WINRIP DOC MPR CTC MPR No.51 2017 03 20170331 00480
Monthly Progress Report No. 51
Covering Project Activities During
(2)
PT. PERENTJANADJAJA in sub consultancy with • Yongma Engineering Co. Ltd and iiPT. Epadascon Pennata Engineering ConsultantzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA CTCOffice:JI.Ciniru VII No. 25, Kebayoran Baru, Jakarta Selatan, 12180
Phone /Fax: (021) 7229823 Team Leader
Cc:
1. Direktur Jenderal Bina Marga
2. InspektoratJenderal, Kementerian PU-PERA 3. DirekturTransportasi - Bappenas
4. Direktur Pengelolaan Kas Negara (PKN), KementerianKeuangan 5. Direktur PengembanganJarinqan Jalan, DitJen Bina Marga
6. Direktur Jalan Bebas Hambatan, Perkotaan dan Fasilitasi Jalan Daerah, DitJen Bina Marga 7. Direktur PembangunanJalan, DitJen Bina Marga
,8. Direktur Preservasi Jalan, DitJen Bina Marga 9. Biro Perencanaan&KLN, Kementnan PU-PERA
10. Kepala Balai Besar PelaksanaanJalan-Nastonal Il Medan 11. Kepala Balai Besar PelaksanaanJalan Nasional ll! Padang 12. Kepala Balai Besar PelaksanaanJalan NasionalV Palembang 13. Kasubdit Keterpaduan Perencanaan&Sistem Jaringan, DPJJ - DJBM 14. Ketua Pelaksana Hanan PIU WINRIP
15. Kepala Satker PembinaanAdministrasi dan Pelaksanaan PengeridalianPHLN 16. PT: Perentjana Djaja
17. Yongma Engineenng Co, Ltd
18. PT. Epadascon Pennata EngineenngConsultant 19. Fil~
Should you have any comment or additional informatioh that need to be incorporated in the Report, please feel free to get in touch with us.
This Report is reproduced in twenty (20) copies for distributionto all concernedauthorities.
In compliance with the Terms of Reference of our Consultancy Contract, we submit herewith the Monthly Progress Report NO.51coverinq the month of March 2017.
Dear Sir,
Subject : Submission of March 2017 Monthly Progress Report No.51; WINRIP Loan IBRD No.8043-ID
Attention: Andria Muharami Fitra, ST. M.Eng Officer In Charge PMU WlNRIP Directorate General of Highways, MPWH JI. Patimura 20 Kebayoran Baru
Jakarta Selatan Indonesia
Jakarta,Apnl07,2017 : 03_02/LHW /O/M-03.2017
Our Ref.No.
Perentjana Djaja
MINISTRY
OF PUBLIC WORKS
8t
HOUSING
DIRECTORATE
GENERAL
OF HIGHWAYS
DIRECTORATE OF ROAD NETWORK DEVELOPMENT Core Team Consultant for
Western Indonesia National Roads Improvement Project (WIN RIP) IBRO Loan No. 8043-10
(3)
(4)
Table of Contents
1 EXECUTIVE SUMMARY... 1-1
1.1 Current Implementation Situation...1-1 1.2 Disbursement...1-4 1.3 World Bank Implementation Review Mission and Site Visit...1-5 1.4 Procurement of Civil Works Contract Under Category 1 of the Loan Agreement...1-5
2 PROJECT DESCRIPTION ... 2-1
2.1 Background...2-1 2.2 Project Development...2-1 2.3 Project Objective ...2-6
3 CONSULTANCY SERVICES ... 3-1
3.1 CTC Consultants ...3-1
3.1.1 Scope of Services ... 3-1
3.1.2 CTC Manning ... 3-2
3.1.3 CTC Contract... 3-3
3.2 DSC Consultants...3-6 3.3 Technical Assistance for Development of Slope Stabilization, Design and Management...3-74 CIVIL WORKS... 4-1
4.1 Detailed Design Preparation...4-1 4.2 Procurements ...4-1 4.3 Civil Works Implementation ...4-1 4.4 Civil Works Progress...4-3 4.5 Quality Assurance...4-7 4.6 Environmental and Social Considerations...4-10
4.6.1 Current Overall Situation... 4-10
4.6.2 Environmental and Social Issues... 4-11
4.7.1 Anti Corruption Action Plan (ACAP) ... 4-27
4.7.2 Community Representative Observers (CRO)... 4-27
4.7.3 Publication / Disclosure ... 4-28
4.7.4 Complaints Handling Mechanism (CHS) ... 4-29
4.7.5 Third Party Monitoring (TPM)... 4-30
4.8 Road Safety Audit ...4-305 FINANCIAL & MANAGEMENT INFORMATION SYSTEMS ... 5-1
5.1 Draw Downs and Future Costs...5-1 5.2 Disbursement...5-1 5.3. Management Information System ...5-1
(5)
6 PROJECT PERFORMANCE ... 6-1
6.1 World Bank and GOI Compliance ...6-1
6.1.1
World Bank Missions ... 6-1
6.1.2 Agreed Key Actions and Mission Plans during Recent World Bank Mission ... 6-1
6.2 Implementation Support Components...6-56.2.1 Core Team Consultant (CTC)... 6-5
6.2.2 Design and Supervision Consultant (DSC)... 6-5
6.2.3 Study on Development of Slope Stabilization Design and Management... 6-6
6.3 Anti Corruption Issues ...6-66.3.1 Anti-Corruption Action Plan (ACAP) ... 6-6
6.3.2 Community Representative Observers (CRO)... 6-7
6.3.3 Third Party Monitoring (TPM) ... 6-7
6.3.4 Complaint Handling System (CHS)... 6-8
6.3.5. Public Disclosures / Publication... 6-8
6.4 Road Safety Audit ...6-96.4.1 Activities during This Month ( March 2017) ... 6-9
6.5 Management Information System ...6-10 6.6 Quality Assurance...6-14 6.7 Project Risks and Mitigation Measures...6-146.7.1 Risks Related to Delays ... 6-14
6.7.2 Financial Risks... 6-14
6.7.3 Risks Related to Quality ... 6-14
6.8 Training to Support Project Implementation...6-157 CURRENT ISSUES AND FOLLOW-UP ACTIONS ... 7-1 8 CORRESPONDENCES ... 8-1
(6)
ABBREVIATIONS AND ACRONYMS
ACAP : Anti Corruption Action Plan
AER : Application Evaluation Report
AIP : Australian Indonesia Partnership
AMDAL : Environmental Management (Analisis Mengenai Dampak
Lingkungan)
ANDAS : Analisis Dampak Sosial
AWPs : Annual Work Programs
Balai : Regional Office for National Roads Implementation
BAPPENAS : Badan Perencanaan Pembangunan Nasional (National
Development Planning Agency of GOI)
Bappedalda : Regional Environmental Impact Agencies
BBPJN : Balai Besar Pelaksanaan Jalan Nasional (Regional Office for
National Roads Implementation)
BER : Bid Evaluation Report
BLH : Badan Lingkungan Hidup
BPK : Badan Pemeriksaan Keuangan (Audit Board of the Government
of Indonesia)
CAD : Computer Aided Design
CHS : Complaint Handling System
CTC : Core Team Consultant
CHU : Complaint Handling Unit
CRO : Community Representative Observer ( = WPM)
DIA : Directorate of Implementing Affairs
DRND : Directorate of Road Network Development
DGH : Directorate General of Highways
DMS : Document Management System
DRP : Directorate Road of Preservation
DMS : Document Management System
DSC : Design and Supervision Consultants
EA : Executing Agency
EINRIP : Eastern Indonesian National Roads Improvement Project
EIRTP-1 : Eastern Indonesia Regional Transport Project First Project
ESAMP : Environmental and Social Assessment Plan
ESS : Environmental and Social Safeguards
FMIS : Financial Management Information System
(7)
FMIS : Financial Management Information System
GIS : Geographic Information System
GOI : Government of Indonesia
IA : Implementation Agency
IBRD : International Bank for Reconstruction and Development
IFR : Interim Financial Report
IRMS : Integrated Road Management System
Kabupaten : Regency
KPIs : Key Performance Indicators
KPPN : Kantor Pelayanan Perbendaharaan Negara (Indonesian: State
Treasury Service Office)
LAN : Local Area Network
LARAP : Land Acquisition and Resettlement Plan (Rencana Tindak
Pengadaan Tanah dan Pemukiman Kembali)
MIS : Management Information System
MOF : Ministry of Finance
MPW H : Ministry of Public Work & Housing
MPRs : Monthly Progress Reports
P2JN : Perencanaan Pengawasan Jalan dan Jembatan Nasional
PDF : Portable Document Format
PMU : Project Management Unit
PAPs : Project Affected Peoples
PMM : Project Management Manual
PMU : Project Management Unit (WINRIP)
POKJA : Bina Marga Project Managers and Procurement Committes
PPC : Project Preparation Consultants
PP3 : Pemantau Pihak ke 3
PPK : Sub Project Manager
PPR : Project Progress Report
QPRs : Quarterly Progress Reports
RKL/RPL : Rencana Pengelolaan/Pemantauan Lingkungan
RS : Road Safety
Satker : Satuan Kerja (Work Unit for Road Project Implementation)
SPPL : Surat Pernyataan Pengelolaan Lingkungan
(8)
TOR : Terms of Reference
UKL/UPL : Upaya Pengelolaan Lingkungan / Upaya Pemantauan Lingkungan
(Site Specific Environmental and Monitoring Plan)
WINRIP : Western Indonesia Roads Improvement Project
WB : World Bank
WP : Work Program
WPs : Works Programs
WPM : Wakil Pengamat dari Masyarakat (or Community Representative
(9)
APPENDICES
Appendix A
:
Overall Loan Progress
Appendix B
:
Road Safety Audit Progress
Appendix C
:
Financial Progress
Appendix D
:
Quality Assurance Progress
Appendix E
:
Environmental and Social Progress
Appendix F
:
Procurement Plan and Progress
Appendix G
:
WINRIP Website Progress
Appendix H
:
ACAP Training/Dissemination Progress
Appendix I
:
Performance Indicator
Appendix J
:
Correspondences
ANNEXES
Annex P-1
:
Package No. 1
Annex P-2
:
Package No. 2
Annex P-3
:
Package No. 3
Annex P-4
:
Package No. 4
Annex P-5
:
Package No. 5
Annex P-6
:
Package No. 6
Annex P-7
:
Package No. 7
Annex P-8
:
Package No. 8
Annex P-11
:
Package No. 11
Annex P-12
:
Package No. 12
Annex P-13
:
Package No. 13
Annex P-14
:
Package No. 14
Annex P-15
:
Package No. 15
Annex P-16
:
Package No. 16
Annex P-17
:
Package No. 17
Annex P-19
:
Package No. 19
Annex P-20
:
Package No. 20
Annex P-21
:
Package No. 21
(10)
1
EXECUTIVE SUMMARY
1.1 Current Implementation Situation
Civil Works
Implementation of the WINRIP Project is scheduled to be implemented into three (3) Annual Work Programs (AWP s). The implementation starts with the preparation of tender documents (detailed design drawings including associated bidding documents), tendering stage (procurement of works) and the actual civil works construction implementation.
