PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS ROOF TANK KUBIKEL 2 KOMPARTEMEN

a. Kabel dari JBX-TELP LT DASAR ke outlet telepon ttk 3.00 0.0088 ITC 2 x 2 x 0.6 mm + PVC dia. 20 LANTAI 1 a. Kabel dari JBX-TELP LT 1 ke outlet telepon ttk 11.00 0.0320 ITC 2 x 2 x 0.6 mm + PVC dia. 20 SUB TOTAL PEKERJAAN SISTEM TELEPON 0.7950 0.0000 0.0000 0.0000 5.8PEKERJAAN RAK KABEL Pemasangan rak kabel beserta peralatan bantu lainnya, sesuai spesifikasi teknik dan gambar, terpasang lengkap LANTAI 1 a. Rak kabel Cable Tray hot dipgalvanised mild steel ukuran m 62.00 0.1263 300 x 100 mm terpasang menggantung di langit-langit SUB TOTAL PEKERJAAN RAK KABEL 0.1263 0.0000 0.0000 0.0000 MATERIAL BANTU lot 1.00 0.0181 TEST COMMISSIONING lot 1.00 0.0302 TOTAL V.I PEKERJAAN INSTALASI ELEKTRONIK 1.5916 0.0000 0.0000 0.0000 VI. PEKERJAAN GWT GROUND WATER TANK DAN RUMAH POMPA 1 GROUND WATER TANK a. Galian tanah m3 82.00 0.0202 0.0000 0.0202 100 100 0.0202 b. Pasir urug 10 cm m3 2.04 0.0045 0.0000 0.0000 0.0000 c. Lantai kerja 5 cm m3 1.02 0.0074 0.0000 0.0000 0.0000 d. Balok dan ring balk 30 x 30 beton K 350 m3 5.26 0.2819 0.0000 0.0000 0.0000 e. Kolom 30 x 30 beton K 350 m3 2.62 0.1492 0.0000 0.0000 0.0000 f. Dinding dasar, samping, penyekat, atas tebal 20 cm K 350 m3 22.98 1.3355 0.0000 0.0000 0.0000 g. Water profing counting m2 108.00 0.1044 0.0000 0.0000 0.0000 h. Keramik 30 x 30 DN putih m2 108.00 0.0906 0.0000 0.0000 0.0000 i. Manhole bh 2.00 0.0371 0.0000 0.0000 0.0000 j. Tangga monyet stainless steel bh 2.00 0.1571 0.0000 0.0000 0.0000 2 RUMAH POMPA PEKERJAAN STRUKTUR a. Kolom 2040 m3 0.96 0.0486 0.0000 0.0000 0.0000 b. Balok 1525 m3 1.01 0.0480 0.0000 0.0000 0.0000 c. Plat beton t. 12 cm m3 2.88 0.0989 0.0000 0.0000 0.0000 d. Lisplank 1050 m3 1.10 0.0378 0.0000 0.0000 0.0000 PEKERJAAN FINISHING a. Dinding hebel t. 10 cm MU-380 m2 42.00 0.0201 0.0000 0.0000 0.0000 b. Plesteran MU-100 dan acian MU-200 m2 84.00 0.0205 0.0000 0.0000 0.0000 c. Acian MU 200 t. 3 mm m2 84.00 0.0611 0.0000 0.0000 0.0000 d. Keramik 3030 DN putih m2 30.00 0.0252 0.0000 0.0000 0.0000 e. Balok lintel 10 x 15 m2 46.00 0.0112 0.0000 0.0000 0.0000 f. Plafond beton expose finishing m2 106.00 0.0771 0.0000 0.0000 0.0000 g. Cat dinding m2 84.00 0.0217 0.0000 0.0000 0.0000 h. Cat plafond dan lisplank m2 106.00 0.0238 0.0000 0.0000 0.0000 i. Waterprofing m2 30.00 0.0290 0.0000 0.0000 0.0000 PEKERJAAN ELEKTRIKAL DAN MEKANIKAL a. Lampu TL IDR 18 W bh 3.00 0.0025 0.0000 0.0000 0.0000 b. Stop kontak 200 W bh 3.00 0.0008 0.0000 0.0000 0.0000 c. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk lampu bh 3.00 0.0051 0.0000 0.0000 0.0000 d. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W bh 3.00 0.0061 0.0000 0.0000 0.0000 e. Stop kontak 200 W bh 3.00 0.0008 0.0000 0.0000 0.0000 f. Saklar seri bh 1.00 0.0002 0.0000 0.0000 0.0000 g. Saklar tunggal bh 1.00 0.0002 0.0000 0.0000 0.0000 h. Saluran air hujan dia. 10 cm AW Wavin m1 4.00 0.0051 0.0000 0.0000 0.0000 PEKERJAAN KUSEN DAN PINTU a. Pintu ruang pompa bh 1.00 0.1283 0.0000 0.0000 0.0000 b. Gril kecil 50 x 50 bh 4.00 0.1052 0.0000 0.0000 0.0000 c. Gril besar 50 x 150 bh 1.00 0.0407 0.0000 0.0000 0.0000 TOTAL VI. PEKERJAAN GWT DAN RUMAH POMPA 3.0059 0.0000 0.0202 0.0202 VII. PEKERJAAN DINDING TURAP BATU KALI a. Pasangan batu kali m3 84.97 0.6286 b. Siar batu kali m2 53.70 0.0838 TOTAL VII. PEKERJAAN DINDING TURAP BATU KALI 0.7124 0.0000 0.0000 0.0000 VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm a. Kabel tweist 3 x 70 mm dan 1 x 50 mm m1 100.00 0.2633 TOTAL VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE 0.2633 0.0000 0.0000 0.0000 SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm

IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS

Pengadaan dan pemasangan sistem sesuai dengan gambar dan spesifikasi teknis 1 System elektrostatis dengan radius proteksi 150 meter lengkap dengan unit 1.00 0.4833 pipa galvanis dia. 2 setinggi 6 m dan NYY 50 mm2 dalam GIP dia. 50 mm 2 Pentanahan copper clad rod 1 x 12 m lengkap dengan bak kontrol unit 1.00 0.0665 ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 3 ohm kbl Coaxial TOTAL IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS 0.54980.0000 0.0000 0.0000

X. ROOF TANK KUBIKEL 2 KOMPARTEMEN

Type : RFP unit 1.00 0.8892 Kap : 8,00 m3 Fiber rainforcement plastic, lengkap dengan dudukan kaki tangki air 2 m serta wc di tangki air dan accessories TOTAL X. PEKERJAAN TANK KUBIKAL 2 KOMPARTEMEN 0.8892 0.0000 0.0000 0.0000 JUMLAH TOTAL 100.0000 12.4584 9.9815 22.4399 PRESTASI MINGGU INI : 9.9815 PRESTASI SD AKHIR MINGGU LALU : 12.4584 PRESTASI SD MINGGU INI : 22.4399 RENCANA SD AKHIR MINGGU INI : 15.8253 SELISIH : 6.6146 : : BOBOT Bobot Bobot SD Minggu Lalu Minggu Ini Minggu Lalu Minggu Ini MINGGU INI I. PEKERJAAN PERSIAPAN DAN PENUNJANG 1 Pekerjaan pengukuran dan pemasangan bowplank m1 117.65 0.0882 0.0882 0.0000 100 100 0.0882 2 Pekerjaan pembersihan lokasi m2 3202.00 0.2050 0.2050 0.0000 100 100 0.2050 3 Direksikeet uk. 3,6 x 7,2 = 25,92 m2 m2 25.92 0.2392 0.2392 0.0000 100 100 0.2392 4 Pagar pengaman proyek m1 233.46 0.4485 0.4485 0.0000 100 100 0.4485 5 Air kerja lot1.00 0.0329 0.0132 0.0016 40 5 45 0.0148 6 Listrik kerja lot1.00 0.0424 0.0170 0.0021 40 5 45 0.0191 7 Foto proyek ls 3.00 0.0056 0.0022 0.0003 40 5 45 0.0025 8 Pekerjaan jalan masuk ke site m1 25.00 0.0260 0.0260 0.0000 100 100 0.0260 9 Pembuatan Dam sementara pekerjaan khusus diarea lot 1.00 1.1350 1.1350 0.0000 100 100 1.1350 kolom yang masuk ke area sungai SUB TOTAL PEKERJAAN PERSIAPAN DAN PENUNJANG 2.22282.1743 0.0040 2.178 3 II. PEKERJAAN STRUKTUR A. PEK. TANAH 1 Galian tanah untuk pile cap dan tie beam m3 358.76 0.0824 0.0824 0.0000 100 100 0.0824 2 Urugan tanah kembali sisa galian m3 200.24 0.0220 0.0220 0.0000 100 100 0.0220 3 Urugan tanah dari luar proyek m3 155.00 0.1813 0.0907 0.0000 50 50 0.0907 4 Urugan pasir di bawah pile cap, tie beam dan plat tebal 10 cm m3 37.67 0.0839 0.0755 0.0000 90 90 0.0755 5 Lantai kerja tebal 5 cm dibawah pile cap, tie beam dan plat lantai m3 15.54 0.1123 0.1011 0.0000 90 90 0.1011 0.4819 0.3716 0.0000 0.3716

