a. Kabel dari JBX-TELP LT DASAR ke outlet telepon
ttk 3.00
0.0088 ITC 2 x 2 x 0.6 mm + PVC dia. 20
LANTAI 1 a.
Kabel dari JBX-TELP LT 1 ke outlet telepon ttk
11.00 0.0320
ITC 2 x 2 x 0.6 mm + PVC dia. 20
SUB TOTAL PEKERJAAN SISTEM TELEPON 0.7950
0.0000 0.0000
0.0000 5.8PEKERJAAN RAK KABEL
Pemasangan rak kabel beserta peralatan bantu lainnya, sesuai spesifikasi teknik dan gambar, terpasang lengkap
LANTAI 1 a.
Rak kabel Cable Tray hot dipgalvanised mild steel ukuran m
62.00 0.1263
300 x 100 mm terpasang menggantung di langit-langit
SUB TOTAL PEKERJAAN RAK KABEL 0.1263
0.0000 0.0000
0.0000 MATERIAL BANTU
lot 1.00
0.0181
TEST COMMISSIONING lot
1.00 0.0302
TOTAL V.I PEKERJAAN INSTALASI ELEKTRONIK 1.5916
0.0000 0.0000
0.0000 VI. PEKERJAAN GWT GROUND WATER TANK DAN RUMAH POMPA
1 GROUND WATER TANK
a. Galian tanah
m3 82.00
0.0202 0.0000
0.0202 100
100 0.0202
b. Pasir urug 10 cm
m3 2.04
0.0045 0.0000
0.0000 0.0000
c. Lantai kerja 5 cm
m3 1.02
0.0074 0.0000
0.0000 0.0000
d. Balok dan ring balk 30 x 30 beton K 350
m3 5.26
0.2819 0.0000
0.0000 0.0000
e. Kolom 30 x 30 beton K 350
m3 2.62
0.1492 0.0000
0.0000 0.0000
f. Dinding dasar, samping, penyekat, atas tebal 20 cm K 350
m3 22.98
1.3355 0.0000
0.0000 0.0000
g. Water profing counting
m2 108.00
0.1044 0.0000
0.0000 0.0000
h. Keramik 30 x 30 DN putih
m2 108.00
0.0906 0.0000
0.0000 0.0000
i. Manhole
bh 2.00
0.0371 0.0000
0.0000 0.0000
j. Tangga monyet stainless steel
bh 2.00
0.1571 0.0000
0.0000 0.0000
2 RUMAH POMPA PEKERJAAN STRUKTUR
a. Kolom 2040
m3 0.96
0.0486 0.0000
0.0000 0.0000
b. Balok 1525
m3 1.01
0.0480 0.0000
0.0000 0.0000
c. Plat beton t. 12 cm
m3 2.88
0.0989 0.0000
0.0000 0.0000
d. Lisplank 1050
m3 1.10
0.0378 0.0000
0.0000 0.0000
PEKERJAAN FINISHING
a. Dinding hebel t. 10 cm MU-380
m2 42.00
0.0201 0.0000
0.0000 0.0000
b. Plesteran MU-100 dan acian MU-200
m2 84.00
0.0205 0.0000
0.0000 0.0000
c. Acian MU 200 t. 3 mm
m2 84.00
0.0611 0.0000
0.0000 0.0000
d. Keramik 3030 DN putih
m2 30.00
0.0252 0.0000
0.0000 0.0000
e. Balok lintel 10 x 15
m2 46.00
0.0112 0.0000
0.0000 0.0000
f. Plafond beton expose finishing
m2 106.00
0.0771 0.0000
0.0000 0.0000
g. Cat dinding
m2 84.00
0.0217 0.0000
0.0000 0.0000
h. Cat plafond dan lisplank
m2 106.00
0.0238 0.0000
0.0000 0.0000
i. Waterprofing
m2 30.00
0.0290 0.0000
0.0000 0.0000
PEKERJAAN ELEKTRIKAL DAN MEKANIKAL
a. Lampu TL IDR 18 W
bh 3.00
0.0025 0.0000
0.0000 0.0000
b. Stop kontak 200 W
bh 3.00
0.0008 0.0000
0.0000 0.0000
c. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk lampu
bh 3.00
0.0051 0.0000
0.0000 0.0000
d. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W
bh 3.00
0.0061 0.0000
0.0000 0.0000
e. Stop kontak 200 W
bh 3.00
0.0008 0.0000
0.0000 0.0000
f. Saklar seri
bh 1.00
0.0002 0.0000
0.0000 0.0000
g. Saklar tunggal
bh 1.00
0.0002 0.0000
0.0000 0.0000
h. Saluran air hujan dia. 10 cm AW Wavin
m1 4.00
0.0051 0.0000
0.0000 0.0000
PEKERJAAN KUSEN DAN PINTU
a. Pintu ruang pompa
bh 1.00
0.1283 0.0000
0.0000 0.0000
b. Gril kecil 50 x 50
bh 4.00
0.1052 0.0000
0.0000 0.0000
c. Gril besar 50 x 150
bh 1.00
0.0407 0.0000
0.0000 0.0000
TOTAL VI. PEKERJAAN GWT DAN RUMAH POMPA 3.0059
0.0000 0.0202
0.0202 VII. PEKERJAAN DINDING TURAP BATU KALI
a. Pasangan batu kali
m3 84.97
0.6286 b.
Siar batu kali m2
53.70 0.0838
TOTAL VII. PEKERJAAN DINDING TURAP BATU KALI 0.7124
0.0000 0.0000
0.0000 VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE
SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm
a. Kabel tweist 3 x 70 mm dan 1 x 50 mm
m1 100.00
0.2633
TOTAL VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE 0.2633
0.0000 0.0000
0.0000 SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm
IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS
Pengadaan dan pemasangan sistem sesuai dengan gambar dan spesifikasi teknis
1 System elektrostatis dengan radius proteksi 150 meter lengkap dengan unit
1.00 0.4833
pipa galvanis dia. 2 setinggi 6 m dan NYY 50 mm2 dalam GIP dia. 50 mm
2 Pentanahan copper clad rod 1 x 12 m lengkap dengan bak kontrol unit
1.00 0.0665
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 3 ohm kbl Coaxial
TOTAL IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS 0.54980.0000
0.0000 0.0000
X. ROOF TANK KUBIKEL 2 KOMPARTEMEN
Type : RFP unit
1.00 0.8892
Kap : 8,00 m3 Fiber rainforcement plastic, lengkap dengan dudukan kaki
tangki air 2 m serta wc di tangki air dan accessories
TOTAL X. PEKERJAAN TANK KUBIKAL 2 KOMPARTEMEN 0.8892
0.0000 0.0000
0.0000 JUMLAH TOTAL
100.0000 12.4584
9.9815 22.4399
PRESTASI MINGGU INI :
9.9815 PRESTASI SD AKHIR MINGGU LALU
: 12.4584
PRESTASI SD MINGGU INI :
22.4399 RENCANA SD AKHIR MINGGU INI
: 15.8253
SELISIH :
6.6146
: :
BOBOT Bobot
Bobot SD
Minggu Lalu Minggu Ini
Minggu Lalu Minggu Ini
MINGGU INI I.