The original implementation schedules of the three (3) Annual Work Programs (AWPs) are scheduled in three (3) phases namely; AWP-1 to start in mid-2011 and to be completed on the last quarter of 2014, AWP-2 is expected to begin in mid 2012 with target date of completion by mid-2016 and AWP-3 is expected to start during the early part of 2013 and to be completed during the middle part of 2017.
However, due to some unavoidable circumstances the original implementation schedules did not materialize.
Based on the present status of the program implementation progress, a revised implementation
schedule, the Project Implementation Timeline (as shown onPage 1-2) is to be implemented in
order to accommodate the originally delayed schedule into the remaining time frame of the
WINRIP Program until the expiry date of the loan agreement by the end ofDecember 2017. Shown
on Page 1-3 is the current actual status of the implementation relative to the Project Implementation Timeline .
Implementation Status as of March 31, 2017
Pack
Package Name Contract Under Under Defect LiabilityPeriod
No. Sign Construct
1 Krui - Biha √ Completed √
2 Padang Sawah - Sp.Empat √ Completed √
3 Manggopoh - Padang Sawah √ Completed √
4 Ipuh - Bantal √ Completed √
5 Sp. Rampa - Poriaha √ √
6 Ps. Pedati - Kerkap √ Completed √
7 Indrapura - Tapan √ √
8 Bts.Pariaman - Manggopoh √ √
11 Bantal - Mukomuko √ √
12 Kambang - Indrapura √ √
13 Sp. Rukis - Tj.Kemuning √ √
14 Painan - Kambang √ √
15 Sibolga - Bts.Tap Sel √ √
16 Seblat - Ipuh √ √
17 Sp.Gn.Kemala - Pg.Tampak √ √
19 Lais - Bintunan √ Completed √
20 Lubuk Alung - Sicincin √ √
21 Lubuk Alung - Kuraijati √ √
T O T A L : 18 12 6
Note: Package No.9 (Rantau Tijang Kota Agung) and Package No.18 (Mukomuko Bts. Sumbar) are cancelled from the program. Package No.10 Sp.Empat-Sp.Air Balam is proposed to be cancelled
(11)
Length C'ti on
Km Peri od J N D J F M AM J J A S O N D J F M A M J J A S O N D J F M AM J J A S O N D J F M AM J J A S O N D J F M AM J J A S O N D J F M AM J J A S O N D
1 Krui - Biha 25,00 21 mth
2 Padang Sawah - Sp.Em pat 40,90 24 mth
3 Manggopoh - Padang Sawah 32,00 24 mth
4 Ipuh - Bantal 42,40 24 mth
5 SI MPANG RAMPA - PORI AHA 11,10 18 mth
11 BANTAL - MUKOMUKO 50,10 24 mth
13 SP RUKIS - TJ KEMUNING 56,30 24 mth
17 Sp.Gn.KEMALA - Pg. TAMPAK 36,80 24 mth
6 PS. PEDATI - KERKAP 25,00 15 mth
19 LAI S - BI NTUNAN 11,60 10 mth
15 SI BOLGA - BATAS TAPSEL 36,00 27 mth
7 I NDRAPURA - TAPAN 19,50 21 mth
8 BTS.Kt PARI AMAN-MANGGOPOH 46,80 24 mth
10 SI MPANG EMPAT - SP.AI R BALAM 61,70 24 mth
12 KAMBANG - I NDRAPURA 55,20 24 mth
14 PAI NAN KAMBANG 31,50 21 mth
16 SEBLAT I PUH 34,50 21 mth
20 LUBUK ALUNG SI CI NCI N 14,60 18 mth
21 LUBUK ALUNG KURAI TAJI 16,80 18 mth
9 RANTAU TI JANG-KOTA AGUNG 42,00 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program 18 MUKOMUKO-BTS SUMBAR 25,80 The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
Original target : 715,60 km ENVIRONMENT & SOCIAL SAFEGUARD
Revised target : 640,00 km Prequalification Detail Eng Design LARAP Study
Road Safety Owner's Estimate Appraisal & Public Consultation
Procurement & Sign Contr Bid Document LARAP Implementation
Preparation for Commencement of Work
CONSTRUCTION CONSTRUCTION COW PROC COW PROC COW PROC CONSTRUCTION
To Be Cancelled
PROC COW
Pack
# PACKAGE NAME
2012 2013 2014 2015 2016 2017 2018
CONSTRUCTION
PROC COW
Review DED & RS
Review DED & RS
Review DED & RS Review DED & RS
Review DED & RS PQ
CONSTRUCTION
Review DED & RS PQ PROC COW
Review DED & RS PQ
COW CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
DED RSA & REVISED DED OE & BD DED RSA & REVISED DED OE & BD
SBD & OE + BD
OE & BD
DED RSA & REVISED DED OE & BD
PROC RSA & REVISED DED
CONSTRUCTION PQ RS Proc COW OE BD DED Rev-DED RS
DED Rev-DED RS PROC COW
PROC COW PROC COW CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION Rev-DED RS DED COW PROC COW CONSTRUCTION
OE & BD DED Rev-DED RS OE & BD
OE & BD
DED OE & BD
COW
CONSTRUCTION SBD & OE + BD
SBD & OE + BD
PQ PROC
PROC
CONSTRUCTION
DED
Project Timeline Schedule
(12)
Actual Implementation Timeline of WINRIP
Length C'tionKm Period J N DJ F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N DJ F M A M J J A S O N D
Core Team Consultant (CTC) 40 mth IMPLEMENTATION Time extension for sevices
Design & Supervision Cslt (DSC) 42 mth IMPLEMENTATION Time extension for sevices
TA for Dev.of Slope Stabilization, Design & M anagement
1 Krui - Biha 25,00 21 mth 8 Jan'14
2 Padang Sawah - Sp.Empat 40,90 24 mth 6 Jan'14
3 Manggopoh - Padang Sawah 32,00 24 mth 6 Jan'14
4 Ipuh - Bantal 42,40 24 mth 10 Jan'14
5 SIMPANG RAMPA - PORIAHA 11,10 18 mth 18 Jun'15 20 Jul'16
11 BANTAL - MUKOMUKO 50,10 24 mth 23 Feb'15 26 May'17
13 SP RUKIS - TJ KEMUNING 56,30 24 mth 10 Jul'17
17 Sp.Gn.KEMALA - Pg. TAMPAK 36,80 24 mth 04 Sep'15 23 Agt'17
6 PS. PEDATI - KERKAP 25,00 15 mth 11 Mar'15 28 Jan'17
19 LAIS - BINTUNAN 11,60 10 mth 11 Mar'15 CONSTRUCTION 300+125+53 days 30 Jun '16
15 SIBOLGA - BATAS TAPSEL 36,00 27 mth 20 Nov'15 31 Dec'17
7 INDRAPURA - TAPAN 19,50 21 mth 10 Dec'15 30 Agt'17
8 BTS.Kt PARIAMAN-MANGGOPOH 46,80 24 mth PROC 23 Mar'16 31 Dec'17
10 SIMPANG EMPAT - SP.AIR BALAM 61,70 24 mth
12 KAMBANG - INDRAPURA 55,20 24 mth 31 Dec'17
14 PAINAN KAMBANG 31,50 21 mth PROC 13 Aug'16 31 Dec'17
16 SEBLAT IPUH 34,50 21 mth 08 Nov'16 30 Jul'18
20 LUBUK ALUNG SICINCIN 14,60 18 mth 1 Sep'16 31 Dec'17
21 LUBUK ALUNG KURAITAJI 16,80 18 mth 1 Sep'16 31 Dec'17
Original target : 715,60 km ENVIRONMENT & SOCIAL SAFEGUARD
1st Revised target : 640,00 km Prequalification Detail Eng Design LARAP Study
2nd Revised target : 586,10 km Road Safety Owner's Estimate Appraisal & Public Consultation Procurement & Sign Contr Bid Document LARAP Implementation Preparation for Commencement of Work
Standard Biding Document
Review DED & RS PQ Review DED & RS PQ
PQ
Review DED & RS Review DED & RS
PROC
CONSTRUCTION 720 days CONSTRUCTION 720 days
22-Jul-15 PQ PROC ICB ICB ICB ICB ICB ######### CONSTRUCTION 640 + 93 days
14-Apr-16
PROC
17-Mar-16
CONSTRUCTION 540 + 224 days CONSTRUCTION 730 + 105 days
CONSTRUCTION 730 + 75 days
CONSTRUCTION 730 + 90 days 31-Mei-16
Pack
# PACKAGE NAME
2012 2013 2014 2015 2016 2017 2018
PQ RS Proc COW SBD DED OE BD DED NCB NCB DED NCB NCB NCB
Review DED & RS
Review DED & RS SBD & OE + BD
RSA & REVISED DED OE & BD DED RSA & REVISED DED OE & BD
SBD & OE + BD
DED RSA & REVISED DED OE & BD
DED
ICB RSA & REVISED DED OE & BD Review DED & RS
SBD & OE + BD 6-Nov-12 19-Jun-13 PROC PROC DED Rev-DED RS ICB ICB NCB NCB DED PROC
CONSTRUCTION 720 + 104 days ICB
ICB
ICB
ICB
PROC
CONSTRUCTION 810 - 37 days
DED
CONSTRUCTION 630 days
23-Mei-16 CONSTRUCTION 720 - 132 days
31-Des-17
31-Des-17
PROC
PROC
to be canceled CONSTRUCTION 720 - 71 days
Rev-DED RS
Rev-DED RS
Rev-DED RS
31-Des-17
PROCUREMENT IMPLEMENTATION
CONSTRUCTION 450+240 days
CONSTRUCTION 540 - 53 days CONSTRUCTION 540 - 53 days CONSTRUCTION 630 - 114 days
(13)
1.2 Disbursement
Loan Allocation and Percent (%) Disbursement To Date
#REF! 1.25
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00
Month
%
Co
m
p
le
te
Actual Expenditure USD 102.92 mil (41.17%) WINRIP ACTUAL PROGRESS UP TO FEBRUARY 2017 AND FORECAST UP TO JUNE 2018
ACTUAL Feb 2017
Original Forecast Forecast Expenditure RevUSD78.38 mil
(31.35%) Forecast Feb 2017
Deviation = + 9.82 %
The total disbursement summary from the loan by The World Bank to the end of March 2017
was USD 105,584,628.95equivalent to approximately42.23%of the loan funds. The following
table summarizes the individual disbursements as calculated by CTC but retaining the total
disbursement from Client Connection at the end of March 2017. Appendix A shows the
Overall Loan Progress Status.