B. PEK. PONDASI

1 Pondasi tiang pancang minipile M25 segi empat K 500 m 2208.00 4.3459 4.3459 0.0000 100 100 4.3459 2 Potong tiang pancang ttk 184.00 0.1601 0.1601 0.0000 100 100 0.1601 3 Mobilisasi alat pancang unit 1.00 0.2439 0.2439 0.0000 100 100 0.2439 4 Pile cap P-1 60 x 60 x 60 m3 0.86 0.0381 0.0381 0.0000 100 100 0.0381 5 Pile cap P-2 135 x 60 x 65 m3 0.51 0.0289 0.0289 0.0000 100 100 0.0289 6 Pile cap P-4 135 x 135 x 85 m3 12.39 0.2937 0.2937 0.0000 100 100 0.2937 7 Pile cap P-8 190 x 210 x 120 m3 28.73 0.7225 0.7225 0.0000 100 100 0.7225 8 Pile cap P-9 210 x 210 x 120 m3 52.92 1.2152 1.2152 0.0000 100 100 1.2152 9 Pit lift - Lantai pit lift m3 5.12 0.1926 0.1156 0.0770 60 40 100 0.1926 - Dinding pit lift m3 4.00 0.1223 0.0734 0.0489 60 40 100 0.1223 10 Tie beam TB 1 40 x 60 m3 20.16 0.5360 0.5360 0.0000 100 100 0.5360 11 Tie beam TB 2 35 x 80 m3 11.14 0.3559 0.3559 0.0000 100 100 0.3559 12 Tie beam TB 3 35 x 80 m3 18.14 0.5794 0.5794 0.0000 100 100 0.5794 13 Tie beam TB 4 35 x 55 m3 9.24 0.2965 0.2965 0.0000 100 100 0.2965 14 Tie beam TB 5 20 x 45 m3 1.94 0.0869 0.0869 0.0000 100 100 0.0869 9.2179 9.0919 0.1260 9.2179 C. PEK. KONSTRUKSI BETON C.1 LANTAI DASAR ELV. -4.250 - ELV. +0.005 1 Kolom K1K 65 x 65 m3 39.04 1.5913 1.5913 0.0000 100 100 1.5913 2 Kolom K4 20 x 40 m3 0.67 0.0485 0.0485 0.0000 100 100 0.0485 3 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1432 0.1432 0.0000 100 100 0.1432 4 Kolom B1 40 x 80 m3 9.18 0.4347 0.2608 0.1739 60 40 100 0.4347 5 Kolom B2 35 x 75 m3 15.02 0.6032 0.3619 0.2413 60 40 100 0.6032 6 Kolom B3 50 x 80 m3 23.09 1.3886 0.8332 0.5554 60 40 100 1.3886 7 Kolom B5 35 x 75 m3 16.54 0.8125 0.4875 0.3250 60 40 100 0.8125 8 Kolom B6 45 x 45 m3 20.25 1.0681 0.6409 0.4272 60 40 100 1.0681 9 Kolom B7 30 x 45 m3 22.14 1.4178 0.8507 0.5671 60 40 100 1.4178 10 Kolom B8 25 x 45 m3 14.85 0.8984 0.5390 0.3594 60 40 100 0.8984 11 Kolom B9 20 x 40 m3 7.04 0.5313 0.3188 0.2125 60 40 100 0.5313 12 Kolom B9K 20 x 40 m3 11.52 0.9060 0.5436 0.3624 60 40 100 0.9060 13 Kolom B10 20 x 40 m3 7.68 0.5768 0.3461 0.2307 60 40 100 0.5768 14 Kolom B10K 20 x 40 m3 0.96 0.0755 0.0453 0.0302 60 40 100 0.0755 15 Plat lantai t. 80 mm ; elv. -4.250 m3 28.68 1.4163 0.8498 0.0000 60 60 0.8498 16 Plat lantai t. 150 mm ; elv. -4.250 m3 14.14 0.4433 0.2660 0.1773 60 40 100 0.4433 17 Plat lantai t. 12 cm ; elv. 0.05 m3 57.30 2.0915 1.2549 0.8366 60 40 100 2.0915 18 Plat tangga utama m3 1.83 0.0629 0.0000 0.0000 0.0000 19 Plat bordes tangga utama m3 0.29 0.0112 0.0000 0.0000 0.0000 14.5211 9.3814 4.4991 13.8805 C.2 LANTAI 1 ELV. +0.005 - ELV. +4.125 1 Kolom K1 d. 50 cm m3 21.72 1.1256 0.6754 0.0000 60 60 0.6754 2 Kolom K2 60 x 60 m3 18.14 0.9270 0.6953 0.0000 75 75 0.6953 3 Kolom K3 60x 60 m3 12.10 0.4713 0.0000 0.2828 60 60 0.2828 4 Kolom K4 20 x 40 m3 0.67 0.0489 0.0000 0.0293 60 60 0.0293 5 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1440 0.0000 0.0864 60 60 0.0864 6 Kolom B1 40 x 80 m3 12.24 0.5795 0.0000 0.2318 40 40 0.2318 7 Kolom B2 35 x 75 m3 19.85 0.7970 0.0000 0.3188 40 40 0.3188 8 Kolom B3 50 x 80 m3 30.60 1.8404 0.0000 0.7362 40 40 0.7362 9 Kolom B5K 35 x 75 m3 16.54 0.8224 0.0000 0.3290 40 40 0.3290 10 Kolom B6 45 x 45 m3 10.13 0.5390 0.0000 0.2156 40 40 0.2156 11 Kolom B7 30 x 45 m3 22.14 1.4332 0.0000 0.5733 40 40 0.5733 12 Kolom B8 25 x 45 m3 14.85 0.9092 0.0000 0.3637 40 40 0.3637 13 Kolom B9 20 x 40 m3 3.52 0.2689 0.0000 0.1076 40 40 0.1076 14 Kolom B9K 20 x 40 m3 5.76 0.4584 0.0000 0.1834 40 40 0.1834 15 Kolom B10 20 x 40 m3 6.68 0.5077 0.0000 0.2031 40 40 0.2031 16 Kolom B10K 20 x 40 m3 0.48 0.0382 0.0000 0.0153 40 40 0.0153 17 Plat lantai t. 12 cm ; elv. 4.125 m3 124.26 4.5995 0.0000 0.0000 0.0000 18 Plat tangga m3 1.83 0.0636 0.0000 0.0000 0.0000 19 Plat bordes tangga utama m3 0.29 0.0114 0.0000 0.0000 0.0000 15.5852 1.3706 3.6761 5.0467 C.3 LANTAI 2 ELV. +4.125 - ELV. +8.350 1 Kolom K1A d. 50 cm m3 14.16 0.7369 2 Kolom K3A 55 x 55 m3 10.16 0.4242 3 Kolom K4 20 x 40 m3 0.67 0.0491 4 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1443 5 Kolom B5 35 x 75 m3 16.54 0.8218 6 Kolom B6 45 x 45 m3 10.13 0.5413 7 Kolom B7 30 x 45 m3 22.14 1.4377 8 Kolom B8 25 x 45 m3 14.85 0.9125 9 Kolom B9 20 x 40 m3 3.52 0.2699 10 Kolom B9K 20 x 40 m3 5.76 0.4600 11 Kolom B10 20 x 40 m3 4.16 0.3173 12 Kolom B10K 20 x 40 m3 0.48 0.0383 13 Plat lantai t. 12 cm ; elv. 8.350 m3 62.16 2.3118 14 Plat tangga m3 1.83 0.0638 15 Plat bordes tangga utama m3 0.29 0.0114 8.5403 0.0000 0.0000 0.0000 C.4 LANTAI 3 ELV. +8.350 - ELV. +12.550 1 Kolom K1B d. 35 cm m3 3.23 0.2366 2 Kolom K3B 55 x 55 m3 10.16 0.4246 3 Kolom K4 20 x 40 m3 0.67 0.0491 4 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1445 5 Kolom B4 25 x 35 m3 11.38 0.7388 6 Kolom B5 35 x 75 m3 16.54 0.8230 7 Kolom B6 45 x 45 m3 10.13 0.5420 8 Kolom B7 30 x 45 m3 22.14 1.4399 9 Kolom B8 25 x 45 m3 12.15 0.7479 10 Kolom B9 20 x 40 m3 3.52 0.2704 11 Kolom B9K 20 x 40 m3 5.76 0.4608 12 Kolom B10 20 x 40 m3 4.16 0.3179 13 Kolom B10K 20 x 40 m3 0.48 0.0385 14 Plat lantai t. 12 cm ; elv. 12.550 m3 40.20 1.4988 15 Plat tangga m3 1.83 0.0639 16 Plat bordes tangga utama m3 0.29 0.0114 7.8081 0.0000 0.0000 0.0000 RINCIAN PROGRES MINGGUAN PEKERJAAN GEDUNG PERPUSTAKAAN MINGGU KE 6 TANGGAL 12-18 OKTOBER SD MINGGU INI NO ITEM PEKERJAAN SATUAN VOLUME PEKERJAAN BOBOT TOTAL PROGRES KEMAJUAN PEKERJAAN C.5 LANTAI 4 ELV. +12.550 - ELV. +16.750 1 Kolom K1B d. 35 cm m3 3.23 0.2392 2 Kolom K3C d. 25 cm m3 1.65 0.1032 3 Kolom K4 20 x 40 m3 0.67 0.0445 4 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1449 5 Kolom B6 45 x 45 m3 10.13 0.5435 6 Kolom B7A 0.15 x 0.5 m3 9.75 0.7298 7 Kolom