PEKERJAAN PERSIAPAN DAN PENUNJANG
1 Pekerjaan pengukuran dan pemasangan bowplank m1
117.65 0.0882
0.0882 0.0000
100 100
0.0882 2 Pekerjaan pembersihan lokasi
m2 3202.00
0.2050 0.2050
0.0000 100
100 0.2050
3 Direksikeet uk. 3,6 x 7,2 = 25,92 m2 m2
25.92 0.2392
0.2392 0.0000
100 100
0.2392 4 Pagar pengaman proyek
m1 233.46
0.4485 0.4485
0.0000 100
100 0.4485
5 Air kerja lot1.00
0.0329 0.0132
0.0016 40
5 45
0.0148 6 Listrik kerja
lot1.00 0.0424
0.0170 0.0021
40 5
45 0.0191
7 Foto proyek ls
3.00 0.0056
0.0022 0.0003
40 5
45 0.0025
8 Pekerjaan jalan masuk ke site m1
25.00 0.0260
0.0260 0.0000
100 100
0.0260 9 Pembuatan Dam sementara pekerjaan khusus diarea
lot 1.00
1.1350 1.1350
0.0000 100
100 1.1350
kolom yang masuk ke area sungai
SUB TOTAL PEKERJAAN PERSIAPAN DAN PENUNJANG 2.22282.1743
0.0040 2.178
3 II. PEKERJAAN STRUKTUR
A. PEK. TANAH 1 Galian tanah untuk pile cap dan tie beam
m3 358.76
0.0824 0.0824
0.0000 100
100 0.0824
2 Urugan tanah kembali sisa galian m3
200.24 0.0220
0.0220 0.0000
100 100
0.0220 3 Urugan tanah dari luar proyek
m3 155.00
0.1813 0.0907
0.0000 50
50 0.0907
4 Urugan pasir di bawah pile cap, tie beam dan plat tebal 10 cm m3
37.67 0.0839
0.0755 0.0000
90 90
0.0755 5 Lantai kerja tebal 5 cm dibawah pile cap, tie beam dan plat lantai
m3 15.54
0.1123 0.1011
0.0000 90
90 0.1011
0.4819 0.3716
0.0000 0.3716
B. PEK. PONDASI
1 Pondasi tiang pancang minipile M25 segi empat K 500 m
2208.00 4.3459
4.3459 0.0000
100 100
4.3459 2 Potong tiang pancang
ttk 184.00
0.1601 0.1601
0.0000 100
100 0.1601
3 Mobilisasi alat pancang unit
1.00 0.2439
0.2439 0.0000
100 100
0.2439 4 Pile cap P-1 60 x 60 x 60
m3 0.86
0.0381 0.0381
0.0000 100
100 0.0381
5 Pile cap P-2 135 x 60 x 65 m3
0.51 0.0289
0.0289 0.0000
100 100
0.0289 6 Pile cap P-4 135 x 135 x 85
m3 12.39
0.2937 0.2937
0.0000 100
100 0.2937
7 Pile cap P-8 190 x 210 x 120 m3
28.73 0.7225
0.7225 0.0000
100 100
0.7225 8 Pile cap P-9 210 x 210 x 120
m3 52.92
1.2152 1.2152
0.0000 100
100 1.2152
9 Pit lift - Lantai pit lift
m3 5.12
0.1926 0.1156
0.0770 60
40 100
0.1926 - Dinding pit lift
m3 4.00
0.1223 0.0734
0.0489 60
40 100
0.1223 10 Tie beam TB 1 40 x 60
m3 20.16
0.5360 0.5360
0.0000 100
100 0.5360
11 Tie beam TB 2 35 x 80 m3
11.14 0.3559
0.3559 0.0000
100 100
0.3559 12 Tie beam TB 3 35 x 80
m3 18.14
0.5794 0.5794
0.0000 100
100 0.5794
13 Tie beam TB 4 35 x 55 m3
9.24 0.2965
0.2965 0.0000
100 100
0.2965 14 Tie beam TB 5 20 x 45
m3 1.94
0.0869 0.0869
0.0000 100
100 0.0869
9.2179 9.0919
0.1260 9.2179
C. PEK. KONSTRUKSI BETON C.1 LANTAI DASAR ELV. -4.250 - ELV. +0.005
1 Kolom K1K 65 x 65 m3
39.04 1.5913
1.5913 0.0000
100 100
1.5913 2 Kolom K4 20 x 40
m3 0.67
0.0485 0.0485
0.0000 100
100 0.0485
3 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1432 0.1432
0.0000 100
100 0.1432
4 Kolom B1 40 x 80 m3
9.18 0.4347
0.2608 0.1739
60 40
100 0.4347
5 Kolom B2 35 x 75 m3
15.02 0.6032
0.3619 0.2413
60 40
100 0.6032
6 Kolom B3 50 x 80 m3
23.09 1.3886
0.8332 0.5554
60 40
100 1.3886
7 Kolom B5 35 x 75 m3
16.54 0.8125
0.4875 0.3250
60 40
100 0.8125
8 Kolom B6 45 x 45 m3
20.25 1.0681
0.6409 0.4272
60 40
100 1.0681
9 Kolom B7 30 x 45 m3
22.14 1.4178
0.8507 0.5671
60 40
100 1.4178
10 Kolom B8 25 x 45 m3
14.85 0.8984
0.5390 0.3594
60 40
100 0.8984
11 Kolom B9 20 x 40 m3
7.04 0.5313
0.3188 0.2125
60 40
100 0.5313
12 Kolom B9K 20 x 40 m3
11.52 0.9060
0.5436 0.3624
60 40
100 0.9060
13 Kolom B10 20 x 40 m3
7.68 0.5768
0.3461 0.2307
60 40
100 0.5768
14 Kolom B10K 20 x 40 m3
0.96 0.0755
0.0453 0.0302
60 40
100 0.0755
15 Plat lantai t. 80 mm ; elv. -4.250 m3
28.68 1.4163
0.8498 0.0000
60 60
0.8498 16 Plat lantai t. 150 mm ; elv. -4.250
m3 14.14
0.4433 0.2660
0.1773 60
40 100
0.4433 17 Plat lantai t. 12 cm ; elv. 0.05
m3 57.30
2.0915 1.2549
0.8366 60
40 100
2.0915 18 Plat tangga utama
m3 1.83
0.0629 0.0000
0.0000 0.0000
19 Plat bordes tangga utama m3
0.29 0.0112
0.0000 0.0000
0.0000
14.5211 9.3814
4.4991 13.8805
C.2 LANTAI 1 ELV. +0.005 - ELV. +4.125
1 Kolom K1 d. 50 cm m3
21.72 1.1256
0.6754 0.0000
60 60
0.6754 2 Kolom K2 60 x 60
m3 18.14
0.9270 0.6953
0.0000 75
75 0.6953
3 Kolom K3 60x 60 m3
12.10 0.4713
0.0000 0.2828
60 60
0.2828 4 Kolom K4 20 x 40
m3 0.67
0.0489 0.0000
0.0293 60
60 0.0293
5 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1440 0.0000
0.0864 60
60 0.0864
6 Kolom B1 40 x 80 m3
12.24 0.5795
0.0000 0.2318
40 40
0.2318 7 Kolom B2 35 x 75
m3 19.85
0.7970 0.0000
0.3188 40
40 0.3188
8 Kolom B3 50 x 80 m3
30.60 1.8404
0.0000 0.7362
40 40
0.7362 9 Kolom B5K 35 x 75
m3 16.54
0.8224 0.0000
0.3290 40
40 0.3290
10 Kolom B6 45 x 45 m3
10.13 0.5390
0.0000 0.2156
40 40
0.2156 11 Kolom B7 30 x 45
m3 22.14
1.4332 0.0000
0.5733 40
40 0.5733
12 Kolom B8 25 x 45 m3
14.85 0.9092
0.0000 0.3637
40 40
0.3637 13 Kolom B9 20 x 40
m3 3.52
0.2689 0.0000
0.1076 40
40 0.1076
14 Kolom B9K 20 x 40 m3
5.76 0.4584
0.0000 0.1834
40 40
0.1834 15 Kolom B10 20 x 40
m3 6.68
0.5077 0.0000
0.2031 40
40 0.2031
16 Kolom B10K 20 x 40 m3
0.48 0.0382
0.0000 0.0153
40 40
0.0153 17 Plat lantai t. 12 cm ; elv. 4.125
m3 124.26
4.5995 0.0000
0.0000 0.0000
18 Plat tangga m3
1.83 0.0636
0.0000 0.0000
0.0000 19 Plat bordes tangga utama
m3 0.29
0.0114 0.0000
0.0000 0.0000
15.5852 1.3706
3.6761 5.0467
C.3 LANTAI 2 ELV. +4.125 - ELV. +8.350
1 Kolom K1A d. 50 cm m3
14.16 0.7369
2 Kolom K3A 55 x 55 m3
10.16 0.4242
3 Kolom K4 20 x 40 m3
0.67 0.0491
4 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1443 5 Kolom B5 35 x 75
m3 16.54
0.8218 6 Kolom B6 45 x 45
m3 10.13
0.5413 7 Kolom B7 30 x 45
m3 22.14
1.4377 8 Kolom B8 25 x 45
m3 14.85
0.9125 9 Kolom B9 20 x 40
m3 3.52
0.2699 10 Kolom B9K 20 x 40
m3 5.76
0.4600 11 Kolom B10 20 x 40
m3 4.16
0.3173 12 Kolom B10K 20 x 40
m3 0.48
0.0383 13 Plat lantai t. 12 cm ; elv. 8.350
m3 62.16
2.3118 14 Plat tangga
m3 1.83
0.0638 15 Plat bordes tangga utama
m3 0.29
0.0114 8.5403
0.0000 0.0000
0.0000 C.4 LANTAI 3 ELV. +8.350 - ELV. +12.550
1 Kolom K1B d. 35 cm m3
3.23 0.2366
2 Kolom K3B 55 x 55 m3
10.16 0.4246
3 Kolom K4 20 x 40 m3
0.67 0.0491
4 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1445 5 Kolom B4 25 x 35
m3 11.38
0.7388 6 Kolom B5 35 x 75
m3 16.54
0.8230 7 Kolom B6 45 x 45
m3 10.13
0.5420 8 Kolom B7 30 x 45
m3 22.14
1.4399 9 Kolom B8 25 x 45
m3 12.15
0.7479 10 Kolom B9 20 x 40
m3 3.52
0.2704 11 Kolom B9K 20 x 40
m3 5.76
0.4608 12 Kolom B10 20 x 40
m3 4.16
0.3179 13 Kolom B10K 20 x 40
m3 0.48
0.0385 14 Plat lantai t. 12 cm ; elv. 12.550
m3 40.20
1.4988 15 Plat tangga
m3 1.83
0.0639 16 Plat bordes tangga utama
m3 0.29
0.0114 7.8081
0.0000 0.0000
0.0000
RINCIAN PROGRES MINGGUAN PEKERJAAN GEDUNG PERPUSTAKAAN
MINGGU KE 6
TANGGAL 12-18 OKTOBER
SD MINGGU INI NO
ITEM PEKERJAAN SATUAN
VOLUME PEKERJAAN BOBOT TOTAL
PROGRES KEMAJUAN PEKERJAAN
C.5 LANTAI 4 ELV. +12.550 - ELV. +16.750
1 Kolom K1B d. 35 cm m3
3.23 0.2392
2 Kolom K3C d. 25 cm m3
1.65 0.1032
3 Kolom K4 20 x 40 m3
0.67 0.0445
4 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1449 5 Kolom B6 45 x 45
