14 Plat lantai t. 12 cm ; elv. 12.550 m3
40.20 1.4988
15 Plat tangga m3
1.83 0.0639
16 Plat bordes tangga utama m3
0.29 0.0114
7.8081 0.0000
0.0000 0.0000
C.5 LANTAI 4 ELV. +12.550 - ELV. +16.750
1 Kolom K1B d. 35 cm m3
3.23 0.2392
2 Kolom K3C d. 25 cm m3
1.65 0.1032
3 Kolom K4 20 x 40 m3
0.67 0.0445
4 Kolom KL 20 x 40 x 40 Lift m3
2.02 0.1449
5 Kolom B6 45 x 45 m3
10.13 0.5435
6 Kolom B7A 0.15 x 0.5 m3
9.75 0.7298
7 Kolom B8A 25 x 45 m3
12.15 0.7503
8 Kolom B9 20 x 40 m3
3.52 0.2713
9 Kolom B9K 20 x 40 m3
5.76 0.4624
10 Kolom B10 20 x 40 m3
4.16 0.3190
11 Kolom B10K 20 x 40 m3
0.48 0.0385
12 Plat lantai t. 12 cm ; elv. 16.750 m3
40.20 1.5049
13 Plat tangga m3
1.83 0.0641
14 Plat bordes tangga utama m3
0.29 0.0114
5.2270 0.0000
0.0000 0.0000
C.6 LANTAI LMR ELV. +16.750 - ELV. +21.250
1 Kolom K1B d. 35 cm m3
3.23 0.2397
2 Kolom K4 20 x 40 m3
0.67 0.0494
3 Kolom KL 20 x 40 x 40 Lift m3
2.02 0.1456
4 Kolom B6 45 x 45 m3
7.09 0.3829
5 Kolom B9 20 x 40 m3
3.52 0.2729
6 Kolom B9K 20 x 40 m3
5.76 0.4651
7 Kolom B10 20 x 40 m3
4.16 0.3208
8 Kolom B10K 20 x 40 m3
0.48 0.0388
9 Plat DAK t.12 cm ; elev. 21.250 m3
11.52 0.3958
2.3110 0.0000
0.0000 0.0000
C.7 LANTAI ATAP
1 Kolom KP9 Pipa baja 8 kg
10348.80 2.1757
2 Balok pipa d. 8 kg
14886.93 3.1298
3 Plat t. 14 mm kg
361.65 0.0516
4 Plat t. 8 mm kg
361.44 0.0515
5 Anchor Bolt d. 19 mm bh
64.00 0.0230
6 Cat ex. Kansai kg
25958.82 0.2196
5.65120.0000 0.0000
0.0000 SUB TOTAL PEKERJAAN STRUKTUR
69.3437 0.0000
0.0000 0.0000
III. PEKERJAAN ARSITEKTUR A. LANTAI DASAR
A.1 PEK. DINDING
1 Dinding hebel t. 10 cm + MU 380 m2
481.14 0.4738
2 Plesteran dinding MU 100 t. 10 mm m2
962.28 0.4604
3 Acian MU 200 t. 3 mm m2
962.28 0.2349
4 Kolom praktis 10 x 10 m
52.21 0.0380
5 Balok lintel 10 x 15 m
132.39 0.1224
6 Finishing kolom MU 200 m2
177.59 0.0433
7 Railing pagar pipa hitam finishing cat m
46.00 0.0708
8 Railing tangga pipa hitam finishing cat m
10.00 0.0154
1.4590 0.0000
0.0000 0.0000
A.2PEK. LANTAI
1 Keramik 3030 DN putih m2
105.61 0.0898
2 Keramik 3030 DN putih tangga m2
21.69 0.0184
3 Stair nozing keramik 7 x 40 cm m
31.05 0.0260
0.13420.0000 0.0000
0.0000 A.3 PEK. KUSEN LENGKAP
1 SD1 unit
1.00 0.0477
2 FD1 unit
1.00 0.0260
3 ADW1 unit
1.00 0.0394
4 ADW2 unit
1.00 0.0609
5 ADW3 unit
1.00 0.0675
6 ADW4 unit
1.00 0.0578
7 BV1 unit
4.00 0.0494
8 BV2 unit
1.00 0.0103
9 BV3 unit
1.00 0.0103
10 Handrall pagar type R-5 bh
1.00 0.2752
0.6445 0.0000
0.0000 0.0000
A.4 PEK. PLAFOND
1 Plafond beton expose finishing m2
105.61 0.0258
0.0258 0.0000
0.0000 0.0000
A.5 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
962.28 0.2163
2 Cat plafond beton expose Vinilex 3x m2
117.97 0.0305
3 Cat kolom dan balok m2
117.59 0.0399
0.2867 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR 2.5502
0.0000 0.0000
0.0000 B. LANTAI - 1
B.1 PEK. DINDING
1 Dinding hebel t. 10 cm + MU 380 m2
514.88 0.5164
2 Plesteran dinding MU 100 dan acian MU 200 m2
1029.76 0.5126
3 Acian MU 200 t. 3 mm m2
1029.76 0.2663
4 Keramik dinding 2025 KMWC m2
144.69 0.1664
5 Kolom praktis 10 x 10 m
55.87 0.0414