Category Description
Loan Restructuring
Amount US$
Disbursement This Period
Previous Disbursement
Totals Disbursed to End Mar 2017
in US$
% Disbursed
1
Part 1Betterment and Capacity Expansion of
National Roads.
220,400,000.00 2,663,049.84 96,131,473.28 98,794,523.12 44.83
2 Part 2
Implementation Support 17,000,000.00 0 6,790,105.83 6,790,105.83 39.94
3
Part 3
Road Sector Institutional Development
0 0 0 0 0
4
Part 4
Contingency for Disaster Risk Response
0 0 0 0 0
Unallocated 12,600,000.00 0 0 0 0
Original Loan
Amount 250,000,000.00 2,663,049.84 102,921,579.11 105,584,628.95 42.23
Breakdown of amount disbursed during the period (March 2017) are for Statement of Work Accomplished for the following civil works contract package :
• Package No.08 : IPC Nos. 07 USD 1,236,807.37
• Package No.11 : IPC Nos. 13 USD 765,238.42
• Package No.17 : IPC Nos. 17 USD 395,003.36
• Package No.21 : MC Nos. 05 USD 266,000.69
The Ending balance for Special Account end of March 2017 USD 941,936.62 (Include Follow up on BPK audit findings for FY 2014 USD 11,765.00).
(14)
1.3 World Bank Implementation Review Mission and Site Visit
Not performed for this month.1.4 Procurement of Civil Works Contract Under Category 1 of the Loan Agreement
As of end this reporting month, nineteen (19) contract packages are already procured and are either completed, eighteen (18) under construction and the remaining one (1) package is proposed to be cancelled
Package No. 10 (Sp. Empat Sp. Air Balam) is proposed to be cancelled, because the road is
still relatively in the good condition and widening is not needed immediately.
1.5 Procurement of Consultancy Package Under Category 2 of the Revised Loan
Agreement Reallocation.
Technical Assistance for Development of Slope Stabilization, Design and
Management
The Technical Assistance for Disaster Risk Reduction was canceled based on the results of meeting between DGH and the WB on October 12, 2015. It was decided to
cancel the Technical Assistance and replaced by a Technical Assistance for
Development of Slope Stabilization, Design and Management (under Loan Category-2).
Eight (8) interested consultants met the deadline for submission of Expression of Interest . After POKJA s evaluation, five (5) consulting firms made the shortlist, three (3) international and two (2) local companies.
The World Bank had issued No Objection Letter for RFP and Shortlisted Consultant respectively on September 23, 2016 and October 27, 2016.
RFP had sent by POKJA to all shortlisted consultants on November 2, 2016. Pre-Proposal Conference was held on November 22, 2016 and all shortlisted consultants attended the event. The submission and opening the technical proposals was held on December 5, 2016. Three (3) consultants submitted the proposals, one (1) consultant was late for submitting their proposal and other one (1) consultant did not submit the proposal.
POKJA evaluated the technical proposal first, while the financial proposal keep closed in envelope and will be opened after NOL for Techanical Evaluation Report (TER) issued by the World Bank. Evaluation of technical proposal was finalized by POKJA on December 23, 2016 with issuance the Technical Evaluation Report (TER). CTC reviewed the TER and submitted the founding issues and recommendation related the TER to PMU WINRIP on December 29, 2016.
Technical Evaluation Report was sent to the World Bank by Director of Road Network on January 12, 2017 after the revision reflecting the comments from CTC.
The World Bank on January 23, 2017 issued the letter to survey some notice regarding submitted TER and still need additional explenation and revision of TER from POKJA. Several discussions between POKJA, CTC and WB team have been held on WB office of Jakarta to solve some discrepancies between POKJA and WB especially in rating and valuation of key personal of consultants.
(15)
to rating and valuation of key personal proposed by POKJA and evaluation the result of above mention.
Related to this selection of consultant, the proposal validity period will be expired on April 4, 2017. CTC have reminded PMU by the letter dated on March 22, 2017 for POKJA to re-arrange their schedule of selection until contract sign and detrmined the need of time extension of proposal validity period.
(16)
2
PROJECT DESCRIPTION
2.1
Background
The Government of Indonesia wishes to continue strengthening of the National Road system in Indonesia while the Eastern Indonesia National Roads Improvement Project (EINRIP which is assisted by AusAID through the Australian Indonesia Partnership or AIP), is providing support program of National road and bridge improvement works in Eastern Indonesia. The Western Indonesia National Road Improvement Project (WINRIP) will provide similar support for National road and bridge in the Sumatera region of Indonesia. The focus of WINRIP will be roads administered directly by the National Government, including those currently classified as Provincial, Kabupaten (District) or non-status roads which are in process of being reclassified as National roads. In addition, provision will be made for major bridge repair works, rehabilitation, duplication and replacement as necessary to complement road betterment works.
2.2
Project Development
The loan effectiveness date for the WINRIP is 12 March 2012 and key project data is shown in the following detail.
Key Project Data WINRIP Loan No. 8043-ID
Project Cost US$350 million
Original Loan Amount US$250 million
Revised Loan Amount N/A
Board Approval Date 26 May 2011
Loan Signing Date 14 December 2011
Effectiveness Date 12 March 2012
Disbursement (as of March 31, 2017) US$ 105,584,628.95 million (42.23%)
Original Closing Date 31 December 2017
Environmental Category B-Partial Assessment
The IBRD loan amount is US$250 million. The Project is intended to finance a part of the DGH investment program for national roads with a particular focus on the Western corridor of Sumatera. The corridor is one of the three main corridors in Sumatera and connects the city of Padang (with a population of around one million) to major towns along the west coast (Bukittinggi, Sibolga and Bengkulu). It also connects through connector roads on the West coast to Medan in the northeast and to Pekanbaru in the centre of the island. The project has four components:
Project Component 1: Betterment and Capacity Expansion of National Roads
According to the Amendment No.2 Loan Agreement, this component will cover three work programs of betterment and capacity expansion of approximately 640 km including replacement of 160 meters of bridges. This civil works program will be executed in three Annual Work
Programs(AWP), as summarized inTable 2.1.The table shows the IBRD assisted scope and costs of
(17)
Table 2.1 Proposed Physical Works by DGH Program
Type of Works
AWP-1 AWP-2 AWP-3
Km USD Million Km USD Million Km USD Million
Road Betterment - - 53.10 22.77 -
-Capacity Expansion 137.10 79.70 314.60 127.67 207.60 74.58
Bridge works 0.100 1.94 - - 0.08 2.06
TOTAL
(excluding tax @ current prices) 137.20 81.64 367.70 150.45 207.68 76.65
The batches of projects are termed Annual Work Programs (AWPs) in line with terminology used in other Bina Marga projects. They are not in fact annual programs as such but rather a series of multi-year programs, each commencing in consecutive years. Hence, hereinafter it will call as just Work Programs (WPs). It is expected that implementation of the first Works Program (WP-1) will commence in the third quarter of 2013 and be completed by third quarter or late 2015. The second Work Program (WP-2) is expected to commence in early 2014 and be completed by late 2015 or middle 2016. The third Work Program (WP-3) is expected to commence in early 2015 and
be completed by mid-2017. The loan will be closed onDecember 2017.