m3 10.13
0.5435 6 Kolom B7A 0.15 x 0.5
m3 9.75
0.7298 7 Kolom B8A 25 x 45
m3 12.15
0.7503 8 Kolom B9 20 x 40
m3 3.52
0.2713 9 Kolom B9K 20 x 40
m3 5.76
0.4624 10 Kolom B10 20 x 40
m3 4.16
0.3190 11 Kolom B10K 20 x 40
m3 0.48
0.0385 12 Plat lantai t. 12 cm ; elv. 16.750
m3 40.20
1.5049 13 Plat tangga
m3 1.83
0.0641 14 Plat bordes tangga utama
m3 0.29
0.0114 5.2270
0.0000 0.0000
0.0000 C.6 LANTAI LMR ELV. +16.750 - ELV. +21.250
1 Kolom K1B d. 35 cm m3
3.23 0.2397
2 Kolom K4 20 x 40 m3
0.67 0.0494
3 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1456 4 Kolom B6 45 x 45
m3 7.09
0.3829 5 Kolom B9 20 x 40
m3 3.52
0.2729 6 Kolom B9K 20 x 40
m3 5.76
0.4651 7 Kolom B10 20 x 40
m3 4.16
0.3208 8 Kolom B10K 20 x 40
m3 0.48
0.0388 9 Plat DAK t.12 cm ; elev. 21.250
m3 11.52
0.3958 2.3110
0.0000 0.0000
0.0000 C.7 LANTAI ATAP
1 Kolom KP9 Pipa baja 8 kg
10348.80 2.1757
2 Balok pipa d. 8 kg
14886.93 3.1298
3 Plat t. 14 mm kg
361.65 0.0516
4 Plat t. 8 mm kg
361.44 0.0515
5 Anchor Bolt d. 19 mm bh
64.00 0.0230
6 Cat ex. Kansai kg
25958.82 0.2196
5.6512 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN STRUKTUR 69.3437
20.2156 8.3011
28.5167 III. PEKERJAAN ARSITEKTUR
A. LANTAI DASAR A.1 PEK. DINDING
1 Dinding hebel t. 10 cm + MU 380 m2
481.14 0.4738
2 Plesteran dinding MU 100 t. 10 mm m2
962.28 0.4604
3 Acian MU 200 t. 3 mm m2
962.28 0.2349
4 Kolom praktis 10 x 10 m
52.21 0.0380
5 Balok lintel 10 x 15 m
132.39 0.1224
6 Finishing kolom MU 200 m2
177.59 0.0433
7 Railing pagar pipa hitam finishing cat m
46.00 0.0708
8 Railing tangga pipa hitam finishing cat m
10.00 0.0154
1.4590 0.0000
0.0000 0.0000
A.2 PEK. LANTAI
1 Keramik 3030 DN putih m2
105.61 0.0898
2 Keramik 3030 DN putih tangga m2
21.69 0.0184
3 Stair nozing keramik 7 x 40 cm m
31.05 0.0260
0.1342 0.0000
0.0000 0.0000
A.3 PEK. KUSEN LENGKAP 1 SD1
unit1.00 0.0477
2 FD1 unit1.00
0.0260 3 ADW1
unit1.00 0.0394
4 ADW2 unit1.00
0.0609 5 ADW3
unit1.00 0.0675
6 ADW4 unit1.00
0.0578 7 BV1
unit4.00 0.0494
8 BV2 unit1.00
0.0103 9 BV3
unit1.00 0.0103
10 Handrall pagar type R-5 bh
1.00 0.2752
0.6445 0.0000
0.0000 0.0000
A.4 PEK. PLAFOND
1 Plafond beton expose finishing m2
105.61 0.0258
0.02580.0000 0.0000
0.0000 A.5 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
962.28 0.2163
2 Cat plafond beton expose Vinilex 3x m2
117.97 0.0305
3 Cat kolom dan balok m2
117.59 0.0399
0.2867 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR 2.5502
0.0000 0.0000
0.0000 B. LANTAI - 1
B.1 PEK. DINDING
1 Dinding hebel t. 10 cm + MU 380 m2
514.88 0.5164
2 Plesteran dinding MU 100 dan acian MU 200 m2
1029.76 0.5126
3 Acian MU 200 t. 3 mm m2
1029.76 0.2663
4 Keramik dinding 2025 KMWC m2
144.69 0.1664
5 Kolom praktis 10 x 10 m
55.87 0.0414
6 Balok lintel 10 x 15 m
141.67 0.1339
7 Finishing kolom MU 200 m2
244.79 0.0633
8 Railing tangga pipa hitam finishing cat m
82.00 0.1263
1.8266 0.0000
0.0000 0.0000
B.2 PEK. LANTAI
1 Floor hardener 3 kgm2 m2
40.50 0.0338
2 Lantai karpet koridor m2
340.00 0.8393
3 Keramik 3030 DN putih tangga m2
21.69 0.0189
4 Stair nozing keramik 7 x 40 cm m
31.05 0.0260
5 Keramik 2020 KMWC m2
32.09 0.0287
0.9467 0.0000
0.0000 0.0000
B.3 PEK. KUSEN LENGKAP 1 AD3
unit3.00 0.0775
2 AD4 unit2.00
0.1028 3 FD1
unit5.00 0.1311
4 PVC unit5.00
0.0417 5 Partisi gypsum rangka metal stud galvalume
m2 30.60
0.0382 6 ADW5
m2 2.00
0.3278 7 AW2
bh 5.00
0.8384 8 AD2
bh 2.00
0.2191 9 Handrall pagar type R-1
bh 5.00
0.2755 10 Handrall pagar type R-2
bh 2.00
0.1024 2.1545
0.0000 0.0000
0.0000 B.4 PEK. PLAFOND
1 Plafond gypsum + rangka m2
196.00 0.2302
2 Plafond acoustik + rangka m2
159.00 0.1502
0.3804 0.0000
0.0000 0.0000
B.5 PEK. SANITAIR
1 Closed duduk ex TOTO bh
5.00 0.1259
2 Washtafel LW 230 J bh
6.00 0.0858
3 Urinoir bh
3.00 0.0680
4 Jet spray bh
3.00 0.0146
5 Floor drain bh
6.00 0.0096
6 Kaca cermin ukuran 2600 x 1200 mm tinggi bh
2.00 0.0063
0.3102 0.0000
0.0000 0.0000
B.6 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
1152.16 0.2701
2 Cat plafond beton kaisiboard Vinilex 3x m2
196.00 0.0537
3 Cat kolom m2
244.79 0.0574
0.3812 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 1 5.9996
0.0000 0.0000
0.0000 C. LANTAI - 2
C.1 PEK. KUSEN LENGKAP
1 Partisi gypsum rangka metal stud galvalume m2
96.16 0.1208
2 ADW5 unit1.00
0.1644 3 ADW5
unit1.00 0.1644
4 AW2 unit5.00
0.8384 5 Tanggulan dudukan kusen Almunium
m1 68.20
0.1188 6 Handrall pagar type R-1
bh 5.00
0.2755 7 Handrall pagar type R-2
bh 2.00
0.1023
1.7846 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 2 1.7846
0.0000 0.0000
0.0000 D. PEK. LANTAI - 3
D.1 PEK. KUSEN LENGKAP
1 Partisi gypsum rangka metal stud galvalume
m2 96.18
0.1212 2 ADW5
unit1.00 0.1646
3 ADW5 unit1.00
0.1646 4 AW2
unit5.00 0.8384
5 Tanggulan dudukan kusen Almunium m1
68.20 0.1188
6 Handrall pagar type R-1 bh
5.00 0.2755
7 Handrall pagar type R-2 bh
2.00 0.1023
1.7854 0.0000
0.0000 0.0000
D.2 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
161.72 0.0387
2 Cat kolom luar Vinilex 3x m2
55.30 0.0132
0.0519 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 3 1.8373
0.0000 0.0000
0.0000 E.
LANTAI - 4 E.1 PEK. KUSEN LENGKAP
1 AW2 bh
7.00 1.1737
2 ADW6 bh
1.00 0.1646
3 Partisi gypsum rangka metal stud galvalume m1
65.58 0.0824
4 Tanggulan dudukan kusen Almunium m1
37.00 0.0644
5 Handrall pagar type R-5 bh
1.00 0.2751
E.2 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
131.16 0.0314
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 4 1.7916
0.0000 0.0000
0.0000 F.
LANTAI - RUANG MESIN F.1 PEK. LANTAI
1 Floor hardener 3 kgm2 m2
105.61 0.0883
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - RUANG MESIN 0.0883
0.0000 0.0000
0.0000 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR 14.0516
0.0000 0.0000
0.0000 IV. PEKERJAAN MEKANIKAL
IV.1 PEKERJAAN INSTALASI PLAMBING A
INSTALASI AIR BERSIH 1
PERALATAN UTAMA Pengadaan dan pemasangan unit
a. Transfer Pump TP
set1.00 0.2918
Type pompa : End Suction Kapasitas : 300 litermenit
Head : 40 meter Putaran : rpm
Power : 5 kW Operasi : 1 Duty 1 Stand By
b. Shallow Well SW
unit1.00 0.0731
Type pompa : Kapasitas : 120 litermenit
Head : meter Putaran : rpm
Power : 2.2 kW c.
Accessories Pompa Gate Valve dia. 80
bh 2.00
0.0333 Gate Valve dia. 65
bh 7.00
0.0496 Gate Valve dia. 50
bh 1.00
0.0038 Check Valve dia. 65
bh 3.00
0.0323 Strainer STR dia. 80
bh 2.00
0.0300 Strainer STR dia. 65
bh 2.00
0.0239 Flexible Joint dia. 65 mm
bh 4.00
0.0236 Preasure gauge
bh 1.00
0.0017 Preasure switch
bh 1.00
0.0057 Pipa GIP Instalassi pemipaan area pompa
cw fitting-fitting support lot
1.00 0.0604
2 INSTALASI PEMIPAAN
Pengadaan dan pemasangan pipa Pemipaan GIP Medium Class Inci. Fitting All Acessories
1 SITE PLAN a.
GIP dia. 50, Pipa dari ruang pompa ke GWT m
28.00 0.0416
b. GIP dia. 25, Pipa dari shallow well ke GWT
m 16.00
0.0238 2 LANTAI DASAR
a. GIP dia. 65, Pipa transfer dari ruang pompa ke Lt. 1
m 5.00
0.0124 3 LANTAI 1
a. GIP dia. 65, Pipa Transfer
m 9.00
0.0224 b.