B8A 25 x 45 m3 12.15 0.7503 8 Kolom B9 20 x 40 m3 3.52 0.2713 9 Kolom B9K 20 x 40 m3 5.76 0.4624 10 Kolom B10 20 x 40 m3 4.16 0.3190 11 Kolom B10K 20 x 40 m3 0.48 0.0385 12 Plat lantai t. 12 cm ; elv. 16.750 m3 40.20 1.5049 13 Plat tangga m3 1.83 0.0641 14 Plat bordes tangga utama m3 0.29 0.0114 5.2270 0.0000 0.0000 0.0000 C.6 LANTAI LMR ELV. +16.750 - ELV. +21.250 1 Kolom K1B d. 35 cm m3 3.23 0.2397 2 Kolom K4 20 x 40 m3 0.67 0.0494 3 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1456 4 Kolom B6 45 x 45 m3 7.09 0.3829 5 Kolom B9 20 x 40 m3 3.52 0.2729 6 Kolom B9K 20 x 40 m3 5.76 0.4651 7 Kolom B10 20 x 40 m3 4.16 0.3208 8 Kolom B10K 20 x 40 m3 0.48 0.0388 9 Plat DAK t.12 cm ; elev. 21.250 m3 11.52 0.3958 2.3110 0.0000 0.0000 0.0000 C.7 LANTAI ATAP 1 Kolom KP9 Pipa baja 8 kg 10348.80 2.1757 2 Balok pipa d. 8 kg 14886.93 3.1298 3 Plat t. 14 mm kg 361.65 0.0516 4 Plat t. 8 mm kg 361.44 0.0515 5 Anchor Bolt d. 19 mm bh 64.00 0.0230 6 Cat ex. Kansai kg 25958.82 0.2196 5.6512 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN STRUKTUR 69.3437 20.2156 8.3011 28.5167 III. PEKERJAAN ARSITEKTUR A. LANTAI DASAR A.1 PEK. DINDING 1 Dinding hebel t. 10 cm + MU 380 m2 481.14 0.4738 2 Plesteran dinding MU 100 t. 10 mm m2 962.28 0.4604 3 Acian MU 200 t. 3 mm m2 962.28 0.2349 4 Kolom praktis 10 x 10 m 52.21 0.0380 5 Balok lintel 10 x 15 m 132.39 0.1224 6 Finishing kolom MU 200 m2 177.59 0.0433 7 Railing pagar pipa hitam finishing cat m 46.00 0.0708 8 Railing tangga pipa hitam finishing cat m 10.00 0.0154 1.4590 0.0000 0.0000 0.0000 A.2 PEK. LANTAI 1 Keramik 3030 DN putih m2 105.61 0.0898 2 Keramik 3030 DN putih tangga m2 21.69 0.0184 3 Stair nozing keramik 7 x 40 cm m 31.05 0.0260 0.1342 0.0000 0.0000 0.0000 A.3 PEK. KUSEN LENGKAP 1 SD1 unit1.00 0.0477 2 FD1 unit1.00 0.0260 3 ADW1 unit1.00 0.0394 4 ADW2 unit1.00 0.0609 5 ADW3 unit1.00 0.0675 6 ADW4 unit1.00 0.0578 7 BV1 unit4.00 0.0494 8 BV2 unit1.00 0.0103 9 BV3 unit1.00 0.0103 10 Handrall pagar type R-5 bh 1.00 0.2752 0.6445 0.0000 0.0000 0.0000 A.4 PEK. PLAFOND 1 Plafond beton expose finishing m2 105.61 0.0258 0.02580.0000 0.0000 0.0000 A.5 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 962.28 0.2163 2 Cat plafond beton expose Vinilex 3x m2 117.97 0.0305 3 Cat kolom dan balok m2 117.59 0.0399 0.2867 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR 2.5502 0.0000 0.0000 0.0000 B. LANTAI - 1 B.1 PEK. DINDING 1 Dinding hebel t. 10 cm + MU 380 m2 514.88 0.5164 2 Plesteran dinding MU 100 dan acian MU 200 m2 1029.76 0.5126 3 Acian MU 200 t. 3 mm m2 1029.76 0.2663 4 Keramik dinding 2025 KMWC m2 144.69 0.1664 5 Kolom praktis 10 x 10 m 55.87 0.0414 6 Balok lintel 10 x 15 m 141.67 0.1339 7 Finishing kolom MU 200 m2 244.79 0.0633 8 Railing tangga pipa hitam finishing cat m 82.00 0.1263 1.8266 0.0000 0.0000 0.0000 B.2 PEK. LANTAI 1 Floor hardener 3 kgm2 m2 40.50 0.0338 2 Lantai karpet koridor m2 340.00 0.8393 3 Keramik 3030 DN putih tangga m2 21.69 0.0189 4 Stair nozing keramik 7 x 40 cm m 31.05 0.0260 5 Keramik 2020 KMWC m2 32.09 0.0287 0.9467 0.0000 0.0000 0.0000 B.3 PEK. KUSEN LENGKAP 1 AD3 unit3.00 0.0775 2 AD4 unit2.00 0.1028 3 FD1 unit5.00 0.1311 4 PVC unit5.00 0.0417 5 Partisi gypsum rangka metal stud galvalume m2 30.60 0.0382 6 ADW5 m2 2.00 0.3278 7 AW2 bh 5.00 0.8384 8 AD2 bh 2.00 0.2191 9 Handrall pagar type R-1 bh 5.00 0.2755 10 Handrall pagar type R-2 bh 2.00 0.1024 2.1545 0.0000 0.0000 0.0000 B.4 PEK. PLAFOND 1 Plafond gypsum + rangka m2 196.00 0.2302 2 Plafond acoustik + rangka m2 159.00 0.1502 0.3804 0.0000 0.0000 0.0000 B.5 PEK. SANITAIR 1 Closed duduk ex TOTO bh 5.00 0.1259 2 Washtafel LW 230 J bh 6.00 0.0858 3 Urinoir bh 3.00 0.0680 4 Jet spray bh 3.00 0.0146 5 Floor drain bh 6.00 0.0096 6 Kaca cermin ukuran 2600 x 1200 mm tinggi bh 2.00 0.0063 0.3102 0.0000 0.0000 0.0000 B.6 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 1152.16 0.2701 2 Cat plafond beton kaisiboard Vinilex 3x m2 196.00 0.0537 3 Cat kolom m2 244.79 0.0574 0.3812 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 1 5.9996 0.0000 0.0000 0.0000 C. LANTAI - 2 C.1 PEK. KUSEN LENGKAP 1 Partisi gypsum rangka metal stud galvalume m2 96.16 0.1208 2 ADW5 unit1.00 0.1644 3 ADW5 unit1.00 0.1644 4 AW2 unit5.00 0.8384 5 Tanggulan dudukan kusen Almunium m1 68.20 0.1188 6 Handrall pagar type R-1 bh 5.00 0.2755 7 Handrall pagar type R-2 bh 2.00 0.1023 1.7846 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 2 1.7846 0.0000 0.0000 0.0000 D. PEK. LANTAI - 3 D.1 PEK. KUSEN LENGKAP 1 Partisi gypsum rangka metal stud galvalume m2 96.18 0.1212 2 ADW5 unit1.00 0.1646 3 ADW5 unit1.00 0.1646 4 AW2 unit5.00 0.8384 5 Tanggulan dudukan kusen Almunium m1 68.20 0.1188 6 Handrall pagar type R-1 bh 5.00 0.2755 7 Handrall pagar type R-2 bh 2.00 0.1023 1.7854 0.0000 0.0000 0.0000 D.2 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 161.72 0.0387 2 Cat kolom luar Vinilex 3x m2 55.30 0.0132 0.0519 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 3 1.8373 0.0000 0.0000 0.0000 E. LANTAI - 4 E.1 PEK. KUSEN LENGKAP 1 AW2 bh 7.00 1.1737 2 ADW6 bh 1.00 0.1646 3 Partisi gypsum rangka metal stud galvalume m1 65.58 0.0824 4 Tanggulan dudukan kusen Almunium m1 37.00 0.0644 5 Handrall pagar type R-5 bh 1.00 0.2751 E.2 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 131.16 0.0314 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 4 1.7916 0.0000 0.0000 0.0000 F. LANTAI - RUANG MESIN F.1 PEK. LANTAI 1 Floor hardener 3 kgm2 m2 105.61 0.0883 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - RUANG MESIN 0.0883 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR 14.0516 0.0000 0.0000 0.0000 IV. PEKERJAAN MEKANIKAL