Table 2.2 presents details of the First Works Program (WP-1). The four packages in this group
should have been free from any land acquisition issues, but in fact two packages (Krui Biha and
Manggopoh Padang Sawah) had land issues which were solved by the DGH properly. Thus, there
are no foreseeable impediments to implementation.
Table2.2 IBRD Assisted WINRIP Civil Work WP-1
No Province Link No. Link Name C la ss R o a d T y p e
Road Works Bridge Works Total Cost
Fr
o
m
T
o Len
g th T re a tm e n t C o st ( 2 0 1 0 ) No Le n g th C o st ( 2 0 1 0 ) 2 0 1 0 P ri ce s E q u iv a le n t
Km Km Km Rp mill m Rp mill Rp mill US$ mill
1 Lampung 053.0 Krui
Biha K1 IU 221.5 246.5 25.0
Bett nt
to 7 m. 148,668 148,668 16.52
2 West Sumatera 047.2 PadangSa wa SimpangE mpat
K1 IU 0.0 40.9 40.9Bett nt
to 7 m. 189,810 189,810 21.09
2a West
Sumatera 34.1
AirGadan
gBridge K1 IU
New
Bridge 1 100 17.580 17,580 1.95
3 West Sumatera 047.1 Manggop oh PadangSa wah
K1 IU 102.2 134.2 32.0Bett nt
(18)
It should be noted that all road sub-projects have been subject to economic appraisal and have estimated Economic Internal Rates of Return (EIRR) in excess of 15%. These were selected for inclusion and are subject to completion of environmental and social screening, to confirm that there is no land acquisition or resettlement requirements remain outstanding.
Final Engineering Designs, Engineer s Estimates and bidding documents have been completed for all projects proposed for WP-1.
Sub-projects to be included in WP-2 and WP-3 have also been determined as listed inTable 2.3.
Final Engineering Designs and Engineer s Estimates for all WP-2 and WP-3 proposed works require preparation or finalization. In the cases of some projects, preliminary Engineering Designs were prepared during Project preparation which will require review and possible amendment by the Design and Supervision Consultant prior to procurement.
The revised costs presented in Table 2.3 are planning estimates only, and the revised
implementation plan is based on the Revised Implementation Timeline Schedule of the civil works.
Table2.3: IBRD Loan WINRIP Civil Work WP-2 and WP-3
NO. SUBPROJECT LINK NO. AND NAME LENGTH (KM)
ENGINEER S ESTIMATE (RP. MILL)
WIDTH (M)
REVISED IMPLEMENTATION PLAN START DURATION
(MONTHS) WP-2
5. Sumut : Link No. 015.xx,
Sp. Rampa Poriaha 11.10 152,870 6.0 Mar 2015 18
6. Bengkulu : Link No. 010.0,
Ps. Pedati Kerkap 25.00 92,127 7.0 Mar 2015 15
7. Sumbar : Link No. 019.0,
Indrapura Tapan 19.50 178,600 7.0 Jan 2016 21
8. Sumbar : Link No. 024.0,
Bts. Pariaman Manggopoh 46.80 379,034 7.0 Jan 2016 24
9. Lampung : Link No. 026.1,
Rantau Tijang - Kota Agung - - - - Cancelled
10. Sumbar : Link No. 034.1,
Sp. Empat - Sp. Air Balam 61.70 515,842 7.0
-Proposed to be Cancelled 11. Bengkulu : Link No. 015.2,
Bantal Mukomuko 50.10 246,500 6.0 Feb 2015 24
12. Sumbar : Link No. 017.2,
Kambang Indrapura 55.20 451,810 7.0 Jan 2016 24
13. Bengkulu : Link No. 006.1,
Simpang Rukis - Tanjung Kemuning 56.30 316,305 7.0 Jun 2015 24
WP-3
14.
Sumbar : Link No. 017.1,
(19)
NO. SUBPROJECT LINK NO. AND NAME LENGTH (KM)
ENGINEER S ESTIMATE (RP. MILL)
WIDTH (M)
REVISED IMPLEMENTATION PLAN START DURATION
(MONTHS)
15. Sumut : Link No. 016.0,
Sibolga - Bts. TapSel 36.00 376,479 7.0 Oct 2015 27
16.
Bengkulu : Link No. 009.4,
Seblat Ipuh, including Air Galang and Air Guntung Bridges
34.50
0.052 241,500 6.0 May 2016 21
17. Lampung : Link No. 061.1,
Sp. Gunung Kemala - Pugung Tampak 36.80 255,269 6.0 May 2015 24
18. Bengkulu : Link No. 015.3,
Mukomuko - Bts. Sumbar - - - - Cancelled
19. Bengkulu : Link No. 009.1,
Lais Bintuan 11.60 35,886 7.0 Feb 2015 10
20. Sumbar : Link No. 002.0,
Lubuk Alung Sicincin 14.60 116.800 7.0 May 2016 18
21. Sumbar : Link No. 027.0
Lubuk Alung Kuraitaji 16.80 65,788 7.0 May 2016 18
Project Component 2: Implementation Support
This component provides consulting services to support project management and implementation so as to ensure implementation efficiency and overall quality of the works. It also includes funds for a small amount of training of DGH staff and for incremental operating costs for the project. This will provide support to the MPWH for the implementation of the civil works, including: (a) provision of Core Team Consultants (CTC), Design and Supervision Consultants (DSC) and road safety audits; (b) Project management support and technical audits. This is directly related to the implementation of the civil works and covers consulting services for design and supervision of the civil works in Component 1; management support and technical audits to help improve the quality
of construction and support to governance improvements during procurement and
implementation; and a series of systematic road safety audits of road designs for all project roads in Component 1. This is to ensure compliance with road safety standards and regulations, identify road hazards and undertake remedial treatments for safety improvements, (c) slope protection design and management. This is related to Technical Assistance and Support to Strengthen Disaster Risk Mitigation in the Road Sector mainly to deal with stabilizing and strengthening, in particular roadway side cut and high embankment slopes by providing appropriate slope protection structures. These activities initially is part of Component-3: Road Sector Institutional Development, however, due to reallocation or realignment of funds, the propose work, Technical Assistance for Development of Slope Stabilization, Design and Management implementation has been realigned to Component-2 : Implementation Support. This activity covers consulting service for design and management of slope protection. The revised Loan Category restructuring is
presented in Table 2.4 and revised implementation is based on the approval of GOI and World
(20)
Tabel 2.4
Project Management Core Team Consultants (CTC)
The CTC will provide support to the PMU and DGH in the management of the Project, based in Jakarta. Their tasks include financial and progress monitoring and reporting, information management and dissemination, quality assurance and performance review for the Design and Supervision Consultants, implementation and monitoring of the anti-corruption action plan, support for project monitoring and evaluation, and support for implementation of a training
program to support project management and implementation. The CTC contract No.
06-20/CTC/TA/LN/8043/1112was signed on5 November 2012by bothDGHand a Joint Venture of
PT. Perentjana Djaja, Yongma Engineering Co,Ltd, and PT. Epadascon Permata Engineering Consultant.
Design and Supervision Consultants (DSC)
A Design and Supervision Consultant (DSC) will be responsible for design of WP-2 and WP-3 civil works and supervision of all civil works. They will have the role of Engineer under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC will also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The team will be contracted and managed by DGH through the Bina Marga Regional
Office (Balai II),and will be based in Padang, West Sumatera.
Category
Original Amount of the Loan Allocated (expressed in USD)
Revised Amount of the Loan
Allocated (expressed in
USD)
Percentage of Expenditures to be financed (inclusive of
Taxes) (1) Civil Works under Part 1 of the
Project WP-l 220,400,000 220,400,000 70%
(2) Goods, Non-consulting Services, Consultants Services and
Incremental Operating Costs* under Part 2 of the Project
16,000,000 17,000,000 100%
(3) Goods, Non-consulting services and Consultants' Services under Part 3 of the Project
1,000,000 Cancelled Cancelled
(4) Works, Goods, Non-Consulting Services, Consultants' Services and Incremental Operating Costs* under Part 4 of the Project
0 0 0%
(5) Unallocated 12,600,000 12,600,000 100%
(21)
Project Component 3: Road Sector Institutional Development
This component which is originally intended to provide technical assistance and support to strengthen disaster risk mitigation in the road sector, including capacity building support for the new environment/risk mitigation and road safety unit of DGH has been cancelled due to revision of the loan allocation. In the meeting, DGH and World Bank agreed upon that DGH will conduct analytical work of an alternative design for road segment that pass through critical environmental assets and vulnerable areas especially on slope protection design and management. Due to deletion of the allocated funds for Category 3 of the loan agreement and reallocated to Category 2 to accommodate the implementation of Technical Assistance for Development of Slope Stabilization, Design and Management, into Component-2. The Loan Category restructuring can be
seen inTable 2.4 page 2-5.
Project Component 4: Contingency for Disaster Risk Response
This special component will provide preparedness and rapid response to disaster, emergency and/or catastrophic events as needed. This provisional zero dollar component will be added under this project to allow for rapid reallocation of loan proceeds from other components under streamlined procurement and disbursement procedures.
2.3 Project Objective
The main objective of the program will be to increase the effective use of selected sections of National roads along the Western Sumatera Corridor by reducing road user costs, through improving the National road network especially in 4 (four) Provinces of Sumatera (North Sumatera, West Sumatera, Bengkulu and Lampung) and, where desirable, raise the road standard to that set by the Directorate General of Highways. This will contribute significantly to ensuring that the national road network in the region provides acceptable standards of service and accessibility, and is capable of supporting local and regional economic development.
(22)
3
CONSULTANCY SERVICES
3.1
CTC Consultants
3.1.1 Scope of Services
The CTC contract services originally were structured in its different project management elements.