GIP dia. 50, Pipa Supply dan Gravitasi m
17.00 0.0252
c. GIP dia. 32
m 187.00
0.1789 d.
GIP dia. 25 m
19.00 0.0138
e. GIP dia. 20
m 20.00
0.0122 f.
GIP dia. 15 m
38.00 0.0196
g. DOP dia. 32
bh 4.00
0.0004 Peralatan katup-katup Kitazawa
h. Gate Valve dia. 32
bh 4.00
0.0097 4 LANTAI 2
a. GIP dia. 65, Pipa Transfer
m 9.00
0.0225 b.
GIP dia. 50, Pipa Supply dan Gravitasi m
17.00 0.0252
c. GIP dia. 32
m 187.00
0.1789 d.
GIP dia. 25 m
19.00 0.0138
e. GIP dia. 20
m 20.00
0.0123 f.
GIP dia. 15 m
38.00 0.0196
g. DOP dia. 32
bh 4.00
0.0004 Peralatan katup-katup Kitazawa
h. Gate Valve dia. 32
bh 4.00
0.0097 5 LANTAI 3
a. GIP dia. 65, Pipa Transfer
m 9.00
0.0225 b.
GIP dia. 50, Pipa Supply dan Gravitasi m
17.00 0.0253
c. DOP dia. 32
bh 4.00
0.0004 Peralatan katup-katup Kitazawa
d. Gate Valve dia. 32
bh 4.00
0.0097 6 LANTAI 4
a. GIP dia. 65, Pipa Transfer
m 9.00
0.0224 b.
GIP dia. 50, Pipa Supply dan Gravitasi m
17.00 0.0252
Peralatan katup-katup Kitazawa c.
Gate Valve dia. 32 bh
2.00 0.0049
d. Gate Valve dia. 25
bh 2.00
0.0040 7 LANTAI MESIN
a. GIP dia. 65, Pipa Transfer
m 9.00
0.0224 b.
GIP dia. 65, Pipa ke Booster m
5.00 0.0124
c. GIP dia. 50, Pipa Supply dan Gravitasi
m 17.00
0.0252 d.
GIP dia. 40, Pipa Gravitasi m
5.00 0.0060
TOTAL A. INSTALASI AIR BERSIH 1.4520
0.0000 0.0000
0.0000 B. INSTALASI AIR KOTOR
1 PERALATAN UTAMA
Pengadaan dan pemasangan unit
a. STP, kapasitas 22 m3
unit 1.00
1.0603
2 INSTALASI PEMIPAAN
Pengadaan dan pemasangan pipa Pipa PVC Kelas AW Inci. Fitting Accessories
1 SITE PLAN a.
PVC dia. 100 ke STP m
22.00 0.0278
2 LANTAI DASAR a.
PVC dia. 100, Pipa tegak m
9.00 0.0114
3 LANTAI 1 a.
PVC dia. 100, Pipa tegak m
9.00 0.0114
b. PVC dia. 100
m 10.00
0.0127 c.
PVC dia. 50 m
4.00 0.0017
Clean Out CO d.
CO dia. 100 bh
2.00 0.0036
TOTAL B. INSTALASI AIR KOTOR 1.1289
0.0000 0.0000
0.0000 C. INSTALASI AIR BEKAS
1 INSTALASI PEMIPAAN
Pengadaan dan pemasangan pipa Pipa PVC Kelas AW Inci. Fitting Accessories
1 SITE PLAN a.
PVC dia. 100 m
20.00 0.0253
2 LANTAI DASAR a.
PVC dia. 100, Pipa tegak m
9.00 0.0114
3 LANTAI 1 a.
PVC dia. 100, Pipa tegak m
9.00 0.0114
b. PVC dia. 65
m 8.00
0.0053 c.
PVC dia. 80 m
4.00 0.0029
d. PVC dia. 50
m 17.00
0.0073 Clean Out CO
e. CO dia. 80
bh 1.00
0.0016 f.
CO dia. 50 bh
1.00 0.0012
TOTAL C. INSTALASI AIR BEKAS 0.0664
0.0000 0.0000
0.0000 D. INSTALASI VENTILASI
Pengadaan dan pemasangan pipa Pipa PVC Kelas D Inci. Fitting Accessories
1 LANTAI 1 a.
PVC dia. 65 m
6.00 0.0015
b. PVC dia. 50
m 27.00
0.0052 c.
PVC dia. 40 m
3.00 0.0005
d. PVC dia. 32
m 28.00
0.0042
TOTAL D. INSTALASI VENTILASI 0.0114
0.0000 0.0000
0.0000 E.
INSTALASI AIR HUJAN Pengadaan dan pemasangan pipa
Pipa PVC Kelas AW Inci. Fitting Accessories 1 SITE PLAN
a. PVC dia. 100
m 48.00
0.0607 0.0000
0.0000 0.0000
2 LANTAI DASAR a.
PVC dia. 100, Pipa tegak m
34.00 0.0430
0.0086 0.0000
20 20
0.0086 3 LANTAI 1
a. PVC dia. 100, Pipa tegak
m 84.00
0.1063 0.0213
0.0000 20
20 0.0213
4 LANTAI 2 a.
PVC dia. 100, Pipa tegak m
84.00 0.1064
0.0000 0.0000
0.0000 5 LANTAI 3
a. PVC dia. 100, Pipa tegak
m 25.00
0.0316 0.0000
0.0000 0.0000
6 LANTAI 4 a.
PVC dia. 100, Pipa tegak m
25.00 0.0316
0.0000 0.0000
0.0000 7 RUANG MESIN
a. PVC dia. 100, Pipa tegak
m 25.00
0.0316 0.0000
0.0000 0.0000
b. Roof Drain dia. 100
bh 4.00
0.0176 0.0000
0.0000 0.0000
TOTAL E. INSTALASI AIR HUJAN 0.4288
0.0299 0.0000
0.0299 MATERIAL BANTU
lot1.00 0.0091
0.0000 0.0000
0.0000
TESTING COMMISSIONING lot1.00
0.0211 0.0000
0.0000 0.0000
TOTAL IV.1 PEKERJAAN PLAMBING 3.1177
0.0299 0.0000
0.0299 IV.3 INSTALASI TATA UDARA DAN SISTEM VENTILASI UDARA
A. PEMIPAAN 1 LANTAI 1
Pipa refrigerant dari pipa tembaga jenis L atau K isolasi armaflex dan duct tape, penyambungan dengan lassolder
perak lengkap dengan peralatan bantu dan tambahan lainnya sesuai spesifikasi teknis, terpasang lengkap
a. Pipa liquid dan Gas dia. 58 dan 1 38
m 65.00
0.0386 b.
Pipa liquid dan Gas dia. 14 dan 12 m
6.00 0.0028
Pipa drain Pipa air buangan dari pipa PVC termasuk perlengkapan
penyambungan fitting, isolasi dan peralatan bantu sesuai spesifikasi teknis, terpasang lengkap
a. Pipa drain PVC-D, dia. 25 mm, diisolasi
m 34.00
0.0046 b.
Pipa drain PVC-D, dia. 20 mm, diisolasi m
6.00 0.0006
TOTAL A. PEMIPAAN 0.0466
0.0000 0.0000
0.0000 B. SALURAN UDARA
Pemasangan saluran lengkap dengan peralatan bantu dan tambahan lainnya sesuai spesifikasi teknis dan gambar
terpasang lengkap 1 LANTAI 1
SUPPLY DUCTING a.
Saluran udara, 950 x 300 m
20.00 0.1218
b. Saluran udara, 800 x 300
m 2.00
0.0094 c.
Saluran udara, 700 x 300 m
19.00 0.0810
d. Saluran udara, 600 x 300
m 14.00
0.0522 e.
Saluran udara, 500 x 300 m
18.00 0.0521
f. Saluran udara, 300 x 300
m 14.00
0.0328 g.
Saluran udara, 300 x 250 m
33.00 0.0713
h. Saluran udara, 250 x 250
m 74.00
0.1459 i.
Saluran udara, 250 x 200 m
7.00 0.0129
j. Saluran udara, 200 x 200
m 16.00
0.0256 RETURN DUCTING
a. Saluran udara, 850 x 300
m 5.00
0.0251 b.
Saluran udara, 750 x 300 m
4.00 0.0183
c. Saluran udara, 600 x 300
m 1.00
0.0037 d.
Saluran udara, 200 x 150 m
11.00 0.0146
e. Saluran udara, 150 x 150
m 5.00
0.0059 EXHAUST DUCTING
a. Saluran udara, 250 x 250
m 19.00
0.0375 b.
Saluran udara, 250 x 200 m
3.00 0.0055
c. Saluran udara, 150 x 150
m 12.00
0.0142 DIFFUSER GRILL
a. Supply Air Diffuser SAD 300 x 300, 4 way + flexible ductbh
89.00 0.1287
b. Supply Air Grill SAG, 200 x 150
bh 2.00
0.0027 c.
Exhaust Air Grillie EAG, 150 x 150 bh
8.00 0.0052
d. Return Air Grill RAG, 600 x 150
bh 64.00
0.0965 e.
Return Air Grill RAG, 400 x 150 bh
18.00 0.0206
f. VD, 950 x 300
bh 2.00
0.0115 g.