IV.1 PEKERJAAN INSTALASI PLAMBING A

INSTALASI AIR BERSIH 1 PERALATAN UTAMA Pengadaan dan pemasangan unit a. Transfer Pump TP set1.00 0.2918 Type pompa : End Suction Kapasitas : 300 litermenit Head : 40 meter Putaran : rpm Power : 5 kW Operasi : 1 Duty 1 Stand By b. Shallow Well SW unit1.00 0.0731 Type pompa : Kapasitas : 120 litermenit Head : meter Putaran : rpm Power : 2.2 kW c. Accessories Pompa Gate Valve dia. 80 bh 2.00 0.0333 Gate Valve dia. 65 bh 7.00 0.0496 Gate Valve dia. 50 bh 1.00 0.0038 Check Valve dia. 65 bh 3.00 0.0323 Strainer STR dia. 80 bh 2.00 0.0300 Strainer STR dia. 65 bh 2.00 0.0239 Flexible Joint dia. 65 mm bh 4.00 0.0236 Preasure gauge bh 1.00 0.0017 Preasure switch bh 1.00 0.0057 Pipa GIP Instalassi pemipaan area pompa cw fitting-fitting support lot 1.00 0.0604

2 INSTALASI PEMIPAAN

Pengadaan dan pemasangan pipa Pemipaan GIP Medium Class Inci. Fitting All Acessories 1 SITE PLAN a. GIP dia. 50, Pipa dari ruang pompa ke GWT m 28.00 0.0416 b. GIP dia. 25, Pipa dari shallow well ke GWT m 16.00 0.0238 2 LANTAI DASAR a. GIP dia. 65, Pipa transfer dari ruang pompa ke Lt. 1 m 5.00 0.0124 3 LANTAI 1 a. GIP dia. 65, Pipa Transfer m 9.00 0.0224 b. GIP dia. 50, Pipa Supply dan Gravitasi m 17.00 0.0252 c. GIP dia. 32 m 187.00 0.1789 d. GIP dia. 25 m 19.00 0.0138 e. GIP dia. 20 m 20.00 0.0122 f. GIP dia. 15 m 38.00 0.0196 g. DOP dia. 32 bh 4.00 0.0004 Peralatan katup-katup Kitazawa h. Gate Valve dia. 32 bh 4.00 0.0097 4 LANTAI 2 a. GIP dia. 65, Pipa Transfer m 9.00 0.0225 b. GIP dia. 50, Pipa Supply dan Gravitasi m 17.00 0.0252 c. GIP dia. 32 m 187.00 0.1789 d. GIP dia. 25 m 19.00 0.0138 e. GIP dia. 20 m 20.00 0.0123 f. GIP dia. 15 m 38.00 0.0196 g. DOP dia. 32 bh 4.00 0.0004 Peralatan katup-katup Kitazawa h. Gate Valve dia. 32 bh 4.00 0.0097 5 LANTAI 3 a. GIP dia. 65, Pipa Transfer m 9.00 0.0225 b. GIP dia. 50, Pipa Supply dan Gravitasi m 17.00 0.0253 c. DOP dia. 32 bh 4.00 0.0004 Peralatan katup-katup Kitazawa d. Gate Valve dia. 32 bh 4.00 0.0097 6 LANTAI 4 a. GIP dia. 65, Pipa Transfer m 9.00 0.0224 b. GIP dia. 50, Pipa Supply dan Gravitasi m 17.00 0.0252 Peralatan katup-katup Kitazawa c. Gate Valve dia. 32 bh 2.00 0.0049 d. Gate Valve dia. 25 bh 2.00 0.0040 7 LANTAI MESIN a. GIP dia. 65, Pipa Transfer m 9.00 0.0224 b. GIP dia. 65, Pipa ke Booster m 5.00 0.0124 c. GIP dia. 50, Pipa Supply dan Gravitasi m 17.00 0.0252 d. GIP dia. 40, Pipa Gravitasi m 5.00 0.0060 TOTAL A. INSTALASI AIR BERSIH 1.4520 0.0000 0.0000 0.0000 B. INSTALASI AIR KOTOR 1 PERALATAN UTAMA Pengadaan dan pemasangan unit a. STP, kapasitas 22 m3 unit 1.00 1.0603

2 INSTALASI PEMIPAAN

Pengadaan dan pemasangan pipa Pipa PVC Kelas AW Inci. Fitting Accessories 1 SITE PLAN a. PVC dia. 100 ke STP m 22.00 0.0278 2 LANTAI DASAR a. PVC dia. 100, Pipa tegak m 9.00 0.0114 3 LANTAI 1 a. PVC dia. 100, Pipa tegak m 9.00 0.0114 b. PVC dia. 100 m 10.00 0.0127 c. PVC dia. 50 m 4.00 0.0017 Clean Out CO d. CO dia. 100 bh 2.00 0.0036 TOTAL B. INSTALASI AIR KOTOR 1.1289 0.0000 0.0000 0.0000 C. INSTALASI AIR BEKAS 1 INSTALASI PEMIPAAN Pengadaan dan pemasangan pipa Pipa PVC Kelas AW Inci. Fitting Accessories 1 SITE PLAN a. PVC dia. 100 m 20.00 0.0253 2 LANTAI DASAR a. PVC dia. 100, Pipa tegak m 9.00 0.0114 3 LANTAI 1 a. PVC dia. 100, Pipa tegak m 9.00 0.0114 b. PVC dia. 65 m 8.00 0.0053 c. PVC dia. 80 m 4.00 0.0029 d. PVC dia. 50 m 17.00 0.0073 Clean Out CO e. CO dia. 80 bh 1.00 0.0016 f. CO dia. 50 bh 1.00 0.0012 TOTAL C. INSTALASI AIR BEKAS 0.0664 0.0000 0.0000 0.0000 D. INSTALASI VENTILASI Pengadaan dan pemasangan pipa Pipa PVC Kelas D Inci. Fitting Accessories 1 LANTAI 1 a. PVC dia. 65 m 6.00 0.0015 b. PVC dia. 50 m 27.00 0.0052 c. PVC dia. 40 m 3.00 0.0005 d. PVC dia. 32 m 28.00 0.0042 TOTAL D. INSTALASI VENTILASI 0.0114 0.0000 0.0000 0.0000 E. INSTALASI AIR HUJAN Pengadaan dan pemasangan pipa Pipa PVC Kelas AW Inci. Fitting Accessories 1 SITE PLAN a. PVC dia. 100 m 48.00 0.0607 0.0000 0.0000 0.0000 2 LANTAI DASAR a. PVC dia. 100, Pipa tegak m 34.00 0.0430 0.0086 0.0000 20 20 0.0086 3 LANTAI 1 a. PVC dia. 100, Pipa tegak m 84.00 0.1063 0.0213 0.0000 20 20 0.0213 4 LANTAI 2 a. PVC dia. 100, Pipa tegak m 84.00 0.1064 0.0000 0.0000 0.0000 5 LANTAI 3 a. PVC dia. 100, Pipa tegak m 25.00 0.0316 0.0000 0.0000 0.0000 6 LANTAI 4 a. PVC dia. 100, Pipa tegak m 25.00 0.0316 0.0000 0.0000 0.0000 7 RUANG MESIN a. PVC dia. 100, Pipa tegak m 25.00 0.0316 0.0000 0.0000 0.0000 b. Roof Drain dia. 100 bh 4.00 0.0176 0.0000 0.0000 0.0000 TOTAL E. INSTALASI AIR HUJAN 0.4288 0.0299 0.0000 0.0299 MATERIAL BANTU lot1.00 0.0091 0.0000 0.0000 0.0000 TESTING COMMISSIONING lot1.00 0.0211 0.0000 0.0000 0.0000 TOTAL IV.1 PEKERJAAN PLAMBING 3.1177 0.0299 0.0000 0.0299 IV.3 INSTALASI TATA UDARA DAN SISTEM VENTILASI UDARA

A. PEMIPAAN 1 LANTAI 1

Pipa refrigerant dari pipa tembaga jenis L atau K isolasi armaflex dan duct tape, penyambungan dengan lassolder perak lengkap dengan peralatan bantu dan tambahan lainnya sesuai spesifikasi teknis, terpasang lengkap a. Pipa liquid dan Gas dia. 58 dan 1 38 m 65.00 0.0386 b. Pipa liquid dan Gas dia. 14 dan 12 m 6.00 0.0028 Pipa drain Pipa air buangan dari pipa PVC termasuk perlengkapan penyambungan fitting, isolasi dan peralatan bantu sesuai spesifikasi teknis, terpasang lengkap a. Pipa drain PVC-D, dia. 25 mm, diisolasi m 34.00 0.0046 b. Pipa drain PVC-D, dia. 20 mm, diisolasi m 6.00 0.0006 TOTAL A. PEMIPAAN 0.0466 0.0000 0.0000 0.0000 B. SALURAN UDARA Pemasangan saluran lengkap dengan peralatan bantu dan tambahan lainnya sesuai spesifikasi teknis dan gambar terpasang lengkap 1 LANTAI 1 SUPPLY DUCTING a. Saluran udara, 950 x 300 m 20.00 0.1218 b. Saluran udara, 800 x 300 m 2.00 0.0094 c. Saluran udara, 700 x 300 m 19.00 0.0810 d. Saluran udara, 600 x 300 m 14.00 0.0522 e. Saluran udara, 500 x 300 m 18.00 0.0521 f. Saluran udara, 300 x 300 m 14.00 0.0328 g. Saluran udara, 300 x 250 m 33.00 0.0713 h. Saluran udara, 250 x 250 m 74.00 0.1459 i. Saluran udara, 250 x 200 m 7.00 0.0129 j. Saluran udara, 200 x 200 m 16.00 0.0256 RETURN DUCTING a. Saluran udara, 850 x 300 m 5.00 0.0251 b. Saluran udara, 750 x 300 m 4.00 0.0183 c. Saluran udara, 600 x 300 m 1.00 0.0037 d. Saluran udara, 200 x 150 m 11.00 0.0146 e. Saluran udara, 150 x 150 m 5.00 0.0059 EXHAUST DUCTING a. Saluran udara, 250 x 250 m 19.00 0.0375 b. Saluran udara, 250 x 200 m 3.00 0.0055 c. Saluran udara, 150 x 150 m 12.00 0.0142 DIFFUSER GRILL a. Supply Air Diffuser SAD 300 x 300, 4 way + flexible ductbh 89.00 0.1287 b. Supply Air Grill SAG, 200 x 150 bh 2.00 0.0027 c. Exhaust Air Grillie EAG, 150 x 150 bh 8.00 0.0052 d. Return Air Grill RAG, 600 x 150 bh 64.00 0.0965 e. Return Air Grill RAG, 400 x 150 bh 18.00 0.0206 f. VD, 950 x 300 bh 2.00 0.0115 g. VD, 850 x 300 bh 2.00 0.0107 TOTAL B. SALURAN UDARA 1.0057 0.0000 0.0000 0.0000 MATERIAL BANTU lot1.00 0.0121 TESTING COMMISSIONING lot1.00 0.0242 TOTAL IV.3 PEKERJAAN TATA UDARA DAN SISTEM VENTILASI UDARA 1.0886 0.0000 0.0000 0.0000 TOTAL IV. PEKERJAAN INSTALASI MEKANIKAL 4.2063 0.0299 0.0000 0.0299