* Inception Phase
A key activity during the inception phase will be to establish lines of communication with PMU-WINRIP and DSC s Team Leader as well as with all Provincial Project Managers (Satkers) where the first works are to be constructed under WP-1.
* Project Management and Support to PMU, including acting DSC until the DSC is established
The Terms of Reference (TOR) identify a number of sub-items to be performed by CTC. The key factor that will ensure success is that the CTC must work pro-actively and alongside PMU counterparts and with DSC team in a professional manner based on mutual respect and trust.
* Preparation of Work Programs
The tendering process for WP 1 sub-projects began as soon as procurement committees have been formed and received appropriate training in the procurement procedures required. The indicative work programs and cost estimates identified for WP-2 and WP-3 are subject to verification, and are likely to change following more detailed investigations. Further preparation for WP-2 and WP-3 will be managed by the PMU supported by the CTC.
* Financial Monitoring
It will be the role of the CTC to first assess the level of understanding of the financial management, monitoring and reporting procedures by the finance staff at the provincial and central level and subsequently devise an appropriate training program and assist the PMU in training delivery.
* Project Progress and Performance Monitoring
CTC will monitor the loan project progress and prepare the report in monthly basis. In the
meantime, GOI and the World Bank have agreed on a set of Key Performance Indicators (KPIs)
to measure the project s performance in achieving its stated development objectives. CTC will therefore first concentrate on the establishment of precise definitions, calculation methods and data collection procedures to monitor the KPIs.
* Support for the Implementation of the ACAP
The CTC will assist PMU and be responsible for ensuring the ACAP is properly implemented. And for revising the Project Management Manual on an annual basis is to incorporate necessary improvements of process and procedure.
(23)
* ESAMP and LARAP Implementation Monitoring
CTC will closely work with BLH and DSC and will monitor and report the action of the Environmental Management Plan on a periodical basis and/or as required.
* Training to Support Project Implementation
CTC is responsible for preparation and management of all training program required under WINRIP.
* Reporting
CTC is responsible for all reports required under the contract agreement with standardize forms, charts and tables.
3.1.2 CTC Manning
CTC professional staffs involved in the project as of end ofFebruary 2017are listed inTable 3.1.
The International Staff (Senior Highway Engineer, Senior Road Safety Audit Engineer and Senior Procurement Specialist) have completed their respective engagements and man-months have demoblized on March 31, 2014 and May 31, 2015, respectively.
The task of conducting final Road Safety Audit during post-construction phase which is supposed to be conducted by the Senior Road Safety Audit Engineer will be performed by the local Road Safety Audit Engineer with man-months for the task to be covered by Amendment No.4 of the Consultancy Contract.
The Training Specialist has been demobilized since the end of August 2016 due to completion of his allocated man-month under Amendement No.4 of the Consultancy Contract.
(24)
Table 3.1
40.00 - - Mahbub ur
Rahman - - - - A
- 35.25 12.25 12.25 12.25 12,20 Per Weiss
Pedersen Apr-2013 Mar-2014 12,25 0,00 B - - 23.00 23.00 30,13 30,13 C.T. Arenas Apr-2014 Oct-2016 30,13 0,00 B
13,00 Lee Hee Won Dec-2016 - 4,00 9,00 Senior Highway
Engineer 8.00 12.50 14.00 14.00 14,00 14,00
Moon, Sung
Hyung Mar-2013 Mar-2014 14,00 0,00 C Senior Road Safety
Audit 6.00 11.00 13.00 13.00 11,00 11,00 Cho, Woo Sung Jun-2013 Mar-2014 11,00 0,00 C
18.00 - - Wasim ur
Rahman - - - - A
- 16.00 16.00 16.00 16,00 16,00 Sanjeev Kumar
Agarwal Jan-2014 May-2015 16,00 0,00 C 40.00 9,67 9,67 9.67 9,67 9,70 Besar Awiat
Bowo Nov-2012 Sep-2013 9.67 0,00 B - 30,33 6,66 6.66 6,66 6,70 Agus Setiawan Sep-2013 Mar-2014 6,66 0,00 B - - 23.67 23.67 45,50 45,00 Julius J. Sohilait Apr-2014 - 35,00 9,00 36.00 7,37 7,37 7.37 7,37 7,40 Whiliyanto Nov-2012 Jun-2013 7.37 0,00 B
- 28.40 28,63 32.13 38,96 54,00 Lebiyartono Jul-2013 - 45,00 9,00 F Quality Assurance
Engineer 30.00 30.00 30.00 32.00 53,83 54,00
Uray Abdul
Manaf Jul-2013 - 45,00 9,00 36.00 10.37 10.37 10.37 10,37 10,40 Uus
Martawijaya Nov-2012 Oct-2013 10,37 0,00 B - 25,63 25,63 29.13 50,96 51,00 YD Tarwanto Oct-2013 - 42,00 9,00 Environmental
Specialist 30.00 30.00 30.00 38.50 60,33 60,47 Leti Hermawati Dec-2012 - 51,47 9,00 36.00 9,37 9.37 9.37 9,37 9,40 M. Sutopo Nov-2012 Oct-2013 9,37 0,00 B
- 26,63 26,63 30.13 39,96 51,97 Witono Sep-2013 - 42,97 9,00
12.00 - - Darmansiri - - - - A
- 12.00 12.00 Muhdi - - - - A
- - 12.00 7.00 7,00 7,00 Mardiansyah Jul-2014 Mar-2015 7,00 0,00 B 12.00 - 4.10 4.10 4,10 4,13 Rudi Rungkat Nov-2012 Mar-2015 4.10 0,00 B - 24.00 24.00 35.40 40,23 43,20 M. Edhi Fachri Mar-2013 - 43,20 0,00 C
30 - - Agung Lukito - - - - A
- 25.00 25.00 34.00 55,83 56,00 Sony Thamrin May-2013 - 47,00 9,00 Community
Development Officer
36.00 36.00 36.00 38.00 59,83 95.93 Yakobus Jan-2013 - 50,93 9,00 Road Safety Audit
Engineer 25.00 25.00 19.00 21.00 42,83 42,97
Aditya Moraza
Alwi Jun-2014 - 33,97 9,00 Bridge Engineer 5.00 5.00 5.00 5.00 5,00 5,00 Harimurti
Suprihantoro Apr-2013 Aug-2013 5.00 0.00 C Training Specialist - 12.00 12.00 25.00 30,83 31,23 Roedjitarjo Jan-2014 Aug-2016 31,23 0,00 C
Traffic Engineer - - - 1,00 7,00 7,00 Harianto Parman Mar-2015 - 1,00 6,00 D Contract Doc.
Specialist - - - 14,00 M Edhi Fachri Nov-2016 - 5,00 9,00 G
Remarks
A - Not able to mobilizied due to poor health or personal reasons B - Resigned due to personal reasons or poor health C - Task assigment completed
D - Intermittent assignment to update AADT
E - Man-months until December 31, 2016 to be covered Amendment No.5 F- Proposed to be extended
G- Waiting Contract Amendment No.5 Highway Engineer Man -Month Remaining Amend No.3
Name Mobilized Demob-ilized
Man - Month Used as of end of Mar 2017 Amend No.4 Financial Management Specialist Social Impact Specialist Procurement Specialist-1 Procurement Specialist-2 Management Information Specialist Remarks Prop. Amend No.5 Team Leader Senior Procurement Specialist Assistant Team Leader Original Contract Amend No.1 Amend No.2 POSITION
(25)
3.1.3 CTC Contract
The CTC contract for Western Indonesia National Roads Improvement Project (Contract No.06-20/CTC/TA/LN/8043/1112) was signed on 05 November 2012. The contract is between the Government of Indonesia represented by Directorate General of Highways in the Ministry of Public Works and PT. Perentjana Djaja in joint venture with Yongma Engineering Co.Ltd. and PT. Epadascon Permata Engineering Consultant.
The Notice To Proceed was issued by letter dated 6 November 2012 from the PPK, and the official starting date of the contract was set at 6 November 2012.
Likewise, Amendment No. 1 to the original contract was signed on 25 October 2013 to cover all requirements of the CTC are summarized below.
* Replacement of the Senior Procurement Specialist
* Extending the assignment of the Senior Highway Engineer.
* Extending the assignment of the Senior Road Safety Audit Engineer.
* Extending the assignment of the Procurement Specialist 2 and replacement of the
Procurement Specialist 1.
* Adding the new position of Bridge Engineer.
* Adding the new position of Training Specialist, and
* Adding the new position of Road Safety Engineer.
Amendment No. 2 to the Original Contract and Amendment No. 1 was signed on September 3, 2014 to cover requirements of CTC are enumerated as follows :
* Additional / Modification to Terms of Reference (TOR)
* Amendment to the Team Composition and Staffing Schedule
* Replacement of Foreign and Local Consultants
* Adjustments of Remuneration paid in foreign currency and local currency
* Adjustment inputs of personnel
* Modification to various reimbursable and provisional sum to match the actual requirement
Amendment No.3 to the current CTC Contract (Original Contract and Amendments 1 and 2 was signed on November 30, 2015 which is in line with the Updated Timeline Bar Schedule taking into consideration the current and look ahead situations of the WINRIP program.
Based on the current progress of the Project, the services of several local professional and sub-professional staff have been extended beyond the end of the respective dates of completion assignments under Amendment No. 2.
In addition, new position of Traffic Engineer for local professional staff have been added to conduct traffic surveys on six (6) selected road links within the WINRIP Program in order to update the AADTs and to prepare a Technical Analysis of the Annual Average Daily Traffic .