VD, 850 x 300 bh
2.00 0.0107
TOTAL B. SALURAN UDARA 1.0057
0.0000 0.0000
0.0000 MATERIAL BANTU
lot1.00 0.0121
TESTING COMMISSIONING lot1.00
0.0242
TOTAL IV.3 PEKERJAAN TATA UDARA DAN SISTEM VENTILASI UDARA 1.0886
0.0000 0.0000
0.0000 TOTAL IV. PEKERJAAN INSTALASI MEKANIKAL
4.2063 0.0299
0.0000 0.0299
V. PEKERJAAN ELEKTRIKAL 5.1 PEKERJAAN PERALATAN PANEL
Pengadaan dan pemasangan peralatan komponen panel sbb,
1 SDP - PERPUSTAKAAN
MCCB 3P, 800 A : 1 bh unit1.00
0.2496 MCCB 3P, 125 A : 7 bh
MCCB 3P, 40 A : 1 bh MCB 3P, 25 A : 2 bh
MCB 3P, 16 A : 2 bh MCB 1P, 6 A : 6 bh
CT 800 5 A : 3 bh Indicator lamp : 3 bh
Ampere meter : 3 bh Volt meter : 1 bh
Selector switch : 1 bh KWH meter : 1 bh
CU Bar : 1 lot Accessories Termination : 1 lot
Box panel : 1 unit
2 DP - LANTAI 1 unit1.00
0.2085 MCCB 3P, 125 A : 1 bh
MCB 1P, 10 A : 67 bh CT 125 5 A : 3 bh
Indicator lamp : 3 bh Ampere meter : 3 bh
CU Bar : 1 lot Accessories Termination : 1 lot
Box panel : 1 unit
3 PP - AC LT1 unit1.00
0.0916 MCCB 3P, 150 A : 1 bh
MCB 3P, 32 A : 5 bh MCB 3P, 16 A : 3 bh
CT 150 5 A : 3 bh Indicator lamp : 3 bh
Ampere meter : 3 bh CU Bar : 1 lot
Accessories Termination : 1 lot Box panel : 1 unit
4 PP - POMPA unit1.00
0.0411 MCB 3P, 32 A : 1 bh
MCB 3P, 16 A : 2 bh Indicator lamp : 3 bh
Ampere meter : 3 bh CT 25 5 A : 3 bh
CU Bar : 1 lot Accessories Termination : 1 lot
Box panel : 1 unit
5 PP - POMPA TRANSFER 1 unit1.00
0.0405 MCB 3P, 16 A : 3 bh
On Off Automan : 1 bh Indicator lamp : 3 bh
Ampere meter : 3 bh CU Bar : 1 lot
Accessories Termination : 1 lot Box panel : 1 unit
6 DP - SERVER unit1.00
0.0575 MCCB 3P, 125 A : 1 bh
MCB 1P, 10 A : 15 bh Indicator lamp : 3 bh
Ampere meter : 3 bh CT 125 5 A : 3 bh
CU Bar : 1 lot Accessories Termination : 1 lot
Box panel : 1 unit
SUB TOTAL PEKERJAAN PERALATAN DAN PANEL 0.6888
0.0000 0.0000
0.0000 5.2 PEKERJAAN INSTALASI KABEL FEEDER
Kabel Distribusi Daya dari SDP Perpustakaan : a.
NYY 4 x 50 mm2 + NYA 25 mm2 ke DP - Lantai 1 m
29.00 0.1051
b. NYY 4 x 70 mm2 + NYA 35 mm2 ke PP - AC LT. 1
m 30.00
0.1468 c.
NYY 4 x 6 mm2 + NYA 6 mm2 ke PP - POMPA m
12.00 0.0134
d. NYY 4 x 6 mm2 + NYA 6 mm2 ke DP - SERVER
m 33.00
0.0367
SUB TOTAL PEKERJAAN INSTALASI KABEL FEEDER 0.3020
0.0000 0.0000
0.0000 5.3 PEKERJAAN ARMATUR LAMPU, SAKLAR STOP KONTAK
1 LANTAI DASAR
a. Lampu TL SM 1 x 36 W
bh 19.00
0.0218 b.
Lampu TL SM 1 x 18 W bh
2.00 0.0021
c. Stop Kontak, 200 W
bh 9.00
0.0023 d.
Saklar ganda bh
3.00 0.0007
e. Saklar tunggal
bh 2.00
0.0004
2 LANTAI 1
a. Lampu TL SM 1 x 36 W
bh 332.00
0.2808 b.
Lampu down light PLC 18 W bh
124.00 0.2094
c. Lampu baret 26 W
bh 7.00
0.0063 d.
Lampu down light HALOGEN 50 W bh
34.00 0.0739
e. Stop kontak, 200 W
bh 107.00
0.0279 f.
Saklar ganda bh
4.00 0.0009
g. Saklar tunggal
bh 2.00
0.0004 h.
Grid switch 8 gang bh
4.00 0.0179
i. Grid switch 12 gang
bh 8.00
0.0377 j.
Grid switch 16 gang bh
8.00 0.0430
k. Grid switch 18 gang
bh 9.00
0.0580
SUB TOTAL PEKERJAAN LAMPU, SAKLAR STOP KONTAK 0.7835
0.0000 0.0000
0.0000 5.4 PEKERJAAN INSTALASI FINAL
1 LANTAI DASAR Pengawatan dari LP-LIGHTING LT DASAR
a. NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk Lampu
ttk 21.00
0.0360 b.
NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W ttk
9.00 0.0183
c. NYY 3 x 2.5 mm2 untuk exhaust fan
ttk 3.00
0.0042
Pengawatan dari PP-POMPA
d. NYY 4 x 4 mm2 ke PP-POMPA TRANSFER 1
m 6.00
0.0014 e.
NYY 4 x 2.5 mm2 + NYA 2.5 ke PP-STP m
22.00 0.0045
Pengawatan dari PP-POMPA TRANSFER 1
f. NYY 4 x 2.5 mm2 ke TP.1 dan TP.2
m 12.00
0.0016
2 LANTAI 1 Pengawatan dari LP-LIGHTING LT. 1
a. NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk Lampu
ttk 497.00
0.8522 b.
NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W ttk
107.00 0.2175
Pengawatan dari PP-AC.1
c. NYY 4 x 6 mm2 untuk IUOU. 1-1 sd 1-5
ttk 5.00
0.0033 d.
NYM 3 x 2.5 mm2 ke TP.1 dan TP.2untuk exhaust fan ttk
2.00 0.0028
SUB TOTAL PEKERJAAN INSTALASI FINAL 1.14180.0000
0.0000 0.0000
5.5 RAK KABEL
Pemasangan rak kabel beserta peralatan bantu lainnya sesuai spesifikasi teknis dan gambar, terpasang lengkap
1 LANTAI 1 a.
Kabel tray ukuran 400 x 100 mm terpasang menggantung pada m
73.00 0.1647
langit-langit b.
Under floor duct ukuran 100 x 80 mm m
72.00 0.0344
SUB TOTAL PEKERJAAN RAK KABEL 0.1991
0.0000 0.0000
0.0000 MATERIAL BANTU
lot1.00 0.0181
TESTING COMMISSIONING lot1.00
0.0302
TOTAL V. PEKERJAAN ELEKTRIKAL 3.1635
0.0000 0.0000
0.0000 V.I PEKERJAAN ELEKTRONIK
5.6 PEKERJAAN FIRE ALARM 1 PERALATAN UTAMA
Pengadaan dan pemasangan peralatan sistem fire alarm di tempatkan di ruang kontrol secara lengkap termasuk
pengkabelan dan koneksi meliputi peralatan sesuai diuraikan dalam gambar dan spesifikasi teknis, terpasang lengkap
a. Panel kontrol utama sistem alarm MCFA konvensional 12 zone
unit 1.00
0.4460 b.
JBX-FA LT DASAR, LT. 1, Lt. 2 bh
3.00 0.1297
2 SISTEM FIRE ALARM
Pengadaan dan pemasangan sistem alarm, berikut alat atau material bantu lainnya sesuai gambar dan spesifikasi
LANTAI DASAR a.
Rate of rise temp heat detector bh
5.00 0.0072
LANTAI 1 b.
Smoke detector bh
11.00 0.0175
3 INSTALASI KABEL FEEDER FIRE ALARM
Instalasi kabel feeder sistem alarm termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai
gambar dan spesifikasi teknis a.
Kabel dari MC-FA ke JBX- FA LT. DASAR, NYA 2 x 2.5 mm2 m
6.00 0.0005
b. Kabel dari MC-FA ke JBX- FA LT. 1, NYA 2 x 2.5 mm2
m 29.00
0.0025
4 INSTALASI DETECTOR FIRE ALARM
Pemasangan instalasi sistem fire alarm termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai
gmabar dan spesifikasi teknis LANTAI DASAR
a. Kabel NYA 2 x 2.5 mm2 dari JBX-FA LT. DASAR
ttk 5.00
0.0058 ke ROR Temp Heat Detector
LANTAI 1 b.
Kabel NYA 2 x 2.5 mm2 dari JBX-FA LT. 1 ke smoke detector ttk
11.00 0.0128
SUB TOTAL PEKERJAAN SISTEM FIRE ALARM 0.6220
0.0000 0.0000
0.0000 5.7 PEKERJAAN SISTEM TELEPON
1 PERALATAN UTAMA
pengadaan dan pemasangan peralatan distribusi untuk sistem telepon dan ijin berikut alat material bantu pemasangan lainnya
sesuai gambar dan spesifikasi teknis a.
PABX Telephone 430 unit1.00
0.5437 b.
MDF-TP 50 Pairs unit1.00
0.0053 c.
PC Computer + Printer unit
1.00 0.0571
d. Power Surge Arrester
unit 1.00
0.0076 e.
UPS Back UP 15 Mnts unit
1.00 0.0463
f. Operator Console
unit 1.00
0.0242 g.
JBX-TELP LT. DASAR. LT. 1, LT. 2 unit3.00
0.0088
2 OUTLET TELEPON
Pengadaan dan pemasangan outlet telepon, berikut alatmaterial bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis
LANTAI DASAR a.
Outlet telepon cw handset analog bh
3.00 0.0107
LANTAI 1 b.