V. PEKERJAAN ELEKTRIKAL 5.1 PEKERJAAN PERALATAN PANEL

Pengadaan dan pemasangan peralatan komponen panel sbb, 1 SDP - PERPUSTAKAAN MCCB 3P, 800 A : 1 bh unit1.00 0.2496 MCCB 3P, 125 A : 7 bh MCCB 3P, 40 A : 1 bh MCB 3P, 25 A : 2 bh MCB 3P, 16 A : 2 bh MCB 1P, 6 A : 6 bh CT 800 5 A : 3 bh Indicator lamp : 3 bh Ampere meter : 3 bh Volt meter : 1 bh Selector switch : 1 bh KWH meter : 1 bh CU Bar : 1 lot Accessories Termination : 1 lot Box panel : 1 unit 2 DP - LANTAI 1 unit1.00 0.2085 MCCB 3P, 125 A : 1 bh MCB 1P, 10 A : 67 bh CT 125 5 A : 3 bh Indicator lamp : 3 bh Ampere meter : 3 bh CU Bar : 1 lot Accessories Termination : 1 lot Box panel : 1 unit 3 PP - AC LT1 unit1.00 0.0916 MCCB 3P, 150 A : 1 bh MCB 3P, 32 A : 5 bh MCB 3P, 16 A : 3 bh CT 150 5 A : 3 bh Indicator lamp : 3 bh Ampere meter : 3 bh CU Bar : 1 lot Accessories Termination : 1 lot Box panel : 1 unit 4 PP - POMPA unit1.00 0.0411 MCB 3P, 32 A : 1 bh MCB 3P, 16 A : 2 bh Indicator lamp : 3 bh Ampere meter : 3 bh CT 25 5 A : 3 bh CU Bar : 1 lot Accessories Termination : 1 lot Box panel : 1 unit 5 PP - POMPA TRANSFER 1 unit1.00 0.0405 MCB 3P, 16 A : 3 bh On Off Automan : 1 bh Indicator lamp : 3 bh Ampere meter : 3 bh CU Bar : 1 lot Accessories Termination : 1 lot Box panel : 1 unit 6 DP - SERVER unit1.00 0.0575 MCCB 3P, 125 A : 1 bh MCB 1P, 10 A : 15 bh Indicator lamp : 3 bh Ampere meter : 3 bh CT 125 5 A : 3 bh CU Bar : 1 lot Accessories Termination : 1 lot Box panel : 1 unit SUB TOTAL PEKERJAAN PERALATAN DAN PANEL 0.6888 0.0000 0.0000 0.0000 5.2 PEKERJAAN INSTALASI KABEL FEEDER Kabel Distribusi Daya dari SDP Perpustakaan : a. NYY 4 x 50 mm2 + NYA 25 mm2 ke DP - Lantai 1 m 29.00 0.1051 b. NYY 4 x 70 mm2 + NYA 35 mm2 ke PP - AC LT. 1 m 30.00 0.1468 c. NYY 4 x 6 mm2 + NYA 6 mm2 ke PP - POMPA m 12.00 0.0134 d. NYY 4 x 6 mm2 + NYA 6 mm2 ke DP - SERVER m 33.00 0.0367 SUB TOTAL PEKERJAAN INSTALASI KABEL FEEDER 0.3020 0.0000 0.0000 0.0000 5.3 PEKERJAAN ARMATUR LAMPU, SAKLAR STOP KONTAK 1 LANTAI DASAR a. Lampu TL SM 1 x 36 W bh 19.00 0.0218 b. Lampu TL SM 1 x 18 W bh 2.00 0.0021 c. Stop Kontak, 200 W bh 9.00 0.0023 d. Saklar ganda bh 3.00 0.0007 e. Saklar tunggal bh 2.00 0.0004 2 LANTAI 1 a. Lampu TL SM 1 x 36 W bh 332.00 0.2808 b. Lampu down light PLC 18 W bh 124.00 0.2094 c. Lampu baret 26 W bh 7.00 0.0063 d. Lampu down light HALOGEN 50 W bh 34.00 0.0739 e. Stop kontak, 200 W bh 107.00 0.0279 f. Saklar ganda bh 4.00 0.0009 g. Saklar tunggal bh 2.00 0.0004 h. Grid switch 8 gang bh 4.00 0.0179 i. Grid switch 12 gang bh 8.00 0.0377 j. Grid switch 16 gang bh 8.00 0.0430 k. Grid switch 18 gang bh 9.00 0.0580 SUB TOTAL PEKERJAAN LAMPU, SAKLAR STOP KONTAK 0.7835 0.0000 0.0000 0.0000 5.4 PEKERJAAN INSTALASI FINAL 1 LANTAI DASAR Pengawatan dari LP-LIGHTING LT DASAR a. NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk Lampu ttk 21.00 0.0360 b. NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W ttk 9.00 0.0183 c. NYY 3 x 2.5 mm2 untuk exhaust fan ttk 3.00 0.0042 Pengawatan dari PP-POMPA d. NYY 4 x 4 mm2 ke PP-POMPA TRANSFER 1 m 6.00 0.0014 e. NYY 4 x 2.5 mm2 + NYA 2.5 ke PP-STP m 22.00 0.0045 Pengawatan dari PP-POMPA TRANSFER 1 f. NYY 4 x 2.5 mm2 ke TP.1 dan TP.2 m 12.00 0.0016 2 LANTAI 1 Pengawatan dari LP-LIGHTING LT. 1 a. NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk Lampu ttk 497.00 0.8522 b. NYY 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W ttk 107.00 0.2175 Pengawatan dari PP-AC.1 c. NYY 4 x 6 mm2 untuk IUOU. 1-1 sd 1-5 ttk 5.00 0.0033 d. NYM 3 x 2.5 mm2 ke TP.1 dan TP.2untuk exhaust fan ttk 2.00 0.0028 SUB TOTAL PEKERJAAN INSTALASI FINAL 1.14180.0000 0.0000 0.0000

5.5 RAK KABEL

Pemasangan rak kabel beserta peralatan bantu lainnya sesuai spesifikasi teknis dan gambar, terpasang lengkap 1 LANTAI 1 a. Kabel tray ukuran 400 x 100 mm terpasang menggantung pada m 73.00 0.1647 langit-langit b. Under floor duct ukuran 100 x 80 mm m 72.00 0.0344 SUB TOTAL PEKERJAAN RAK KABEL 0.1991 0.0000 0.0000 0.0000 MATERIAL BANTU lot1.00 0.0181 TESTING COMMISSIONING lot1.00 0.0302 TOTAL V. PEKERJAAN ELEKTRIKAL 3.1635 0.0000 0.0000 0.0000 V.I PEKERJAAN ELEKTRONIK