(26)
Amendment No.3 covers the requirements of CTC are as follows:
* Amendment to the team composition and staffing schedule
* Adjustment of inputs of personnel
* Adjustment of remuneration paid in local currency
* Adding the new position of Traffic Engineer
* Modification to various reimbursable to match the actual requirements.
Amendment No. 4 to the current CTC Contract (Original Contract and Amendements 1, 2 and 3) was signed on March 4, 2016 and to expire or completed on December 31, 2017, the same date as the expiry/closing date of the loan agreement.
Based on the current progress of the Project, services of professional international and local staff as well as local sub-professional staff have been extended beyond their respective dates of assignment engagement covered by Amendment No. 3.
Amendment No.4 covers the requirements of CTC are as follows:
* Consultancy services time extension
* Additional/Modification to TOR/Terms of Reference
* Adjustment of input schedule for Professional Staff, Sub Professional and Supporting Staff
* Amendment to the Team Composition
* Amendment of the Staffing Schedule
* Modification to the Provisional Sums
* Adjustment of Remuneration paid in foreign currency and local currency
* Adjustment to the reimbursable expenses
* Amendment to Clause 6.1(b) of the Special Condition of Contract
Proposed Amendment No.5 to the current CTC Contract will cover the following requirements of CTC :
* Adjustment of input schedule for professional staff, sub-professional and supporting staff.
* Amendment of Staffing schedule.
* Adjustment of remuneration covered by Special Conditions of the Contract, Clause 6.2 (a).
* Adjustment of cost estimates for foreign and local curriencies.
Presented inTable 3.2is the current status of CTC contract.
Table 3.2
Description USD IDR
Original Contractincluding 10% VAT 1,404,370 23,556,940,000 Amendment No.1including 10% VAT 1,447,517 24,668,792,500
Variance Against Original Contract +3,07% +4,72%
Combine Variance Against Original Contract +4.12%
Amendment No. 2including 10% VAT 1,509,117 24,704,544,150
Variance Against Original Contract +7,46% +4,87%
(27)
Description USD IDR Amendment No.3including 10% VAT 1,473,917 26,328,054,500
Variance Against Original Contract +4.95% +11.76%
Combine Variance Against Original Contract +9.29%
Amendment No. 4including 10% VAT 1,918,158 40,878,169,529
Variance Against Original Contract +36.58% +73.53%
Combine Variance Against Original Contract +60.12%
Amendment No. 5including 10% VAT *1,914,495 *41,215,451,529
Variance Against Original Contract *36.32% *73.84%
Combine Variance Against Original Contract *60.22%
* Tentative, pending approval of Amendment No. 5.
Note :Combine variance (USD+IDR) is based on 1 USD = Rp. 9,558 exchange rate used during the time of signing the original Contract Agreement.
3.2
DSC Consultants
The Design and Supervision Consultant (DSC) is responsible to design of WP-2 and WP-3 civil works and supervision of all civil works. They will assume the role of Engineer under a FIDIC-type contract. The tasks include the preparation and maintenance of a quality assurance plan, validation and updating of designs, supervision of all civil works, environmental and social monitoring and management, and support for financial and progress monitoring and reporting. The DSC is also be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures. The team is being contracted and managed by DGH through the Bina Marga Regional Office (Balai II), and is being based in Padang, West Sumatera.
DSC has been established in Balai II Padang following the contract signing on 11 June 2013 between Balai II and Renardet SA in joint venture with PT. Cipta Strada, PT. Daya Creasi Mitrayasa, PT. Seecons and PT. Yodya Karya. The Notice To Proceed was issued by the Balai II on 19 June 2013.
Shown inTable 3.3is the present status of the Design Supervision Consultant (DSC) contract.
Table 3.3
Description USD IDR
Original Contract plus 10% VAT 902.660 57,000,575,500
Addendum No.1 plus 10% VAT 1,147,190 60,541,139,347
Variance Against Original Contract +27.09% +6.21%
Note:
1) Adendum No.1 was approved by DGH on 18 December 2016 with World Bank concurrance and issuance of No Objection Letter (NOL)
(28)
3.3
Technical Assistance for Development of Slope Stabilization, Design and
Management
The TA s objective is to provide technical support to DGH in improving their capacity for road slope/embankment protection and management. It will include identification and inventory of the existing slope and embankment conditions, assesment of future potential land slide /road erosion problems, development of risk maps, prioritization of high problem/high risk areas, and development of the Detail Engineering Design for a limited amount of areas in the Western corridor of Sumatra. It will also include the review (and revision) of the National Standard and Manual (NSPM) related to the slope protection, and capacity building.
The current progress of procurement of Consultancy package under Category 2 to be referred clause 1.5, No.1 EXECUTIVE SUMMARY of this report.
(29)
4
CIVIL WORKS
4.1
Detailed Design Preparation
Final Engineering Designs, Engineer s Estimates and bidding documents have been completed for all projects proposed for WP-1, WP-2, and WP-3.
A brief status of the eighten (18) sub-projects relative to the procurement of Civil works contracts
and implementation can be found in Implementation Status table onPage 1-1 of thisReport.
The progresses of road safety audit are shown inAppendix B.
4.2 Procurements
Procurement shall be conducted under the Bank s Procurement Procedures as mentioned in the Loan Agreement. The International Competitive Bidding (ICB) based on the Bank letter Ref. WINRIP/136 will apply to the packages with the construction estimated cost of more than US$ 25 Million to comply with the new Bank s threshold for ICB. According to the GOI regulation, a prequalification shall be applied for the packages with the construction estimated cost more than IDR 10 Billion. Review from previous procurement process, the World Bank in the Aide Memoire requested to GOI, for next 4 ICB subprojects qualification still used Pre-Qualification and for remaining sub-project must be process with Post Qualification. As well as for all NCB the World Bank also requested to follow Post Qualification in procurement process.
As of this reporting month, a more detailed current updates are fully indicated in Sub-Chapter 1.4 Procurement of Civil Works Contract Under Category 1onPage 1-5of thisReport.
Under Category 3 of Loan Agreement the three (3) consultancy packages (capacity building for disaster risk reduction, environmental management and road safety) has been cancelled. As a result of the cancellation of the three (3) Technical Assistances, the Technical Assistance for Development of Slope Stabilization, Design and Management has been included as replacement, but to be part of the Loan Category-2;
Procurement update of the new consultancy package can be found inSub-Chapter 1.5 Procurement of
Consultancy Package under Category 2onPage 1-5of thisReport.
The WINRIP updated Procurement Plan and Progress is shown inAppendix F.
4.3 Civil Works Implementation
As of end of this reporting month, five (5) of contract packages were previously completed and currently under defects liability period for twenty four (24) months effective on the day the TOCs were issued and thirteen (13) packages are currently under construction.
(30)
Table 4.1
Program
Contract Package
#
Contractor Name of Road Province Contract
Signed Commence ment of Work Original Time Extension/ Contraction Revised Contract Amount Contract Time Completion
Date Contract Amount
Contract Time
Completion Date
AWP-1
1 PT. Jaya KonstruksiManggala Pratama Tbk Biha - Krui Lampung Nov 25,
2013 Jan 8, 2014 134,909,211,000 640 CD Oct 9, 2015 93 CD 140,255,020,000 733 CD Jan 20, 2016
2
PT.Jaya Konstruksi Manggala Pratama Tbk
Padang Sawah Sp. Empat including Air Gadang
West
Sumatera Dec 6, 2013 Jan 6, 2014 197,936,699,000 730 CD Jan 5, 2016 105 CD 247,572,130,000 835 CD
Apr 14, 2016
3 PT. Jaya Konstruksi Manggala Pratama Tbk
Manggopoh Padang Sawah
West
Sumatera Dec 6, 2013 Jan 6, 2014 143,688,963,000 730 CD Jan 5, 2016 75 CD 183,940,872,000 805 CD
Mar 17, 2016 4 PT. Waskita Karya and PT.
Mulya Turangga (JO) Ipuh - Bantal Bengkulu
Nov 14,
2013 Jan 13, 2014 186,936,750,000 730 CD Jan 12, 2016 90 CD 194,902,179,000 820 CD
May 31, 2016
AWP-2
5 PT. Nusa Konstruksi Enjiniring Tbk.
Sp. Rampa -Poriaha North Sumatera March 17, 2015 June 18,
2015 107,321,260,310 540 CD Dec 8, 2016 224 CD 107,321,260,310 764 CD Jul 20, 2017 6 PT. Waskita Karya (Persero)
Tbk. Ps. Pedati - Kerkap Bengkulu
Feb 27, 2015
Mar 11,
2015 86,517,470,000 450 CD Jun 2, 2016 240 CD 118,444,156,000 690 CD Jan 28, 2017 7 PT. Adhi Karya Indrapura Tapan West
Sumatera
Nov 26, 2015
Dec 10,
2015 129,699,900,000 630 CD
Aug 30,
2017 - -
-8 PT. PP/PT. Statika MitraSarana J.O Bts. Kota Pariaman- Manggopoh SumateraWest Jan 28, 2016 Mar 23, 2016
355,500,000,000 720 CD Mar 12,
2018 - 71 CD 649 CD
Dec 31, 2017 11 PT. Hutama Karya/PT. Daya
Mulya J.O. Bantal Mukomuko Bengkulu Dec 18, 2014 Feb 23, 2015
228,899,717,000 720 CD Feb 11,
2017 104 CD 262,611,303,000 824 CD
May 26, 2017 12 PT. Lancar Jaya/PT. Cahaya
T.A. J.O
Kambang Indrapura
West
Sumatera Jan 28, 2016
May 23, 2016
358,650,400,000
720 CD May 12,
2018 -132 CD 588 CD
Dec 31, 2017 13 PT. Waskita Karya (Persero)
Tbk.
Sp. Rukis TJ.