Outlet telepon cw handset analog bh
11.00 0.0390
3 INSTALASI KABEL FEEDER TELEPON
Instalasi kabel feeder sistem telepon menggunakan kabel ITC termasuk semua aksesoris, material alat bantu pemasangan
lainnya sesuai gambar dan spesifikasi teknis a.
Kabel dari MDF ke JBX-TELP LT. DASAR, ITC 10 x 2 x 0.6 mm2 m
6.00 0.0011
b. Kabel dari MDF ke JBX-TELP LT. 1, ITC 10 x 2 x 0.6 mm2
m 29.00
0.0104
4 INSTALASI OUTLET TELEPON
Pemasangan instalasi outlet telepon termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai
gambar dan spesifikasi teknis
a. Kabel dari JBX-TELP LT DASAR ke outlet telepon
ttk 3.00
0.0088 ITC 2 x 2 x 0.6 mm + PVC dia. 20
LANTAI 1 a.
Kabel dari JBX-TELP LT 1 ke outlet telepon ttk
11.00 0.0320
ITC 2 x 2 x 0.6 mm + PVC dia. 20
SUB TOTAL PEKERJAAN SISTEM TELEPON 0.7950
0.0000 0.0000
0.0000 5.8PEKERJAAN RAK KABEL
Pemasangan rak kabel beserta peralatan bantu lainnya, sesuai spesifikasi teknik dan gambar, terpasang lengkap
LANTAI 1 a.
Rak kabel Cable Tray hot dipgalvanised mild steel ukuran m
62.00 0.1263
300 x 100 mm terpasang menggantung di langit-langit
SUB TOTAL PEKERJAAN RAK KABEL 0.1263
0.0000 0.0000
0.0000 MATERIAL BANTU
lot1.00 0.0181
TEST COMMISSIONING lot1.00
0.0302
TOTAL V.I PEKERJAAN INSTALASI ELEKTRONIK 1.5916
0.0000 0.0000
0.0000 VI. PEKERJAAN GWT GROUND WATER TANK DAN RUMAH POMPA
1 GROUND WATER TANK
a. Galian tanah
m3 82.00
0.0202 0.0202
0.0000 100
100 0.0202
b. Pasir urug 10 cm
m3 2.04
0.0045 0.0000
0.0000 0.0000
c. Lantai kerja 5 cm
m3 1.02
0.0074 0.0000
0.0000 0.0000
d. Balok dan ring balk 30 x 30 beton K 350
m3 5.26
0.2819 0.0000
0.0000 0.0000
e. Kolom 30 x 30 beton K 350
m3 2.62
0.1492 0.0000
0.0000 0.0000
f. Dinding dasar, samping, penyekat, atas tebal 20 cm K 350
m3 22.98
1.3355 0.0000
0.0000 0.0000
g. Water profing counting
m2 108.00
0.1044 0.0000
0.0000 0.0000
h. Keramik 30 x 30 DN putih
m2 108.00
0.0906 0.0000
0.0000 0.0000
i. Manhole
bh 2.00
0.0371 0.0000
0.0000 0.0000
j. Tangga monyet stainless steel
bh 2.00
0.1571 0.0000
0.0000 0.0000
2 RUMAH POMPA PEKERJAAN STRUKTUR
a. Kolom 2040
m3 0.96
0.0486 0.0000
0.0000 0.0000
b. Balok 1525
m3 1.01
0.0480 0.0000
0.0000 0.0000
c. Plat beton t. 12 cm
m3 2.88
0.0989 0.0000
0.0000 0.0000
d. Lisplank 1050
m3 1.10
0.0378 0.0000
0.0000 0.0000
PEKERJAAN FINISHING
a. Dinding hebel t. 10 cm MU-380
m2 42.00
0.0201 0.0000
0.0000 0.0000
b. Plesteran MU-100 dan acian MU-200
m2 84.00
0.0205 0.0000
0.0000 0.0000
c. Acian MU 200 t. 3 mm
m2 84.00
0.0611 0.0000
0.0000 0.0000
d. Keramik 3030 DN putih
m2 30.00
0.0252 0.0000
0.0000 0.0000
e. Balok lintel 10 x 15
m2 46.00
0.0112 0.0000
0.0000 0.0000
f. Plafond beton expose finishing
m2 106.00
0.0771 0.0000
0.0000 0.0000
g. Cat dinding
m2 84.00
0.0217 0.0000
0.0000 0.0000
h. Cat plafond dan lisplank
m2 106.00
0.0238 0.0000
0.0000 0.0000
i. Waterprofing
m2 30.00
0.0290 0.0000
0.0000 0.0000
PEKERJAAN ELEKTRIKAL DAN MEKANIKAL
a. Lampu TL IDR 18 W
bh 3.00
0.0025 0.0000
0.0000 0.0000
b. Stop kontak 200 W
bh 3.00
0.0008 0.0000
0.0000 0.0000
c. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk lampu
bh 3.00
0.0051 0.0000
0.0000 0.0000
d. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W
bh 3.00
0.0061 0.0000
0.0000 0.0000
e. Stop kontak 200 W
bh 3.00
0.0008 0.0000
0.0000 0.0000
f. Saklar seri
bh 1.00
0.0002 0.0000
0.0000 0.0000
g. Saklar tunggal
bh 1.00
0.0002 0.0000
0.0000 0.0000
h. Saluran air hujan dia. 10 cm AW Wavin
m1 4.00
0.0051 0.0000
0.0000 0.0000
PEKERJAAN KUSEN DAN PINTU
a. Pintu ruang pompa
bh 1.00
0.1283 0.0000
0.0000 0.0000
b. Gril kecil 50 x 50
bh 4.00
0.1052 0.0000
0.0000 0.0000
c. Gril besar 50 x 150
bh 1.00
0.0407 0.0000
0.0000 0.0000
TOTAL VI. PEKERJAAN GWT DAN RUMAH POMPA 3.0059
0.0202 0.0000
0.0202 VII. PEKERJAAN DINDING TURAP BATU KALI
a. Pasangan batu kali
m3 84.97
0.6286 b.
Siar batu kali m2
53.70 0.0838
TOTAL VII. PEKERJAAN DINDING TURAP BATU KALI 0.7124
0.0000 0.0000
0.0000 VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE
SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm
a. Kabel tweist 3 x 70 mm dan 1 x 50 mm
m1 100.00
0.2633
TOTAL VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE 0.2633
0.0000 0.0000
0.0000 SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm
IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS
Pengadaan dan pemasangan sistem sesuai dengan gambar dan spesifikasi teknis
1 System elektrostatis dengan radius proteksi 150 meter lengkap dengan unit
1.00 0.4833
pipa galvanis dia. 2 setinggi 6 m dan NYY 50 mm2 dalam GIP dia. 50 mm
2 Pentanahan copper clad rod 1 x 12 m lengkap dengan bak kontrol unit
1.00 0.0665
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 3 ohm kbl Coaxial
TOTAL IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS 0.54980.0000
0.0000 0.0000
X. ROOF TANK KUBIKEL 2 KOMPARTEMEN
Type : RFP unit1.00
0.8892 Kap : 8,00 m3
Fiber rainforcement plastic, lengkap dengan dudukan kaki tangki air 2 m serta wc di tangki air dan accessories
TOTAL X. PEKERJAAN TANK KUBIKAL 2 KOMPARTEMEN 0.8892
0.0000 0.0000
0.0000 JUMLAH TOTAL
100.0000 22.4399
8.3052 30.7451
PRESTASI MINGGU INI :
8.3052 PRESTASI SD AKHIR MINGGU LALU
: 22.4399
PRESTASI SD MINGGU INI :
30.7451 RENCANA SD AKHIR MINGGU INI
: 26.5291
SELISIH :
4.2159
: :
BOBOT Bobot
Bobot SD
Minggu Lalu Minggu Ini
Minggu Lalu Minggu Ini
MINGGU INI I.
