Community Representative Observers CRO Third Party Monitoring TPM

Western I ndonesia National Roads I mprovement Project 6 - 9  The first stage of monitoring field visit by TPM for package 16 Seblat Ipuh in Bengkulu Province.  The second stage of monitoring field visit by TPM for package 13 simpang Rukis Tanjung Kemuning in Bengkulu Province.

6.4 Road Safety Audit

6.4.1 Activities during This Month June 2017

The Road Safety activities of this month is: 1. Regularly Road Safety Design check at the office.

6.4.2 Current status of the project for technical field as of June 2017

The Details of Program of Road Safety Audit as of the end of June 2017 are shown in the table on Appendix B.

6.5 Management Information System

In relation to the compilation of the Project Completion Report PCR we will compile all documents and reports following the code system that divides project activities into 3 main components already in operation: • Component 1: Civil Works • Component 2: Consulting Services • Component 3: Technical Assistant Documents and reports are collected in hardcopy and soft files, where both forms use the same coding system, making it easier to archive the files. The hardcopy will be collected in the File Box Storage, and the soft file will be stored in an external hard drive. Hard copy collection has started now until the end of CTC-WINRIP contract. This activity is carried out periodically in accordance with the availability of documents and reports. Regarding to document update, the DMS application is still online well. And upload activities into the DMS database continues as usual. Then number of files that have been uploaded to increase rapidly. The data that has been uploaded to the DMS database until the end of June 2017 are: 796 records of letters and 457 records of documents.

6.5.1 DMS Statistic

Today the DMS application already stored many file of Letters and Documents. And the next days will be more files are stored in the DMS database. At the end, it is expected to store all Western I ndonesia National Roads I mprovement Project 6 - 10 10 20 30 40 50 60 70 7 38 66 33 15 13 6 8 18 10 28 8 Document Statistic Sorted by Document Type Document Type of files that related with WINRIP project. Below is the number of Letter files that have been stored in DMS database, updates until the end of June 2017. This Letter statistics have sorted by Package. 10 20 30 40 50 60 70 P1 K ru i - B ih a P2 P ad an g Sa w ah - Sp E m pa t P3 M an gg op oh - Pa da ng S aw ah P4 Ip uh - B an ta l P5 S p R am pa - Po ria ha P6 P as ar P ed at i - K er ka p P7 In dr ap ur a - T ap an P8 B ts K ot a Pa ria m an - M an gg op oh P9 R an ta u Tij an g - K ot a A gu ng P1 Sp E m pa t - S p A ir B ala m P1 1 B an ta l - M uk om uk o P1 2 Ka m ba ng - In dr ap ur a P1 3 Sp R uk is - Tj K em un in g P1 4 Pa in an - Ka m ba ng P1 5 Sib olg a - B at as T ap se l P1 6 Se bla t - I pu h P1 7 Sp G n Ke m ala - Pg T am pa k P1 8 M uk om uk o - B ts S um ba r P1 9 La is - B in tu na n P2 Lu bu k A lu ng - Sic in cin P2 1 Lu bu k A lu ng - Ku ra it aj i W IN R IP 36 28 61 25 15 17 11 7 6 16 12 12 6 8 5 4 14 2 2 66 Package Letter Statistic Sorted by Package And here are the number of Document files that have been stored in DMS database, updates until the end of June 2017. This Document statistics have sorted by Document Type. 6.6 Quality Assurance In the month June, 2017 the Quality Assurance Engineer has not visited to site. QA monitored the follow-up report of TFAC findings package 20, package 21 and package 14. For package 20 already approved by informal by WB on June 5,2017, package 21 approved by WB informal on June 15,2017 while package 14 has not been approved. In June, 2017 also