6 Balok lintel 10 x 15 m
141.67 0.1339
7 Finishing kolom MU 200 m2
244.79 0.0633
8 Railing tangga pipa hitam finishing cat m
82.00 0.1263
1.8266 0.0000
0.0000 0.0000
B.2PEK. LANTAI
1 Floor hardener 3 kgm2 m2
40.50 0.0338
2 Lantai karpet koridor m2
340.00 0.8393
3 Keramik 3030 DN putih tangga m2
21.69 0.0189
4 Stair nozing keramik 7 x 40 cm m
31.05 0.0260
5 Keramik 2020 KMWC m2
32.09 0.0287
0.9467 0.0000
0.0000 0.0000
B.3 PEK. KUSEN LENGKAP 1 AD3
unit 3.00
0.0775 2 AD4
unit 2.00
0.1028 3 FD1
unit 5.00
0.1311 4 PVC
unit 5.00
0.0417 5 Partisi gypsum rangka metal stud galvalume
m2 30.60
0.0382 6 ADW5
m2 2.00
0.3278 7 AW2
bh 5.00
0.8384 8 AD2
bh 2.00
0.2191 9 Handrall pagar type R-1
bh 5.00
0.2755 10 Handrall pagar type R-2
bh 2.00
0.1024 2.1545
0.0000 0.0000
0.0000 B.4 PEK. PLAFOND
1 Plafond gypsum + rangka m2
196.00 0.2302
2 Plafond acoustik + rangka m2
159.00 0.1502
0.3804 0.0000
0.0000 0.0000
B.5 PEK. SANITAIR
1 Closed duduk ex TOTO bh
5.00 0.1259
2 Washtafel LW 230 J bh
6.00 0.0858
3 Urinoir bh
3.00 0.0680
4 Jet spray bh
3.00 0.0146
5 Floor drain bh
6.00 0.0096
6 Kaca cermin ukuran 2600 x 1200 mm tinggi bh
2.00 0.0063
0.31020.0000 0.0000
0.0000 B.6 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
1152.16 0.2701
2 Cat plafond beton kaisiboard Vinilex 3x m2
196.00 0.0537
3 Cat kolom m2
244.79 0.0574
0.38120.0000 0.0000
0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 1
5.9996 0.0000
0.0000 0.0000
C. LANTAI - 2 C.1 PEK. KUSEN LENGKAP
1 Partisi gypsum rangka metal stud galvalume m2
96.16 0.1208
2 ADW5 unit
1.00 0.1644
3 ADW5 unit
1.00 0.1644
4 AW2 unit
5.00 0.8384
5 Tanggulan dudukan kusen Almunium m1
68.20 0.1188
6 Handrall pagar type R-1 bh
5.00 0.2755
7 Handrall pagar type R-2 bh
2.00 0.1023
1.7846 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 2 1.7846
0.0000 0.0000
0.0000 D. PEK. LANTAI - 3
D.1 PEK. KUSEN LENGKAP
1 Partisi gypsum rangka metal stud galvalume
m2 96.18
0.1212 2 ADW5
unit 1.00
0.1646 3 ADW5
unit 1.00
0.1646 4 AW2
unit 5.00
0.8384 5 Tanggulan dudukan kusen Almunium
m1 68.20
0.1188 6 Handrall pagar type R-1
bh 5.00
0.2755 7 Handrall pagar type R-2
bh 2.00
0.1023 1.7854
0.0000 0.0000
0.0000 D.2PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
161.72 0.0387
2 Cat kolom luar Vinilex 3x m2
55.30 0.0132
0.0519 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 3 1.8373
0.0000 0.0000
0.0000 E.
LANTAI - 4 E.1 PEK. KUSEN LENGKAP
1 AW2 bh
7.00 1.1737
2 ADW6 bh
1.00 0.1646
3 Partisi gypsum rangka metal stud galvalume m1
65.58 0.0824
4 Tanggulan dudukan kusen Almunium m1
37.00 0.0644
5 Handrall pagar type R-5 bh
1.00 0.2751
E.2PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
131.16 0.0314
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 4 1.7916
0.0000 0.0000
0.0000 F.
LANTAI - RUANG MESIN F.1 PEK. LANTAI
1 Floor hardener 3 kgm2 m2
105.61 0.0883
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - RUANG MESIN 0.0883
0.0000 0.0000
0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR
14.0516 0.0000
0.0000 0.0000
IV. PEKERJAAN MEKANIKAL IV.1 PEKERJAAN INSTALASI PLAMBING