5.6 PEKERJAAN FIRE ALARM 1 PERALATAN UTAMA

Pengadaan dan pemasangan peralatan sistem fire alarm di tempatkan di ruang kontrol secara lengkap termasuk pengkabelan dan koneksi meliputi peralatan sesuai diuraikan dalam gambar dan spesifikasi teknis, terpasang lengkap a. Panel kontrol utama sistem alarm MCFA konvensional 12 zone unit 1.00 0.4460 b. JBX-FA LT DASAR, LT. 1, Lt. 2 bh 3.00 0.1297 2 SISTEM FIRE ALARM Pengadaan dan pemasangan sistem alarm, berikut alat atau material bantu lainnya sesuai gambar dan spesifikasi LANTAI DASAR a. Rate of rise temp heat detector bh 5.00 0.0072 LANTAI 1 b. Smoke detector bh 11.00 0.0175 3 INSTALASI KABEL FEEDER FIRE ALARM Instalasi kabel feeder sistem alarm termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis a. Kabel dari MC-FA ke JBX- FA LT. DASAR, NYA 2 x 2.5 mm2 m 6.00 0.0005 b. Kabel dari MC-FA ke JBX- FA LT. 1, NYA 2 x 2.5 mm2 m 29.00 0.0025 4 INSTALASI DETECTOR FIRE ALARM Pemasangan instalasi sistem fire alarm termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai gmabar dan spesifikasi teknis LANTAI DASAR a. Kabel NYA 2 x 2.5 mm2 dari JBX-FA LT. DASAR ttk 5.00 0.0058 ke ROR Temp Heat Detector LANTAI 1 b. Kabel NYA 2 x 2.5 mm2 dari JBX-FA LT. 1 ke smoke detector ttk 11.00 0.0128 SUB TOTAL PEKERJAAN SISTEM FIRE ALARM 0.6220 0.0000 0.0000 0.0000 5.7 PEKERJAAN SISTEM TELEPON 1 PERALATAN UTAMA pengadaan dan pemasangan peralatan distribusi untuk sistem telepon dan ijin berikut alat material bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis a. PABX Telephone 430 unit1.00 0.5437 b. MDF-TP 50 Pairs unit1.00 0.0053 c. PC Computer + Printer unit 1.00 0.0571 d. Power Surge Arrester unit 1.00 0.0076 e. UPS Back UP 15 Mnts unit 1.00 0.0463 f. Operator Console unit 1.00 0.0242 g. JBX-TELP LT. DASAR. LT. 1, LT. 2 unit3.00 0.0088 2 OUTLET TELEPON Pengadaan dan pemasangan outlet telepon, berikut alatmaterial bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis LANTAI DASAR a. Outlet telepon cw handset analog bh 3.00 0.0107 LANTAI 1 b. Outlet telepon cw handset analog bh 11.00 0.0390 3 INSTALASI KABEL FEEDER TELEPON Instalasi kabel feeder sistem telepon menggunakan kabel ITC termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis a. Kabel dari MDF ke JBX-TELP LT. DASAR, ITC 10 x 2 x 0.6 mm2 m 6.00 0.0011 b. Kabel dari MDF ke JBX-TELP LT. 1, ITC 10 x 2 x 0.6 mm2 m 29.00 0.0104 4 INSTALASI OUTLET TELEPON Pemasangan instalasi outlet telepon termasuk semua aksesoris, material alat bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis a. Kabel dari JBX-TELP LT DASAR ke outlet telepon ttk 3.00 0.0088 ITC 2 x 2 x 0.6 mm + PVC dia. 20 LANTAI 1 a. Kabel dari JBX-TELP LT 1 ke outlet telepon ttk 11.00 0.0320 ITC 2 x 2 x 0.6 mm + PVC dia. 20 SUB TOTAL PEKERJAAN SISTEM TELEPON 0.7950 0.0000 0.0000 0.0000 5.8PEKERJAAN RAK KABEL Pemasangan rak kabel beserta peralatan bantu lainnya, sesuai spesifikasi teknik dan gambar, terpasang lengkap LANTAI 1 a. Rak kabel Cable Tray hot dipgalvanised mild steel ukuran m 62.00 0.1263 300 x 100 mm terpasang menggantung di langit-langit SUB TOTAL PEKERJAAN RAK KABEL 0.1263 0.0000 0.0000 0.0000 MATERIAL BANTU lot1.00 0.0181 TEST COMMISSIONING lot1.00 0.0302 TOTAL V.I PEKERJAAN INSTALASI ELEKTRONIK 1.5916 0.0000 0.0000 0.0000 VI. PEKERJAAN GWT GROUND WATER TANK DAN RUMAH POMPA 1 GROUND WATER TANK a. Galian tanah m3 82.00 0.0202 0.0202 0.0000 100 100 0.0202 b. Pasir urug 10 cm m3 2.04 0.0045 0.0000 0.0000 0.0000 c. Lantai kerja 5 cm m3 1.02 0.0074 0.0000 0.0000 0.0000 d. Balok dan ring balk 30 x 30 beton K 350 m3 5.26 0.2819 0.0000 0.0000 0.0000 e. Kolom 30 x 30 beton K 350 m3 2.62 0.1492 0.0000 0.0000 0.0000 f. Dinding dasar, samping, penyekat, atas tebal 20 cm K 350 m3 22.98 1.3355 0.0000 0.0000 0.0000 g. Water profing counting m2 108.00 0.1044 0.0000 0.0000 0.0000 h. Keramik 30 x 30 DN putih m2 108.00 0.0906 0.0000 0.0000 0.0000 i. Manhole bh 2.00 0.0371 0.0000 0.0000 0.0000 j. Tangga monyet stainless steel bh 2.00 0.1571 0.0000 0.0000 0.0000 2 RUMAH POMPA PEKERJAAN STRUKTUR a. Kolom 2040 m3 0.96 0.0486 0.0000 0.0000 0.0000 b. Balok 1525 m3 1.01 0.0480 0.0000 0.0000 0.0000 c. Plat beton t. 12 cm m3 2.88 0.0989 0.0000 0.0000 0.0000 d. Lisplank 1050 m3 1.10 0.0378 0.0000 0.0000 0.0000 PEKERJAAN FINISHING a. Dinding hebel t. 10 cm MU-380 m2 42.00 0.0201 0.0000 0.0000 0.0000 b. Plesteran MU-100 dan acian MU-200 m2 84.00 0.0205 0.0000 0.0000 0.0000 c. Acian MU 200 t. 3 mm m2 84.00 0.0611 0.0000 0.0000 0.0000 d. Keramik 3030 DN putih m2 30.00 0.0252 0.0000 0.0000 0.0000 e. Balok lintel 10 x 15 m2 46.00 0.0112 0.0000 0.0000 0.0000 f. Plafond beton expose finishing m2 106.00 0.0771 0.0000 0.0000 0.0000 g. Cat dinding m2 84.00 0.0217 0.0000 0.0000 0.0000 h. Cat plafond dan lisplank m2 106.00 0.0238 0.0000 0.0000 0.0000 i. Waterprofing m2 30.00 0.0290 0.0000 0.0000 0.0000 PEKERJAAN ELEKTRIKAL DAN MEKANIKAL a. Lampu TL IDR 18 W bh 3.00 0.0025 0.0000 0.0000 0.0000 b. Stop kontak 200 W bh 3.00 0.0008 0.0000 0.0000 0.0000 c. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk lampu bh 3.00 0.0051 0.0000 0.0000 0.0000 d. NYM 3 x 2.5 mm2 + PVC Conduit dia. 20 untuk stop kontak 200 W bh 3.00 0.0061 0.0000 0.0000 0.0000 e. Stop kontak 200 W bh 3.00 0.0008 0.0000 0.0000 0.0000 f. Saklar seri bh 1.00 0.0002 0.0000 0.0000 0.0000 g. Saklar tunggal bh 1.00 0.0002 0.0000 0.0000 0.0000 h. Saluran air hujan dia. 10 cm AW Wavin m1 4.00 0.0051 0.0000 0.0000 0.0000 PEKERJAAN KUSEN DAN PINTU a. Pintu ruang pompa bh 1.00 0.1283 0.0000 0.0000 0.0000 b. Gril kecil 50 x 50 bh 4.00 0.1052 0.0000 0.0000 0.0000 c. Gril besar 50 x 150 bh 1.00 0.0407 0.0000 0.0000 0.0000 TOTAL VI. PEKERJAAN GWT DAN RUMAH POMPA 3.0059 0.0202 0.0000 0.0202 VII. PEKERJAAN DINDING TURAP BATU KALI a. Pasangan batu kali m3 84.97 0.6286 b. Siar batu kali m2 53.70 0.0838 TOTAL VII. PEKERJAAN DINDING TURAP BATU KALI 0.7124 0.0000 0.0000 0.0000 VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm a. Kabel tweist 3 x 70 mm dan 1 x 50 mm m1 100.00 0.2633 TOTAL VIII. PEMASANGAN KABEL SEMENTARA DARI PERPUSTAKAAN LAMA KE 0.2633 0.0000 0.0000 0.0000 SDP PERPUSTAKAAN KABEL TWEIST 3 x 70 mm, 1 x 50 mm

IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS

Pengadaan dan pemasangan sistem sesuai dengan gambar dan spesifikasi teknis 1 System elektrostatis dengan radius proteksi 150 meter lengkap dengan unit 1.00 0.4833 pipa galvanis dia. 2 setinggi 6 m dan NYY 50 mm2 dalam GIP dia. 50 mm 2 Pentanahan copper clad rod 1 x 12 m lengkap dengan bak kontrol unit 1.00 0.0665 ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 3 ohm kbl Coaxial TOTAL IX. PEKERJAAN PENANGKAL PETIR SYSTEM ELEKTROSTATIS 0.54980.0000 0.0000 0.0000

X. ROOF TANK KUBIKEL 2 KOMPARTEMEN

Type : RFP unit1.00 0.8892 Kap : 8,00 m3 Fiber rainforcement plastic, lengkap dengan dudukan kaki tangki air 2 m serta wc di tangki air dan accessories TOTAL X. PEKERJAAN TANK KUBIKAL 2 KOMPARTEMEN 0.8892 0.0000 0.0000 0.0000 JUMLAH TOTAL 100.0000 22.4399 8.3052 30.7451 PRESTASI MINGGU INI : 8.3052 PRESTASI SD AKHIR MINGGU LALU : 22.4399 PRESTASI SD MINGGU INI : 30.7451 RENCANA SD AKHIR MINGGU INI : 26.5291 SELISIH : 4.2159 : : BOBOT Bobot Bobot SD Minggu Lalu Minggu Ini Minggu Lalu Minggu Ini MINGGU INI I. PEKERJAAN PERSIAPAN DAN PENUNJANG 1 Pekerjaan pengukuran dan pemasangan bowplank m1 117.65 0.0882 0.0882 0.0000 100 100 0.0882 2 Pekerjaan pembersihan lokasi m2 3202.00 0.2050 0.2050 0.0000 100 100 0.2050 3 Direksikeet uk. 3,6 x 7,2 = 25,92 m2 m2 25.92 0.2392 0.2392 0.0000 100 100 0.2392 4 Pagar pengaman proyek m1 233.46 0.4485 0.4485 0.0000 100 100 0.4485 5 Air kerja lot1.00 0.0329 0.0148 0.0016 45 5 50 0.0165 6 Listrik kerja lot1.00 0.0424 0.0191 0.0021 45 5 50 0.0212 7 Foto proyek ls 3.00 0.0056 0.0025 0.0003 45 5 50 0.0028 8 Pekerjaan jalan masuk ke site m1 25.00 0.0260 0.0260 0.0000 100 100 0.0260 9 Pembuatan Dam sementara pekerjaan khusus diarea lot 1.00 1.1350 1.1350 0.0000 100 100 1.1350 kolom yang masuk ke area sungai SUB TOTAL PEKERJAAN PERSIAPAN DAN PENUNJANG 2.2228 2.1783 0.0040 2.1824 II. PEKERJAAN STRUKTUR A. PEK. TANAH 1 Galian tanah untuk pile cap dan tie beam m3 358.76 0.0824 0.0824 0.0000 100 100 0.0824 2 Urugan tanah kembali sisa galian m3 200.24 0.0220 0.0220 0.0000 100 100 0.0220 3 Urugan tanah dari luar proyek m3 155.00 0.1813 0.0907 0.0000 50 50 0.0907 4 Urugan pasir di bawah pile cap, tie beam dan plat tebal 10 cm m3 37.67 0.0839 0.0755 0.0000 90 90 0.0755 5 Lantai kerja tebal 5 cm dibawah pile cap, tie beam dan plat lantai m3 15.54 0.1123 0.1011 0.0000 90 90 0.1011 0.4819 0.3716 0.0000 0.3716