Kemuning Bengkulu
Dec 18, 2014
July 22,
2015 292,700,000,000 720 CD
July 10,
2017 - -
-AWP-3
14 PT. Yasa Patria
Perkasa/Conbloc, JO Painan Kambang
West
Sumatera Jun 1, 2016 Aug 3, 2016 214,327,429,680 630CD
Apr 12,
2018 -114 CD - 516 CD
Dec 31, 2017 15 PT. Pembangunan
Perumahan (Persero) Sibolga Bts. Tapsel North Sumatera July 13, 2015 Nov 20,
2015 260,100,000,000 810 CD Feb 6, 2018 - 37 CD 773 CD
Dec 31, 2017 16 KSO PT Yasa PP-Multi
Structure Ipuh - seblat Bengkulu Oct 28, 2016 Nov 8, 2016 211,374,500,000 630CD
July 30, 2018
--
-17 PT. Jaya Konstruksi Manggala Pratama Tbk
Sp. Gunung Kemala
Pugung Tampak Lampung
Nov 17,
2014 Sept 4, 2015 199,551,000,000 720 CD
Aug 23,
2017 38 CD 758 CD
Sep 30, 2017 19 PT. Roda Tekindo Purajaya Bintunan - Lais Bengkulu Feb 27,2015 Mar 11,2015 33,689,452,000 300 CD Jan 4, 2016 125CD 44,419,760.000 425CD June 30,2016
20 PT. Nindya Karya Lubuk AlungSicincin SumateraWest Jun 1, 2016 Sept 1, 2016 113,818,300,000 540CD Feb 22,2018 - 54 CD - 486 CD Dec 31,2017
21 PT. Multi Structure Lubuk AlungKuraitaji SumateraWest Jun 1, 2016 Sept 1, 2016 126,301,900,000 540CD Feb 22,
2018 - 54 CD - 486 CD
Dec 31, 2017
(31)
4.4 Civil Works Progress
Activities done during this month on the on-going construction packages were repair and restoration of deteriorated existing pavements, roadway excavation, embankment formation, spreading of granular pavement for roadway widening, asphalt paving, structural works, construction of stone masonry side ditches, stockpiling of raw material, production of crush aggregates, other minor works, bridge construction, finalization of Field Engineering surveys and mobilization of resources of the newly started contract package.
The four (4) contract packages under implementation program AWP-1 were already completed and now under defects liability period for two (2) years since the issuance of TOCs.
Under the implementation program AWP-2 and AWP-3, there are currently twelve (12) contract packages that are on-going construction implementation. Physical progress of six (6) of the packages are lagging far behind schedule with negative slippages from -34.62% to -12.21% while progress for the other four (4) packages are still slightly on or behind schedule, two (2) packages are on ahead schedule.
Progress status of the on-going civil works contracts as of this reporting period are shown inTable 4.2.
Following are brief status of the on-going construction contract packages:
Package No. 1 : Biha Krui
The contract package is completed on January 20, 2016 and provisionally handed over to the Employeer and currently under Defects Notification Period until after two (2) years reckoned from the issuance of the TOC.
A more detailed previous status during the whole duration of the contract implementation of this Package is
presented inANNEX P-I Executive Summary Report.
Package No. 2 : Padang Sawah Sp. Empat (Including Air Gadang Bridge)
The contract package is completed on April 14, 2016 and provisionally handed over to the Employeer and currently under Defects Notification Period until after two (2) years reckoned from the issuance of the TOC.
ANNEX P-2 Executive Summary Reportpresent a more detailed status during the whole duration of the contract implementation of the Contract Package.
Package No. 3 : Manggopoh Padang Sawah
The contract package is completed on March 17, 2016 and provisionally handed over to the Employeer on March 17, 2016 and currently under Defects Notification Period until after two (2) years reckoned from the issuance of the TOC.
A more detailed status of the project progress during the whole duration of the contract implementation
are shown inANNEX P-3 Executive Summary Report .
Package No. 4 : Ipuh Bantal
The contract package is completed on May 31, 2016 and provisionally handed over to the Employeer on May 31, 2016 and currently under Defects Notification Period until after two (2) years reckoned from the issuance of the TOC.
(32)
Table 4.2
Program
Contract Package
#
Contractor Name of Road
Target Progress Schedule Ending March 2017
Actual Progress
Accomplished Slippage Time Elapsed
Remaining
Time Remarks
AWP-1
1 PT. Jaya Konstruksi Manggala
Pratama Tbk Biha - Krui * - - -
-Completed PHO : Jan 20, 2016
2
PT. Jaya Konstruksi Manggala
Pratama Tbk Padang Sawah
Sp.Empat incl.Air Gadang * - -- -
-Completed PHO : April 14, 2016
3 PT. Jaya Konstruksi Manggala Pratama Tbk
Manggopoh Padang
Sawah * - - -
-Completed PHO : Mar 17, 2016 4 PT. Waskita Karya and PT.
Mulya Turangga (JO) Ipuh - Bantal * - - -
-Completed PHO : May 31, 2016
AWP-2
5 PT. Nusa Konstruksi Enjiniring Sp. Rampa - Poriaha 76.53% 48.20% -28.32% 84.67% 117 CD Based on revised contract time
and schedule
6 PT. Waskita Karya Tbk Ps. Pedati Kerkap * - - - - Completed
PHO : Jan 28, 2017 7 PT. Adhi Karya Indrapura - Tapan 55.68% 48.05% -7.63% 74.88% 158 CD Based on revised contract time
and schedule 8 PT. PP/PT. Statika Mitra J.O Bts. Kota Pariaman
Manggopoh 51.83% 57.22% 5.39% 56.64% 281 CD
Based on revised contract time and schedule
11 PT. Hutama Karya/ PT. DMT Mukomuko - Bantal 95.85% 96.37% 0.52% 92.47% 62CD Based on revised contract time
and schedule 12 PT. Lancarjaya/PT. Cahaya
T.A. JO Kambang Indrapura 40.55% 5.93% -34.62% 52.13% 281 CD
Based on revised contract time and schedule
13 PT. Waskita Karya (Persero)
Tbk Sp. Rukis Tj. Kemuning 72.34% 44.34% -28.01% 85.12% 107 CD
Based on original contract time and revised schedule
AWP-3
14 PT. Yasa PT. Conbloc (JO) Painan Kambang 20.60% 15.63% -4.96% 45.44% 281 CD Based on revised contract time
and schedule 15 PT. Pembangunan
Perumahan (Persero) Sibolga Bts. Tapsel 63.52% 29.44% -34.08% 63.60% 281 CD
Based on revised contract time and schedule
16 PT Yasa-Multi Structure, Jo Seblat Ipuh 2.10% 2.17% 0.07% 21.78% 492 CD
17 PT. Jaya Konstruksi Manggala Pratama Tbk
Sp. Gn Kemala Pg.
Tampak 62.09% 61.37% -0.72% 75.03% 189 CD
Based on revised contract time and schedule
19 PT. Rodatekindo Purajaya Lais - Bintunan * - - - - Completed
PHO : June 30, 2016 20 PT. Nindya Karya Lubuk Alung Sicincin 42.24% 33.37% -12.21% 42.18% 281 CD Based on revised contract time 21 PT. Multi Structure Lubuk Alung Kuraitaji 35.21% 21.25% -13.96% 42.18% 281 CD Based on revised contract time * Under defects liability period for 720 calendar days.
(33)
Package No. 5 : Sp. Rampa Poriaha
The progress, 2.22% of this month is still much lagging for the scheduled 13.15% having negative slippage -28.32% accumulatively.
The main work items leading the delayed progress are earth works, pavement works, structures.
The work forces for rock excavation are to be increasesd and early start of A/p pavement works on the stretches which were completed for aggregate class A is so necessary in order to catch-up the delayed progress.
ANNEX P-5 Executive Summary Report shows the Contractor s Progress Schedule.
Package No. 6 : Kerkap Ps. Pedati
The contract package is completed on January 28, 2017 and provisionally handed over to the Employer and currently under Defects Notification Period until after two (2) years reckoned from the issuance of TOC.
ANNEX P-6 Executive Summary Report shows the complete details of the contract package.
Package No. 7: Indrapura Tapan
The scheduled progress as of this month (55.68%) was made in accordance with the 2ndrevised schedule.
Most of delayed progress as of this month (-7.63%) have been made from drainage works and Asphalt Pavement works.
In case of Drainage work, the main reasons of delay were unallocated utilities espicially electrical poles, water pipes ete and the delayed reason of Asphalt pavement works were due to low products of aggregates because of the limitted operation time (08 AM to 5 PM) of stone crusher strongly required by local peoples.
ANNEX P-7 Executive Summary Report shows the complete details of the contract package.
Package No. 8 : Bts. Kota Pariaman - Manggopoh
Ahead progress as of this month had been made of 5.39% comparing the scheduled 51.83% and the actual 57.22%.
Owing to ample working areas for Asphalt pavement, for comming several months, the work progress of this package is to be maintained ahead.
ANNEX P-8 Executive Summary Report shows the complete details of the contract package.
Package No. 11 : Bantal - Mukomuko
Ahead progress as of this month had been made of 0.53% comparing the scheduled 95.86% and the actual 96.37%.
The completion date is May 26, 2017. However the most of main works are almost completed, asphalt pavement works remain only for AC-WC, 4 km from 50.7 km in total lenght.
The remain works are only minor works like lane marking, traffic signages, so on.
(34)
Package No. 12 : Kambang - Indrapura
The progress of this month is only 0.94% likely, the last month 0.96% against the scheduled 13.31%.
After failure of the 1sttest case, the client gave the 2ndtest case (March, 14 27, 2017) to the contractor
but, the results were so poor as well due to the poor management and no financial supports of the contractor.