PEKERJAAN PERSIAPAN DAN PENUNJANG
1 Pekerjaan pengukuran dan pemasangan bowplank m1
117.65 0.0882
0.0882 0.0000
100 100
0.0882 2 Pekerjaan pembersihan lokasi
m2 3202.00
0.2050 0.2050
0.0000 100
100 0.2050
3 Direksikeet uk. 3,6 x 7,2 = 25,92 m2 m2
25.92 0.2392
0.2392 0.0000
100 100
0.2392 4 Pagar pengaman proyek
m1 233.46
0.4485 0.4485
0.0000 100
100 0.4485
5 Air kerja lot1.00
0.0329 0.0148
0.0016 45
5 50
0.0165 6 Listrik kerja
lot1.00 0.0424
0.0191 0.0021
45 5
50 0.0212
7 Foto proyek ls
3.00 0.0056
0.0025 0.0003
45 5
50 0.0028
8 Pekerjaan jalan masuk ke site m1
25.00 0.0260
0.0260 0.0000
100 100
0.0260 9 Pembuatan Dam sementara pekerjaan khusus diarea
lot 1.00
1.1350 1.1350
0.0000 100
100 1.1350
kolom yang masuk ke area sungai
SUB TOTAL PEKERJAAN PERSIAPAN DAN PENUNJANG 2.2228
2.1783 0.0040
2.1824 II. PEKERJAAN STRUKTUR
A. PEK. TANAH 1 Galian tanah untuk pile cap dan tie beam
m3 358.76
0.0824 0.0824
0.0000 100
100 0.0824
2 Urugan tanah kembali sisa galian m3
200.24 0.0220
0.0220 0.0000
100 100
0.0220 3 Urugan tanah dari luar proyek
m3 155.00
0.1813 0.0907
0.0000 50
50 0.0907
4 Urugan pasir di bawah pile cap, tie beam dan plat tebal 10 cm m3
37.67 0.0839
0.0755 0.0000
90 90
0.0755 5 Lantai kerja tebal 5 cm dibawah pile cap, tie beam dan plat lantai
m3 15.54
0.1123 0.1011
0.0000 90
90 0.1011
0.4819 0.3716
0.0000 0.3716
B. PEK. PONDASI
1 Pondasi tiang pancang minipile M25 segi empat K 500 m
2208.00 4.3459
4.3459 0.0000
100 100
4.3459 2 Potong tiang pancang
ttk 184.00
0.1601 0.1601
0.0000 100
100 0.1601
3 Mobilisasi alat pancang unit
1.00 0.2439
0.2439 0.0000
100 100
0.2439 4 Pile cap P-1 60 x 60 x 60
m3 0.86
0.0381 0.0381
0.0000 100
100 0.0381
5 Pile cap P-2 135 x 60 x 65 m3
0.51 0.0289
0.0289 0.0000
100 100
0.0289 6 Pile cap P-4 135 x 135 x 85
m3 12.39
0.2937 0.2937
0.0000 100
100 0.2937
7 Pile cap P-8 190 x 210 x 120 m3
28.73 0.7225
0.7225 0.0000
100 100
0.7225 8 Pile cap P-9 210 x 210 x 120
m3 52.92
1.2152 1.2152
0.0000 100
100 1.2152
9 Pit lift - Lantai pit lift
m3 5.12
0.1926 0.1926
0.0000 100
100 0.1926
- Dinding pit lift m3
4.00 0.1223
0.1223 0.0000
100 100
0.1223 10 Tie beam TB 1 40 x 60
m3 20.16
0.5360 0.5360
0.0000 100
100 0.5360
11 Tie beam TB 2 35 x 80 m3
11.14 0.3559
0.3559 0.0000
100 100
0.3559 12 Tie beam TB 3 35 x 80
m3 18.14
0.5794 0.5794
0.0000 100
100 0.5794
13 Tie beam TB 4 35 x 55 m3
9.24 0.2965
0.2965 0.0000
100 100
0.2965 14 Tie beam TB 5 20 x 45
m3 1.94
0.0869 0.0869
0.0000 100
100 0.0869
9.2179 9.2179
0.0000 9.2179
C. PEK. KONSTRUKSI BETON C.1 LANTAI DASAR ELV. -4.250 - ELV. +0.005
1 Kolom K1K 65 x 65 m3
39.04 1.5913
1.5913 0.0000
100 100
1.5913 2 Kolom K4 20 x 40
m3 0.67
0.0485 0.0485
0.0000 100
100 0.0485
3 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1432 0.1432
0.0000 100
100 0.1432
4 Kolom B1 40 x 80 m3
9.18 0.4347
0.4347 0.0000
100 100
0.4347 5 Kolom B2 35 x 75
m3 15.02
0.6032 0.6032
0.0000 100
100 0.6032
6 Kolom B3 50 x 80 m3
23.09 1.3886
1.3886 0.0000
100 100
1.3886 7 Kolom B5 35 x 75
m3 16.54
0.8125 0.8125
0.0000 100
100 0.8125
8 Kolom B6 45 x 45 m3
20.25 1.0681
1.0681 0.0000
100 100
1.0681 9 Kolom B7 30 x 45
m3 22.14
1.4178 1.4178
0.0000 100
100 1.4178
10 Kolom B8 25 x 45 m3
14.85 0.8984
0.8984 0.0000
100 100
0.8984 11 Kolom B9 20 x 40
m3 7.04
0.5313 0.5313
0.0000 100
100 0.5313
12 Kolom B9K 20 x 40 m3
11.52 0.9060
0.9060 0.0000
100 100
0.9060 13 Kolom B10 20 x 40
m3 7.68
0.5768 0.5768
0.0000 100
100 0.5768
14 Kolom B10K 20 x 40 m3
0.96 0.0755
0.0755 0.0000
100 100
0.0755 15 Plat lantai t. 80 mm ; elv. -4.250
m3 28.68
1.4163 0.8498
0.0000 60
60 0.8498
16 Plat lantai t. 150 mm ; elv. -4.250 m3
14.14 0.4433
0.4433 0.0000
100 100
0.4433 17 Plat lantai t. 12 cm ; elv. 0.05
m3 57.30
2.0915 2.0915
0.0000 100
100 2.0915
18 Plat tangga utama m3
1.83 0.0629
0.0000 0.0157
25 25
0.0157 19 Plat bordes tangga utama
m3 0.29
0.0112 0.0000
0.0028 25
25 0.0028
14.5211 13.8805
0.0185 13.8990
C.2 LANTAI 1 ELV. +0.005 - ELV. +4.125
1 Kolom K1 d. 50 cm m3
21.72 1.1256
0.6754 0.4502
60 40
100 1.1256
2 Kolom K2 60 x 60 m3
18.14 0.9270
0.6953 0.2318
75 25
100 0.9270
3 Kolom K3 60x 60 m3
12.10 0.4713
0.2828 0.1885
60 40
100 0.4713
4 Kolom K4 20 x 40 m3
0.67 0.0489
0.0293 0.0196
60 40
100 0.0489
5 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1440 0.0864
0.0576 60
40 100
0.1440 6 Kolom B1 40 x 80
m3 12.24
0.5795 0.2318
0.3477 40
60 100
0.5795 7 Kolom B2 35 x 75
m3 19.85
0.7970 0.3188
0.4782 40
60 100
0.7970 8 Kolom B3 50 x 80
m3 30.60
1.8404 0.7362
1.1042 40
60 100
1.8404 9 Kolom B5K 35 x 75
m3 16.54
0.8224 0.3290
0.1645 40
20 60
0.4934 10 Kolom B6 45 x 45
m3 10.13
0.5390 0.2156
0.1078 40
20 60
0.3234 11 Kolom B7 30 x 45
m3 22.14
1.4332 0.5733
0.2866 40
20 60
0.8599 12 Kolom B8 25 x 45
m3 14.85
0.9092 0.3637
0.1818 40
20 60
0.5455 13 Kolom B9 20 x 40
m3 3.52
0.2689 0.1076
0.0538 40
20 60
0.1613 14 Kolom B9K 20 x 40
m3 5.76
0.4584 0.1834
0.0917 40
20 60
0.2750 15 Kolom B10 20 x 40
m3 6.68
0.5077 0.2031
0.1015 40
20 60
0.3046 16 Kolom B10K 20 x 40
m3 0.48
0.0382 0.0153
0.0076 40
20 60
0.0229 17 Plat lantai t. 12 cm ; elv. 4.125
m3 124.26
4.5995 0.0000
3.6796 80
80 3.6796
18 Plat tangga m3
1.83 0.0636
0.0000 0.0000
0.0000 19 Plat bordes tangga utama
m3 0.29
0.0114 0.0000
0.0000 0.0000
15.5852 5.0467
7.5528 12.5995
C.3 LANTAI 2 ELV. +4.125 - ELV. +8.350
1 Kolom K1A d. 50 cm m3
14.16 0.7369
0.0000 0.1842
25 25
0.1842 2 Kolom K3A 55 x 55
m3 10.16
0.4242 0.0000
0.1061 25
25 0.1061
3 Kolom K4 20 x 40 m3
0.67 0.0491
0.0000 0.0123
25 25
0.0123 4 Kolom KL 20 x 40 x 40 Liftm3
2.02 0.1443
0.0000 0.0361
25 25
0.0361 5 Kolom B5 35 x 75
m3 16.54
0.8218 0.0000
0.2055 25
25 0.2055
6 Kolom B6 45 x 45 m3
10.13 0.5413
0.0000 0.1353
25 25
0.1353 7 Kolom B7 30 x 45
m3 22.14
1.4377 0.0000
0.3594 25
25 0.3594
8 Kolom B8 25 x 45 m3
14.85 0.9125
0.0000 0.2281
25 25
0.2281 9 Kolom B9 20 x 40
m3 3.52
0.2699 0.0000
0.0675 25
25 0.0675
10 Kolom B9K 20 x 40 m3
5.76 0.4600
0.0000 0.1150
25 25
0.1150 11 Kolom B10 20 x 40
m3 4.16
0.3173 0.0000
0.0793 25
25 0.0793
12 Kolom B10K 20 x 40 m3
0.48 0.0383
0.0000 0.0096
25 25
0.0096 13 Plat lantai t. 12 cm ; elv. 8.350
m3 62.16
2.3118 0.0000
0.5780 25
25 0.5780
14 Plat tangga m3
1.83 0.0638
0.0000 0.0000
0.0000 15 Plat bordes tangga utama
m3 0.29
0.0114 0.0000
0.0000 0.0000
8.5403 0.0000
2.1163 2.1163
C.4 LANTAI 3 ELV. +8.350 - ELV. +12.550
1 Kolom K1B d. 35 cm m3
3.23 0.2366
2 Kolom K3B 55 x 55 m3
10.16 0.4246
3 Kolom K4 20 x 40 m3
0.67 0.0491
4 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1445 5 Kolom B4 25 x 35
m3 11.38
0.7388 6 Kolom B5 35 x 75
m3 16.54
0.8230 7 Kolom B6 45 x 45