B. PEK. PONDASI

1 Pondasi tiang pancang minipile M25 segi empat K 500 m 2208.00 4.3459 4.3459 0.0000 100 100 4.3459 2 Potong tiang pancang ttk 184.00 0.1601 0.1601 0.0000 100 100 0.1601 3 Mobilisasi alat pancang unit 1.00 0.2439 0.2439 0.0000 100 100 0.2439 4 Pile cap P-1 60 x 60 x 60 m3 0.86 0.0381 0.0381 0.0000 100 100 0.0381 5 Pile cap P-2 135 x 60 x 65 m3 0.51 0.0289 0.0289 0.0000 100 100 0.0289 6 Pile cap P-4 135 x 135 x 85 m3 12.39 0.2937 0.2937 0.0000 100 100 0.2937 7 Pile cap P-8 190 x 210 x 120 m3 28.73 0.7225 0.7225 0.0000 100 100 0.7225 8 Pile cap P-9 210 x 210 x 120 m3 52.92 1.2152 1.2152 0.0000 100 100 1.2152 9 Pit lift - Lantai pit lift m3 5.12 0.1926 0.1926 0.0000 100 100 0.1926 - Dinding pit lift m3 4.00 0.1223 0.1223 0.0000 100 100 0.1223 10 Tie beam TB 1 40 x 60 m3 20.16 0.5360 0.5360 0.0000 100 100 0.5360 11 Tie beam TB 2 35 x 80 m3 11.14 0.3559 0.3559 0.0000 100 100 0.3559 12 Tie beam TB 3 35 x 80 m3 18.14 0.5794 0.5794 0.0000 100 100 0.5794 13 Tie beam TB 4 35 x 55 m3 9.24 0.2965 0.2965 0.0000 100 100 0.2965 14 Tie beam TB 5 20 x 45 m3 1.94 0.0869 0.0869 0.0000 100 100 0.0869 9.2179 9.2179 0.0000 9.2179 C. PEK. KONSTRUKSI BETON C.1 LANTAI DASAR ELV. -4.250 - ELV. +0.005 1 Kolom K1K 65 x 65 m3 39.04 1.5913 1.5913 0.0000 100 100 1.5913 2 Kolom K4 20 x 40 m3 0.67 0.0485 0.0485 0.0000 100 100 0.0485 3 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1432 0.1432 0.0000 100 100 0.1432 4 Kolom B1 40 x 80 m3 9.18 0.4347 0.4347 0.0000 100 100 0.4347 5 Kolom B2 35 x 75 m3 15.02 0.6032 0.6032 0.0000 100 100 0.6032 6 Kolom B3 50 x 80 m3 23.09 1.3886 1.3886 0.0000 100 100 1.3886 7 Kolom B5 35 x 75 m3 16.54 0.8125 0.8125 0.0000 100 100 0.8125 8 Kolom B6 45 x 45 m3 20.25 1.0681 1.0681 0.0000 100 100 1.0681 9 Kolom B7 30 x 45 m3 22.14 1.4178 1.4178 0.0000 100 100 1.4178 10 Kolom B8 25 x 45 m3 14.85 0.8984 0.8984 0.0000 100 100 0.8984 11 Kolom B9 20 x 40 m3 7.04 0.5313 0.5313 0.0000 100 100 0.5313 12 Kolom B9K 20 x 40 m3 11.52 0.9060 0.9060 0.0000 100 100 0.9060 13 Kolom B10 20 x 40 m3 7.68 0.5768 0.5768 0.0000 100 100 0.5768 14 Kolom B10K 20 x 40 m3 0.96 0.0755 0.0755 0.0000 100 100 0.0755 15 Plat lantai t. 80 mm ; elv. -4.250 m3 28.68 1.4163 0.8498 0.0000 60 60 0.8498 16 Plat lantai t. 150 mm ; elv. -4.250 m3 14.14 0.4433 0.4433 0.0000 100 100 0.4433 17 Plat lantai t. 12 cm ; elv. 0.05 m3 57.30 2.0915 2.0915 0.0000 100 100 2.0915 18 Plat tangga utama m3 1.83 0.0629 0.0000 0.0157 25 25 0.0157 19 Plat bordes tangga utama m3 0.29 0.0112 0.0000 0.0028 25 25 0.0028 14.5211 13.8805 0.0185 13.8990 C.2 LANTAI 1 ELV. +0.005 - ELV. +4.125 1 Kolom K1 d. 50 cm m3 21.72 1.1256 0.6754 0.4502 60 40 100 1.1256 2 Kolom K2 60 x 60 m3 18.14 0.9270 0.6953 0.2318 75 25 100 0.9270 3 Kolom K3 60x 60 m3 12.10 0.4713 0.2828 0.1885 60 40 100 0.4713 4 Kolom K4 20 x 40 m3 0.67 0.0489 0.0293 0.0196 60 40 100 0.0489 5 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1440 0.0864 0.0576 60 40 100 0.1440 6 Kolom B1 40 x 80 m3 12.24 0.5795 0.2318 0.3477 40 60 100 0.5795 7 Kolom B2 35 x 75 m3 19.85 0.7970 0.3188 0.4782 40 60 100 0.7970 8 Kolom B3 50 x 80 m3 30.60 1.8404 0.7362 1.1042 40 60 100 1.8404 9 Kolom B5K 35 x 75 m3 16.54 0.8224 0.3290 0.1645 40 20 60 0.4934 10 Kolom B6 45 x 45 m3 10.13 0.5390 0.2156 0.1078 40 20 60 0.3234 11 Kolom B7 30 x 45 m3 22.14 1.4332 0.5733 0.2866 40 20 60 0.8599 12 Kolom B8 25 x 45 m3 14.85 0.9092 0.3637 0.1818 40 20 60 0.5455 13 Kolom B9 20 x 40 m3 3.52 0.2689 0.1076 0.0538 40 20 60 0.1613 14 Kolom B9K 20 x 40 m3 5.76 0.4584 0.1834 0.0917 40 20 60 0.2750 15 Kolom B10 20 x 40 m3 6.68 0.5077 0.2031 0.1015 40 20 60 0.3046 16 Kolom B10K 20 x 40 m3 0.48 0.0382 0.0153 0.0076 40 20 60 0.0229 17 Plat lantai t. 12 cm ; elv. 4.125 m3 124.26 4.5995 0.0000 3.6796 80 80 3.6796 18 Plat tangga m3 1.83 0.0636 0.0000 0.0000 0.0000 19 Plat bordes tangga utama m3 0.29 0.0114 0.0000 0.0000 0.0000 15.5852 5.0467 7.5528 12.5995 C.3 LANTAI 2 ELV. +4.125 - ELV. +8.350 1 Kolom K1A d. 50 cm m3 14.16 0.7369 0.0000 0.1842 25 25 0.1842 2 Kolom K3A 55 x 55 m3 10.16 0.4242 0.0000 0.1061 25 25 0.1061 3 Kolom K4 20 x 40 m3 0.67 0.0491 0.0000 0.0123 25 25 0.0123 4 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1443 0.0000 0.0361 25 25 0.0361 5 Kolom B5 35 x 75 m3 16.54 0.8218 0.0000 0.2055 25 25 0.2055 6 Kolom B6 45 x 45 m3 10.13 0.5413 0.0000 0.1353 25 25 0.1353 7 Kolom B7 30 x 45 m3 22.14 1.4377 0.0000 0.3594 25 25 0.3594 8 Kolom B8 25 x 45 m3 14.85 0.9125 0.0000 0.2281 25 25 0.2281 9 Kolom B9 20 x 40 m3 3.52 0.2699 0.0000 0.0675 25 25 0.0675 10 Kolom B9K 20 x 40 m3 5.76 0.4600 0.0000 0.1150 25 25 0.1150 11 Kolom B10 20 x 40 m3 4.16 0.3173 0.0000 0.0793 25 25 0.0793 12 Kolom B10K 20 x 40 m3 0.48 0.0383 0.0000 0.0096 25 25 0.0096 13 Plat lantai t. 12 cm ; elv. 8.350 m3 62.16 2.3118 0.0000 0.5780 25 25 0.5780 14 Plat tangga m3 1.83 0.0638 0.0000 0.0000 0.0000 15 Plat bordes tangga utama m3 0.29 0.0114 0.0000 0.0000 0.0000 8.5403 0.0000 2.1163 2.1163 C.4 LANTAI 3 ELV. +8.350 - ELV. +12.550 1 Kolom K1B d. 35 cm m3 3.23 0.2366 2 Kolom K3B 55 x 55 m3 10.16 0.4246 3 Kolom K4 20 x 40 m3 0.67 0.0491 4 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1445 5 Kolom B4 25 x 35 m3 11.38 0.7388 6 Kolom B5 35 x 75 m3 16.54 0.8230 7 Kolom B6 45 x 45 m3 10.13 0.5420 8 Kolom B7 30 x 45 m3 22.14 1.4399 9 Kolom B8 25 x 45 m3 12.15 0.7479 10 Kolom B9 20 x 40 m3 3.52 0.2704 11 Kolom B9K 20 x 40 m3 5.76 0.4608 12 Kolom B10 20 x 40 m3 4.16 0.3179 13 Kolom B10K 20 x 40 m3 0.48 0.0385 14 Plat lantai t. 12 cm ; elv. 12.550 m3 40.20 1.4988 15 Plat tangga m3 1.83 0.0639 16 Plat bordes tangga utama m3 0.29 0.0114 7.8081 0.0000 0.0000 0.0000 RINCIAN PROGRES MINGGUAN PEKERJAAN GEDUNG PERPUSTAKAAN MINGGU KE 7 TANGGAL 19-25 OKTOBER SD MINGGU INI NO ITEM PEKERJAAN SATUAN VOLUME PEKERJAAN BOBOT TOTAL PROGRES KEMAJUAN PEKERJAAN C.5 LANTAI 4 ELV. +12.550 - ELV. +16.750 1 Kolom K1B d. 35 cm m3 3.23 