The client is to give the final test case to the contractor soon and consider the next phase of determination in accordance with the results of the final Test Case.
Details of the Contract Package are shown inANNEX P-12 Executive Summary Report .
Package No. 13 : Sp. Rukis Tj. Kemuning
This month progress is achieved of 1.63% against the scheduled 8.80%.
The reasons of delayed progress are almost same as those of the last month accordingly the client have given the test case to the contractor. The new GS of contractor had been in duty. It is expected to settle the delayed payments to the subcontractors which was of the main reasons of delay.
The contractor is still preparing for the extension of time due to the unsettled land acquisition (sta. 25 km 43 km).
Details of the work progress are shown inANNEX P-13 Executive Summary Reports.
Package No. 14: Painan - Kambang
The progress of this month is achieved of 6.37% against the scheduled 5.24%.
Working activities of this month have been done in extentive areas and with Earthworks, pavement works, structures. Considering the target date of completion as of December, 2017, this package is so necessary to secure the working areas for asphalt pavement work continueosly and the unsettled land acquisition (12.9 km) has to be cleared soon.
ANNEX P-14 Executive Summary Report shows the complete details of the project.
Package No. 15: Sibolga Bts. Tapsel
The progress of this month is only achieved of 1.58% against the scheduled 6.50%.
In order to catch-up the delayed progress, the most crucial problems are the unsettled land acquisition (Apprx. 16.5 km) and relocation of existing utilities (electrical poles, water pipes).
Without resolutions of the above, it is so difficult to secure the working areas for pavement works which are the major works about 65% of the total contract amount.
Detailed and work progresses of the contract package are shown in ANNEX P-15 Executive Summary
Report .
Package No. 16 : Seblat Ipuh
In accordance with the revised schedule, this month progress is achieved of 1.13% against the scheduled 1.08%.
The major works at the early stage of the project have been done, in normal, with Drainage, Earthworks, Granular Pavement Works.
(35)
ANNEX P-16 Executive Summary Report shows the complete details and work progress of the project.
Package No. 17 : Sp. Gunung Kemala Pg. Tampak
The progress as of this month is achieved of 61.37% against the scheduled 62.09%.
The most of major works are executing in normal with those works like Drainage, Earthworks, Pavement Works, Structures.
ANNEX P-17 Executive Summary Report shows the complete details and work progress of the project.
Package No. 19 : Lais Bintunan
The contract package is completed on June 30, 2016 and provisionally handed over to the employer and currently under Defects Notification Period until after two (2) years reckoned from the issuance of the TOC
Complete details of the contract package are shown inANNEX P-19 Executive Summary Report .
Package No. 20 : Lubuk Alung - Sicincin
The progress as of this month is achieved of 33.37% against the scheduled 45.58%. Hence the slippage of progress cecomes -12.21%.
Except the drainage works, all other works and espicially pavement works are still much delayed.
ANNEX P-20 Executive Summary Report shows the Contractor s schedule and work progress.
Package No. 21 : Lubuk Alung - Kuraitaji
The progress as of this month is achieved of 21.2% against the scheduled 35.21% having slippage of -13.96%
The delayed progress was made from Drainage works for which the slippage of this work are reached at -12.91% comparing the scheduled, 16.35% and the actual, 3.44% as of this month.
The contractor made his commitment to increase the work forces of drainage work from 3 teams to 9 teams gradually.
ANNEX P-21 Executive Summary Report shows the Contractor s schedule and work progress.
4.5 Quality Assurance
The DSC will be responsible for quality assurance of materials and workmanship, certifying whether or not contractors have achieved the required results, as well as documentation and reporting based on the financial management plan. They will prepare a Quality Assurance system covering all subprojects, and continuously monitor the effectiveness of their supervision procedures.
Following are current problems which were the same problems during the preceding month and issues relative to the execution of the works and quality assurance:
Package No.1 : Krui - Biha a) Completed.
(1)
! "
March 31, 2017 Ketua Pelaksana Harian PIU WINRIP
CTC WINRIP Undangan Rapat Koordinasi Penjelasan Tindak Lanjut Hasil Temuan TFAC; WINRIP IBRD Loan No. 8043-ID
(2)
#$ %&'() &*+ % %+,
-.// 01 2.3403 50
6 780 9/.: ;. <58= >= 8?
March 01, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Duty Trip Report of Team Leader CTC WINRIP
March 01, 2017 Team Leader CTC WINRIP
Team Leader DSC WINRIP
Monthly Progress Meeting with The Consultants and The Contractors; WINRIP
March 01, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Reports for Packages No. 13: Sp. Rukis Tj. Kemuning in Bengkulu Province and No. 17: Sp. Gn. Kemala Pg. Tampak in Lampung Province; WINRIP March 01, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
RKL & RPL Implementation Monitoring Report for Road Link of Painan Kambang Indrapura Tapan Kab. Pesisir Selatan, Province of West Sumatera; WINRIP IBRD Loan 8043-ID
March 01, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Wrap-Up Meeting, World Bank Supervision Mission of WINRIP, February 2017
March 06, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Meeting of Technical Team for Rock Excavation Package No. 05: Sp. Rampa Poriaha in North Sumatera Province; WINRIP IBRD Loan 8043-ID March 13, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Anti-Corruption Action Plan (ACAP) Reports WINRIP; TPM Monitoring Reports
March 13, 2017 Team Leader CTC WINRIP
Kasatker PAP2PHLN Leave of Absence to Family Matters
March 13, 2017 Team Leader CTC WINRIP
Co-Team Leader CTC WINRIP
Authority as Team Leader March 14, 2017 Team Leader CTC
WINRIP
Team Leader DSC WINRIP
Installation of Reference Point for Displacement and Settlement Control; WINRIP March 16, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Report of Monthly Progress Meeting with Design Supervision Consultant (DSC), Site Supervision Engineers (SSE), Contractors and Core Team Consultant (CTC) WINRIP March 16, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Reports for Packages No. 05: Sp. Rampa
(3)
@ ABC DE FG H F I JBK LK BM
Bts. Tapsel in North Sumatera Province; WINRIP
March 16, 2017 Team Leader CTC WINRIP
Team Leader DSC WINRIP
Meeting with DSC, PPK, Contractor, and SSE for Provisional Sum of Geotechnical Investigation and Design of Cut Slope of Rock Excavation of Package No. 05: Sp. Rampa Poriaha; WINRIP
March 16, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Submission of Fact Finding Report of Issues of Package No.14: Painan Kambang in West Sumatera Province; WINRIP IBRD Loan 8043-ID March 20, 2017 Team Leader CTC
WINRIP
Kasatker PAP2PHLN Leave of Absence to Family Matters and Health Checkup March 20, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Interim Financial Report (IFR) WINRIP Period of October December 2016
March 20, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Crucial Issues of Land Acquisition for Packages No. 12: Kambang Inderapura, No. 13: Sp. Rukis Tj. Kemuning and No. 15: Sibolga Batas Tapsel; WINRIP IBRD Loan 8043-ID March 20, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Interim Financial Report (IFR) for Special Account Replenishment WINRIP Period of October December 2016 March 22, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Extension of the Proposal Validity Period for Selection of consultant for TA for Slope Stabilization Design and Management.
March 23, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Outstanding Issues and Measures of Each Package of WINRIP
March 24, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Duty Trip Report of Team Leader CTC WINRIP
March 29, 2017 Team Leader CTC WINRIP
Director of Road Preservation
Submission of LARAP Implementation Monitoring Report for Package No. 17: Sp. Gn. Kemala Pugung Tampak in Lampung Province; WINRIP Loan IBRD No. 8043-ID
NCOFE BPQRG K SSK FT
(4)
U VWX YZ[\ ] [ ^ _ W`a` Wb
March 01, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Duty Trip Report of Team Leader CTC WINRIP
March 01, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Reports for Packages No. 13: Sp. Rukis Tj. Kemuning in Bengkulu Province and No. 17: Sp. Gn. Kemala Pg. Tampak in Lampung Province; WINRIP March 01, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
RKL & RPL Implementation Monitoring Report for Road Link of Painan Kambang Indrapura Tapan Kab. Pesisir Selatan, Province of West Sumatera; WINRIP IBRD Loan 8043-ID
March 13, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Submission of Anti-Corruption Action Plan (ACAP) Reports WINRIP; TPM Monitoring Reports
March 16, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Report of Monthly Progress Meeting with Design Supervision Consultant (DSC), Site Supervision Engineers (SSE), Contractors and Core Team Consultant (CTC) WINRIP March 16, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Site Visit Reports for Packages No. 05: Sp. Rampa
Poriaha and No. 15: Sibolga Bts. Tapsel in North Sumatera Province; WINRIP
March 16, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Submission of Fact Finding Report of Issues of Package No.14: Painan Kambang in West Sumatera Province; WINRIP IBRD Loan 8043-ID March 20, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Submission of Interim Financial Report (IFR) WINRIP Period of October December 2016
March 20, 2017 Team Leader CTC WINRIP
Officer in Charge PMU WINRIP
Submission of Interim Financial Report (IFR) for Special Account Replenishment WINRIP Period of October December 2016 March 24, 2017 Team Leader CTC
WINRIP
Officer in Charge PMU WINRIP
Duty Trip Report of Team Leader CTC WINRIP
March 29, 2017 Team Leader CTC WINRIP
Director of Road Preservation
Submission of LARAP Implementation Monitoring Report for Package No. 17: Sp. Gn. Kemala Pugung Tampak in Lampung Province; WINRIP Loan IBRD No. 8043-ID
(5)
cddef gh
i je d klmn o m p qefrfes
- - -
(6)