m3 10.13
0.5420 8 Kolom B7 30 x 45
m3 22.14
1.4399 9 Kolom B8 25 x 45
m3 12.15
0.7479 10 Kolom B9 20 x 40
m3 3.52
0.2704 11 Kolom B9K 20 x 40
m3 5.76
0.4608 12 Kolom B10 20 x 40
m3 4.16
0.3179 13 Kolom B10K 20 x 40
m3 0.48
0.0385 14 Plat lantai t. 12 cm ; elv. 12.550
m3 40.20
1.4988 15 Plat tangga
m3 1.83
0.0639 16 Plat bordes tangga utama
m3 0.29
0.0114 7.8081
0.0000 0.0000
0.0000
RINCIAN PROGRES MINGGUAN PEKERJAAN GEDUNG PERPUSTAKAAN
MINGGU KE 7
TANGGAL 19-25 OKTOBER
SD MINGGU INI NO
ITEM PEKERJAAN SATUAN
VOLUME PEKERJAAN BOBOT TOTAL
PROGRES KEMAJUAN PEKERJAAN
C.5 LANTAI 4 ELV. +12.550 - ELV. +16.750
1 Kolom K1B d. 35 cm m3
3.23 0.2392
2 Kolom K3C d. 25 cm m3
1.65 0.1032
3 Kolom K4 20 x 40 m3
0.67 0.0445
4 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1449 5 Kolom B6 45 x 45
m3 10.13
0.5435 6 Kolom B7A 0.15 x 0.5
m3 9.75
0.7298 7 Kolom B8A 25 x 45
m3 12.15
0.7503 8 Kolom B9 20 x 40
m3 3.52
0.2713 9 Kolom B9K 20 x 40
m3 5.76
0.4624 10 Kolom B10 20 x 40
m3 4.16
0.3190 11 Kolom B10K 20 x 40
m3 0.48
0.0385 12 Plat lantai t. 12 cm ; elv. 16.750
m3 40.20
1.5049 13 Plat tangga
m3 1.83
0.0641 14 Plat bordes tangga utama
m3 0.29
0.0114 5.2270
0.0000 0.0000
0.0000 C.6 LANTAI LMR ELV. +16.750 - ELV. +21.250
1 Kolom K1B d. 35 cm m3
3.23 0.2397
2 Kolom K4 20 x 40 m3
0.67 0.0494
3 Kolom KL 20 x 40 x 40 Liftm3 2.02
0.1456 4 Kolom B6 45 x 45
m3 7.09
0.3829 5 Kolom B9 20 x 40
m3 3.52
0.2729 6 Kolom B9K 20 x 40
m3 5.76
0.4651 7 Kolom B10 20 x 40
m3 4.16
0.3208 8 Kolom B10K 20 x 40
m3 0.48
0.0388 9 Plat DAK t.12 cm ; elev. 21.250
m3 11.52
0.3958 2.3110
0.0000 0.0000
0.0000 C.7 LANTAI ATAP
1 Kolom KP9 Pipa baja 8 kg
10348.80 2.1757
2 Balok pipa d. 8 kg
14886.93 3.1298
3 Plat t. 14 mm kg
361.65 0.0516
4 Plat t. 8 mm kg
361.44 0.0515
5 Anchor Bolt d. 19 mm bh
64.00 0.0230
6 Cat ex. Kansai kg
25958.82 0.2196
5.6512 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN STRUKTUR 69.3437
28.5167 9.6876
38.2043 III. PEKERJAAN ARSITEKTUR
A. LANTAI DASAR A.1 PEK. DINDING
1 Dinding hebel t. 10 cm + MU 380 m2
481.14 0.4738
2 Plesteran dinding MU 100 t. 10 mm m2
962.28 0.4604
3 Acian MU 200 t. 3 mm m2
962.28 0.2349
4 Kolom praktis 10 x 10 m
52.21 0.0380
5 Balok lintel 10 x 15 m
132.39 0.1224
6 Finishing kolom MU 200 m2
177.59 0.0433
7 Railing pagar pipa hitam finishing cat m
46.00 0.0708
8 Railing tangga pipa hitam finishing cat m
10.00 0.0154
1.4590 0.0000
0.0000 0.0000
A.2 PEK. LANTAI
1 Keramik 3030 DN putih m2
105.61 0.0898
2 Keramik 3030 DN putih tangga m2
21.69 0.0184
3 Stair nozing keramik 7 x 40 cm m
31.05 0.0260
0.1342 0.0000
0.0000 0.0000
A.3 PEK. KUSEN LENGKAP 1 SD1
unit1.00 0.0477
2 FD1 unit1.00
0.0260 3 ADW1
unit1.00 0.0394
4 ADW2 unit1.00
0.0609 5 ADW3
unit1.00 0.0675
6 ADW4 unit1.00
0.0578 7 BV1
unit4.00 0.0494
8 BV2 unit1.00
0.0103 9 BV3
unit1.00 0.0103
10 Handrall pagar type R-5 bh
1.00 0.2752
0.6445 0.0000
0.0000 0.0000
A.4 PEK. PLAFOND
1 Plafond beton expose finishing m2
105.61 0.0258
0.02580.0000 0.0000
0.0000 A.5 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
962.28 0.2163
2 Cat plafond beton expose Vinilex 3x m2
117.97 0.0305
3 Cat kolom dan balok m2
117.59 0.0399
0.2867 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR 2.5502
0.0000 0.0000
0.0000 B. LANTAI - 1
B.1 PEK. DINDING
1 Dinding hebel t. 10 cm + MU 380 m2
514.88 0.5164
2 Plesteran dinding MU 100 dan acian MU 200 m2
1029.76 0.5126
3 Acian MU 200 t. 3 mm m2
1029.76 0.2663
4 Keramik dinding 2025 KMWC m2
144.69 0.1664
5 Kolom praktis 10 x 10 m
55.87 0.0414
6 Balok lintel 10 x 15 m
141.67 0.1339
7 Finishing kolom MU 200 m2
244.79 0.0633
8 Railing tangga pipa hitam finishing cat m
82.00 0.1263
1.8266 0.0000
0.0000 0.0000
B.2 PEK. LANTAI
1 Floor hardener 3 kgm2 m2
40.50 0.0338
2 Lantai karpet koridor m2
340.00 0.8393
3 Keramik 3030 DN putih tangga m2
21.69 0.0189
4 Stair nozing keramik 7 x 40 cm m
31.05 0.0260
5 Keramik 2020 KMWC m2
32.09 0.0287
0.9467 0.0000
0.0000 0.0000
B.3 PEK. KUSEN LENGKAP 1 AD3
unit3.00 0.0775
2 AD4 unit2.00
0.1028 3 FD1
unit5.00 0.1311
4 PVC unit5.00
0.0417 5 Partisi gypsum rangka metal stud galvalume
m2 30.60
0.0382 6 ADW5
m2 2.00
0.3278 7 AW2
bh 5.00
0.8384 8 AD2
bh 2.00
0.2191 9 Handrall pagar type R-1
bh 5.00
0.2755 10 Handrall pagar type R-2
bh 2.00
0.1024 2.1545
0.0000 0.0000
0.0000 B.4 PEK. PLAFOND
1 Plafond gypsum + rangka m2
196.00 0.2302
2 Plafond acoustik + rangka m2
159.00 0.1502
0.3804 0.0000
0.0000 0.0000
B.5 PEK. SANITAIR
1 Closed duduk ex TOTO bh
5.00 0.1259
2 Washtafel LW 230 J bh
6.00 0.0858
3 Urinoir bh
3.00 0.0680
4 Jet spray bh
3.00 0.0146
5 Floor drain bh
6.00 0.0096
6 Kaca cermin ukuran 2600 x 1200 mm tinggi bh
2.00 0.0063
0.3102 0.0000
0.0000 0.0000
B.6 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
1152.16 0.2701
2 Cat plafond beton kaisiboard Vinilex 3x m2
196.00 0.0537
3 Cat kolom m2
244.79 0.0574
0.3812 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 1 5.9996
0.0000 0.0000
0.0000 C. LANTAI - 2
C.1 PEK. KUSEN LENGKAP
1 Partisi gypsum rangka metal stud galvalume m2
96.16 0.1208
2 ADW5 unit1.00
0.1644 3 ADW5
unit1.00 0.1644
4 AW2 unit5.00
0.8384 5 Tanggulan dudukan kusen Almunium
m1 68.20
0.1188 6 Handrall pagar type R-1
bh 5.00
0.2755 7 Handrall pagar type R-2
bh 2.00
0.1023
1.7846 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 2 1.7846
0.0000 0.0000
0.0000 D. PEK. LANTAI - 3
D.1 PEK. KUSEN LENGKAP
1 Partisi gypsum rangka metal stud galvalume
m2 96.18
0.1212 2 ADW5
unit1.00 0.1646
3 ADW5 unit1.00
0.1646 4 AW2
unit5.00 0.8384
5 Tanggulan dudukan kusen Almunium m1
68.20 0.1188
6 Handrall pagar type R-1 bh
5.00 0.2755
7 Handrall pagar type R-2 bh
2.00 0.1023
1.7854 0.0000
0.0000 0.0000
D.2 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
161.72 0.0387
2 Cat kolom luar Vinilex 3x m2
55.30 0.0132
0.0519 0.0000
0.0000 0.0000
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 3 1.8373
0.0000 0.0000
0.0000 E.
LANTAI - 4 E.1 PEK. KUSEN LENGKAP
1 AW2 bh
7.00 1.1737
2 ADW6 bh
1.00 0.1646
3 Partisi gypsum rangka metal stud galvalume m1
65.58 0.0824
4 Tanggulan dudukan kusen Almunium m1
37.00 0.0644
5 Handrall pagar type R-5 bh
1.00 0.2751
E.2 PEK. PENGECATAN
1 Cat dinding Vinilex 3x m2
131.16 0.0314
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 4 1.7916
0.0000 0.0000
0.0000 F.
LANTAI - RUANG MESIN F.1 PEK. LANTAI
1 Floor hardener 3 kgm2 m2
105.61 0.0883
SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - RUANG MESIN 0.0883
0.0000 0.0000
0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR
14.0516 0.0000
0.0000 0.0000
IV. PEKERJAAN MEKANIKAL IV.1 PEKERJAAN INSTALASI PLAMBING