0.2392 2 Kolom K3C d. 25 cm m3 1.65 0.1032 3 Kolom K4 20 x 40 m3 0.67 0.0445 4 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1449 5 Kolom B6 45 x 45 m3 10.13 0.5435 6 Kolom B7A 0.15 x 0.5 m3 9.75 0.7298 7 Kolom B8A 25 x 45 m3 12.15 0.7503 8 Kolom B9 20 x 40 m3 3.52 0.2713 9 Kolom B9K 20 x 40 m3 5.76 0.4624 10 Kolom B10 20 x 40 m3 4.16 0.3190 11 Kolom B10K 20 x 40 m3 0.48 0.0385 12 Plat lantai t. 12 cm ; elv. 16.750 m3 40.20 1.5049 13 Plat tangga m3 1.83 0.0641 14 Plat bordes tangga utama m3 0.29 0.0114 5.2270 0.0000 0.0000 0.0000 C.6 LANTAI LMR ELV. +16.750 - ELV. +21.250 1 Kolom K1B d. 35 cm m3 3.23 0.2397 2 Kolom K4 20 x 40 m3 0.67 0.0494 3 Kolom KL 20 x 40 x 40 Liftm3 2.02 0.1456 4 Kolom B6 45 x 45 m3 7.09 0.3829 5 Kolom B9 20 x 40 m3 3.52 0.2729 6 Kolom B9K 20 x 40 m3 5.76 0.4651 7 Kolom B10 20 x 40 m3 4.16 0.3208 8 Kolom B10K 20 x 40 m3 0.48 0.0388 9 Plat DAK t.12 cm ; elev. 21.250 m3 11.52 0.3958 2.3110 0.0000 0.0000 0.0000 C.7 LANTAI ATAP 1 Kolom KP9 Pipa baja 8 kg 10348.80 2.1757 2 Balok pipa d. 8 kg 14886.93 3.1298 3 Plat t. 14 mm kg 361.65 0.0516 4 Plat t. 8 mm kg 361.44 0.0515 5 Anchor Bolt d. 19 mm bh 64.00 0.0230 6 Cat ex. Kansai kg 25958.82 0.2196 5.6512 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN STRUKTUR 69.3437 28.5167 9.6876 38.2043 III. PEKERJAAN ARSITEKTUR A. LANTAI DASAR A.1 PEK. DINDING 1 Dinding hebel t. 10 cm + MU 380 m2 481.14 0.4738 2 Plesteran dinding MU 100 t. 10 mm m2 962.28 0.4604 3 Acian MU 200 t. 3 mm m2 962.28 0.2349 4 Kolom praktis 10 x 10 m 52.21 0.0380 5 Balok lintel 10 x 15 m 132.39 0.1224 6 Finishing kolom MU 200 m2 177.59 0.0433 7 Railing pagar pipa hitam finishing cat m 46.00 0.0708 8 Railing tangga pipa hitam finishing cat m 10.00 0.0154 1.4590 0.0000 0.0000 0.0000 A.2 PEK. LANTAI 1 Keramik 3030 DN putih m2 105.61 0.0898 2 Keramik 3030 DN putih tangga m2 21.69 0.0184 3 Stair nozing keramik 7 x 40 cm m 31.05 0.0260 0.1342 0.0000 0.0000 0.0000 A.3 PEK. KUSEN LENGKAP 1 SD1 unit1.00 0.0477 2 FD1 unit1.00 0.0260 3 ADW1 unit1.00 0.0394 4 ADW2 unit1.00 0.0609 5 ADW3 unit1.00 0.0675 6 ADW4 unit1.00 0.0578 7 BV1 unit4.00 0.0494 8 BV2 unit1.00 0.0103 9 BV3 unit1.00 0.0103 10 Handrall pagar type R-5 bh 1.00 0.2752 0.6445 0.0000 0.0000 0.0000 A.4 PEK. PLAFOND 1 Plafond beton expose finishing m2 105.61 0.0258 0.02580.0000 0.0000 0.0000 A.5 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 962.28 0.2163 2 Cat plafond beton expose Vinilex 3x m2 117.97 0.0305 3 Cat kolom dan balok m2 117.59 0.0399 0.2867 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR 2.5502 0.0000 0.0000 0.0000 B. LANTAI - 1 B.1 PEK. DINDING 1 Dinding hebel t. 10 cm + MU 380 m2 514.88 0.5164 2 Plesteran dinding MU 100 dan acian MU 200 m2 1029.76 0.5126 3 Acian MU 200 t. 3 mm m2 1029.76 0.2663 4 Keramik dinding 2025 KMWC m2 144.69 0.1664 5 Kolom praktis 10 x 10 m 55.87 0.0414 6 Balok lintel 10 x 15 m 141.67 0.1339 7 Finishing kolom MU 200 m2 244.79 0.0633 8 Railing tangga pipa hitam finishing cat m 82.00 0.1263 1.8266 0.0000 0.0000 0.0000 B.2 PEK. LANTAI 1 Floor hardener 3 kgm2 m2 40.50 0.0338 2 Lantai karpet koridor m2 340.00 0.8393 3 Keramik 3030 DN putih tangga m2 21.69 0.0189 4 Stair nozing keramik 7 x 40 cm m 31.05 0.0260 5 Keramik 2020 KMWC m2 32.09 0.0287 0.9467 0.0000 0.0000 0.0000 B.3 PEK. KUSEN LENGKAP 1 AD3 unit3.00 0.0775 2 AD4 unit2.00 0.1028 3 FD1 unit5.00 0.1311 4 PVC unit5.00 0.0417 5 Partisi gypsum rangka metal stud galvalume m2 30.60 0.0382 6 ADW5 m2 2.00 0.3278 7 AW2 bh 5.00 0.8384 8 AD2 bh 2.00 0.2191 9 Handrall pagar type R-1 bh 5.00 0.2755 10 Handrall pagar type R-2 bh 2.00 0.1024 2.1545 0.0000 0.0000 0.0000 B.4 PEK. PLAFOND 1 Plafond gypsum + rangka m2 196.00 0.2302 2 Plafond acoustik + rangka m2 159.00 0.1502 0.3804 0.0000 0.0000 0.0000 B.5 PEK. SANITAIR 1 Closed duduk ex TOTO bh 5.00 0.1259 2 Washtafel LW 230 J bh 6.00 0.0858 3 Urinoir bh 3.00 0.0680 4 Jet spray bh 3.00 0.0146 5 Floor drain bh 6.00 0.0096 6 Kaca cermin ukuran 2600 x 1200 mm tinggi bh 2.00 0.0063 0.3102 0.0000 0.0000 0.0000 B.6 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 1152.16 0.2701 2 Cat plafond beton kaisiboard Vinilex 3x m2 196.00 0.0537 3 Cat kolom m2 244.79 0.0574 0.3812 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 1 5.9996 0.0000 0.0000 0.0000 C. LANTAI - 2 C.1 PEK. KUSEN LENGKAP 1 Partisi gypsum rangka metal stud galvalume m2 96.16 0.1208 2 ADW5 unit1.00 0.1644 3 ADW5 unit1.00 0.1644 4 AW2 unit5.00 0.8384 5 Tanggulan dudukan kusen Almunium m1 68.20 0.1188 6 Handrall pagar type R-1 bh 5.00 0.2755 7 Handrall pagar type R-2 bh 2.00 0.1023 1.7846 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 2 1.7846 0.0000 0.0000 0.0000 D. PEK. LANTAI - 3 D.1 PEK. KUSEN LENGKAP 1 Partisi gypsum rangka metal stud galvalume m2 96.18 0.1212 2 ADW5 unit1.00 0.1646 3 ADW5 unit1.00 0.1646 4 AW2 unit5.00 0.8384 5 Tanggulan dudukan kusen Almunium m1 68.20 0.1188 6 Handrall pagar type R-1 bh 5.00 0.2755 7 Handrall pagar type R-2 bh 2.00 0.1023 1.7854 0.0000 0.0000 0.0000 D.2 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 161.72 0.0387 2 Cat kolom luar Vinilex 3x m2 55.30 0.0132 0.0519 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 3 1.8373 0.0000 0.0000 0.0000 E. LANTAI - 4 E.1 PEK. KUSEN LENGKAP 1 AW2 bh 7.00 1.1737 2 ADW6 bh 1.00 0.1646 3 Partisi gypsum rangka metal stud galvalume m1 65.58 0.0824 4 Tanggulan dudukan kusen Almunium m1 37.00 0.0644 5 Handrall pagar type R-5 bh 1.00 0.2751 E.2 PEK. PENGECATAN 1 Cat dinding Vinilex 3x m2 131.16 0.0314 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - 4 1.7916 0.0000 0.0000 0.0000 F. LANTAI - RUANG MESIN F.1 PEK. LANTAI 1 Floor hardener 3 kgm2 m2 105.61 0.0883 SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI - RUANG MESIN 0.0883 0.0000 0.0000 0.0000 SUB TOTAL PEKERJAAN ARSITEKTUR 14.0516 0.0000 0.0000 0.0000 IV. PEKERJAAN MEKANIKAL IV.1 PEKERJAAN INSTALASI PLAMBING