose Vinilex 3x m2 117.97 0.0305 3 Cat kolom dan balok m2 117.59 0.0399 0.2867 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR 2.5502 0.0000 0.0000 0.0000 B. LANTAI - 1 B.1 PEK. DINDING 1 Dinding hebel t. 10 cm + MU 380 m2 514.88 0.5164 2 Plesteran dinding MU 100 dan acian MU 200 m2 1029.76 0.5126 3 Acian MU 200 t. 3 mm m2 1029.76 0.2663 4 Keramik dinding 2025 KMWC m2 144.69 0.1664 5 Kolom praktis 10 x 10 m 55.87 0.0414 6 Balok lintel 10 x 15 m 141.67 0.1339 7 Finishing kolom MU 200 m2 244.79 0.0633 8 Railing tangga pipa hitam finishing cat m 82.00 0.1263 1.8266 0.0000 0.0000 0.0000 B.2PEK. LANTAI 1 Floor hardener 3 kgm2 m2 40.50 0.0338 2 Lantai karpet koridor m2 340.00 0.8393 3 Keramik 3030 DN putih tangga m2 21.69 0.0189 4 Stair nozing keramik 7 x 40 cm m 31.05 0.0260 5 Keramik 2020 KMWC m2 32.09 0.0287 0.9467 0.0000 0.0000 0.0000 B.3 PEK. KUSEN LENGKAP 1 AD3 unit 3.00 0.0775 2 AD4 unit 2.00 0.1028 3 FD1 unit 5.00 0.1311 4 PVC unit 5.00 0.0417 5 Partisi gypsum rangka metal stud galvalume m2 30.60 0.0382 6 ADW5 m2 2.00 0.3278 7 AW2 bh 5.00 0.8384 8 AD2 bh 2.00 0.2191 9 Handrall pagar type R-1 bh 5.00 0.2755 10 Handrall pagar type R-2 bh 2.00 0.1024 2.1545 0.0000 0.0000 0.0000 B.4 PEK. PLAFOND 1 Plafond gypsum + rangka m2 196.00 0.2302 2 Plafond acoustik + rangka m2 159.00 0.1502 0.3804 0.0000 0.0000 0.0000 B.5 PEK. SANITAIR 1 Closed duduk ex TOTO bh 5.00 0.1259 2 Washtafel LW 230 J bh 6.00 0.0858 3 Urinoir bh 3.00 0.0680 4 Jet spray bh 3.00 0.0146 5 Floor drain bh 6.00 0.0096 6 Kaca cermin ukuran 2600 x 1200 mm tinggi bh 2.00 0.0063 0.31020.0000 0.0000 0.0000 B.6 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 1152.16 0.2701 2 Cat plafond beton kaisiboard Vinilex 3x m2 196.00 0.0537 3 Cat kolom m2 244.79 0.0574 0.38120.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 1 5.9996 0.0000 0.0000 0.0000 C. LANTAI - 2 C.1 PEK. KUSEN LENGKAP 1 Partisi gypsum rangka metal stud galvalume m2 96.16 0.1208 2 ADW5 unit 1.00 0.1644 3 ADW5 unit 1.00 0.1644 4 AW2 unit 5.00 0.8384 5 Tanggulan dudukan kusen Almunium m1 68.20 0.1188 6 Handrall pagar type R-1 bh 5.00 0.2755 7 Handrall pagar type R-2 bh 2.00 0.1023 1.7846 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 2 1.7846 0.0000 0.0000 0.0000 D. PEK. LANTAI - 3 D.1 PEK. KUSEN LENGKAP 1 Partisi gypsum rangka metal stud galvalume m2 96.18 0.1212 2 ADW5 unit 1.00 0.1646 3 ADW5 unit 1.00 0.1646 4 AW2 unit 5.00 0.8384 5 Tanggulan dudukan kusen Almunium m1 68.20 0.1188 6 Handrall pagar type R-1 bh 5.00 0.2755 7 Handrall pagar type R-2 bh 2.00 0.1023 1.7854 0.0000 0.0000 0.0000 D.2PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 161.72 0.0387 2 Cat kolom luar Vinilex 3x m2 55.30 0.0132 0.0519 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 3 1.8373 0.0000 0.0000 0.0000 E. LANTAI - 4 E.1 PEK. KUSEN LENGKAP 1 AW2 bh 7.00 1.1737 2 ADW6 bh 1.00 0.1646 3 Partisi gypsum rangka metal stud galvalume m1 65.58 0.0824 4 Tanggulan dudukan kusen Almunium m1 37.00 0.0644 5 Handrall pagar type R-5 bh 1.00 0.2751 E.2PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 131.16 0.0314 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 4 1.7916 0.0000 0.0000 0.0000 F. LANTAI - RUANG MESIN F.1 PEK. LANTAI 1 Floor hardener 3 kgm2 m2 105.61 0.0883 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - RUANG MESIN 0.0883 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR 14.0516 0.0000 0.0000 0.0000 IV. PEKERJAAN MEKANIKAL IV.1 PEKERJAAN INSTALASI PLAMBING